Rennes International School of Business




                 ESC RENNES


Executive Master of Business Administration
                     EMBA
         COHORT 1 (2003 - 2004)


            Management Science
                 Conducted by:
               Dr. Sabry Shaabana


     Decision-Making Processes & Tools

                        By
               Magdy A. Sattar


                 October, 2003
                  Cairo, Egypt




                                                 1
TABLE OF CONTENTS

Executive Summary                              II

Introduction & Objective                        1

Part 1- Menatel Presentation                    1

    1-1-What Is Menatel                         1

    1-2-Business Nature                         1

    1-3-Structure & Organization                1

    1-4-Delta Branch                            2

                1-4-1- Environment              2

                1-4-2- Objectives               2

                 1-4-3- Organization            2

                1-4-4- Identified Situations    2

Part 2- First Situation                         3

Part 3- Second Situation                        5

Part 4- Third Situation                         9

Part 5- Fourth Situation                       10

     5-1- Shortest Route                       10

     5-2- Minimal Spanning Tree                12

Part 6- Conclusions & Recommendations          14

Reference                                      15




                                                    1
EXECUTEVE SUMMARY
This report is about how management science is enhancing managers – me included-
abilities to make better decisions. First I will present my company Menatel and in
addition my business unit. Second, through some of the situations I faced as examples
of problems from my business unit, in which using management science tools
enhanced my decision-making process skills.

First situation is relocation bad revenue payphones decision in which I used Excel’s
Goal Seek Tool to determine the breakeven points through which I can decide which
payphone is to be relocated.

Second situation is planning, scheduling, and controlling the branch activities
decisions in which I used (PERT/CPM) Tool to have the optimal solution for the use
of the available recourses.

The third situation is assignment situation in which I enhanced my professional
experience with my technical staff with the quantitative analysis of their effectiveness
in the assigned tasks in order to decide, who is most effective and where.

Situation number four I am to obtain and maintain high service quality through use of
resources available, I used management science quantitative analysis to decide the
most economical routes for branch vehicles through which we can save time, money,
and achieve target.

In these situations tools of management science proved to be strong support to my
decision making process.




                                                                                      II


EMBA Cairo

Rennes International School of Business
INTRODUCTION & OBJECTIVE
The purpose of this report is to identify situations for Delta Branch, in which
management science methods or models are used , in addition to analyze one of these
situations deep enough to make suggestions for improvement. The focus of this report
is on the decision- making process and the role of management science in this
process.


1. MENATEL PRESENTATION
   1.1   WHAT IS MENATEL

Menatel is a joint stock company under investment low number 8/1997 registered in
1998 under number 314030. Menatel is granted a ten years; renewable license, to
install, operate, and manage a telecommunication network of at least 30,000 public
payphone. Menatel is determined to achieve this target by the end of 2004. Egyptian
shares are 51% and foreign shares are 49%. France Telecom (FCR) “providing
Menatel with the know-how technology and management” holds the main foreign
shares, which is 44 %. The main Egyptian company with 18% share is the National
Bank of Egypt (NBE).

   1.2   BUSINESS NATURE

Menatel is in the prepaid cards business, Menatel products are calls (minutes), local
calls, national calls, mobile calls, and international calls. Menatel is selling its
products through a payphone network that covers all Egypt and managed by a
payphone management system. These calls category are Menatel profit contribution.


   1.3   STRUCTURE AND ORGANIZATION

With a centralized management style Menatel structured into five main divisions
headed by corresponding Director and five Branches allocated all over Egypt, to form
simple flat functional organizational structure. Technical division activities are
managing all technical issues related to Menatel payphones (installations,
maintenance, and the payphones management system), coordination with all
subcontractors, and managing the Branches. Commercial division activities are
advertising, cards direct and indirect distribution, customer hot line, payphone
locations determination, and sites owner management. Financial and administrative
division activities are preparing financial statements, business plan, budgets, and
payroll sheets, recruitment, training, and cash and contracts management. Business
development division activities are handling assignments and projects to improve
Menatel performance, and to define and build major business indicators. Logistic
division activities are managing security, premises, vehicles, transportation, and
warehouse, in addition to manage purchases and custom clearance. For the five
branches there, activities are the same as all Menatel division activities through the
matrix and centralize Menatel organization as per the branch assigned area.



                                                                                    1
1.4    DELTA BRANCH

     1.4.1 ENVIROMENT

The green triangle occupying the north of Egypt’s map we call Nile Delta, as it
occupies the landscape in which the two branches of the Nile (Damiatte and Rasheed)
flows with all their sub-branches. This landscape occupies 16411Km.*, divided into 6
governorates, 31 Cities, 45 Towns and 3000 Villages and small villages, shaping a
percentage of 30% urban and 70%rural. Delta population is 20 Million their main
source of income is agriculture and some small industries related to it. There is a high
percentage of illiteracy among Delta population especially females, which is
considered a great obstacle on the way of social and economical development.

     1.4.2 OBJECTIVES
Delta branch objective is to install, operate, and manage a telecommunication network
of 4200 public payphones by the end of 2004 all over the assigned area, most of this
area is rural inhibited by more than 20,000,000 people, 33 % of them inhibit urban,
and the remaining inhibits rural.

     1.4.3 ORGANISATION

In a centralized management environment, the branch manager in the matrix heads the
branch organization with functional managers in the head office. The branch manager
is responsible to manage the branch team to meet the objectives planned by Menatel
Managing Director in accordance with company strategy and guidelines given by the
functional directors. The branch team is organized in a simple flat structure
corresponding to the nature of the activities, which are technical activities
(production, maintenance, and Payphone Management System “PMS”), commercial
and customer service activities, financial and administrative activities, and finally
public relations and logistic activities. As for the sales team, they are supervised by a
local sales supervisor who is reporting technically to Menatel cards distribution
manager and administratively to the branch manager in matrix organization.

     1.4.4 IDENTIFIED SITUATIONS
Identified situations for Delta Branch are:
1- Monitoring the daily revenue of the payphones installed in Delta.

2- Planning, scheduling, and controlling the branch activities.

3- Choosing the right people for the right activities.

4- Improving the payphones quality service.
                                                                                       2


EMBA Cairo

Rennes International School of Business
2. FIREST SITUATION
One of the obstacles facing the business community in Egypt these days is shading its
climate with uncertainty and its decisions with caution. The devaluation of the
Egyptian pound came at a time when people were already feeling the squeeze of a
depressed economy. That is why it is important in this environment to monitor closely
payphones revenue. In delta, I faced the problem of low revenue payphones and I
have to decide why this payphone is low revenue? How to identify low revenue
payphone? When to move or close low revenue payphone? Moreover, where to move
this low revenue payphone? The calls type being the contribution to Menatel profit
equation are the core of the revenue monitoring process, knowing the breakeven point
for each can help me taking the most profitable decisions in terms of where, when,
how, and why installing or removing a low revenue payphone. Management science
tools help me answering all these questions.

