SlideShare uma empresa Scribd logo
1 de 24
Baixar para ler offline
Presented By:
Counsilman ▪ Hunsaker
June 10th, 2014
AgendaAgenda
— Process Review
— What We Heard
— Options for Consideration
— Demographic Overview
— Operational Pro-forma
— Summary
Feasibility Study ProcessFeasibility Study Process
— Needs Assessment
— Community Outreach
— Common Vocabulary, Vision
— Public Meeting
— Stakeholder Meetings
— Evaluate Existing Area Providers
— Research Area Demographics
— Identify Potential User Groups
— Program Requirements
— Develop Options for Programming
— Develop Project Cost Estimates
— Conceptual Plan
— Operations Plan
— Opinion Of Revenue
— Opinion Of Operating Expenses
— Determine Cashflow
Types of Aquatic ProgrammingTypes of Aquatic Programming
Aquatic Components
ü Competitive
ü Recreation
ü Instruction
ü Fitness & Therapy
What We Heard
— Need new pool to enhance “quality of life” within
Jasper
— Definition of Success
— Financial – Reduce “loss” per visitor
— Improve quality of life in community – attract
visitors/new residents
— Maximize number of users – increase visits
— Provide amenities that are viable option to the Holiday
World “event”
Options for Consideration
— Option 1 – Multi-purpose leisure pool with zero depth entry,
play feature, 6-25 yard lap lanes, diving board, separate tot
pool, crossing activity, separate waterslide catch pool, shade
structures and required support spaces
— Option 2 – Multi-purpose leisure pool with zero depth entry,
play feature, 6-25 yard lap lanes, diving board, crossing
activity, current channel
— Option 3 – 50 meter lap pool, diving board, drop slide,
waterslide with run-out, leisure pool with ramp entry, water
slide, spray features
Option 1
— Option 1 – Multi-purpose leisure pool with zero depth entry,
play feature, 6-25 yard lap lanes, diving board, separate tot
pool, crossing activity, separate waterslide catch pool, shade
structures and required support spaces
Option 1 Description Unit Amount Opinion of Cost
Demolition Not Included
Bathhouse 4,020 $762,000
Entrance/Recep Office Sq. Ft. 150
First Aid /Guard Room Sq. Ft. 200
Manager Office Sq. Ft. 150
Mechanical/Storage Sq. Ft. 1,050
Locker Rooms Sq. Ft. 1,200
Family Changing Room Sq. Ft. 150
Snack Bar/Concessions Sq. Ft. 450
Efficiency Sq. Ft. 670
Outdoor Leisure Pool 8,706 $1,765,100
Multi-Purpose Pool Sq. Ft. 7,225
Diving Boards Add. Cost 1
Participatory Play Feature Allowance 1
Crossing Activity Add. Cost 1
Slide Catch Pool Sq. Ft. 785
Waterslide 1st flume Quantity 1
Waterslide 2nd flume Quantity 1
Tot Area Sq. Ft. 690
Features Allowance 1
Support 26,118 $383,238
Pool Deck Sq. Ft. 17,412
Fence Linear Ft. 1,000
Overhead Lighting Sq. Ft. 26,118
Funbrellas Quantity 3
Equipment Allowance 1
Total Building Construction Costs 2,910,338
Site Construction Costs (parking lot, landscaping, utilities, walks) $602,760
Subtotal $3,513,098
Contingency 5% $175,655
Indirect Costs 10% $368,875
Total Estimated Project Costs: $4,057,628
Say $4,100,000
OPINION OF PROJECT COST: Concept I
Option 2
— Option 2 – Multi-purpose leisure pool with zero depth entry, play
feature, 6-25 yard lap lanes, diving board, crossing activity, current
channel
Option 2 Description Unit Amount Opinion of Cost
Demolition Not Included
Bathhouse 4,020 $762,000
Entrance/Recep Office Sq. Ft. 150
First Aid /Guard Room Sq. Ft. 200
Manager Office Sq. Ft. 150
Mechanical/Storage Sq. Ft. 1,050
Locker Rooms Sq. Ft. 1,200
Family Changing Room Sq. Ft. 150
Snack Bar/Concessions Sq. Ft. 450
Efficiency Sq. Ft. 670
Outdoor Leisure Pool 10,780 $2,046,500
Multi-Purpose Pool Sq. Ft. 10,775
River / Vortex Equipment Add. Cost 1
Participatory Play Feature Allowance 1
Waterslide 1st flume Quantity 1
Diving Board Quantity 1
Crossing Activity Quantity 1
Support 32,340 $480,440
Pool Deck Sq. Ft. 21,560
Fence Linear Ft. 1,100
Overhead Lighting Sq. Ft. 32,340
Funbrellas Quantity 6
Equipment Allowance 1
Total Building Construction Costs 3,288,940
Site Construction Costs (parking lot, landscaping, utilities, walks) $654,480
Subtotal $3,943,420
Indirect Costs 10% $394,342
Contingency 5% $216,888
Total Estimated Project Costs: $4,554,650
Say $4,600,000
OPINION OF PROJECT COST: Concept II
Option 3
— Option 3 – 50 meter lap pool, diving board, drop slide, waterslide
with run-out, leisure pool with ramp entry, water slide, spray features
Option 3 Description Unit Amount Opinion of Cost
Demolition Not Included
Bathhouse 6,240 $1,147,750
Entrance/Recep Office Sq. Ft. 200
First Aid /Guard Room Sq. Ft. 200
Manager Office Sq. Ft. 150
Mechanical/Storage Sq. Ft. 2,150
Locker Rooms Sq. Ft. 1,500
Family Changing Room Sq. Ft. 250
Snack Bar/Concessions Sq. Ft. 750
Efficiency Sq. Ft. 1,040
Outdoor Leisure Pool 14,655 $2,695,000
50 Meter Pool Sq. Ft. 11,500
Waterslide 1st flume Quantity 1
Waterslide 2nd flume Quantity 1
Diving Board Quantity 1
Tot Area Sq. Ft. 3,150
Features Allowance 1
Waterslide 1st flume Add. Cost 1
