SlideShare uma empresa Scribd logo
1 de 31
Going Beyond the 2008  Residential Title 24 Standards October 26th, 2009 Residential New Construction Programs San Diego Gas & Electric Presenter: Michael James Colby
Residential New Construction Programs Advanced Home Program Performance Based Energy Efficiency Incentive Program Incentives are paid for building energy efficient New Homes including affordable housing New Solar Homes Partnership Performance Based Renewable Incentive Program Incentives are paid based upon the expected performance of installed solar electric (photovoltaic) systems on New Homes including affordable housing Customers are encouraged to participate in both programs!
Advanced  Home Program
Advanced Home Program (2009) Single-Family Incentives Tier I (exceed T-24 by 15%) Coastal Climate Zone: $400/dwelling unit Inland Climate Zone: $500/dwelling unit Tier II (exceed T-24 by 35% & reduce cooling budget 40%) $2,000 in all climate zones
Advanced Home Program (2009)Multi-Family Incentives Tier I (exceed T-24 by 15%) Coastal Climate Zone: $150/dwelling unit Inland Climate Zone: $200/dwelling unit
Program in Transition Name changed to the California Advanced Home Program Statewide program consistent across California Calculated incentives instead of deemed incentives Incentive Kickers Begins January 1st, 2010
California Advanced Home Program (2010-2012) Kickers ENERGY STAR® Green Home Compact Home Solar Thermal  kW Reduction
Utility Incentive Worksheet Generated by the compliance software Will provide estimated savings and incentives
New Solar Homes Partnership
Timeline August 2004 Governor Announces Million Solar Roofs Program January 2006 CPUC Approves CSI August 2006 Governor signs SB1 into Law January 2007 Go Solar California Launched March 2008 SDG&E begins administration of NSHP
New Solar Homes Partnership Provides financial incentives, technical assistance, and marketing support to new home builders of energy-efficient, solar-powered homes Budget of $400 million out of the  	$3.3 billion CSI Overall goal of the NSHP is to achieve 400 megawatts of new solar-produced electricity by the end of 2016
NSHP Requirements Location: Electric distribution service must be from one of the California investor-owned utilities (PG&E, SCE, SDG&E) System: System must be 1 kW AC or larger, interconnected to the utility distribution grid, and generate electricity to offset the end-use consumer’s on-site electrical load Quality: The system must use new certified components, have a 10 year warranty, and must be field-verified by a third-party inspector  Energy Efficiency: The new homes must exceed Title 24 energy efficiency requirements  Tier 1- Exceed Title 24 by a minimum of 15%  Tier 2- Exceed Title 24 by a minimum of 35% (30% 2008 T-24) Builder provided appliances must be ENERGY STAR® labeled
NSHP Incentives NSHP offers generous financial incentives Market Rate Housing $2.50/watt  	base incentive $2.60/watt  	solar as standard incentive Affordable Housing $3.30/watt 	common areas $3.50/watt 	dwelling units Incentive depends on the Expected Performance Based Incentive calculation (CEC PV Calculator)
How to apply to the NSHP Contact the SDG&E NSHP team as early as possible by phone or email at 1-866-631-1744 or newsolarhomes@sdge.com Hire a Certified Energy Plan Examiner (CEPE) to create the Title-24 energy efficiency documentation http://www.cabec.org/ceperosterall.php Contract with a registered solar contractor http://www.gosolarcalifornia.ca.gov/retailers/search-new.php Hire a HERS rater to perform the energy efficiency and PV verifications http://www.energy.ca.gov/HERS/index.html Work with the solar contractor, CEPE, and HERS rater to submit a completed reservation package to SDG&E
Reservation Phase Documents
Reservation Phase(NSHP-1) Home Location Housing Type HERS Rater Incentive Recipient Signed by builder/ developer and retailer
