SlideShare uma empresa Scribd logo
1 de 157
• Determination Requests Filed For Construction Code
and Zoning Resolution Issues
• Easements and Restrictive Declarations
• Flood Zones
• PENS Appointment
• Resolution of Comments and Objections with a Plan
Examiner
COURSE 203
Filing Representative Training
for
Class 2 Code and Zoning Representatives
Includes:
• Enforcement and Tracking Appointments with Plan
Examiners
• Alteration Applications Cost Validation
• Records and Records Room Operation
• Solar Power
• Solar Photovoltaic and the Construction Codes
• Tax Abatement
Determination Requests Filed for
Construction Code and
Zoning Resolution Issues
Ira Gluckman, R.A.
Borough Commissioner
Code and Zoning Representative
Training Module 3.9
build safe | live safe
2
• Construction Code Determination Form (CCD1)
• Zoning Resolution Determination Form (ZRD1)
Types of Determination Requests
build safe | live safe
When to file a CCD1 form?
File Construction Code Determination Form (CCD1) for:
• Interpretations or clarifications of Building Code sections;
• Variation of Building Code or Rules, per AC 28-103.3; or
• Variation of Multiple Dwelling Law (MDL) for Article 7B
Buildings, per MDL 277.16.
Reminder: Article 7B Buildings under the Multiple Dwelling Law are
any buildings which at any time prior to January 1, 1977 was
occupied for loft, commercial, institutional, public, community
facility or manufacturing purposes that are now occupied in whole
or in part for joint living-work quarters for artists or general
residential purposes.
3
build safe | live safe
Variations of Building Code or
Rules and Multiple Dwelling Law
Variations of the Building Code or Rules, per AC
28-103.3, and variations of the Multiple Dwelling
Law, per MDL 277.16, both require:
• Practical difficulty stated in detail that is specific to the
project; and
• Provide analysis as to an equally safe or safer
alternative, per NYC Charter Section 645(b)(2).
4
build safe | live safe
When to file a ZRD1 form?
File a Zoning Resolution Determination Form (ZRD1) for:
• Interpretations of clarifications of Zoning Resolution
sections only
Reminder: Requests for variations of the Zoning Resolution must
be filed with the Board of Standards and Appeals (BSA) or the
Department of City Planning (DCP)
5
build safe | live safe
When to file a CCD1 or ZRD1 form?
The CCD1 and ZRD1 forms should only be used
for:
• An objection raised by a plan examiner; or
• A possible future objection (pre-determination) for an
application not yet filed.
6
build safe | live safe
Procedure in Obtaining a
Decision for a Determination
Step 1: Filings for CCD1 and ZRD1 are reviewed
initially by the Department borough office by:
• Borough Commissioner;
• Deputy Borough Commissioner; and/or
• Code and Zoning Specialist.
7
Borough
Office
Review
Borough
Determination
Tech Affairs
Review
Final
Determination
build safe | live safe
Step 2: After the review of the applicant’s
determination request, including all plans and
supporting documents, by the borough office, one
of the following decisions shall be issued:
• Approved
• Approved with conditions
• Denied
8
Procedure in Obtaining a
Decision for a Determination
Borough Office
Review
Borough
Determination
Tech Affairs
Review
Final
Determination
build safe | live safe
Step 3: If the borough issues a denial, the
applicant may submit their requests to Technical
Affairs for further clarification or if new information
arises that may alter the initial decision in their
favor
9
Procedure in Obtaining a
Decision for a Determination
Borough Office
Review
Borough
Determination
Tech Affairs
Review
Final
Determination
build safe | live safe
Step 4: In submitting requests to Technical Affairs,
all documents shall be submitted as scanned
documents in PDF format to the email address:
TADeterminations@buildings.nyc.gov
10
Procedure in Obtaining a
Decision for a Determination
Borough Office
Review
Borough
Determination
Tech Affairs
Review
Final
Determination
build safe | live safe
Step 5: Submissions for determinations must
include:
• Completed CCD1 or ZRD1 form
• Copy of the borough office denial
• All applicable plans signed and sealed by the applicant
• Any supporting documentation
11
Procedure in Obtaining a
Decision for a Determination
Borough Office
Review
Borough
Determination
Tech Affairs
Review
Final
Determination
build safe | live safe
Step 6: Submitted ZRD1 and CCD1 determination
requests are reviewed for completeness (see Step
5). Any incomplete submissions shall be rejected
with comments to submit the missing items