Support 43,965 $593,565
Pool Deck Sq. Ft. 29,310
Fence Linear Ft. 1,100
Overhead Lighting Sq. Ft. 43,965
Funbrellas Quantity 10
Equipment Allowance 1
Total Building Construction Costs 4,436,315
Site Construction Costs (parking lot, landscaping, utilities, walks) $903,690
Subtotal $5,340,005
Indirect Costs 10% $534,001
Contingency 5% $293,700
Total Estimated Project Costs: $6,167,706
Say $6,200,000
OPINION OF PROJECT COST: Concept III
Capacity
Option 1 Option 2 Option 3
WET-SIDE CAPACITY
Training (Available 25-Yard Lanes)
Multi-purpose pool 6 6 11
Tot Pool 0 0 0
Slide Catch Pool 0 0 0
Total 6 6 11
Estimated Training Holding Capacity 30 30 55
Daily Training Capacity 90 90 165
Recreation (Surface Area Sq. Ft.)
Multi-purpose pool 7,225 10,775 11,500
Tot Pool 690 0 3,150
Slide Catch Pool 785 0 0
Total 8,700 10,775 14,650
Shallow Water 6,525 8,081 10,255
Deep Water 2,175 2,694 4,395
Estimated Recreation Holding Capacity 283 350 454
Daily Recreation Holding Capacity 707 875 1,135
Total Holding Capacity 313 380 509
Total Daily Facility Capacity 797 965 1,300
Parking / Site Size
Option 1 Option 2 Option 3
Parking 125 152 204
Parking Sq. Ft. 41,000 50,000 67,000
Impervious Structure 30,138 36,360 50,205
Total Program Sq. Ft. 71,138 86,360 117,205
Total Sq. Ft. with Efficiency 142,276 172,720 234,410
Preferred Site Size Requirements (acres) 3.27 3.97 5.38
Recommended Site Size (acres) 4.90 5.95 8.07
Population
Radius Number Percent Number Percent Number Percent Number Percent Number Percent
(000's) of Total (000's) of Total (000's) of Total (000's) Percent (000's) Percent
0 to 3 Miles 16.9 7.2% 17.0 7.2% 17.7 7.3% 0.0 0.3% 0.1 0.7%
3 to 5 Miles 19.3 8.2% 19.4 8.2% 20.1 8.3% 0.0 0.2% 0.1 0.8%
5 to 10 Miles 34.6 14.7% 34.7 14.7% 35.8 14.8% 0.1 0.2% 0.2 0.6%
Subtotal 70.7 30.0% 71.2 30.1% 73.7 30.4% 0.2 0.2% 0.5 0.7%
10 to 15 Miles 47.9 20.3% 48.1 20.3% 49.5 20.4% 0.1 0.1% 0.3 0.6%
15 to 25 Miles 117.2 49.7% 117.2 49.5% 119.1 49.2% 0.0 0.0% 0.4 0.3%
Subtotal 165.1 70.0% 165.3 69.9% 168.7 69.6% 0.1 0.0% 0.7 0.4%
Total (0-25 Miles) 235.8 100.0% 236.4 100.0% 242.3 100.0% 0.2 0.1% 1.2 0.5%
Jasper, IN 15.0 15.2 15.6 0.0 0.3% 0.1 0.6%
MARKET AREA POPULATION BY DISTANCE
Population Average Annual Change
2010 2013 2018 2010-2013 2014-2019
Source: Experian
Age
Age Groups U.S. Age
# % # % # % # % # % # % Population
Age 0-4 1,166 6.8% 1,285 6.6% 2,285 6.6% 3,066 6.4% 7,582 6.5% 1,061 7.0% 6.5%
Age 5-9 1,143 6.7% 1,316 6.8% 2,384 6.9% 3,243 6.7% 8,088 6.9% 1,006 6.6% 6.5%
Age 10-14 1,249 7.3% 1,435 7.4% 2,555 7.4% 3,519 7.3% 8,346 7.1% 1,089 7.2% 6.6%
Age 15-19 1,092 6.4% 1,278 6.6% 2,374 6.8% 3,276 6.8% 7,907 6.7% 939 6.2% 6.9%
Subtotal 4,650 27.3% 5,314 27.4% 9,598 27.6% 13,104 27.2% 31,923 27.2% 4,095 27.0% 26.5%
Age 20-24 814 4.8% 914 4.7% 1,658 4.8% 2,280 4.7% 6,192 5.3% 737 4.9% 7.1%
Age 25-29 1,092 6.4% 1,195 6.2% 2,054 5.9% 2,740 5.7% 6,598 5.6% 999 6.6% 6.8%
Age 30-34 1,065 6.2% 1,178 6.1% 2,134 6.1% 2,873 6.0% 6,814 5.8% 970 6.4% 6.6%
Age 35-39 941 5.5% 1,082 5.6% 2,009 5.8% 2,782 5.8% 6,816 5.8% 833 5.5% 6.3%
Age 40-44 1,073 6.3% 1,241 6.4% 2,277 6.6% 3,212 6.7% 7,470 6.4% 939 6.2% 6.8%
Age 45-49 1,257 7.4% 1,461 7.5% 2,639 7.6% 3,736 7.8% 8,685 7.4% 1,093 7.2% 7.1%
Age 50-54 1,324 7.8% 1,551 8.0% 2,781 8.0% 3,903 8.1% 9,216 7.9% 1,147 7.6% 7.3%
Age 55-59 1,180 6.9% 1,374 7.1% 2,460 7.1% 3,489 7.3% 8,340 7.1% 1,031 6.8% 6.5%
Age 60-64 975 5.7% 1,127 5.8% 2,030 5.8% 2,838 5.9% 7,347 6.3% 862 5.7% 5.7%
Age 65-69 706 4.1% 800 4.1% 1,423 4.1% 2,003 4.2% 5,322 4.5% 634 4.2% 4.2%
Age 70-74 603 3.5% 685 3.5% 1,228 3.5% 1,742 3.6% 4,331 3.7% 543 3.6% 3.1%
Age 75-79 491 2.9% 544 2.8% 953 2.7% 1,345 2.8% 3,245 2.8% 447 3.0% 2.4%
Age 80-84 417 2.4% 451 2.3% 746 2.1% 1,053 2.2% 2,510 2.1% 384 2.5% 1.9%
Age 85+ 463 2.7% 486 2.5% 741 2.1% 1,009 2.1% 2,347 2.0% 437 2.9% 1.9%
TOTAL: 17,051 100.0% 19,403 100.0% 34,731 100.0% 48,109 100.0% 117,156 100.0% 15,151 100.0% 100%
Median Age 37.0
MARKET AREA
AGE DISTRIBUTION
0 to 3 Miles 3 to 5 Miles 5 to 10 Miles 10 to 15 Miles 15 to 25 Miles
Source: Experian
Jasper, IN
39.8 40.1 39.8 40.5 40.2 39.7
Income
Radius Dollars Index Dollars Index
0 to 3 Miles $30,293 1.14 $57,432 1.09
3 to 5 Miles $30,506 1.15 $59,036 1.12
5 to 10 Miles $27,487 1.04 $55,518 1.06
10 to 15 Miles $26,221 0.99 $54,124 1.03
15 to 25 Miles $23,781 0.90 $49,867 0.95
Jasper, IN $30,090 1.14 $56,122 1.07
Total U.S. $26,464 1.00 $52,599 1.00
Source: Experian
MARKET AREA INCOME
Per Capita Incomes Median Household Incomes
Group ProgrammingVisits per Program Day Option 1 Option 2 Option 3
Swim Meet Rental 1 1 1
USA / City Swim Team 20 20 50
Masters Swim Team 30 30 30
Summer Swim Lessons 30 30 30
Lifeguard Training 10 10 10
Wellness Programming 10 10 10
Birthday Party 2 2 2
Private Rental 1 1 1
Programming Days Option 1 Option 2 Option 3
Swim Meet Rental 2 2 6
USA / City Swim Team 60 60 60
Masters Swim Team 50 50 50