Reservation Phase(CF-1R-PV) Address matches NSHP-1 Climate Zone matches CF-1R Equipment matches contract Form is signed Certified Version * Also need the .emf and .her files
Reservation Phase(CF-1R) Created and signed by CEPE or CEA At least 15% better than T-24 * Also need the electronic input file (either .bld or .mp7)
Reservation Phase(Equipment Purchase Agreement & Installation Contract) Equipment Purchase Agreement Address matches NSHP-1 Quantity, make, & model of equipment matches CF-1R-PV Meters to be installed From a registered retailer Signed by both retailer and applicant Installation Contract Name, address, and license number of the company performing the installation Address matches NSHP-1 Description of work to be performed Total agreed price Payment terms Approximate start & end dates (unless on build out schedule Cancellation Notice Contact info for the CSLB Legal notices Signed by both retailer and the applicant
Reservation Phase(Build Out Schedule) Installation Start Installation End Ready for Operation On Solar Retailers Letterhead
Reservation Phase(System Size Justification) System Size Greater than 5 kW  Estimated Electricity Consumption Completed by a CEPE/CEA, Architect, Engineer, or a C-10 Licensed Contractor
Reservation Phase(Building Permit) Applicants name and address match NSHP-1  Permit states “New Construction” * N/A if Subdivision Map is Submitted
Reservation Phase(Subdivision Map) Map must highlight which buildings will have solar systems installed  * N/A if Building Permit is Submitted
Reservation Phase(Construction Plans) Architectural floor plans, elevations, & sections Site plan indicating north Electrical & mechanical         (if available) * Submit electronically if possible
Reservation Phase Overview Once all forms are complete and submitted, SDG&E submits to the CEC for the reservation of funds Once reserved, projects have:  36 Months to Complete – Housing developments with 6 or more units installing solar on at least 50 percent of the units OR 18 Months to Complete – All other categories of new housing SDG&E will send a letter and payment claim form after the funds are reserved
Are we having fun yet?
Payment Phase Overview For the payment of funds, builders must provide: Payment Claim Form (NSHP-2)                                          [Note: Original Signature Required] Final Invoice for Equipment and Installation Final PV Permit Certificate of Field Verification and Diagnostic Testing   (CF-4R-PV) for PV Certificate of Field Verification and Diagnostic Testing   (CF-4R) for Energy Efficiency Ten-Year Warranty Form (NSHP-3) W-9 Form Form 587 or 590 (CA Withholding Forms)
Example One: New Single-Family Home 3.4 kW system (AC) in San Diego $2.50 per watt NSHP Incentive Tier 2 Energy Efficiency (at least 35% better than 2005 T24)      $2,000 per home AHP Incentive Incentives $10,737 NSHP + $2,000 AHP = $12,737 Total Incentives
Example 2: New 42-Unit, 3-Story Apartment Building w/ Affordability Restrictions 30 kW System (AC) Serving Common Area in Chula Vista $3.30 per watt NSHP Incentive 48 kW System (AC) Serving 42 Dwelling Units in Chula Vista $3.50 per watt NSHP Incentive Tier 1 Energy Efficiency (at least 15% better than 2005 T-24)  $150 per unit AHP incentives Incentives $308,630 NSHP + $6,300 AHP = $314,930 Total Incentives
Resources San Diego Gas & Electric, New Construction Department www.sdge.com/construction Go Solar California www.gosolarcalifornia.ca.gov California Association of Building Energy Consultants (CABEC) www.cabec.org California Home Energy Efficiency Rating Services (CHEERS) www.cheers.org California Certified Energy Rating & Testing Services (CalCERTS) www.calcerts.com California Building Performance Contractors Association (CBPCA) www.cbpca.org
Thank You For more information please contact us at: 1-866-631-1744 newsolarhomes@sdge.com 8335 Century Park Court, CP12G San Diego, CA 92123