Determining the Breakeven Point Using Excel’s Goal Seek Tool


Local                                             National 1
Fixed cost                          2500          Fixed cost                            2500

Variable Cost Per Unit             0.036          Variable Cost Per Unit                0.054

Selling Price Per Unit              0.12          Selling Price Per Unit                 0.18



Models                                            Models

Production Volume                29761.9          Production Volume               19841.27

Total Cost                      3571.429          Total Cost                      3571.429

Total Revenue                   3571.429          Total Re                        3571.429

Total Profit ( loss)                   0          Total Profit ( loss)                     0

                                 41.22%                                             27.48%




                                                                                   3


EMBA Cairo

Rennes International School of Business
National 2                                Mobile
Fixed cost                        2500    Fixed cost                     2500

Variable Cost Per Unit            0.117   Variable Cost Per Unit          0.3

Selling Price Per Unit             0.39   Selling Price Per Unit          0.6



Models                                    Models

Production Volume             9157.509    Production Volume        8333.333

Total Cost                    3571.429    Total Cost                     5000

Total Revenue                 3571.429    Total Revenue                  5000

Total Profit ( loss)                  0   Total Profit ( loss)              0

                                12.68%                              11.54%



International 1                           International 2
Fixed cost                        2500    Fixed cost                     2500

Variable Cost Per Unit              2.9   Variable Cost Per Unit         3.36

Selling Price Per Unit             4.13   Selling Price Per Unit          4.8



Models                                    Models

Production Volume               2032.52   Production Volume        1736.111

Total Cost                    8394.309    Total Cost               8333.333

Total Revenue                 8394.309    Total Revenue            8333.333

Total Profit ( loss)                  0   Total Profit ( loss)              0

                                 2.81%                                  2.40%




                                                                    4


EMBA Cairo

Rennes International School of Business
International 3
Fixed cost                           2500

Variable Cost Per Unit                4.34

Selling Price Per Unit                 6.2



Models

Production Volume                1344.086

Total Cost                       8333.333

Total Revenue                    8333.333

Total Profit ( loss)                     0

                                    1.86%

For payphones with bad revenue having the same commercial and economical
environments, using the calculated breakeven points for all kinds of calls helps me to
decide which payphone to remove. For example if I have to decide to remove one of
two payphones with the same average revenue, knowing the profitability of each is
the base of my choice. The results were improving the average revenue of a total 150
relocated payphones by 13 LE. Per day.



3. SECOND SITUATION
DELTA BRANCH ACTIVITIES SCHEDULING
PERT/CPM

The most important or practical situation I am facing in the branch is how I manage to
plane, schedule, and control the branch activities and resources, using management
science methods (PERT/CPM for this situation) assist me as Branch Manager to have
answers for, what is the time required for completing my target? What start and finish
dates should be scheduled or set for each activity? Which are the critical activities? In
addition, how long can non-critical activities be delayed before they become critical?
The tables below show how I manage to answer these questions with simple
mathematical calculations.

                                                                                       5


EMBA Cairo

Rennes International School of Business
Delta Branch Activities
                                      Immediate        Op.      M.Pr           Pes. T    Expected
Activity          Description                                                                          Variance
                                      Predecessor      T (a)    T (m)           (b)      Time (t)
   A        Location Survey                 -            1        3              5          3             0.4
   B        Prepare Drawings               A             1        1              1          1            Zero
   C        Digging permit                  B            6       22             32          21           18.7
   D        Lines Request                  A             1        1              1          1            Zero
   E        Lines Retain                   D            10       15             20          15            2.7
   F        Lines Creation                  E            1        1              1          1            Zero
   G        Lines Received                  F            1        2              3          2             0.1
   H        Civil Work                     C             1        2              3          2             0.1
   I        Booth installation           E, H            1        1              1          1            Zero
   J        Payphone and cabling          I, G           1        2              3          2             0.1
   K        Payphone In Operation           J            1        1              1          1            Zero
                                         Total          25       51             71          50           22.1
Delta Branch Project Network
                                Prepare
                                Drawing




                                                                                            PP               Pay
           Location             Digging       Civil                Booth                Installation        phone
            Survey              Permit        Work              Installation            and Cabling          IO




                                 Lines            Lines              Lines
                                Request           Return            Received




Delta Branch Project Critical Path                 Lines
                                                  Creation

                                                                  Slack             Critical
               Activity    ES        LS     EF             LF
                                                                 (LS-ES)             Path?
                      A     0         0      3             3        0                 Yes
                      B     3         3      4             4        0                 Yes
                      C     4         4      25            25       0                 Yes
                      D     3        10      4             11       7                 NO
                      E     4        11      19            26       7                 NO
                      F    19        25      20            26       7                 NO
                      G    20        26      22            28       6                 NO
                      H    25        25      27            27       0                 Yes
                      I    27        27      28            28       0                 Yes
                      J    28        28      30            30       0                 Yes
                      K    30        30      31            31       0                 Yes


                                                                                                                6


EMBA Cairo

 Rennes International School of Business
Where:

         ES; Earliest start time for an activity.
         LS; Latest start time for an activity.
         EF; Earliest finish time for an activity.
         LF; Latest finish time for an activity.

                 B    3    4
                 1    3    4




 A   0    3      C    4    25    H   25   27   I     27   28   J   28   30   k   30   31
 3   0    3      21   4    25    2   25   27   1     27   28   2   28   30   1   30   31




                 D    3     4    E   4    19   G     20   22
                 1    10   11    1   11   26   2     26   28




                                 F   19   20
                                 1   25   26


Delta Branch Critical Path is: A, B, C, H, I, J, K.

Solving the problem using management science software we obtain the following
results.
PROJECT SCHEDULING WITH PERT/CPM
********************************

                                *** PROJECT ACTIVITY LIST ***

                IMMEDIATE       OPTIMISTIC   MOST PROBABLE   PESSIMISTIC
   ACTIVITY    PREDECESSORS        TIME          TIME           TIME
 -------------------------------------------------------------------------
      A             -                1             3             5
      B             A                1             1             1
      C             B                6            22            32
      D             A                1             1             1
      E             D               10            15            20
      F             E                1             1             1
      G             F                1             2             3
      H             C                1             2             3
      I            E, H              1             1             1
      J            G, I              1             2             3
      K             J                1             1             1
 -----------------------------------------------------------------------------
                                                                     7


EMBA Cairo

Rennes International School of Business
EXPECTED TIMES AND VARIANCES FOR ACTIVITIES

                           ACTIVITY     EXPECTED TIME      VARIANCE
                         -------------------------------------------
                               A                 3            0.44
                               B                 1            0.00
                               C                21           18.78
                               D                 1            0.00
                               E                15            2.78
                               F                 1            0.00
                               G                 2            0.11
                               H                 2            0.11
                               I                 1            0.00
                               J                 2            0.11
                               K                 1            0.00
                         -------------------------------------------
                                 *** ACTIVITY SCHEDULE ***

           EARLIEST     LATEST     EARLIEST     LATEST                CRITICAL
 ACTIVITY    START       START      FINISH      FINISH      SLACK     ACTIVITY
 -----------------------------------------------------------------------------

      A              0               0              3               3               0        YES
      B              3               3              4               4               0        YES
      C              4               4             25              25               0        YES
      D              3               9              4              10               6
      E              4              10             19              25               6
      F             19              25             20              26               6
      G             20              26             22              28               6
      H             25              25             27              27               0        YES
      I             27              27             28              28               0        YES
      J             28              28             30              30               0        YES
      K             30              30             31              31               0        YES