Summer Swim Lessons 32 32 32
Lifeguard Training 10 10 10
Wellness Programming 30 30 30
Birthday Party 60 60 60
Private Rental 50 50 50
Per Capita Spending (Net) Option 1 Option 2 Option 3
Swim Meet Rental $500.00 $500.00 $1,000.00
USA / City Swim Team $1.00 $1.00 $2.00
Masters Swim Team $1.50 $1.50 $1.50
Summer Swim Lessons $2.50 $2.50 $2.50
Lifeguard Training $3.50 $3.50 $3.50
Wellness Programming $1.50 $1.50 $1.50
Birthday Party $50.00 $50.00 $50.00
Private Rental $75.00 $75.00 $75.00
Opinion of Revenue (Net) Option 1 Option 2 Option 3
Swim Meet Rental $1,000 $1,000 $6,000
USA / City Swim Team $1,200 $1,200 $6,000
Masters Swim Team $2,250 $2,250 $2,250
Summer Swim Lessons $2,400 $2,400 $2,400
Lifeguard Training $350 $350 $350
Wellness Programming $450 $450 $450
Birthday Party $6,000 $6,000 $6,000
Private Rental $3,750 $3,750 $3,750
User-Group Revenue $17,400 $17,400 $27,200
Per Cap Spending
Category Rate
Percent of
Visits
Per Visit
Unit
Residents
Adult (18 & Older) 6.00 17% 1.02
Children (3-17) 4.00 20% 0.80
Free 0 2% -
Non-Resident
Adult 7.00 14% 0.98
Child 5.00 11% 0.55
Season Pass
Resident
Individual 90.00 12% 0.27
Family 200.00 10% 0.17
Non-Resident
Individual 110.00 8% 0.25
Family 275.00 6% 0.15
Subtotal / Average 100% 4.19
Food / Merchandise 0.05$
Total $4.24
Revenue
Option 1 Option 2 Option 3
Attendance
2014 30,664 35,039 33,084
2015 30,876 35,280 33,310
2016 31,013 35,431 33,461
2017 31,225 35,672 33,687
2018 31,437 35,913 33,913
Per Capita Spending (3% Annual Increase) $4.24 $4.24 $4.24
Special User Group Spending $17,400 $17,400 $27,200
2014 $147,358 $165,898 $167,412
2015 $152,182 $171,404 $172,605
2016 $156,724 $176,570 $177,520
2017 $161,647 $182,187 $182,818
2018 $166,623 $187,866 $188,174
Expenses
Option 1 Option 2 Option 3
Facility Staff
Full Time Employment Not Included Not Included Not Included
Summer Employment $76,901 $93,461 $143,141
Winter Employment $2,760 $2,760 $4,140
Training $1,000 $1,000 $2,000
Total Labor $80,661 $97,221 $149,281
Contractual Services
Insurance $23,129 $26,175 $35,860
Repair and Maintenance $10,300 $11,500 $15,500
Total Contractual Services $33,429 $37,675 $51,360
Commodities
Operating Supplies $6,180 $6,900 $9,300
Chemicals $11,824 $16,001 $22,832
Advertising $10,000 $11,667 $11,000
Total Commodities $28,004 $34,568 $43,132
Utilities
HVAC $6,271 $6,271 $9,734
Electricity $25,072 $30,332 $31,470
Pool Heating $0 $0 $0
Telephone $336 $336 $336
Trash Service $2,700 $2,700 $2,700
Water & Sewer $8,463 $10,455 $11,929
Total Utilities $42,842 $50,094 $56,169
Total Operating Expenses $184,935 $219,557 $299,942
Capital Replacement Fund $20,500 $23,000 $31,000
Total Expense $205,435 $242,557 $330,942
Labor
Job Description
Option1
Option2
Option3
HourlyRate
Ratewithoverhead
Indoor
Outdoor
Sprayground
Option1
Option2
Option3
Summer
Cashier 9 9 9 7.00 $8.05 90 90 100 6,521 6,521 6,521
Pool Manager 10 10 10 9.00 $10.35 90 90 100 9,315 9,315 9,315
Lifeguard 70 90 150 8.00 $9.20 90 90 100 57,960 74,520 124,200
Maintenance 2 2 2 15.00 $17.25 90 90 100 3,105 3,105 3,105
Summer Total 91 111 171 $76,901 $93,461 $143,141
Winter
Cashier 0 0 0 7.00 $8.05 265 20 50 0 0 0
Pool Manager 0 0 0 9.00 $10.35 265 20 50 0 0 0
Lifeguard 0 0 0 8.00 $9.20 265 20 50 0 0 0
Maintenance 8 8 12 15.00 $17.25 265 20 50 2,760 2,760 4,140
Winter Total 8 8 12 $2,760 $2,760 $4,140
Annual Labor Expense $79,661 $96,221 $147,281
Total Employer ExpenseDays per SeasonCost Per HourHours Per Day
Summary
2014 2015 2016 2017 2018
Option 1
Project Cost $4,100,000
Attendance 30,664
Revenue $147,358 $152,182 $156,724 $161,647 $166,623
Expense $184,935 $189,559 $194,298 $199,155 $204,134
Operating Cashflow ($37,578) ($37,377) ($37,573) ($37,508) ($37,511)
Recapture Rate 80% 80% 81% 81% 82%
Capital Replacement Fund $20,500 $20,500 $20,500 $20,500 $20,500
Debt Service ($328,995) ($328,995) ($328,995) ($328,995) ($328,995)
Cash Flow ($387,072) ($386,872) ($387,068) ($387,003) ($387,006)
Option 2
Project Cost $4,600,000
Attendance 35,039
Revenue $165,898 $171,404 $176,570 $182,187 $187,866
Expense $219,557 $225,046 $230,672 $236,439 $242,350
Operating Cashflow ($53,660) ($53,642) ($54,103) ($54,252) ($54,484)
Recapture Rate 76% 76% 77% 77% 78%
Capital Replacement Fund $23,000 $23,000 $23,000 $23,000 $23,000
Debt Service ($369,116) ($369,116) ($369,116) ($369,116) ($369,116)
Cash Flow ($445,776) ($445,758) ($446,219) ($446,368) ($446,600)
Option 3
Project Cost $6,200,000
Attendance 33,084
Revenue $167,412 $172,605 $177,520 $182,818 $188,174
Expense $299,942 $307,440 $315,126 $323,005 $331,080
Operating Cashflow ($132,530) ($134,836) ($137,607) ($140,186) ($142,906)
Recapture Rate 56% 56% 56% 57% 57%
Capital Replacement Fund $31,000 $31,000 $31,000 $31,000 $31,000
Debt Service ($497,504) ($497,504) ($497,504) ($497,504) ($497,504)
Cash Flow ($661,034) ($663,340) ($666,111) ($668,691) ($671,410)
Presented By:
Counsilman ▪ Hunsaker
June 10th, 2014