Mais conteúdo relacionado

Mais procurados

SEAM Centre Seminar - July 2010
SEAM Centre Seminar - July 2010SEAM Centre Seminar - July 2010
SEAM Centre Seminar - July 2010The SEAM Centre
 
The EU Renewables Directive
The EU Renewables DirectiveThe EU Renewables Directive
The EU Renewables DirectiveLeonardo ENERGY
 
The Renewables EU Directive
The Renewables EU DirectiveThe Renewables EU Directive
The Renewables EU Directivefernando nuño
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India sanjeev jain
 
Final repair regulations: What has changed and how will it impact you?
Final repair regulations: What has changed and how will it impact you?Final repair regulations: What has changed and how will it impact you?
Final repair regulations: What has changed and how will it impact you?Grant Thornton LLP
 
Massachusetts policies for combined heat & power
Massachusetts policies for combined heat & powerMassachusetts policies for combined heat & power
Massachusetts policies for combined heat & powerTNenergy
 
SEAM Centre seminar - Sept 2010 (Part 2)
SEAM Centre seminar - Sept 2010 (Part 2)SEAM Centre seminar - Sept 2010 (Part 2)
SEAM Centre seminar - Sept 2010 (Part 2)The SEAM Centre
 
Renewable Energy Certificate
Renewable Energy CertificateRenewable Energy Certificate
Renewable Energy CertificateJaspal Bhatia
 
Introduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismIntroduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismSpark Network
 
Physical needs assessment debbie gardner
Physical needs assessment   debbie gardnerPhysical needs assessment   debbie gardner
Physical needs assessment debbie gardnermeagsindevelopment
 
Course on Regulation and Sustainable Energy in Developing Countries - Session 3
Course on Regulation and Sustainable Energy in Developing Countries - Session 3Course on Regulation and Sustainable Energy in Developing Countries - Session 3
Course on Regulation and Sustainable Energy in Developing Countries - Session 3Leonardo ENERGY
 
SEAM Centre Seminar - Oct 2011
SEAM Centre Seminar - Oct 2011SEAM Centre Seminar - Oct 2011
SEAM Centre Seminar - Oct 2011The SEAM Centre
 
Eng vi encontro - cpfl renováveis - miguel
Eng   vi encontro - cpfl renováveis - miguelEng   vi encontro - cpfl renováveis - miguel
Eng vi encontro - cpfl renováveis - miguelCPFL RI
 
Zero carbon projects
Zero carbon projectsZero carbon projects
Zero carbon projectsPeter Mumford
 
Developing Solar Projects under REC Mechanism in India
Developing Solar Projects under REC Mechanism in IndiaDeveloping Solar Projects under REC Mechanism in India
Developing Solar Projects under REC Mechanism in IndiaBhargav Parmar
 
Delivering a nearly zero energy commercial building
Delivering a nearly zero energy commercial buildingDelivering a nearly zero energy commercial building
Delivering a nearly zero energy commercial buildingSustainableEnergyAut
 
Sdge Cypress Cool Gas Seminar 6 17 09 Pk
Sdge Cypress Cool Gas Seminar 6 17 09 PkSdge Cypress Cool Gas Seminar 6 17 09 Pk
Sdge Cypress Cool Gas Seminar 6 17 09 PkPaul Kuhlman
 

Mais procurados (20)

Levellised generic tariff
Levellised generic tariffLevellised generic tariff
Levellised generic tariff
 
SEAM Centre Seminar - July 2010
SEAM Centre Seminar - July 2010SEAM Centre Seminar - July 2010
SEAM Centre Seminar - July 2010
 
The EU Renewables Directive
The EU Renewables DirectiveThe EU Renewables Directive
The EU Renewables Directive
 
The Renewables EU Directive
The Renewables EU DirectiveThe Renewables EU Directive
The Renewables EU Directive
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India
 
Final repair regulations: What has changed and how will it impact you?
Final repair regulations: What has changed and how will it impact you?Final repair regulations: What has changed and how will it impact you?
Final repair regulations: What has changed and how will it impact you?
 
White Certificates in Australia
White Certificates in Australia White Certificates in Australia
White Certificates in Australia
 
Massachusetts policies for combined heat & power
Massachusetts policies for combined heat & powerMassachusetts policies for combined heat & power
Massachusetts policies for combined heat & power
 
SEAM Centre seminar - Sept 2010 (Part 2)
SEAM Centre seminar - Sept 2010 (Part 2)SEAM Centre seminar - Sept 2010 (Part 2)
SEAM Centre seminar - Sept 2010 (Part 2)
 
Renewable Energy Certificate
Renewable Energy CertificateRenewable Energy Certificate
Renewable Energy Certificate
 
Introduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismIntroduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) Mechanism
 
Physical needs assessment debbie gardner
Physical needs assessment   debbie gardnerPhysical needs assessment   debbie gardner
Physical needs assessment debbie gardner
 
Course on Regulation and Sustainable Energy in Developing Countries - Session 3
Course on Regulation and Sustainable Energy in Developing Countries - Session 3Course on Regulation and Sustainable Energy in Developing Countries - Session 3
Course on Regulation and Sustainable Energy in Developing Countries - Session 3
 