 ----------------------------------------------------------------------------

          CRITICAL PATH: A-C-H-I-J-K

          EXPECTED PROJECT COMPLETION TIME = 31

          VARIANCE OF PROJECT COMPLETION TIME = 19.44

Now it is obvious that with the resource I have I am facing a problem of not achieving
my monthly target on time (Menatel is losing the opportunity of earlier revenue).
PERT assist me identifying the weakness of the project. First, the critical path is
mainly controlled by Menatel sub-contractor; second the big variance of time for
activities C, and E. To solve this problem, I decided to recruit a public relation officer
to be dedicated to follow the digging permit procedures with the contractor. Unlike
other branches, I dedicated one of the three engineers in the branch to supervise
production activities and to monitor the daily production progress. In addition, I

                                                                                        8


EMBA Cairo

Rennes International School of Business
decided to add another contractor to the available one. The result was reducing the
expected time of activity C to 15 days, which affects the expected project completion
time to be 25 days instead of 31. This cost Menatel the salary of the new recruitment
(1000 LE) per month, but the benefits is 100 unit of payphones/month to be in
operation six days earlier with average revenue 20 LE per payphone, that is to say
2000 LE per month earlier.


4. THIRD SITUATION
ASSIGNMENT PROBLEM

I faced the problem of assigning three supervisor engineers (Ahmad, Sherif, and
Khaled) each for one of the three tasks (Payphone management system activities,
Maintenance activities, and Production activities). I realized that the efficiency of
each activity, consequently the branch performance, and the efficiency to achieve the
assigned objectives of the branch, depends on the experience, ability, and
performance of each engineer. Since the three activities have the same priority, I
decided to maximize the total tasks efficiency by assigning one engineer to supervise
one and only one activity. After five years of experience managing the branch, I know
now which one of the engineers to be assigned to supervise which activity. Using
management science to prove my decision through quantitative analysis (Assignment
model) is to guaranty the maximum benefits to the branch and hence the company.
The alternative and the estimated engineers’ qualifications are summarized in the
table below as ranked on the base of ten.

Engineer             Production activities  Maintenance activities PMS activities
SHEREIF                        9                      7                      8
AHMAD                          8                      9                      8
KHALED                         7                      8                      8
   Solving the problem using management science software we obtain the following
results.

    ASSIGNMENT PROBLEM
    ******************
    OBJECTIVE: MAXIMIZATION

    SUMMARY OF UNIT COST OR REVENUE DATA
    ************************************
                  TASK
 AGENT       1      2      3
 ------   ------ ------ ------
    1          9      7      8
    2          8      9      8
    3          7       8     8

                                                                                   9


EMBA Cairo

Rennes International School of Business
OPTIMAL ASSIGNMENTS                  COST/REVENUE
           *******************                  ************

        ASSIGN AGENT 1 TO TASK 1                         9

        ASSIGN AGENT 2 TO TASK 2                         9

        ASSIGN AGENT 3 TO TASK 3                        8
                                                  ----------
           TOTAL COST/REVENUE                             26

5. FOURTH SITUATION
   5. 1 SHORTEST ROUTE

One of the branch manager objectives is to obtain high quality of service of the
payphones in operation in his region. To achieve this objective:

First, I faced the challenge of determining the shortest routes and the most economical
ones for the maintenance vehicles through Delta road network; I faced a vehicle
routing problem. Management science quantitative analysis solves this and helps me
take the proper decision to determine each vehicle route. Each one of the vehicle is
assigned to cover eight different cities or more and as an example, I will show how
management science software helps in determining the right figures. The table below
describes the travel alternatives to and from eight cities covered by one of the two
cars assigned to Kalubia Governorate, in which we see that we have seven nodes and
nine arcs


Cities Connected                            Distance in Km.
Banha-Beltan                                        5
Banha-kafer Shoker                                 20
Banha-Tokh                                         15
Beltan-Tokh                                         5
Tokh-kaha                                          10
Tokh-Shebeen El Kanater                            10
Shebeen El Kanater-Mashtool                        10
Mashtool-Kafer Shoker                              35

Solving the problem using management science software we obtain the following
results for the shortest rout from node 1 to nodes 4, 5, or 6.



                                                                                    10


EMBA Cairo

Rennes International School of Business
SHORTEST ROUTE
      **************
                  **** NETWORK DESCRIPTION ****
                       7 NODES AND 8 ARCS
             ARC   START NODE   END NODE   DISTANCE
             ---   ----------   --------   --------
              1         1           3          15
              2         1           2            5
              3         1           7          20
              4         2           3            5
              5         3           4           10
              6         3           5          10
              7         5           6          10
              8         6           7          35

                THE SHORTEST ROUTE FROM NODE 1 TO NODE 6
                ****************************************
                START NODE       END NODE       DISTANCE
                ----------       --------       --------
                     1               2               5
                     2               3               5
                     3               5              10
                     5               6              10

                        TOTAL DISTANCE              30
                THE SHORTEST ROUTE FROM NODE 1 TO NODE 5
                ****************************************
                START NODE       END NODE       DISTANCE
                ----------       --------       --------
                     1               2               5
                     2               3               5
                     3               5              10

                        TOTAL DISTANCE              20
                THE SHORTEST ROUTE FROM NODE 1 TO NODE 4
                ****************************************
                START NODE       END NODE       DISTANCE
                ----------       --------       --------
                     1               2               5
                     2               3               5
                     3               4              10

                            TOTAL DISTANCE         20

                                                           11


EMBA Cairo

Rennes International School of Business
As easy as it is to have the needed results as important it is to use this kind of
quantitative analysis to obtain the most effective and proper solutions.

   5. 2 MINIMAL SPANNING TREE

Second, I have to minimize the average consumed time by the technicians in repairing
the faulty payphones, and for that, I use the minimal spanning tree module of the
management scientist to find the optimal solution for problem of how a technician
should cover five cities through nine arcs. The table below describes the travels
alternatives for the technician to cover his assigned area.


Cities Connected                           Distance in Km.
Tanta-Samanoud                                    20
Tanta-Kotour                                      30
Tanta- Kafe El Zayat                              25
Kotour-Mahala                                     25
Kotour-Samanoud                                   20
Samanoud-Mahala                                    5
Ssmsnoud-Mahalet Zeyad                            15
Mahalet Zeyad-Mahala                              10
Kafer El Zayat-Mahala                             35

Solving the problem using management science software we obtain the following
result

      MINIMAL SPANNING TREE
      *********************
                 **** NETWORK DESCRIPTION ****
                      6 NODES AND 9 ARCS

              ARC    START NODE      END NODE     DISTANCE
              ---    ----------      --------     --------
               1          1              2            20
               2          1              3            30
               3          1              4            25
               4          3              4            20
               5          3              5            25
               6          2              5            40
               7          4              5             5
               8          4              6            15
               9          5              6            15


                        MINIMAL SPANNING TREE
                        *********************

                                                                                  12


EMBA Cairo

Rennes International School of Business
START NODE       END NODE     DISTANCE
                 ----------       --------     --------
                      1               2            20

                       1              4             25

                       4              5              5

                       4              6             15

                       4              3             20



                           TOTAL LENGTH             85

The results were good improvement by 2 % in branch total service quality.