Mais conteúdo relacionado

Semelhante a Jasper pool study 061014

Wahid Presentation Mobile Tracking
Wahid Presentation Mobile TrackingWahid Presentation Mobile Tracking
Wahid Presentation Mobile Tracking
Wahid Omer
 
Author of Article Paul BarrTitle of Article Flexing your budge.docx
Author of Article Paul BarrTitle of Article Flexing your budge.docxAuthor of Article Paul BarrTitle of Article Flexing your budge.docx
Author of Article Paul BarrTitle of Article Flexing your budge.docx
rock73
 
HEEF Real Estate Proposal - University of Missouri (1)
HEEF Real Estate Proposal - University of Missouri (1)HEEF Real Estate Proposal - University of Missouri (1)
HEEF Real Estate Proposal - University of Missouri (1)
Joshua Vaslie
 
Cost Curve Presentation 11.20.15
Cost Curve Presentation 11.20.15Cost Curve Presentation 11.20.15
Cost Curve Presentation 11.20.15
Nick Perrone
 
Brunswick (BC) Pitch - Jonathan Chang - FINAL COPY
Brunswick (BC) Pitch - Jonathan Chang - FINAL COPYBrunswick (BC) Pitch - Jonathan Chang - FINAL COPY
Brunswick (BC) Pitch - Jonathan Chang - FINAL COPY
Jonathan Chang
 
Aminullah assagaf mp10 manajemen proyek
Aminullah assagaf mp10 manajemen proyekAminullah assagaf mp10 manajemen proyek
Aminullah assagaf mp10 manajemen proyek
Aminullah Assagaf
 
capwappresentgsdfgsdfgsdfgsdfgsdfgsdfgsdfg.ppt
capwappresentgsdfgsdfgsdfgsdfgsdfgsdfgsdfg.pptcapwappresentgsdfgsdfgsdfgsdfgsdfgsdfgsdfg.ppt
capwappresentgsdfgsdfgsdfgsdfgsdfgsdfgsdfg.ppt
akhoanguyeneng
 
Awards Day April 2009
Awards Day April 2009Awards Day April 2009
Awards Day April 2009
Angus Leisure
 
Appendix  A  Future value in.docx
Appendix  A  Future value in.docxAppendix  A  Future value in.docx
Appendix  A  Future value in.docx
rossskuddershamus
 
Round 3 - 2021Sim ID Z78284_3High Level OverviewTe.docx
Round 3 - 2021Sim ID Z78284_3High Level OverviewTe.docxRound 3 - 2021Sim ID Z78284_3High Level OverviewTe.docx
Round 3 - 2021Sim ID Z78284_3High Level OverviewTe.docx
daniely50
 
Housing Overhang Summary Data
Housing Overhang Summary DataHousing Overhang Summary Data
Housing Overhang Summary Data
bsucobe
 
Procurement best practices
Procurement best practicesProcurement best practices
Procurement best practices
remoeneltigre
 

Semelhante a Jasper pool study 061014 (20)

The Woodlands Demographics 2015
The Woodlands Demographics 2015The Woodlands Demographics 2015
The Woodlands Demographics 2015
 
PV Project Development Pre-Feasibility Financial Model
PV Project Development Pre-Feasibility Financial ModelPV Project Development Pre-Feasibility Financial Model
PV Project Development Pre-Feasibility Financial Model
 
Wahid Presentation Mobile Tracking
Wahid Presentation Mobile TrackingWahid Presentation Mobile Tracking
Wahid Presentation Mobile Tracking
 
Author of Article Paul BarrTitle of Article Flexing your budge.docx
Author of Article Paul BarrTitle of Article Flexing your budge.docxAuthor of Article Paul BarrTitle of Article Flexing your budge.docx
Author of Article Paul BarrTitle of Article Flexing your budge.docx
 
0 Max Fin.pptx
0 Max Fin.pptx0 Max Fin.pptx
0 Max Fin.pptx
 
HEEF Real Estate Proposal - University of Missouri (1)
HEEF Real Estate Proposal - University of Missouri (1)HEEF Real Estate Proposal - University of Missouri (1)
HEEF Real Estate Proposal - University of Missouri (1)
 
Cost Curve Presentation 11.20.15
Cost Curve Presentation 11.20.15Cost Curve Presentation 11.20.15
Cost Curve Presentation 11.20.15
 
Appendix A
Appendix AAppendix A
Appendix A
 
Parks User Fees Methodology
Parks User Fees MethodologyParks User Fees Methodology
Parks User Fees Methodology
 
Brunswick (BC) Pitch - Jonathan Chang - FINAL COPY
Brunswick (BC) Pitch - Jonathan Chang - FINAL COPYBrunswick (BC) Pitch - Jonathan Chang - FINAL COPY
Brunswick (BC) Pitch - Jonathan Chang - FINAL COPY
 
Aminullah assagaf mp10 manajemen proyek
Aminullah assagaf mp10 manajemen proyekAminullah assagaf mp10 manajemen proyek
Aminullah assagaf mp10 manajemen proyek
 