12
Procedure in Obtaining a
Decision for a Determination
Borough Office
Review
Borough
Determination
Tech Affairs
Review
Final
Determination
build safe | live safe
Step 7: Determination requests are reviewed at
Technical Affairs by a panel of at least three
persons:
• Chairperson
• Attorney
• Plan Examiner
13
Procedure in Obtaining a
Decision for a Determination
Borough Office
Review
Borough
Determination
Tech Affairs
Review
Final
Determination
build safe | live safe
Step 8: Final decision is issued by the Technical
Affairs panel
14
Procedure in Obtaining a
Decision for a Determination
Borough Office
Review
Borough
Determination
Tech Affairs
Review
Final
Determination
build safe | live safe
CCD1: Construction Code
Determination Form
15
build safe | live safe
16
CCD1: Construction Code
Determination Form
build safe | live safe
ZRD1: Zoning Resolution
Determination Form
17
build safe | live safe
18
ZRD1: Zoning Resolution
Determination Form
build safe | live safe
Common Errors in Filing a CCD1 or ZRD1
Determination Request with Technical Affairs
Which May Delay the Review
19
Common Errors when Filing a
Determination Request
build safe | live safe
Common Errors when Filing a
Determination Request
• Submissions do not include a complete copy of
the borough denial
• Copy of the plan examiner’s objection is not
included
• Multiple unrelated issues are filed on the same
CCD1 or ZRD1 forms
• File separate determination requests for each distinct
issue
20
build safe | live safe
Missing information on the CCD1 or ZRD1 forms:
• Relevant code or zoning sections not cited
• Applicant’s email address is missing
• The final decision is emailed to the applicant
• For CCD1 forms, the version of the construction code
(2008, 1968, or prior to 1968 Code) is not checked-off in
Section 4
• For CCD1 forms, the type of request in Section 5 for
either an interpretation or a variance is not checked-off
21
Common Errors when Filing a
Determination Request
build safe | live safe
• Submitted plans are not signed and sealed by the
applicant, unless filed by an attorney
• Determination requests involving a zoning
regulation are filed incorrectly on a CCD1 form,
and vice versa
• Scanned documents and plans are not legible
22
Common Errors when Filing a
Determination Request
build safe | live safe
For variations of the Building Code or the Multiple
Dwelling Law, the applicant fails to:
• State in detail the practical difficulty that is specific to the
project; and
• Fails to provide the analysis as to an equally safe or safer
alternative, as required by NYC Charter Section 645(b)(2).
23
Common Errors when Filing a
Determination Request
build safe | live safe
Sample Final Determination (ZRD1)
24
build safe | live safe
25
Sample Final Determination (ZRD1)
build safe | live safe
26
Sample Final Determination (ZRD1)
build safe | live safe
27
Sample Final Determination (ZRD1)
build safe | live safe
28
Thank You!
Easements and Restrictive
Declarations
Janine Gaylard, Esq.
Assistant General Counsel
Code and Zoning Representative
Training Module 4.2
build safe | live safe
2
 A Restrictive Declaration is a covenant running with
the land that binds the present and future owners of
the property.
 An Easement is the right to use the real property of
another for a specific purpose.
 Both are typically required prior to the approval of
any applications submitted to the Department of
Buildings
Definitions
build safe | live safe
Why do I need an Easement /
Restrictive Declaration?
• The Department may accept an easement or
restrictive declaration as an alternate means of
compliance with Code requirements
• In addition, compliance with certain provisions of
zoning may require the execution of restrictive
declarations
3
build safe | live safe
• A restrictive declaration is usually used when the
properties are owned by the same owner. The fee owner
is identified as the “Declarant” and signs the agreement
• An easement agreement is usually used when there are
different owners. The fee owners of the respective parcels
are identified as the “grantor” and “grantee.” Both must
sign the agreement
• It is also acceptable to have a declaration granting an
easement where the properties are owned by the same
owner
• When in doubt, ask your lawyer
4
When Should I Submit an Easement
or a Restrictive Declaration?
build safe | live safe
Signatures
• All signatures must be notarized using the:
• Individual;
• Partnership; or,
• Corporate acknowledgement form
5
build safe | live safe
Long-Term Tenants
Can long-term tenants sign?