SEAM Centre Seminar - Oct 2011
SEAM Centre Seminar - Oct 2011SEAM Centre Seminar - Oct 2011
SEAM Centre Seminar - Oct 2011
 
Eng vi encontro - cpfl renováveis - miguel
Eng   vi encontro - cpfl renováveis - miguelEng   vi encontro - cpfl renováveis - miguel
Eng vi encontro - cpfl renováveis - miguel
 
Zero carbon projects
Zero carbon projectsZero carbon projects
Zero carbon projects
 
Zero Carbon technology
Zero Carbon technologyZero Carbon technology
Zero Carbon technology
 
Developing Solar Projects under REC Mechanism in India
Developing Solar Projects under REC Mechanism in IndiaDeveloping Solar Projects under REC Mechanism in India
Developing Solar Projects under REC Mechanism in India
 
Delivering a nearly zero energy commercial building
Delivering a nearly zero energy commercial buildingDelivering a nearly zero energy commercial building
Delivering a nearly zero energy commercial building
 
Sdge Cypress Cool Gas Seminar 6 17 09 Pk
Sdge Cypress Cool Gas Seminar 6 17 09 PkSdge Cypress Cool Gas Seminar 6 17 09 Pk
Sdge Cypress Cool Gas Seminar 6 17 09 Pk
 

Destaque

Presentation Bus Thai Digest
Presentation Bus Thai DigestPresentation Bus Thai Digest
Presentation Bus Thai Digestchampoo13
 
Measuring social media
Measuring social mediaMeasuring social media
Measuring social mediaDavid Alston
 
Bus Thai Alliance
Bus Thai AllianceBus Thai Alliance
Bus Thai Alliancechampoo13
 
Company Profile New
Company Profile NewCompany Profile New
Company Profile Newchampoo13
 
Presentationslides4heart
Presentationslides4heartPresentationslides4heart
Presentationslides4heartrocktomytune
 
Customers 1st Presentation
Customers 1st PresentationCustomers 1st Presentation
Customers 1st PresentationDavid Alston
 
Surface Conduction Electron Emitter Display
Surface Conduction Electron Emitter DisplaySurface Conduction Electron Emitter Display
Surface Conduction Electron Emitter Displayadarsh
 
Why We Believe
Why We BelieveWhy We Believe
Why We Believeandrecama
 
Bustraining Company profile
Bustraining Company profileBustraining Company profile
Bustraining Company profilechampoo13
 
Quantitative methods minimal spanning tree and dijkstra
Quantitative methods minimal spanning tree and dijkstraQuantitative methods minimal spanning tree and dijkstra
Quantitative methods minimal spanning tree and dijkstraadarsh
 
Quantitative methods minimal spanning tree and dijkstra [compatibility mode]
Quantitative methods minimal spanning tree and dijkstra [compatibility mode]Quantitative methods minimal spanning tree and dijkstra [compatibility mode]
Quantitative methods minimal spanning tree and dijkstra [compatibility mode]adarsh
 
Quantitative methods minimal spanning tree and dijkstra
Quantitative methods minimal spanning tree and dijkstraQuantitative methods minimal spanning tree and dijkstra
Quantitative methods minimal spanning tree and dijkstraadarsh
 
mdr tb and xdr tb
mdr tb and xdr tbmdr tb and xdr tb
mdr tb and xdr tbguestf7e546
 
BusThai Digest
BusThai DigestBusThai Digest
BusThai Digestchampoo13
 
Annie Nine Characteristics of Life
Annie Nine Characteristics of LifeAnnie Nine Characteristics of Life
Annie Nine Characteristics of Lifeguest3748c79
 
Quantitative management minimal spanning tree and dijkstra
Quantitative management minimal spanning tree and dijkstraQuantitative management minimal spanning tree and dijkstra
Quantitative management minimal spanning tree and dijkstraadarsh
 
Company Profile
Company ProfileCompany Profile
Company Profilechampoo13
 

Destaque (18)

Presentation Bus Thai Digest
Presentation Bus Thai DigestPresentation Bus Thai Digest
Presentation Bus Thai Digest
 
Measuring social media
Measuring social mediaMeasuring social media
Measuring social media
 