LINN Linkedin
LINN LinkedinLINN Linkedin
LINN Linkedin
 
capwappresentgsdfgsdfgsdfgsdfgsdfgsdfgsdfg.ppt
capwappresentgsdfgsdfgsdfgsdfgsdfgsdfgsdfg.pptcapwappresentgsdfgsdfgsdfgsdfgsdfgsdfgsdfg.ppt
capwappresentgsdfgsdfgsdfgsdfgsdfgsdfgsdfg.ppt
 
Awards Day April 2009
Awards Day April 2009Awards Day April 2009
Awards Day April 2009
 
Appendix  A  Future value in.docx
Appendix  A  Future value in.docxAppendix  A  Future value in.docx
Appendix  A  Future value in.docx
 
Continuously improving top tasks - Gerry McGovern
Continuously improving top tasks - Gerry McGovernContinuously improving top tasks - Gerry McGovern
Continuously improving top tasks - Gerry McGovern
 
Parkland Dedication Audit
Parkland Dedication AuditParkland Dedication Audit
Parkland Dedication Audit
 
Round 3 - 2021Sim ID Z78284_3High Level OverviewTe.docx
Round 3 - 2021Sim ID Z78284_3High Level OverviewTe.docxRound 3 - 2021Sim ID Z78284_3High Level OverviewTe.docx
Round 3 - 2021Sim ID Z78284_3High Level OverviewTe.docx
 
Housing Overhang Summary Data
Housing Overhang Summary DataHousing Overhang Summary Data
Housing Overhang Summary Data
 
Procurement best practices
Procurement best practicesProcurement best practices
Procurement best practices
 

Mais de Matthew Crane

Mais de Matthew Crane (20)

Dubois county justice project discussion
Dubois county justice project discussionDubois county justice project discussion
Dubois county justice project discussion
 
Dubois County School Reopening framework
Dubois County School Reopening frameworkDubois County School Reopening framework
Dubois County School Reopening framework
 
Together We Thrive Dubois County Reopening Campaign
Together We Thrive Dubois County Reopening CampaignTogether We Thrive Dubois County Reopening Campaign
Together We Thrive Dubois County Reopening Campaign
 
Dccf report to the public 2019
Dccf report to the public 2019Dccf report to the public 2019
Dccf report to the public 2019
 
Jasper by the numbers 2019
Jasper by the numbers 2019Jasper by the numbers 2019
Jasper by the numbers 2019
 
Dubois county park master plan final
Dubois county park master plan   finalDubois county park master plan   final
Dubois county park master plan final
 
Dubois county park master plan final
Dubois county park master plan   finalDubois county park master plan   final
Dubois county park master plan final
 
2018 Jasper State of the City
2018 Jasper State of the City2018 Jasper State of the City
2018 Jasper State of the City
 
Dubois
DuboisDubois
Dubois
 
2016 01-12 Jasper Parklands Plan and costs
2016 01-12 Jasper Parklands Plan and costs2016 01-12 Jasper Parklands Plan and costs
2016 01-12 Jasper Parklands Plan and costs
 
Complete Northeast Dubois feasibility study
Complete Northeast Dubois feasibility studyComplete Northeast Dubois feasibility study
Complete Northeast Dubois feasibility study
 
Northeast Dubois Presentation on feasibility
Northeast Dubois Presentation on feasibilityNortheast Dubois Presentation on feasibility
Northeast Dubois Presentation on feasibility
 
Jasper Cabinet River Centre project
Jasper Cabinet River Centre projectJasper Cabinet River Centre project
Jasper Cabinet River Centre project
 
2015 Huntingburg State of the City
2015 Huntingburg State of the City2015 Huntingburg State of the City
2015 Huntingburg State of the City
 
Hoosier Desk final presentation with cost estimates
Hoosier Desk final presentation with cost estimatesHoosier Desk final presentation with cost estimates
Hoosier Desk final presentation with cost estimates
 
Structural assessments of Hoosier Desk
Structural assessments of Hoosier DeskStructural assessments of Hoosier Desk
Structural assessments of Hoosier Desk
 
Final Dubois County housing strategies
Final Dubois County housing strategiesFinal Dubois County housing strategies
Final Dubois County housing strategies
 
Structural report of Hoosier Desk building conversion
Structural report of Hoosier Desk building conversionStructural report of Hoosier Desk building conversion
Structural report of Hoosier Desk building conversion
 
Huntingburg Concept for Market Street Park and Heritage Trail/Fourth Street
Huntingburg Concept for Market Street Park and Heritage Trail/Fourth StreetHuntingburg Concept for Market Street Park and Heritage Trail/Fourth Street
Huntingburg Concept for Market Street Park and Heritage Trail/Fourth Street
 
Hoosier desk landscape concepts
Hoosier desk landscape conceptsHoosier desk landscape concepts
Hoosier desk landscape concepts
 

Último

THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
PsychicRuben LoveSpells
 

Último (20)

Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 47 (Gurgaon)
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
Politician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsPolitician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full Details
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
 