• Long-term tenants may not bind the owners of the
parcels, and therefore may not sign the
agreement or declaration on behalf of the owner
6
build safe | live safe
Easement /
Restrictive Declaration Approval
What is the easiest way to get an easement or
restrictive declaration approved?
• Use one of the Department’s approved agreement
forms available on the Department’s website
7
build safe | live safe
Approved Agreement Forms
The following Department-approved agreement forms can
be found on the Department’s website, as specified in
Legal / Buildings Bulletin 2008-007:
• Caretaker’s Apartment
• Driveway / Frontage Space
• Egress
• Flood Zone (1968 Code)
• Flood Zone (2008 Code)
• Light and Air
8
• Lot-line Window
• Off Site Parking
• Party Wall
• Plumbing System
• Student Dormitory
build safe | live safe
Light and Air Easement Agreement
• The Light and Air Easement Agreement cannot
be used between parties with buildings on
separate zoning lots to satisfy the provisions of:
• The New York City Zoning Resolution; or,
• Section 30 of the Multiple Dwelling Law
• These provisions require unrestricted light and air
to be located on the same zoning lot as the
building’s windows
9
build safe | live safe
Other Types of Agreements
• An attorney will need to prepare the agreement
when no Department-approved form is available
• The form must include a clause describing the
specific statutory provision or other requirement
being satisfied by the agreement or declaration
• Required language is specified on page 3 of the
Building Bulletin 2008-007
10
build safe | live safe
Required Language
1. A “run with the land” clause
2. A metes and bounds description of all affected tax lots;
3. A clause stating that the agreement or declaration “shall not
be modified, amended or terminated without the prior written
consent of the New York City Department of Buildings”
4. The application number for which the agreement or
declaration is required
5. Where necessary to clarify the exact location of the benefited
or burdened area (e.g., attach diagrams)
6. A clause stating that a “Failure to comply with the terms of
this restrictive declaration or easement agreement may result
in the revocation of a building permit or certificate of
occupancy”
11
build safe | live safe
Procedure for Professional
Certification Submission
• For professionally certified applications, the P.E. / R.A.
must state on the Department’s POC3 form the statutory
requirement being satisfied by the easement/declaration.
Then the P.E./R.A has two choices:
1. The P.E./R.A. may use one of the Department’s approved forms
and certify that the agreement conforms in all respects to one of
Department’s approved forms
2. The P.E./R.A. may use an agreement that does not conform in all
respects to a DOB approved form and request that DOB Legal
review the agreement by submitting the POC3 form identifying the
applicable statutory provision with the proposed agreement to
DOB Legal
12
build safe | live safe
Procedure for
Plan Examination Submission
If the Agreement is an Approved Form:
• Applications that require plan examination may be
submitted to the borough office for review and approval
• The plan examiner will perform a technical review to
determine whether the agreement or declaration satisfies
the applicable objection or statutory requirement
13
build safe | live safe
If Agreement is not an Approved Form:
• The agreement must be referred to the DOB General
Counsel’s Office via the Borough Plan Examination Unit
along with the objection identifying the applicable statutory
requirement or need for the agreement
• Agreements cannot be submitted to the General
Counsel’s Office directly, this will only delay review
• General Counsel’s Office requires the Borough Plan
Exam referral as confirmation that a plan examiner has
performed the necessary technical review to determine
whether the agreement, if approved as to form, is an
acceptable technical means of satisfying the statutory
requirement
14
Procedure for
Plan Examination Submission
build safe | live safe
• The Department’s General Counsel’s Office will either
approve your agreement as acceptable to form or identify
issues that need to be corrected.
