SlideShare uma empresa Scribd logo
1 de 4
Baixar para ler offline
2nd

          THE DEPARTMENT OF DEFENSE’S FAILED
PROJECT




          ELECTRONIC HEALTH RECORD
DATE                    BY
          26 FEB 2013        MARK SILVERBERG
Project Overview
HISTORY                                  COMPONENTS
 1988 - DOD begins to acquire an EHR      client-server architecture
 (“Composite Health Care System”)             client-side apps
 1993 - deployed but lacked many              server software/hardware
 features like integration b/w systems        clinical data repository
 and did not use data standards
 “perpetuated the reliance on paper-     DELIVERY
 based record”                            Like CHCS I, development and
                                          implementation contracted out
 1997 - new project (CHCS II) with            26 competitive RFPs which
 nearly identical scope as 1988 but w/        resulted in contracts for T&M & FFP
 emphasis on worldwide, 24/7 access,          11 non-competitive contracts
 common data standards                            later found to be unnecessary
                                                  by FAR guidelines
KEY INPUTS                                2009 - deployment with overwhelming
 requirements were first of many           negative feedback
 problems; delayed multiple times             “Intolerable” - congress hearing
    => delay in creating WBS                  “slow, difficult to use, unreliable”

                                          “EHR Way Ahead” = CHCS III
Challenges
POOR PROJECT PLANNING
  “comprehensive project management plan was not established” - GAO
  “poor planning and execution and a failure to appreciate the ‘significant complexity’
  of the program” - health industry analyst

REQUIREMENTS GATHERING
 Essential to establishing and controlling scope
 End users of the system were only engaged at the beginning and end of the project
 lifecycle so when they did provide feedback at the end, it was too late to inform
 development

LACK OF BUY-IN AND NO FEEDBACK LOOP WITH USERS
 Army’s Surgeon General “faced a near mutiny of our healthcare
 providers, our doctors, our nurse practitioners, physician assistants”
 USAF Deputy Surgeon General: “low productivity and provider
 morale [from] working around the system trying to find new solutions”
 GAO: “[DOD] stopped measuring user satisfaction levels in July 2007
 after overall user satisfaction had declined to its lowest point
 in more than 2 years.”
What Project Management?
Costs were neither minimized nor benefits maximized (or in many cases realized)

                                           $2 BILLION OVER 13 YEARS

Mais conteúdo relacionado

Semelhante a IT Project Management @ GW: Analysis of DOD’s Electronic Health Record Initiatives

Crafting Infrastructures. Requirements, scenarios and evaluation in the SPICE...
Crafting Infrastructures. Requirements, scenarios and evaluation in the SPICE...Crafting Infrastructures. Requirements, scenarios and evaluation in the SPICE...
Crafting Infrastructures. Requirements, scenarios and evaluation in the SPICE...Luca Galli
 
Fromscrumtokanbantowardlean
FromscrumtokanbantowardleanFromscrumtokanbantowardlean
FromscrumtokanbantowardleanLuca Aliberti
 
6 An Innovative Distributed Project Control
6 An Innovative Distributed Project Control6 An Innovative Distributed Project Control
6 An Innovative Distributed Project Controlpmb25
 
Iaetsd pinpointing performance deviations of subsystems in distributed
Iaetsd pinpointing performance deviations of subsystems in distributedIaetsd pinpointing performance deviations of subsystems in distributed
Iaetsd pinpointing performance deviations of subsystems in distributedIaetsd Iaetsd
 
Computers as data analysis in preclinical development
Computers as data analysis in preclinical developmentComputers as data analysis in preclinical development
Computers as data analysis in preclinical developmentHemantAlhat1
 
Bba 3626, project management overview 1 course learni
 Bba 3626, project management overview 1 course learni Bba 3626, project management overview 1 course learni
Bba 3626, project management overview 1 course learniSALU18
 