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
 
422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf
 

Jasper pool study 061014

  • 1. Presented By: Counsilman ▪ Hunsaker June 10th, 2014
  • 2. AgendaAgenda — Process Review — What We Heard — Options for Consideration — Demographic Overview — Operational Pro-forma — Summary
  • 3. Feasibility Study ProcessFeasibility Study Process — Needs Assessment — Community Outreach — Common Vocabulary, Vision — Public Meeting — Stakeholder Meetings — Evaluate Existing Area Providers — Research Area Demographics — Identify Potential User Groups — Program Requirements — Develop Options for Programming — Develop Project Cost Estimates — Conceptual Plan — Operations Plan — Opinion Of Revenue — Opinion Of Operating Expenses — Determine Cashflow
  • 4. Types of Aquatic ProgrammingTypes of Aquatic Programming Aquatic Components ü Competitive ü Recreation ü Instruction ü Fitness & Therapy
  • 5. What We Heard — Need new pool to enhance “quality of life” within Jasper — Definition of Success — Financial – Reduce “loss” per visitor — Improve quality of life in community – attract visitors/new residents — Maximize number of users – increase visits — Provide amenities that are viable option to the Holiday World “event”
  • 6. Options for Consideration — Option 1 – Multi-purpose leisure pool with zero depth entry, play feature, 6-25 yard lap lanes, diving board, separate tot pool, crossing activity, separate waterslide catch pool, shade structures and required support spaces — Option 2 – Multi-purpose leisure pool with zero depth entry, play feature, 6-25 yard lap lanes, diving board, crossing activity, current channel — Option 3 – 50 meter lap pool, diving board, drop slide, waterslide with run-out, leisure pool with ramp entry, water slide, spray features
  • 7. Option 1 — Option 1 – Multi-purpose leisure pool with zero depth entry, play feature, 6-25 yard lap lanes, diving board, separate tot pool, crossing activity, separate waterslide catch pool, shade structures and required support spaces
  • 8. Option 1 Description Unit Amount Opinion of Cost Demolition Not Included Bathhouse 4,020 $762,000 Entrance/Recep Office Sq. Ft. 150 First Aid /Guard Room Sq. Ft. 200 Manager Office Sq. Ft. 150 Mechanical/Storage Sq. Ft. 1,050 Locker Rooms Sq. Ft. 1,200 Family Changing Room Sq. Ft. 150 Snack Bar/Concessions Sq. Ft. 450 Efficiency Sq. Ft. 670 Outdoor Leisure Pool 8,706 $1,765,100 Multi-Purpose Pool Sq. Ft. 7,225 Diving Boards Add. Cost 1 Participatory Play Feature Allowance 1 Crossing Activity Add. Cost 1 Slide Catch Pool Sq. Ft. 785 Waterslide 1st flume Quantity 1 Waterslide 2nd flume Quantity 1 Tot Area Sq. Ft. 690 Features Allowance 1 Support 26,118 $383,238 Pool Deck Sq. Ft. 17,412 Fence Linear Ft. 1,000 Overhead Lighting Sq. Ft. 26,118 Funbrellas Quantity 3 Equipment Allowance 1 Total Building Construction Costs 2,910,338 Site Construction Costs (parking lot, landscaping, utilities, walks) $602,760 Subtotal $3,513,098 Contingency 5% $175,655 Indirect Costs 10% $368,875 Total Estimated Project Costs: $4,057,628 Say $4,100,000 OPINION OF PROJECT COST: Concept I
  • 9. Option 2 — Option 2 – Multi-purpose leisure pool with zero depth entry, play feature, 6-25 yard lap lanes, diving board, crossing activity, current channel
  • 10. Option 2 Description Unit Amount Opinion of Cost Demolition Not Included Bathhouse 4,020 $762,000 Entrance/Recep Office Sq. Ft. 150 First Aid /Guard Room Sq. Ft. 200 Manager Office Sq. Ft. 150 Mechanical/Storage Sq. Ft. 1,050 Locker Rooms Sq. Ft. 1,200 Family Changing Room Sq. Ft. 150 Snack Bar/Concessions Sq. Ft. 450 Efficiency Sq. Ft. 670 Outdoor Leisure Pool 10,780 $2,046,500 Multi-Purpose Pool Sq. Ft. 10,775 River / Vortex Equipment Add. Cost 1 Participatory Play Feature Allowance 1 Waterslide 1st flume Quantity 1 Diving Board Quantity 1 Crossing Activity Quantity 1 Support 32,340 $480,440 Pool Deck Sq. Ft. 21,560 Fence Linear Ft. 1,100 Overhead Lighting Sq. Ft. 32,340 Funbrellas Quantity 6 Equipment Allowance 1 Total Building Construction Costs 3,288,940 Site Construction Costs (parking lot, landscaping, utilities, walks) $654,480 Subtotal $3,943,420 Indirect Costs 10% $394,342 Contingency 5% $216,888 Total Estimated Project Costs: $4,554,650 Say $4,600,000 OPINION OF PROJECT COST: Concept II
  • 11. Option 3 — Option 3 – 50 meter lap pool, diving board, drop slide, waterslide with run-out, leisure pool with ramp entry, water slide, spray features
