Matimba Power Station
- 1.
Overview
AEG's construction division were awarded the
project to design, supply and install such a
system to provide plant alarm status, monitoring
and reporting. This was repeat business for AEG
who also executed the station MV switchgear
project and the overland Ash Handling conveyor
systems.
The project was carried out during the transition
period from AEG to AGE Engineering and was
completed ahead of the prescribed contract
period.
Duration of project
The 12‐month contract, which comprised 64
man‐months effort, included the full project
management, PLC engineering using a Modicon
'A' series PLC, full equipment supply, installation
and commissioning.
www.age.co.za
ESKOM identified the need for the replacement
of the coal stacker/ reclaimer control system at
their dry cooled power station near Ellisras in the
Northern province.
Significant feature
of this project was the design, by one of AGE's
engineers, of unique connection terminals ‐
housed in the PLC cabinet ‐ which comprised full
lightning protection on all inputs and outputs.
This type of terminal has now become a standard
in the electrical industry