                                                                            13


EMBA Cairo

Rennes International School of Business
6. CONCLUSIONS & RECOMMENDATIONS
Looking at previous situations and result, we shall notice the following points:

For the first situation, it is obvious that the decision-making process is based on the
best-expected monitory value. This provides individual improvement per payphone,
but it does not insure the improvement of the global revenue or what is the effect of
relocating payphone or moving this payphone to a new location on both the old and
the new location. In addition, I think that this way of analysis will lead to relocate the
payphones in a way that will negatively affect Menatel competitive advantage, which
is the availability of payphones everywhere. For that, my recommendation is to have
some constrains for relocation decision, and my decision strategy is as follows:

First, we have to start by analyzing the revenue in a global form and not per
payphone, to determine first why the revenue is not good, this is on monthly basis.

Second, to eliminate first all the causes that negatively affect the revenue, if possible,
such as maintenance, cleaning, availability of Menatel cards, and if the booth is easy
to be noticed and usable or not.

Third, to start to redistribute the concentration of payphones per area and not to cancel
a location, that is to say, we can convert a PD2 to PD1 or remove one or two wall
mount booth but not to cancel the location. This should be on monthly target and the
effect of this step should be monitored monthly.

Finally, if the revenue is not improved for this location, a decision of removing or
canceling this location can then be taken.

For the second situation, it is obvious that management science effectively help to
plan, schedule, and control the branch activities in a way that optimizes the branch
resources, both qualitative and quantitative analysis are fruitful for this situation.

Finally, for the third and fourth situations, the problems I am facing are relatively
simple. As I have experience with similar problems, but even so using management
science tools for more quantitative analysis increased my decision-making
effectiveness and put me in a much better position to make the best possible
decisions.




                                                                                       14


EMBA Cairo

Rennes International School of Business
References


            Annual Report, Menatel, 1999.
            The Statistical Year Book 1994 - 2001, Central Agency
             for Public. Mobilization & Statistics – June 2002.
            http://www.managementhelp.org

            Introduction to Management Science, Anderson, Sweeney, and
             Williams- Tenth Edition, West, 2003




                                                                     15


EMBA Cairo

Rennes International School of Business

Mais conteúdo relacionado

Mais procurados

Understanding financial statements ppt @ mba finance
Understanding financial statements ppt @ mba financeUnderstanding financial statements ppt @ mba finance
Understanding financial statements ppt @ mba financeBabasab Patil
 
Utsav Mahendra : Generation and screening of project ideas
Utsav Mahendra : Generation and screening of project ideasUtsav Mahendra : Generation and screening of project ideas
Utsav Mahendra : Generation and screening of project ideasUtsav Mahendra
 
Scarcity project
Scarcity projectScarcity project
Scarcity projectmiko0421
 
1. introduction to corporate finance
1. introduction to corporate finance1. introduction to corporate finance
1. introduction to corporate financeirfan_1
 
Introduction To Economics
Introduction To EconomicsIntroduction To Economics
Introduction To Economicsdheva B
 
Small business management
Small business managementSmall business management
Small business managementsunil patro
 
Introduction to microeconomics
Introduction to microeconomicsIntroduction to microeconomics
Introduction to microeconomicsmattbentley34
 
Chapter 4 – Business Ethics, Corporate Social Responsibility, Corporate Gover...
Chapter 4 – Business Ethics, Corporate Social Responsibility, Corporate Gover...Chapter 4 – Business Ethics, Corporate Social Responsibility, Corporate Gover...
Chapter 4 – Business Ethics, Corporate Social Responsibility, Corporate Gover...UAF_BA330
 
Enterprise And Entrepreneurs
Enterprise And EntrepreneursEnterprise And Entrepreneurs
Enterprise And EntrepreneursPeter Sammons
 
Concept og Human Resource Accounting
Concept og Human Resource AccountingConcept og Human Resource Accounting
Concept og Human Resource AccountingROBINBISHNOI2
 
Business ethics C3 theories principles in_business_ethics
Business ethics C3 theories principles in_business_ethicsBusiness ethics C3 theories principles in_business_ethics
Business ethics C3 theories principles in_business_ethicsIzah Asmadi
 
Module 1 the entrepreneurial perspective
Module  1 the entrepreneurial perspectiveModule  1 the entrepreneurial perspective
Module 1 the entrepreneurial perspectivePriya Srinivas
 
Performance Evaluation of Portfolio
Performance Evaluation of PortfolioPerformance Evaluation of Portfolio
Performance Evaluation of PortfolioAnoop S S
 
Basics of entrepreneurship
Basics of entrepreneurshipBasics of entrepreneurship
Basics of entrepreneurshipDivya Pandey
 

Mais procurados (20)

Microeconomics
MicroeconomicsMicroeconomics
Microeconomics
 
Understanding financial statements ppt @ mba finance
Understanding financial statements ppt @ mba financeUnderstanding financial statements ppt @ mba finance
Understanding financial statements ppt @ mba finance
 
Utsav Mahendra : Generation and screening of project ideas
Utsav Mahendra : Generation and screening of project ideasUtsav Mahendra : Generation and screening of project ideas
Utsav Mahendra : Generation and screening of project ideas
 
Business environment
Business environmentBusiness environment
Business environment
 
Scarcity project
Scarcity projectScarcity project
Scarcity project
 
1. introduction to corporate finance
1. introduction to corporate finance1. introduction to corporate finance
1. introduction to corporate finance
 
Бизнесийн стратегийн шинжилгээ
Бизнесийн стратегийн шинжилгээБизнесийн стратегийн шинжилгээ
Бизнесийн стратегийн шинжилгээ
 
Introduction To Economics
Introduction To EconomicsIntroduction To Economics
Introduction To Economics
 
Corporate Governance
Corporate GovernanceCorporate Governance
Corporate Governance
 
Small business management
Small business managementSmall business management
Small business management
 
Introduction to microeconomics
Introduction to microeconomicsIntroduction to microeconomics
Introduction to microeconomics
 
Chapter 4 – Business Ethics, Corporate Social Responsibility, Corporate Gover...
Chapter 4 – Business Ethics, Corporate Social Responsibility, Corporate Gover...Chapter 4 – Business Ethics, Corporate Social Responsibility, Corporate Gover...
Chapter 4 – Business Ethics, Corporate Social Responsibility, Corporate Gover...
 