  • 12. Option 3 Description Unit Amount Opinion of Cost Demolition Not Included Bathhouse 6,240 $1,147,750 Entrance/Recep Office Sq. Ft. 200 First Aid /Guard Room Sq. Ft. 200 Manager Office Sq. Ft. 150 Mechanical/Storage Sq. Ft. 2,150 Locker Rooms Sq. Ft. 1,500 Family Changing Room Sq. Ft. 250 Snack Bar/Concessions Sq. Ft. 750 Efficiency Sq. Ft. 1,040 Outdoor Leisure Pool 14,655 $2,695,000 50 Meter Pool Sq. Ft. 11,500 Waterslide 1st flume Quantity 1 Waterslide 2nd flume Quantity 1 Diving Board Quantity 1 Tot Area Sq. Ft. 3,150 Features Allowance 1 Waterslide 1st flume Add. Cost 1 Support 43,965 $593,565 Pool Deck Sq. Ft. 29,310 Fence Linear Ft. 1,100 Overhead Lighting Sq. Ft. 43,965 Funbrellas Quantity 10 Equipment Allowance 1 Total Building Construction Costs 4,436,315 Site Construction Costs (parking lot, landscaping, utilities, walks) $903,690 Subtotal $5,340,005 Indirect Costs 10% $534,001 Contingency 5% $293,700 Total Estimated Project Costs: $6,167,706 Say $6,200,000 OPINION OF PROJECT COST: Concept III
  • 13. Capacity Option 1 Option 2 Option 3 WET-SIDE CAPACITY Training (Available 25-Yard Lanes) Multi-purpose pool 6 6 11 Tot Pool 0 0 0 Slide Catch Pool 0 0 0 Total 6 6 11 Estimated Training Holding Capacity 30 30 55 Daily Training Capacity 90 90 165 Recreation (Surface Area Sq. Ft.) Multi-purpose pool 7,225 10,775 11,500 Tot Pool 690 0 3,150 Slide Catch Pool 785 0 0 Total 8,700 10,775 14,650 Shallow Water 6,525 8,081 10,255 Deep Water 2,175 2,694 4,395 Estimated Recreation Holding Capacity 283 350 454 Daily Recreation Holding Capacity 707 875 1,135 Total Holding Capacity 313 380 509 Total Daily Facility Capacity 797 965 1,300
  • 14. Parking / Site Size Option 1 Option 2 Option 3 Parking 125 152 204 Parking Sq. Ft. 41,000 50,000 67,000 Impervious Structure 30,138 36,360 50,205 Total Program Sq. Ft. 71,138 86,360 117,205 Total Sq. Ft. with Efficiency 142,276 172,720 234,410 Preferred Site Size Requirements (acres) 3.27 3.97 5.38 Recommended Site Size (acres) 4.90 5.95 8.07
  • 15. Population Radius Number Percent Number Percent Number Percent Number Percent Number Percent (000's) of Total (000's) of Total (000's) of Total (000's) Percent (000's) Percent 0 to 3 Miles 16.9 7.2% 17.0 7.2% 17.7 7.3% 0.0 0.3% 0.1 0.7% 3 to 5 Miles 19.3 8.2% 19.4 8.2% 20.1 8.3% 0.0 0.2% 0.1 0.8% 5 to 10 Miles 34.6 14.7% 34.7 14.7% 35.8 14.8% 0.1 0.2% 0.2 0.6% Subtotal 70.7 30.0% 71.2 30.1% 73.7 30.4% 0.2 0.2% 0.5 0.7% 10 to 15 Miles 47.9 20.3% 48.1 20.3% 49.5 20.4% 0.1 0.1% 0.3 0.6% 15 to 25 Miles 117.2 49.7% 117.2 49.5% 119.1 49.2% 0.0 0.0% 0.4 0.3% Subtotal 165.1 70.0% 165.3 69.9% 168.7 69.6% 0.1 0.0% 0.7 0.4% Total (0-25 Miles) 235.8 100.0% 236.4 100.0% 242.3 100.0% 0.2 0.1% 1.2 0.5% Jasper, IN 15.0 15.2 15.6 0.0 0.3% 0.1 0.6% MARKET AREA POPULATION BY DISTANCE Population Average Annual Change 2010 2013 2018 2010-2013 2014-2019 Source: Experian
  • 16. Age Age Groups U.S. Age # % # % # % # % # % # % Population Age 0-4 1,166 6.8% 1,285 6.6% 2,285 6.6% 3,066 6.4% 7,582 6.5% 1,061 7.0% 6.5% Age 5-9 1,143 6.7% 1,316 6.8% 2,384 6.9% 3,243 6.7% 8,088 6.9% 1,006 6.6% 6.5% Age 10-14 1,249 7.3% 1,435 7.4% 2,555 7.4% 3,519 7.3% 8,346 7.1% 1,089 7.2% 6.6% Age 15-19 1,092 6.4% 1,278 6.6% 2,374 6.8% 3,276 6.8% 7,907 6.7% 939 6.2% 6.9% Subtotal 4,650 27.3% 5,314 27.4% 9,598 27.6% 13,104 27.2% 31,923 27.2% 4,095 27.0% 26.5% Age 20-24 814 4.8% 914 4.7% 1,658 4.8% 2,280 4.7% 6,192 5.3% 737 4.9% 7.1% Age 25-29 1,092 6.4% 1,195 6.2% 2,054 5.9% 2,740 5.7% 6,598 5.6% 999 6.6% 6.8% Age 30-34 1,065 6.2% 1,178 6.1% 2,134 6.1% 2,873 6.0% 6,814 5.8% 970 6.4% 6.6% Age 35-39 941 5.5% 1,082 5.6% 2,009 5.8% 2,782 5.8% 6,816 5.8% 833 5.5% 6.3% Age 40-44 1,073 6.3% 1,241 6.4% 2,277 6.6% 3,212 6.7% 7,470 6.4% 939 6.2% 6.8% Age 45-49 1,257 7.4% 1,461 7.5% 2,639 7.6% 3,736 7.8% 8,685 7.4% 1,093 7.2% 7.1% Age 50-54 1,324 7.8% 1,551 8.0% 2,781 8.0% 3,903 8.1% 9,216 7.9% 1,147 7.6% 7.3% Age 55-59 1,180 6.9% 1,374 7.1% 2,460 7.1% 3,489 7.3% 8,340 7.1% 1,031 6.8% 6.5% Age 60-64 975 5.7% 1,127 5.8% 2,030 5.8% 2,838 5.9% 7,347 6.3% 862 5.7% 5.7% Age 65-69 706 4.1% 800 4.1% 1,423 4.1% 2,003 4.2% 5,322 4.5% 634 4.2% 4.2% Age 70-74 603 3.5% 685 3.5% 1,228 3.5% 1,742 3.6% 4,331 3.7% 543 3.6% 3.1% Age 75-79 491 2.9% 544 2.8% 953 2.7% 1,345 2.8% 3,245 2.8% 447 3.0% 2.4% Age 80-84 417 2.4% 451 2.3% 746 2.1% 1,053 2.2% 2,510 2.1% 384 2.5% 1.9% Age 85+ 463 2.7% 486 2.5% 741 2.1% 1,009 2.1% 2,347 2.0% 437 2.9% 1.9% TOTAL: 17,051 100.0% 19,403 100.0% 34,731 100.0% 48,109 100.0% 117,156 100.0% 15,151 100.0% 100% Median Age 37.0 MARKET AREA AGE DISTRIBUTION 0 to 3 Miles 3 to 5 Miles 5 to 10 Miles 10 to 15 Miles 15 to 25 Miles Source: Experian Jasper, IN 39.8 40.1 39.8 40.5 40.2 39.7
  • 17. Income Radius Dollars Index Dollars Index 0 to 3 Miles $30,293 1.14 $57,432 1.09 3 to 5 Miles $30,506 1.15 $59,036 1.12 5 to 10 Miles $27,487 1.04 $55,518 1.06 10 to 15 Miles $26,221 0.99 $54,124 1.03 15 to 25 Miles $23,781 0.90 $49,867 0.95 Jasper, IN $30,090 1.14 $56,122 1.07 Total U.S. $26,464 1.00 $52,599 1.00 Source: Experian MARKET AREA INCOME Per Capita Incomes Median Household Incomes