Lect2 conventional software management
Lect2 conventional software managementLect2 conventional software management
Lect2 conventional software managementmeena466141
 
Project Name Project CharterVersion 1.0 DraftHealth.docx
Project Name Project CharterVersion 1.0 DraftHealth.docxProject Name Project CharterVersion 1.0 DraftHealth.docx
Project Name Project CharterVersion 1.0 DraftHealth.docxdenneymargareta
 
DEIS: Dependability Engineering Innovation for Cypber-Physical Systems
DEIS: Dependability Engineering Innovation for Cypber-Physical SystemsDEIS: Dependability Engineering Innovation for Cypber-Physical Systems
DEIS: Dependability Engineering Innovation for Cypber-Physical SystemsRan Wei
 
Transf React Proact T&D Ass Management
Transf React Proact T&D Ass ManagementTransf React Proact T&D Ass Management
Transf React Proact T&D Ass ManagementBert Taube
 
SOFTWARE AS A SERVICE – COMMON SERVICE BUS (SAAS-CSB)
SOFTWARE AS A SERVICE – COMMON SERVICE BUS (SAAS-CSB)SOFTWARE AS A SERVICE – COMMON SERVICE BUS (SAAS-CSB)
SOFTWARE AS A SERVICE – COMMON SERVICE BUS (SAAS-CSB)IJCSEA Journal
 
Earned value, XP and government contracts
Earned value, XP and government contractsEarned value, XP and government contracts
Earned value, XP and government contractsGlen Alleman
 
IT Application Development - with SDLC.pptx
IT Application Development - with SDLC.pptxIT Application Development - with SDLC.pptx
IT Application Development - with SDLC.pptxdjualaja88
 
BBA 3626, Project Management Overview 1 Course Learni
 BBA 3626, Project Management Overview 1 Course Learni BBA 3626, Project Management Overview 1 Course Learni
BBA 3626, Project Management Overview 1 Course LearniMargaritoWhitt221
 

Semelhante a IT Project Management @ GW: Analysis of DOD’s Electronic Health Record Initiatives (20)

Chap 5.pdf
Chap 5.pdfChap 5.pdf
Chap 5.pdf
 
Chap 5.pdf
Chap 5.pdfChap 5.pdf
Chap 5.pdf
 
Crafting Infrastructures. Requirements, scenarios and evaluation in the SPICE...
Crafting Infrastructures. Requirements, scenarios and evaluation in the SPICE...Crafting Infrastructures. Requirements, scenarios and evaluation in the SPICE...
Crafting Infrastructures. Requirements, scenarios and evaluation in the SPICE...
 
Fromscrumtokanbantowardlean
FromscrumtokanbantowardleanFromscrumtokanbantowardlean
Fromscrumtokanbantowardlean
 
6 An Innovative Distributed Project Control
6 An Innovative Distributed Project Control6 An Innovative Distributed Project Control
6 An Innovative Distributed Project Control
 
Iaetsd pinpointing performance deviations of subsystems in distributed
Iaetsd pinpointing performance deviations of subsystems in distributedIaetsd pinpointing performance deviations of subsystems in distributed
Iaetsd pinpointing performance deviations of subsystems in distributed
 
Computers as data analysis in preclinical development
Computers as data analysis in preclinical developmentComputers as data analysis in preclinical development
Computers as data analysis in preclinical development
 
PERIL LIBRARY
PERIL LIBRARYPERIL LIBRARY
PERIL LIBRARY
 
Case study
Case studyCase study
Case study
 
Bba 3626, project management overview 1 course learni
 Bba 3626, project management overview 1 course learni Bba 3626, project management overview 1 course learni
Bba 3626, project management overview 1 course learni
 
Lect2 conventional software management
Lect2 conventional software managementLect2 conventional software management
Lect2 conventional software management
 
Project Name Project CharterVersion 1.0 DraftHealth.docx
Project Name Project CharterVersion 1.0 DraftHealth.docxProject Name Project CharterVersion 1.0 DraftHealth.docx
Project Name Project CharterVersion 1.0 DraftHealth.docx
 