Bus Thai Alliance
Bus Thai AllianceBus Thai Alliance
Bus Thai Alliance
 
Company Profile New
Company Profile NewCompany Profile New
Company Profile New
 
Presentationslides4heart
Presentationslides4heartPresentationslides4heart
Presentationslides4heart
 
Customers 1st Presentation
Customers 1st PresentationCustomers 1st Presentation
Customers 1st Presentation
 
Surface Conduction Electron Emitter Display
Surface Conduction Electron Emitter DisplaySurface Conduction Electron Emitter Display
Surface Conduction Electron Emitter Display
 
Beyond T 24
Beyond T 24Beyond T 24
Beyond T 24
 
Why We Believe
Why We BelieveWhy We Believe
Why We Believe
 
Bustraining Company profile
Bustraining Company profileBustraining Company profile
Bustraining Company profile
 
Quantitative methods minimal spanning tree and dijkstra
Quantitative methods minimal spanning tree and dijkstraQuantitative methods minimal spanning tree and dijkstra
Quantitative methods minimal spanning tree and dijkstra
 
Quantitative methods minimal spanning tree and dijkstra [compatibility mode]
Quantitative methods minimal spanning tree and dijkstra [compatibility mode]Quantitative methods minimal spanning tree and dijkstra [compatibility mode]
Quantitative methods minimal spanning tree and dijkstra [compatibility mode]
 
Quantitative methods minimal spanning tree and dijkstra
Quantitative methods minimal spanning tree and dijkstraQuantitative methods minimal spanning tree and dijkstra
Quantitative methods minimal spanning tree and dijkstra
 
mdr tb and xdr tb
mdr tb and xdr tbmdr tb and xdr tb
mdr tb and xdr tb
 
BusThai Digest
BusThai DigestBusThai Digest
BusThai Digest
 
Annie Nine Characteristics of Life
Annie Nine Characteristics of LifeAnnie Nine Characteristics of Life
Annie Nine Characteristics of Life
 
Quantitative management minimal spanning tree and dijkstra
Quantitative management minimal spanning tree and dijkstraQuantitative management minimal spanning tree and dijkstra
Quantitative management minimal spanning tree and dijkstra
 
Company Profile
Company ProfileCompany Profile
Company Profile
 

Semelhante a Sdge Incentives Beyond Title 24 10.26.2009

Energy Incentives Presentation
Energy Incentives PresentationEnergy Incentives Presentation
Energy Incentives Presentationswatosh
 
Funding Energy Efficiency With Rebates & Incentives Kim
Funding Energy Efficiency With Rebates & Incentives KimFunding Energy Efficiency With Rebates & Incentives Kim
Funding Energy Efficiency With Rebates & Incentives Kimkimcollins01
 
Sustainability Incentives presentation
Sustainability Incentives presentationSustainability Incentives presentation
Sustainability Incentives presentationRyan Slack
 
Howard Marks, U.S. DOE
Howard Marks, U.S. DOEHoward Marks, U.S. DOE
Howard Marks, U.S. DOEguest9fb1af
 
PG&E Demand Response Programs
PG&E Demand Response ProgramsPG&E Demand Response Programs
PG&E Demand Response Programsmichaeljmack
 
ECA Conference Session 3: Stu Jerue
ECA Conference Session 3: Stu JerueECA Conference Session 3: Stu Jerue
ECA Conference Session 3: Stu JerueThomas Flaherty
 
Stimulus Package Energy Efficiency Credits White Paper
Stimulus Package Energy Efficiency Credits White PaperStimulus Package Energy Efficiency Credits White Paper
Stimulus Package Energy Efficiency Credits White PaperMarky Moore
 
New jersey's clean energy program opportunities for chp
New jersey's clean energy program   opportunities for chpNew jersey's clean energy program   opportunities for chp
New jersey's clean energy program opportunities for chpTNenergy
 
Energy Efficiency and Conservation Strategy- Patrick Weller, Pacific West Ene...
Energy Efficiency and Conservation Strategy- Patrick Weller, Pacific West Ene...Energy Efficiency and Conservation Strategy- Patrick Weller, Pacific West Ene...
Energy Efficiency and Conservation Strategy- Patrick Weller, Pacific West Ene...Contract Cities
 