  • 18. Group ProgrammingVisits per Program Day Option 1 Option 2 Option 3 Swim Meet Rental 1 1 1 USA / City Swim Team 20 20 50 Masters Swim Team 30 30 30 Summer Swim Lessons 30 30 30 Lifeguard Training 10 10 10 Wellness Programming 10 10 10 Birthday Party 2 2 2 Private Rental 1 1 1 Programming Days Option 1 Option 2 Option 3 Swim Meet Rental 2 2 6 USA / City Swim Team 60 60 60 Masters Swim Team 50 50 50 Summer Swim Lessons 32 32 32 Lifeguard Training 10 10 10 Wellness Programming 30 30 30 Birthday Party 60 60 60 Private Rental 50 50 50 Per Capita Spending (Net) Option 1 Option 2 Option 3 Swim Meet Rental $500.00 $500.00 $1,000.00 USA / City Swim Team $1.00 $1.00 $2.00 Masters Swim Team $1.50 $1.50 $1.50 Summer Swim Lessons $2.50 $2.50 $2.50 Lifeguard Training $3.50 $3.50 $3.50 Wellness Programming $1.50 $1.50 $1.50 Birthday Party $50.00 $50.00 $50.00 Private Rental $75.00 $75.00 $75.00 Opinion of Revenue (Net) Option 1 Option 2 Option 3 Swim Meet Rental $1,000 $1,000 $6,000 USA / City Swim Team $1,200 $1,200 $6,000 Masters Swim Team $2,250 $2,250 $2,250 Summer Swim Lessons $2,400 $2,400 $2,400 Lifeguard Training $350 $350 $350 Wellness Programming $450 $450 $450 Birthday Party $6,000 $6,000 $6,000 Private Rental $3,750 $3,750 $3,750 User-Group Revenue $17,400 $17,400 $27,200
  • 19. Per Cap Spending Category Rate Percent of Visits Per Visit Unit Residents Adult (18 & Older) 6.00 17% 1.02 Children (3-17) 4.00 20% 0.80 Free 0 2% - Non-Resident Adult 7.00 14% 0.98 Child 5.00 11% 0.55 Season Pass Resident Individual 90.00 12% 0.27 Family 200.00 10% 0.17 Non-Resident Individual 110.00 8% 0.25 Family 275.00 6% 0.15 Subtotal / Average 100% 4.19 Food / Merchandise 0.05$ Total $4.24
  • 20. Revenue Option 1 Option 2 Option 3 Attendance 2014 30,664 35,039 33,084 2015 30,876 35,280 33,310 2016 31,013 35,431 33,461 2017 31,225 35,672 33,687 2018 31,437 35,913 33,913 Per Capita Spending (3% Annual Increase) $4.24 $4.24 $4.24 Special User Group Spending $17,400 $17,400 $27,200 2014 $147,358 $165,898 $167,412 2015 $152,182 $171,404 $172,605 2016 $156,724 $176,570 $177,520 2017 $161,647 $182,187 $182,818 2018 $166,623 $187,866 $188,174
  • 21. Expenses Option 1 Option 2 Option 3 Facility Staff Full Time Employment Not Included Not Included Not Included Summer Employment $76,901 $93,461 $143,141 Winter Employment $2,760 $2,760 $4,140 Training $1,000 $1,000 $2,000 Total Labor $80,661 $97,221 $149,281 Contractual Services Insurance $23,129 $26,175 $35,860 Repair and Maintenance $10,300 $11,500 $15,500 Total Contractual Services $33,429 $37,675 $51,360 Commodities Operating Supplies $6,180 $6,900 $9,300 Chemicals $11,824 $16,001 $22,832 Advertising $10,000 $11,667 $11,000 Total Commodities $28,004 $34,568 $43,132 Utilities HVAC $6,271 $6,271 $9,734 Electricity $25,072 $30,332 $31,470 Pool Heating $0 $0 $0 Telephone $336 $336 $336 Trash Service $2,700 $2,700 $2,700 Water & Sewer $8,463 $10,455 $11,929 Total Utilities $42,842 $50,094 $56,169 Total Operating Expenses $184,935 $219,557 $299,942 Capital Replacement Fund $20,500 $23,000 $31,000 Total Expense $205,435 $242,557 $330,942
  • 22. Labor Job Description Option1 Option2 Option3 HourlyRate Ratewithoverhead Indoor Outdoor Sprayground Option1 Option2 Option3 Summer Cashier 9 9 9 7.00 $8.05 90 90 100 6,521 6,521 6,521 Pool Manager 10 10 10 9.00 $10.35 90 90 100 9,315 9,315 9,315 Lifeguard 70 90 150 8.00 $9.20 90 90 100 57,960 74,520 124,200 Maintenance 2 2 2 15.00 $17.25 90 90 100 3,105 3,105 3,105 Summer Total 91 111 171 $76,901 $93,461 $143,141 Winter Cashier 0 0 0 7.00 $8.05 265 20 50 0 0 0 Pool Manager 0 0 0 9.00 $10.35 265 20 50 0 0 0 Lifeguard 0 0 0 8.00 $9.20 265 20 50 0 0 0 Maintenance 8 8 12 15.00 $17.25 265 20 50 2,760 2,760 4,140 Winter Total 8 8 12 $2,760 $2,760 $4,140 Annual Labor Expense $79,661 $96,221 $147,281 Total Employer ExpenseDays per SeasonCost Per HourHours Per Day
  • 23. Summary 2014 2015 2016 2017 2018 Option 1 Project Cost $4,100,000 Attendance 30,664 Revenue $147,358 $152,182 $156,724 $161,647 $166,623 Expense $184,935 $189,559 $194,298 $199,155 $204,134 Operating Cashflow ($37,578) ($37,377) ($37,573) ($37,508) ($37,511) Recapture Rate 80% 80% 81% 81% 82% Capital Replacement Fund $20,500 $20,500 $20,500 $20,500 $20,500 Debt Service ($328,995) ($328,995) ($328,995) ($328,995) ($328,995) Cash Flow ($387,072) ($386,872) ($387,068) ($387,003) ($387,006) Option 2 Project Cost $4,600,000 Attendance 35,039 Revenue $165,898 $171,404 $176,570 $182,187 $187,866 Expense $219,557 $225,046 $230,672 $236,439 $242,350 Operating Cashflow ($53,660) ($53,642) ($54,103) ($54,252) ($54,484) Recapture Rate 76% 76% 77% 77% 78% Capital Replacement Fund $23,000 $23,000 $23,000 $23,000 $23,000 Debt Service ($369,116) ($369,116) ($369,116) ($369,116) ($369,116) Cash Flow ($445,776) ($445,758) ($446,219) ($446,368) ($446,600) Option 3 Project Cost $6,200,000 Attendance 33,084 Revenue $167,412 $172,605 $177,520 $182,818 $188,174 Expense $299,942 $307,440 $315,126 $323,005 $331,080 Operating Cashflow ($132,530) ($134,836) ($137,607) ($140,186) ($142,906) Recapture Rate 56% 56% 56% 57% 57% Capital Replacement Fund $31,000 $31,000 $31,000 $31,000 $31,000 Debt Service ($497,504) ($497,504) ($497,504) ($497,504) ($497,504) Cash Flow ($661,034) ($663,340) ($666,111) ($668,691) ($671,410)
  • 24. Presented By: Counsilman ▪ Hunsaker June 10th, 2014