DEIS: Dependability Engineering Innovation for Cypber-Physical Systems
DEIS: Dependability Engineering Innovation for Cypber-Physical SystemsDEIS: Dependability Engineering Innovation for Cypber-Physical Systems
DEIS: Dependability Engineering Innovation for Cypber-Physical Systems
 
Transf React Proact T&D Ass Management
Transf React Proact T&D Ass ManagementTransf React Proact T&D Ass Management
Transf React Proact T&D Ass Management
 
SOFTWARE AS A SERVICE – COMMON SERVICE BUS (SAAS-CSB)
SOFTWARE AS A SERVICE – COMMON SERVICE BUS (SAAS-CSB)SOFTWARE AS A SERVICE – COMMON SERVICE BUS (SAAS-CSB)
SOFTWARE AS A SERVICE – COMMON SERVICE BUS (SAAS-CSB)
 
System lifecycle
System lifecycleSystem lifecycle
System lifecycle
 
Earned value, XP and government contracts
Earned value, XP and government contractsEarned value, XP and government contracts
Earned value, XP and government contracts
 
IT Application Development - with SDLC.pptx
IT Application Development - with SDLC.pptxIT Application Development - with SDLC.pptx
IT Application Development - with SDLC.pptx
 
2009 ASME final
2009 ASME final2009 ASME final
2009 ASME final
 
BBA 3626, Project Management Overview 1 Course Learni
 BBA 3626, Project Management Overview 1 Course Learni BBA 3626, Project Management Overview 1 Course Learni
BBA 3626, Project Management Overview 1 Course Learni
 

Último

Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfhans926745
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 

Último (20)

Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 

IT Project Management @ GW: Analysis of DOD’s Electronic Health Record Initiatives

  • 1. 2nd THE DEPARTMENT OF DEFENSE’S FAILED PROJECT ELECTRONIC HEALTH RECORD DATE BY 26 FEB 2013 MARK SILVERBERG
  • 2. Project Overview HISTORY COMPONENTS 1988 - DOD begins to acquire an EHR client-server architecture (“Composite Health Care System”) client-side apps 1993 - deployed but lacked many server software/hardware features like integration b/w systems clinical data repository and did not use data standards “perpetuated the reliance on paper- DELIVERY based record” Like CHCS I, development and implementation contracted out 1997 - new project (CHCS II) with 26 competitive RFPs which nearly identical scope as 1988 but w/ resulted in contracts for T&M & FFP emphasis on worldwide, 24/7 access, 11 non-competitive contracts common data standards later found to be unnecessary by FAR guidelines KEY INPUTS 2009 - deployment with overwhelming requirements were first of many negative feedback problems; delayed multiple times “Intolerable” - congress hearing => delay in creating WBS “slow, difficult to use, unreliable” “EHR Way Ahead” = CHCS III
  • 3. Challenges POOR PROJECT PLANNING “comprehensive project management plan was not established” - GAO “poor planning and execution and a failure to appreciate the ‘significant complexity’ of the program” - health industry analyst REQUIREMENTS GATHERING Essential to establishing and controlling scope End users of the system were only engaged at the beginning and end of the project lifecycle so when they did provide feedback at the end, it was too late to inform development LACK OF BUY-IN AND NO FEEDBACK LOOP WITH USERS Army’s Surgeon General “faced a near mutiny of our healthcare providers, our doctors, our nurse practitioners, physician assistants” USAF Deputy Surgeon General: “low productivity and provider morale [from] working around the system trying to find new solutions” GAO: “[DOD] stopped measuring user satisfaction levels in July 2007 after overall user satisfaction had declined to its lowest point in more than 2 years.”
  • 4. What Project Management? Costs were neither minimized nor benefits maximized (or in many cases realized) $2 BILLION OVER 13 YEARS