179D Tax Break for Energy Efficient Buildings
179D Tax Break for Energy Efficient Buildings179D Tax Break for Energy Efficient Buildings
179D Tax Break for Energy Efficient BuildingsEEReports.com
 
Audit Funding Program Update
Audit Funding Program UpdateAudit Funding Program Update
Audit Funding Program UpdateAnne Patenaude
 
Allies Federal Energy Policy 7 09
Allies Federal Energy Policy 7 09Allies Federal Energy Policy 7 09
Allies Federal Energy Policy 7 09msciortino
 
Allies Federal Energy Policy 7 09
Allies Federal Energy Policy 7 09Allies Federal Energy Policy 7 09
Allies Federal Energy Policy 7 09msciortino
 
National grid's energy efficiency programs
National grid's energy efficiency programsNational grid's energy efficiency programs
National grid's energy efficiency programsTNenergy
 
The Importance of Energy Efficiency in Climate Action Plans
The Importance of Energy Efficiency in Climate Action PlansThe Importance of Energy Efficiency in Climate Action Plans
The Importance of Energy Efficiency in Climate Action PlansCenter for Sustainable Energy
 

Semelhante a Sdge Incentives Beyond Title 24 10.26.2009 (20)

Energy Incentives Presentation
Energy Incentives PresentationEnergy Incentives Presentation
Energy Incentives Presentation
 
Funding Energy Efficiency With Rebates & Incentives Kim
Funding Energy Efficiency With Rebates & Incentives KimFunding Energy Efficiency With Rebates & Incentives Kim
Funding Energy Efficiency With Rebates & Incentives Kim
 
Sustainability Incentives presentation
Sustainability Incentives presentationSustainability Incentives presentation
Sustainability Incentives presentation
 
Overview of Solar Incentive Programs
Overview of  Solar Incentive ProgramsOverview of  Solar Incentive Programs
Overview of Solar Incentive Programs
 
Howard Marks- U.S DOE
Howard Marks- U.S DOEHoward Marks- U.S DOE
Howard Marks- U.S DOE
 
Howard Marks, U.S. DOE
Howard Marks, U.S. DOEHoward Marks, U.S. DOE
Howard Marks, U.S. DOE
 
PG&E Demand Response Programs
PG&E Demand Response ProgramsPG&E Demand Response Programs
PG&E Demand Response Programs
 
ECA Conference Session 3: Stu Jerue
ECA Conference Session 3: Stu JerueECA Conference Session 3: Stu Jerue
ECA Conference Session 3: Stu Jerue
 
Stimulus Package Energy Efficiency Credits White Paper
Stimulus Package Energy Efficiency Credits White PaperStimulus Package Energy Efficiency Credits White Paper
Stimulus Package Energy Efficiency Credits White Paper
 
New jersey's clean energy program opportunities for chp
New jersey's clean energy program   opportunities for chpNew jersey's clean energy program   opportunities for chp
New jersey's clean energy program opportunities for chp
 
Energy Efficiency and Conservation Strategy- Patrick Weller, Pacific West Ene...
Energy Efficiency and Conservation Strategy- Patrick Weller, Pacific West Ene...Energy Efficiency and Conservation Strategy- Patrick Weller, Pacific West Ene...
Energy Efficiency and Conservation Strategy- Patrick Weller, Pacific West Ene...
 
179D Tax Break for Energy Efficient Buildings
179D Tax Break for Energy Efficient Buildings179D Tax Break for Energy Efficient Buildings
179D Tax Break for Energy Efficient Buildings
 
Audit Funding Program Update
Audit Funding Program UpdateAudit Funding Program Update
Audit Funding Program Update
 
Generating Energy Through Efficiency
Generating Energy Through EfficiencyGenerating Energy Through Efficiency
Generating Energy Through Efficiency
 
Allies Federal Energy Policy 7 09
Allies Federal Energy Policy 7 09Allies Federal Energy Policy 7 09
Allies Federal Energy Policy 7 09
 
Allies Federal Energy Policy 7 09
Allies Federal Energy Policy 7 09Allies Federal Energy Policy 7 09
Allies Federal Energy Policy 7 09
 
National grid's energy efficiency programs
National grid's energy efficiency programsNational grid's energy efficiency programs
National grid's energy efficiency programs
 