Enterprise And Entrepreneurs
Enterprise And EntrepreneursEnterprise And Entrepreneurs
Enterprise And Entrepreneurs
 
Concept og Human Resource Accounting
Concept og Human Resource AccountingConcept og Human Resource Accounting
Concept og Human Resource Accounting
 
Business ethics C3 theories principles in_business_ethics
Business ethics C3 theories principles in_business_ethicsBusiness ethics C3 theories principles in_business_ethics
Business ethics C3 theories principles in_business_ethics
 
Managerial economics
Managerial economicsManagerial economics
Managerial economics
 
Module 1 the entrepreneurial perspective
Module  1 the entrepreneurial perspectiveModule  1 the entrepreneurial perspective
Module 1 the entrepreneurial perspective
 
Performance Evaluation of Portfolio
Performance Evaluation of PortfolioPerformance Evaluation of Portfolio
Performance Evaluation of Portfolio
 
Basics of entrepreneurship
Basics of entrepreneurshipBasics of entrepreneurship
Basics of entrepreneurship
 
4th chapter
4th chapter4th chapter
4th chapter
 

Semelhante a Rennes International School of Business EMBA Cohort 1 Management Science Report

Management of information system report
Management of information system reportManagement of information system report
Management of information system reportMagdy Abdelsattar Omar
 
M. Laudisa Executive Profile (www.exec-profiles.com)
M. Laudisa Executive Profile (www.exec-profiles.com)M. Laudisa Executive Profile (www.exec-profiles.com)
M. Laudisa Executive Profile (www.exec-profiles.com)Maurizio Laudisa
 
Chapter 5 location - 1st
Chapter 5 location - 1stChapter 5 location - 1st
Chapter 5 location - 1stShadina Shah
 
Noemi, a collaborative management for ict process improvement in sme experien...
Noemi, a collaborative management for ict process improvement in sme experien...Noemi, a collaborative management for ict process improvement in sme experien...
Noemi, a collaborative management for ict process improvement in sme experien...christophefeltus
 
Optimising decision making
Optimising decision makingOptimising decision making
Optimising decision makingRakesh Kariholoo
 
SWOT ANALYSIS OF MOBILINK
SWOT ANALYSIS OF MOBILINKSWOT ANALYSIS OF MOBILINK
SWOT ANALYSIS OF MOBILINKSher Asim
 
A Value Centric Approach to Governance Risk & Compliance
A Value Centric Approach to Governance Risk & ComplianceA Value Centric Approach to Governance Risk & Compliance
A Value Centric Approach to Governance Risk & ComplianceInnoTech
 
Organization Behaviour
Organization BehaviourOrganization Behaviour
Organization Behaviouramana fathima
 
Stragic accounting workshop 2009
Stragic accounting workshop 2009Stragic accounting workshop 2009
Stragic accounting workshop 2009Ari Manninen
 
Annamalai solved assignments 2020
Annamalai solved assignments 2020Annamalai solved assignments 2020
Annamalai solved assignments 2020AVINASH KAUR
 

Semelhante a Rennes International School of Business EMBA Cohort 1 Management Science Report (20)

Principles of management report
Principles of management reportPrinciples of management report
Principles of management report
 
Management of information system report
Management of information system reportManagement of information system report
Management of information system report
 
Strategy report
Strategy reportStrategy report
Strategy report
 
Management accounting report
Management accounting reportManagement accounting report
Management accounting report
 
Operation management business report
Operation management business reportOperation management business report
Operation management business report
 
Supervisory skills
Supervisory skillsSupervisory skills
Supervisory skills
 
M. Laudisa Executive Profile (www.exec-profiles.com)
M. Laudisa Executive Profile (www.exec-profiles.com)M. Laudisa Executive Profile (www.exec-profiles.com)
M. Laudisa Executive Profile (www.exec-profiles.com)
 
Chapter 5 location - 1st
Chapter 5 location - 1stChapter 5 location - 1st
Chapter 5 location - 1st
 
Noemi, a collaborative management for ict process improvement in sme experien...
Noemi, a collaborative management for ict process improvement in sme experien...Noemi, a collaborative management for ict process improvement in sme experien...
Noemi, a collaborative management for ict process improvement in sme experien...
 
Noemi, a collaborative management for ict process improvement in sme experien...
Noemi, a collaborative management for ict process improvement in sme experien...Noemi, a collaborative management for ict process improvement in sme experien...
Noemi, a collaborative management for ict process improvement in sme experien...
 
Optimising decision making
Optimising decision makingOptimising decision making
Optimising decision making
 
Study tour report
Study tour reportStudy tour report
Study tour report
 
Departmentation methods
Departmentation methodsDepartmentation methods
Departmentation methods
 
SWOT ANALYSIS OF MOBILINK
SWOT ANALYSIS OF MOBILINKSWOT ANALYSIS OF MOBILINK
SWOT ANALYSIS OF MOBILINK
 
Information Management Project
Information Management ProjectInformation Management Project
Information Management Project
 
A Value Centric Approach to Governance Risk & Compliance
A Value Centric Approach to Governance Risk & ComplianceA Value Centric Approach to Governance Risk & Compliance
A Value Centric Approach to Governance Risk & Compliance
 
Organization Behaviour
Organization BehaviourOrganization Behaviour
Organization Behaviour
 
Untitled
UntitledUntitled
Untitled
 
Stragic accounting workshop 2009
Stragic accounting workshop 2009Stragic accounting workshop 2009
Stragic accounting workshop 2009
 
Annamalai solved assignments 2020
Annamalai solved assignments 2020Annamalai solved assignments 2020
Annamalai solved assignments 2020
 

Mais de Magdy Abdelsattar Omar

Mais de Magdy Abdelsattar Omar (20)

International Business
International BusinessInternational Business
International Business
 
Business intelligence
Business intelligence Business intelligence
Business intelligence
 
Launching new handset mobile
Launching new handset mobileLaunching new handset mobile
Launching new handset mobile
 
Reasons to leave a job
Reasons to leave a jobReasons to leave a job
Reasons to leave a job
 
How to save your job if you're about to be fired
How to save your job if you're about to be firedHow to save your job if you're about to be fired
How to save your job if you're about to be fired
 
Do not apply for this job
Do not apply for this jobDo not apply for this job
Do not apply for this job
 
Can a company cut your pay or hours
Can a company cut your pay or hoursCan a company cut your pay or hours
Can a company cut your pay or hours
 
Why you may not have gotten a raise
Why you may not have gotten a raiseWhy you may not have gotten a raise
Why you may not have gotten a raise
 
10 steps to a successful career change
10 steps to a successful career change10 steps to a successful career change
10 steps to a successful career change
 
Top 10 e commerce builders
Top 10 e commerce buildersTop 10 e commerce builders
Top 10 e commerce builders
 
Sales management
Sales managementSales management
Sales management
 
Push & pull strategy
Push & pull strategyPush & pull strategy
Push & pull strategy
 
Egyptian e commerce market to reach $2.7bn by 2020
Egyptian e commerce market to reach $2.7bn by 2020Egyptian e commerce market to reach $2.7bn by 2020
Egyptian e commerce market to reach $2.7bn by 2020
 
Economy
EconomyEconomy
Economy
 
E commerce in egypt
E commerce in egyptE commerce in egypt
E commerce in egypt
 
B plan ssm
B plan ssmB plan ssm
B plan ssm
 
Distribution strategy
Distribution strategyDistribution strategy
Distribution strategy
 
Cv vs Resume
Cv vs ResumeCv vs Resume
Cv vs Resume
 
Distribution business
Distribution businessDistribution business
Distribution business
 
Telecommunication
TelecommunicationTelecommunication
Telecommunication
 

Último

Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptxmary850239
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxSayali Powar
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvRicaMaeCastro1
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Developmentchesterberbo7
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1GloryAnnCastre1
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQuiz Club NITW
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdfMr Bounab Samir
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptxmary850239
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Multi Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleMulti Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleCeline George
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research DiscourseAnita GoswamiGiri
 

Último (20)

Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Development
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1
 
prashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Professionprashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Profession
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdf
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Multi Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleMulti Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP Module
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research Discourse
 