PA DEP Solar Incentive Programs
PA DEP Solar Incentive ProgramsPA DEP Solar Incentive Programs
PA DEP Solar Incentive Programs
 
The Importance of Energy Efficiency in Climate Action Plans
The Importance of Energy Efficiency in Climate Action PlansThe Importance of Energy Efficiency in Climate Action Plans
The Importance of Energy Efficiency in Climate Action Plans
 
Multifamily Energy Efficiency Webinar
Multifamily Energy Efficiency WebinarMultifamily Energy Efficiency Webinar
Multifamily Energy Efficiency Webinar
 

Último

Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 

Último (20)

Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 

Sdge Incentives Beyond Title 24 10.26.2009

  • 1. Going Beyond the 2008 Residential Title 24 Standards October 26th, 2009 Residential New Construction Programs San Diego Gas & Electric Presenter: Michael James Colby
  • 2. Residential New Construction Programs Advanced Home Program Performance Based Energy Efficiency Incentive Program Incentives are paid for building energy efficient New Homes including affordable housing New Solar Homes Partnership Performance Based Renewable Incentive Program Incentives are paid based upon the expected performance of installed solar electric (photovoltaic) systems on New Homes including affordable housing Customers are encouraged to participate in both programs!
  • 3. Advanced Home Program
  • 4. Advanced Home Program (2009) Single-Family Incentives Tier I (exceed T-24 by 15%) Coastal Climate Zone: $400/dwelling unit Inland Climate Zone: $500/dwelling unit Tier II (exceed T-24 by 35% & reduce cooling budget 40%) $2,000 in all climate zones
  • 5. Advanced Home Program (2009)Multi-Family Incentives Tier I (exceed T-24 by 15%) Coastal Climate Zone: $150/dwelling unit Inland Climate Zone: $200/dwelling unit
  • 6. Program in Transition Name changed to the California Advanced Home Program Statewide program consistent across California Calculated incentives instead of deemed incentives Incentive Kickers Begins January 1st, 2010
  • 7. California Advanced Home Program (2010-2012) Kickers ENERGY STAR® Green Home Compact Home Solar Thermal kW Reduction
  • 8. Utility Incentive Worksheet Generated by the compliance software Will provide estimated savings and incentives
  • 9. New Solar Homes Partnership
  • 10. Timeline August 2004 Governor Announces Million Solar Roofs Program January 2006 CPUC Approves CSI August 2006 Governor signs SB1 into Law January 2007 Go Solar California Launched March 2008 SDG&E begins administration of NSHP
  • 11. New Solar Homes Partnership Provides financial incentives, technical assistance, and marketing support to new home builders of energy-efficient, solar-powered homes Budget of $400 million out of the $3.3 billion CSI Overall goal of the NSHP is to achieve 400 megawatts of new solar-produced electricity by the end of 2016
  • 12. NSHP Requirements Location: Electric distribution service must be from one of the California investor-owned utilities (PG&E, SCE, SDG&E) System: System must be 1 kW AC or larger, interconnected to the utility distribution grid, and generate electricity to offset the end-use consumer’s on-site electrical load Quality: The system must use new certified components, have a 10 year warranty, and must be field-verified by a third-party inspector Energy Efficiency: The new homes must exceed Title 24 energy efficiency requirements Tier 1- Exceed Title 24 by a minimum of 15% Tier 2- Exceed Title 24 by a minimum of 35% (30% 2008 T-24) Builder provided appliances must be ENERGY STAR® labeled
  • 13. NSHP Incentives NSHP offers generous financial incentives Market Rate Housing $2.50/watt base incentive $2.60/watt solar as standard incentive Affordable Housing $3.30/watt common areas $3.50/watt dwelling units Incentive depends on the Expected Performance Based Incentive calculation (CEC PV Calculator)
  • 14. How to apply to the NSHP Contact the SDG&E NSHP team as early as possible by phone or email at 1-866-631-1744 or newsolarhomes@sdge.com Hire a Certified Energy Plan Examiner (CEPE) to create the Title-24 energy efficiency documentation http://www.cabec.org/ceperosterall.php Contract with a registered solar contractor http://www.gosolarcalifornia.ca.gov/retailers/search-new.php Hire a HERS rater to perform the energy efficiency and PV verifications http://www.energy.ca.gov/HERS/index.html Work with the solar contractor, CEPE, and HERS rater to submit a completed reservation package to SDG&E