Rennes International School of Business EMBA Cohort 1 Management Science Report

  • 1. Rennes International School of Business ESC RENNES Executive Master of Business Administration EMBA COHORT 1 (2003 - 2004) Management Science Conducted by: Dr. Sabry Shaabana Decision-Making Processes & Tools By Magdy A. Sattar October, 2003 Cairo, Egypt 1
  • 2. TABLE OF CONTENTS Executive Summary II Introduction & Objective 1 Part 1- Menatel Presentation 1 1-1-What Is Menatel 1 1-2-Business Nature 1 1-3-Structure & Organization 1 1-4-Delta Branch 2 1-4-1- Environment 2 1-4-2- Objectives 2 1-4-3- Organization 2 1-4-4- Identified Situations 2 Part 2- First Situation 3 Part 3- Second Situation 5 Part 4- Third Situation 9 Part 5- Fourth Situation 10 5-1- Shortest Route 10 5-2- Minimal Spanning Tree 12 Part 6- Conclusions & Recommendations 14 Reference 15 1
  • 3. EXECUTEVE SUMMARY This report is about how management science is enhancing managers – me included- abilities to make better decisions. First I will present my company Menatel and in addition my business unit. Second, through some of the situations I faced as examples of problems from my business unit, in which using management science tools enhanced my decision-making process skills. First situation is relocation bad revenue payphones decision in which I used Excel’s Goal Seek Tool to determine the breakeven points through which I can decide which payphone is to be relocated. Second situation is planning, scheduling, and controlling the branch activities decisions in which I used (PERT/CPM) Tool to have the optimal solution for the use of the available recourses. The third situation is assignment situation in which I enhanced my professional experience with my technical staff with the quantitative analysis of their effectiveness in the assigned tasks in order to decide, who is most effective and where. Situation number four I am to obtain and maintain high service quality through use of resources available, I used management science quantitative analysis to decide the most economical routes for branch vehicles through which we can save time, money, and achieve target. In these situations tools of management science proved to be strong support to my decision making process. II EMBA Cairo Rennes International School of Business
  • 4. INTRODUCTION & OBJECTIVE The purpose of this report is to identify situations for Delta Branch, in which management science methods or models are used , in addition to analyze one of these situations deep enough to make suggestions for improvement. The focus of this report is on the decision- making process and the role of management science in this process. 1. MENATEL PRESENTATION 1.1 WHAT IS MENATEL Menatel is a joint stock company under investment low number 8/1997 registered in 1998 under number 314030. Menatel is granted a ten years; renewable license, to install, operate, and manage a telecommunication network of at least 30,000 public payphone. Menatel is determined to achieve this target by the end of 2004. Egyptian shares are 51% and foreign shares are 49%. France Telecom (FCR) “providing Menatel with the know-how technology and management” holds the main foreign shares, which is 44 %. The main Egyptian company with 18% share is the National Bank of Egypt (NBE). 1.2 BUSINESS NATURE Menatel is in the prepaid cards business, Menatel products are calls (minutes), local calls, national calls, mobile calls, and international calls. Menatel is selling its products through a payphone network that covers all Egypt and managed by a payphone management system. These calls category are Menatel profit contribution. 1.3 STRUCTURE AND ORGANIZATION With a centralized management style Menatel structured into five main divisions headed by corresponding Director and five Branches allocated all over Egypt, to form simple flat functional organizational structure. Technical division activities are managing all technical issues related to Menatel payphones (installations, maintenance, and the payphones management system), coordination with all subcontractors, and managing the Branches. Commercial division activities are advertising, cards direct and indirect distribution, customer hot line, payphone locations determination, and sites owner management. Financial and administrative division activities are preparing financial statements, business plan, budgets, and payroll sheets, recruitment, training, and cash and contracts management. Business development division activities are handling assignments and projects to improve Menatel performance, and to define and build major business indicators. Logistic division activities are managing security, premises, vehicles, transportation, and warehouse, in addition to manage purchases and custom clearance. For the five branches there, activities are the same as all Menatel division activities through the matrix and centralize Menatel organization as per the branch assigned area. 1
  • 5. 1.4 DELTA BRANCH 1.4.1 ENVIROMENT The green triangle occupying the north of Egypt’s map we call Nile Delta, as it occupies the landscape in which the two branches of the Nile (Damiatte and Rasheed) flows with all their sub-branches. This landscape occupies 16411Km.*, divided into 6 governorates, 31 Cities, 45 Towns and 3000 Villages and small villages, shaping a percentage of 30% urban and 70%rural. Delta population is 20 Million their main source of income is agriculture and some small industries related to it. There is a high percentage of illiteracy among Delta population especially females, which is considered a great obstacle on the way of social and economical development. 1.4.2 OBJECTIVES Delta branch objective is to install, operate, and manage a telecommunication network of 4200 public payphones by the end of 2004 all over the assigned area, most of this area is rural inhibited by more than 20,000,000 people, 33 % of them inhibit urban, and the remaining inhibits rural. 1.4.3 ORGANISATION In a centralized management environment, the branch manager in the matrix heads the branch organization with functional managers in the head office. The branch manager is responsible to manage the branch team to meet the objectives planned by Menatel Managing Director in accordance with company strategy and guidelines given by the functional directors. The branch team is organized in a simple flat structure corresponding to the nature of the activities, which are technical activities (production, maintenance, and Payphone Management System “PMS”), commercial and customer service activities, financial and administrative activities, and finally public relations and logistic activities. As for the sales team, they are supervised by a local sales supervisor who is reporting technically to Menatel cards distribution manager and administratively to the branch manager in matrix organization. 1.4.4 IDENTIFIED SITUATIONS Identified situations for Delta Branch are: 1- Monitoring the daily revenue of the payphones installed in Delta. 2- Planning, scheduling, and controlling the branch activities. 3- Choosing the right people for the right activities. 4- Improving the payphones quality service. 2 EMBA Cairo Rennes International School of Business