  • 16. Reservation Phase(NSHP-1) Home Location Housing Type HERS Rater Incentive Recipient Signed by builder/ developer and retailer
  • 17. Reservation Phase(CF-1R-PV) Address matches NSHP-1 Climate Zone matches CF-1R Equipment matches contract Form is signed Certified Version * Also need the .emf and .her files
  • 18. Reservation Phase(CF-1R) Created and signed by CEPE or CEA At least 15% better than T-24 * Also need the electronic input file (either .bld or .mp7)
  • 19. Reservation Phase(Equipment Purchase Agreement & Installation Contract) Equipment Purchase Agreement Address matches NSHP-1 Quantity, make, & model of equipment matches CF-1R-PV Meters to be installed From a registered retailer Signed by both retailer and applicant Installation Contract Name, address, and license number of the company performing the installation Address matches NSHP-1 Description of work to be performed Total agreed price Payment terms Approximate start & end dates (unless on build out schedule Cancellation Notice Contact info for the CSLB Legal notices Signed by both retailer and the applicant
  • 20. Reservation Phase(Build Out Schedule) Installation Start Installation End Ready for Operation On Solar Retailers Letterhead
  • 21. Reservation Phase(System Size Justification) System Size Greater than 5 kW Estimated Electricity Consumption Completed by a CEPE/CEA, Architect, Engineer, or a C-10 Licensed Contractor
  • 22. Reservation Phase(Building Permit) Applicants name and address match NSHP-1 Permit states “New Construction” * N/A if Subdivision Map is Submitted
  • 23. Reservation Phase(Subdivision Map) Map must highlight which buildings will have solar systems installed * N/A if Building Permit is Submitted
  • 24. Reservation Phase(Construction Plans) Architectural floor plans, elevations, & sections Site plan indicating north Electrical & mechanical (if available) * Submit electronically if possible
  • 25. Reservation Phase Overview Once all forms are complete and submitted, SDG&E submits to the CEC for the reservation of funds Once reserved, projects have: 36 Months to Complete – Housing developments with 6 or more units installing solar on at least 50 percent of the units OR 18 Months to Complete – All other categories of new housing SDG&E will send a letter and payment claim form after the funds are reserved
  • 26. Are we having fun yet?
  • 27. Payment Phase Overview For the payment of funds, builders must provide: Payment Claim Form (NSHP-2) [Note: Original Signature Required] Final Invoice for Equipment and Installation Final PV Permit Certificate of Field Verification and Diagnostic Testing (CF-4R-PV) for PV Certificate of Field Verification and Diagnostic Testing (CF-4R) for Energy Efficiency Ten-Year Warranty Form (NSHP-3) W-9 Form Form 587 or 590 (CA Withholding Forms)
  • 28. Example One: New Single-Family Home 3.4 kW system (AC) in San Diego $2.50 per watt NSHP Incentive Tier 2 Energy Efficiency (at least 35% better than 2005 T24) $2,000 per home AHP Incentive Incentives $10,737 NSHP + $2,000 AHP = $12,737 Total Incentives
  • 29. Example 2: New 42-Unit, 3-Story Apartment Building w/ Affordability Restrictions 30 kW System (AC) Serving Common Area in Chula Vista $3.30 per watt NSHP Incentive 48 kW System (AC) Serving 42 Dwelling Units in Chula Vista $3.50 per watt NSHP Incentive Tier 1 Energy Efficiency (at least 15% better than 2005 T-24) $150 per unit AHP incentives Incentives $308,630 NSHP + $6,300 AHP = $314,930 Total Incentives
  • 30. Resources San Diego Gas & Electric, New Construction Department www.sdge.com/construction Go Solar California www.gosolarcalifornia.ca.gov California Association of Building Energy Consultants (CABEC) www.cabec.org California Home Energy Efficiency Rating Services (CHEERS) www.cheers.org California Certified Energy Rating & Testing Services (CalCERTS) www.calcerts.com California Building Performance Contractors Association (CBPCA) www.cbpca.org
  • 31. Thank You For more information please contact us at: 1-866-631-1744 newsolarhomes@sdge.com 8335 Century Park Court, CP12G San Diego, CA 92123