  • 6. 2. FIREST SITUATION One of the obstacles facing the business community in Egypt these days is shading its climate with uncertainty and its decisions with caution. The devaluation of the Egyptian pound came at a time when people were already feeling the squeeze of a depressed economy. That is why it is important in this environment to monitor closely payphones revenue. In delta, I faced the problem of low revenue payphones and I have to decide why this payphone is low revenue? How to identify low revenue payphone? When to move or close low revenue payphone? Moreover, where to move this low revenue payphone? The calls type being the contribution to Menatel profit equation are the core of the revenue monitoring process, knowing the breakeven point for each can help me taking the most profitable decisions in terms of where, when, how, and why installing or removing a low revenue payphone. Management science tools help me answering all these questions. Determining the Breakeven Point Using Excel’s Goal Seek Tool Local National 1 Fixed cost 2500 Fixed cost 2500 Variable Cost Per Unit 0.036 Variable Cost Per Unit 0.054 Selling Price Per Unit 0.12 Selling Price Per Unit 0.18 Models Models Production Volume 29761.9 Production Volume 19841.27 Total Cost 3571.429 Total Cost 3571.429 Total Revenue 3571.429 Total Re 3571.429 Total Profit ( loss) 0 Total Profit ( loss) 0 41.22% 27.48% 3 EMBA Cairo Rennes International School of Business
  • 7. National 2 Mobile Fixed cost 2500 Fixed cost 2500 Variable Cost Per Unit 0.117 Variable Cost Per Unit 0.3 Selling Price Per Unit 0.39 Selling Price Per Unit 0.6 Models Models Production Volume 9157.509 Production Volume 8333.333 Total Cost 3571.429 Total Cost 5000 Total Revenue 3571.429 Total Revenue 5000 Total Profit ( loss) 0 Total Profit ( loss) 0 12.68% 11.54% International 1 International 2 Fixed cost 2500 Fixed cost 2500 Variable Cost Per Unit 2.9 Variable Cost Per Unit 3.36 Selling Price Per Unit 4.13 Selling Price Per Unit 4.8 Models Models Production Volume 2032.52 Production Volume 1736.111 Total Cost 8394.309 Total Cost 8333.333 Total Revenue 8394.309 Total Revenue 8333.333 Total Profit ( loss) 0 Total Profit ( loss) 0 2.81% 2.40% 4 EMBA Cairo Rennes International School of Business
  • 8. International 3 Fixed cost 2500 Variable Cost Per Unit 4.34 Selling Price Per Unit 6.2 Models Production Volume 1344.086 Total Cost 8333.333 Total Revenue 8333.333 Total Profit ( loss) 0 1.86% For payphones with bad revenue having the same commercial and economical environments, using the calculated breakeven points for all kinds of calls helps me to decide which payphone to remove. For example if I have to decide to remove one of two payphones with the same average revenue, knowing the profitability of each is the base of my choice. The results were improving the average revenue of a total 150 relocated payphones by 13 LE. Per day. 3. SECOND SITUATION DELTA BRANCH ACTIVITIES SCHEDULING PERT/CPM The most important or practical situation I am facing in the branch is how I manage to plane, schedule, and control the branch activities and resources, using management science methods (PERT/CPM for this situation) assist me as Branch Manager to have answers for, what is the time required for completing my target? What start and finish dates should be scheduled or set for each activity? Which are the critical activities? In addition, how long can non-critical activities be delayed before they become critical? The tables below show how I manage to answer these questions with simple mathematical calculations. 5 EMBA Cairo Rennes International School of Business
  • 9. Delta Branch Activities Immediate Op. M.Pr Pes. T Expected Activity Description Variance Predecessor T (a) T (m) (b) Time (t) A Location Survey - 1 3 5 3 0.4 B Prepare Drawings A 1 1 1 1 Zero C Digging permit B 6 22 32 21 18.7 D Lines Request A 1 1 1 1 Zero E Lines Retain D 10 15 20 15 2.7 F Lines Creation E 1 1 1 1 Zero G Lines Received F 1 2 3 2 0.1 H Civil Work C 1 2 3 2 0.1 I Booth installation E, H 1 1 1 1 Zero J Payphone and cabling I, G 1 2 3 2 0.1 K Payphone In Operation J 1 1 1 1 Zero Total 25 51 71 50 22.1 Delta Branch Project Network Prepare Drawing PP Pay Location Digging Civil Booth Installation phone Survey Permit Work Installation and Cabling IO Lines Lines Lines Request Return Received Delta Branch Project Critical Path Lines Creation Slack Critical Activity ES LS EF LF (LS-ES) Path? A 0 0 3 3 0 Yes B 3 3 4 4 0 Yes C 4 4 25 25 0 Yes D 3 10 4 11 7 NO E 4 11 19 26 7 NO F 19 25 20 26 7 NO G 20 26 22 28 6 NO H 25 25 27 27 0 Yes I 27 27 28 28 0 Yes J 28 28 30 30 0 Yes K 30 30 31 31 0 Yes 6 EMBA Cairo Rennes International School of Business
  • 10. Where: ES; Earliest start time for an activity. LS; Latest start time for an activity. EF; Earliest finish time for an activity. LF; Latest finish time for an activity. B 3 4 1 3 4 A 0 3 C 4 25 H 25 27 I 27 28 J 28 30 k 30 31 3 0 3 21 4 25 2 25 27 1 27 28 2 28 30 1 30 31 D 3 4 E 4 19 G 20 22 1 10 11 1 11 26 2 26 28 F 19 20 1 25 26 Delta Branch Critical Path is: A, B, C, H, I, J, K. Solving the problem using management science software we obtain the following results. PROJECT SCHEDULING WITH PERT/CPM ******************************** *** PROJECT ACTIVITY LIST *** IMMEDIATE OPTIMISTIC MOST PROBABLE PESSIMISTIC ACTIVITY PREDECESSORS TIME TIME TIME ------------------------------------------------------------------------- A - 1 3 5 B A 1 1 1 C B 6 22 32 D A 1 1 1 E D 10 15 20 F E 1 1 1 G F 1 2 3 H C 1 2 3 I E, H 1 1 1 J G, I 1 2 3 K J 1 1 1 ----------------------------------------------------------------------------- 7 EMBA Cairo Rennes International School of Business
  • 11. EXPECTED TIMES AND VARIANCES FOR ACTIVITIES ACTIVITY EXPECTED TIME VARIANCE ------------------------------------------- A 3 0.44 B 1 0.00 C 21 18.78 D 1 0.00 E 15 2.78 F 1 0.00 G 2 0.11 H 2 0.11 I 1 0.00 J 2 0.11 K 1 0.00 ------------------------------------------- *** ACTIVITY SCHEDULE *** EARLIEST LATEST EARLIEST LATEST CRITICAL ACTIVITY START START FINISH FINISH SLACK ACTIVITY ----------------------------------------------------------------------------- A 0 0 3 3 0 YES B 3 3 4 4 0 YES C 4 4 25 25 0 YES D 3 9 4 10 6 E 4 10 19 25 6 F 19 25 20 26 6 G 20 26 22 28 6 H 25 25 27 27 0 YES I 27 27 28 28 0 YES J 28 28 30 30 0 YES K 30 30 31 31 0 YES ---------------------------------------------------------------------------- CRITICAL PATH: A-C-H-I-J-K EXPECTED PROJECT COMPLETION TIME = 31 VARIANCE OF PROJECT COMPLETION TIME = 19.44 Now it is obvious that with the resource I have I am facing a problem of not achieving my monthly target on time (Menatel is losing the opportunity of earlier revenue). PERT assist me identifying the weakness of the project. First, the critical path is mainly controlled by Menatel sub-contractor; second the big variance of time for activities C, and E. To solve this problem, I decided to recruit a public relation officer to be dedicated to follow the digging permit procedures with the contractor. Unlike other branches, I dedicated one of the three engineers in the branch to supervise production activities and to monitor the daily production progress. In addition, I 8 EMBA Cairo Rennes International School of Business
  • 12. decided to add another contractor to the available one. The result was reducing the expected time of activity C to 15 days, which affects the expected project completion time to be 25 days instead of 31. This cost Menatel the salary of the new recruitment (1000 LE) per month, but the benefits is 100 unit of payphones/month to be in operation six days earlier with average revenue 20 LE per payphone, that is to say 2000 LE per month earlier. 4. THIRD SITUATION ASSIGNMENT PROBLEM I faced the problem of assigning three supervisor engineers (Ahmad, Sherif, and Khaled) each for one of the three tasks (Payphone management system activities, Maintenance activities, and Production activities). I realized that the efficiency of each activity, consequently the branch performance, and the efficiency to achieve the assigned objectives of the branch, depends on the experience, ability, and performance of each engineer. Since the three activities have the same priority, I decided to maximize the total tasks efficiency by assigning one engineer to supervise one and only one activity. After five years of experience managing the branch, I know now which one of the engineers to be assigned to supervise which activity. Using management science to prove my decision through quantitative analysis (Assignment model) is to guaranty the maximum benefits to the branch and hence the company. The alternative and the estimated engineers’ qualifications are summarized in the table below as ranked on the base of ten. Engineer Production activities Maintenance activities PMS activities SHEREIF 9 7 8 AHMAD 8 9 8 KHALED 7 8 8 Solving the problem using management science software we obtain the following results. ASSIGNMENT PROBLEM ****************** OBJECTIVE: MAXIMIZATION SUMMARY OF UNIT COST OR REVENUE DATA ************************************ TASK AGENT 1 2 3 ------ ------ ------ ------ 1 9 7 8 2 8 9 8 3 7 8 8 9 EMBA Cairo Rennes International School of Business
  • 13. OPTIMAL ASSIGNMENTS COST/REVENUE ******************* ************ ASSIGN AGENT 1 TO TASK 1 9 ASSIGN AGENT 2 TO TASK 2 9 ASSIGN AGENT 3 TO TASK 3 8 ---------- TOTAL COST/REVENUE 26 5. FOURTH SITUATION 5. 1 SHORTEST ROUTE One of the branch manager objectives is to obtain high quality of service of the payphones in operation in his region. To achieve this objective: First, I faced the challenge of determining the shortest routes and the most economical ones for the maintenance vehicles through Delta road network; I faced a vehicle routing problem. Management science quantitative analysis solves this and helps me take the proper decision to determine each vehicle route. Each one of the vehicle is assigned to cover eight different cities or more and as an example, I will show how management science software helps in determining the right figures. The table below describes the travel alternatives to and from eight cities covered by one of the two cars assigned to Kalubia Governorate, in which we see that we have seven nodes and nine arcs Cities Connected Distance in Km. Banha-Beltan 5 Banha-kafer Shoker 20 Banha-Tokh 15 Beltan-Tokh 5 Tokh-kaha 10 Tokh-Shebeen El Kanater 10 Shebeen El Kanater-Mashtool 10 Mashtool-Kafer Shoker 35 Solving the problem using management science software we obtain the following results for the shortest rout from node 1 to nodes 4, 5, or 6. 10 EMBA Cairo Rennes International School of Business
  • 14. SHORTEST ROUTE ************** **** NETWORK DESCRIPTION **** 7 NODES AND 8 ARCS ARC START NODE END NODE DISTANCE --- ---------- -------- -------- 1 1 3 15 2 1 2 5 3 1 7 20 4 2 3 5 5 3 4 10 6 3 5 10 7 5 6 10 8 6 7 35 THE SHORTEST ROUTE FROM NODE 1 TO NODE 6 **************************************** START NODE END NODE DISTANCE ---------- -------- -------- 1 2 5 2 3 5 3 5 10 5 6 10 TOTAL DISTANCE 30 THE SHORTEST ROUTE FROM NODE 1 TO NODE 5 **************************************** START NODE END NODE DISTANCE ---------- -------- -------- 1 2 5 2 3 5 3 5 10 TOTAL DISTANCE 20 THE SHORTEST ROUTE FROM NODE 1 TO NODE 4 **************************************** START NODE END NODE DISTANCE ---------- -------- -------- 1 2 5 2 3 5 3 4 10 TOTAL DISTANCE 20 11 EMBA Cairo Rennes International School of Business
  • 15. As easy as it is to have the needed results as important it is to use this kind of quantitative analysis to obtain the most effective and proper solutions. 5. 2 MINIMAL SPANNING TREE Second, I have to minimize the average consumed time by the technicians in repairing the faulty payphones, and for that, I use the minimal spanning tree module of the management scientist to find the optimal solution for problem of how a technician should cover five cities through nine arcs. The table below describes the travels alternatives for the technician to cover his assigned area. Cities Connected Distance in Km. Tanta-Samanoud 20 Tanta-Kotour 30 Tanta- Kafe El Zayat 25 Kotour-Mahala 25 Kotour-Samanoud 20 Samanoud-Mahala 5 Ssmsnoud-Mahalet Zeyad 15 Mahalet Zeyad-Mahala 10 Kafer El Zayat-Mahala 35 Solving the problem using management science software we obtain the following result MINIMAL SPANNING TREE ********************* **** NETWORK DESCRIPTION **** 6 NODES AND 9 ARCS ARC START NODE END NODE DISTANCE --- ---------- -------- -------- 1 1 2 20 2 1 3 30 3 1 4 25 4 3 4 20 5 3 5 25 6 2 5 40 7 4 5 5 8 4 6 15 9 5 6 15 MINIMAL SPANNING TREE ********************* 12 EMBA Cairo Rennes International School of Business
  • 16. START NODE END NODE DISTANCE ---------- -------- -------- 1 2 20 1 4 25 4 5 5 4 6 15 4 3 20 TOTAL LENGTH 85 The results were good improvement by 2 % in branch total service quality. 13 EMBA Cairo Rennes International School of Business
  • 17. 6. CONCLUSIONS & RECOMMENDATIONS Looking at previous situations and result, we shall notice the following points: For the first situation, it is obvious that the decision-making process is based on the best-expected monitory value. This provides individual improvement per payphone, but it does not insure the improvement of the global revenue or what is the effect of relocating payphone or moving this payphone to a new location on both the old and the new location. In addition, I think that this way of analysis will lead to relocate the payphones in a way that will negatively affect Menatel competitive advantage, which is the availability of payphones everywhere. For that, my recommendation is to have some constrains for relocation decision, and my decision strategy is as follows: First, we have to start by analyzing the revenue in a global form and not per payphone, to determine first why the revenue is not good, this is on monthly basis. Second, to eliminate first all the causes that negatively affect the revenue, if possible, such as maintenance, cleaning, availability of Menatel cards, and if the booth is easy to be noticed and usable or not. Third, to start to redistribute the concentration of payphones per area and not to cancel a location, that is to say, we can convert a PD2 to PD1 or remove one or two wall mount booth but not to cancel the location. This should be on monthly target and the effect of this step should be monitored monthly. Finally, if the revenue is not improved for this location, a decision of removing or canceling this location can then be taken. For the second situation, it is obvious that management science effectively help to plan, schedule, and control the branch activities in a way that optimizes the branch resources, both qualitative and quantitative analysis are fruitful for this situation. Finally, for the third and fourth situations, the problems I am facing are relatively simple. As I have experience with similar problems, but even so using management science tools for more quantitative analysis increased my decision-making effectiveness and put me in a much better position to make the best possible decisions. 14 EMBA Cairo Rennes International School of Business
  • 18. References  Annual Report, Menatel, 1999.  The Statistical Year Book 1994 - 2001, Central Agency for Public. Mobilization & Statistics – June 2002.  http://www.managementhelp.org  Introduction to Management Science, Anderson, Sweeney, and Williams- Tenth Edition, West, 2003 15 EMBA Cairo Rennes International School of Business