• Once General Counsel approves your agreement as to
form, you must then record it
15
General Counsel Review
build safe | live safe
Recording the Agreement
• Agreements should be recorded prior to approval
• An application may not be approved until proof of
the recording of the easement agreement or
restrictive declaration has been submitted to the
Borough Office
• For specific recording instructions see page 5 of
Legal / Buildings Bulletin 2008-007 for recording
instructions
16
build safe | live safe
Certificate of Occupancy
Where an application will result in the issuance of
a Certificate of Occupancy, the Certificate of
Occupancy must include:
• Reference to the type of easement agreement or
restrictive declaration
• The city register numbers issued by the Office of
the City Register, or if in Richmond County, the
reel and page numbers
17
build safe | live safe
CCD1: Construction Code
Determination Form
• There may be situations where DOB will approve an
easement / restrictive declaration where an applicant is
unable to comply with all of the requirements set forth in
the Buildings Bulletin
• A CCD1 Construction Code Determination Form must be
submitted in these instances and include a proposal that
provides a safe and legally binding alternative
18
build safe | live safe
19
Thank You!
Flood Zones
Joseph Ackroyd
Acting Director, Engineering
Code and Zoning Representative
Training Module 4.4
build safe | live safe
Permit Application Requirements
• Per BC G104.3 site plans shall delineate the
flood hazard area, including the delineation of
the base and design flood elevation
• Applications should include a “FIRMette” printed
from FEMAs Map Service Center to support the site
plan
2
build safe | live safe
FEMAs Map Service Center
3
build safe | live safe
FIRMette Printed from FEMA
Map Service Center
4
build safe | live safe
Repairs and Alterations
Substantial Improvement
• If the cost of an alteration exceeds 50% of the
market value of the structure the project is
substantial improvement.
• Per BC G102.1, Item 8, substantially improved
buildings must be brought into full compliance
with Appendix G.
5
build safe | live safe
Substantial Improvement
Per 1RCNY 3606-01 any alteration that
exceeds $40,000 that is not a substantial
improvement must include:
• Calculations of the Market Value of the
Structure
• Calculation of Construction Costs
• A statement by the applicant
6
build safe | live safe
Repairs and Alterations
§3606-01 Determinations of Market Value and
Substantial Improvement
Two acceptable methods to determine market
value:
• Assessment roll option
• Appraisal option
7
build safe | live safe
Repairs/Alterations/Reconstructions
Requirements for Substantially Improved Structures
Like New: No basements (for residential buildings)
• Elevate lowest floor
• Adequately anchor the structure (uplift & lateral displacement)
• Below the DFE: solely for building access, parking and storage
• Flood openings in enclosed spaces below the DFE
• Flood resistant materials used up to the DFE
• Electrical, plumbing, heating/air conditioning components are
elevated above DFE or design to prohibit accumulation of
water, FEMA 348
• Above ground tanks are anchored or elevated above DFE
8
build safe | live safe
Thank you!
9
PENS Appointments
Lisa Lewis
Director, Customer Service
Code and Zoning Representative
Training Module 5.2
What we do?
• Walk in customer service
• Telephone customer service
• Follow up customer service
2
Customer Service Unit
build safe | live safe
3
The Plan Examination Notification
System (PENS) is a system that allows
plan examination customers to
schedule appointments with Plan
Examiners using an electronic system.
Plan Examination
Notification System (PENS)
build safe | live safe
4
For all appointments a
PENS ID & Password is required
Contacting 311:
• Plan Review appointments
Manual:
• PER 11 form
Emergency:
• Fax PER 11 form
Borough Office
• Manual Requests
• Fax manual requests
Plan Examination
Scheduling Options
build safe | live safe
5
Appointments
build safe | live safe
6
Scheduling
build safe | live safe
DO
• Remember your user ID
and Password
• Use the correct job number
and document number
• Be honest with the PENS
Coordinator
DON’T
• Schedule erroneous
appointments
• Cancel appointments on
the same day
• Schedule same day
appointments
• Send requests for
appointments that can be
made through 311
• Send multiple requests for
the same job.
build safe | live safe
7
PENS Best Practices
Resolution of Comments and
Objections with a Plan Examiner
Neil Adler, P.E.
Chief Plan Examiner
Code and Zoning Representative
Training Module 5.3
2
How a Filing Representative Can Best Prepare for
an Appointment:
1. Understand all of the drawings and the design of the
Licensed Professional Applicant
2. Review all of the examiner’s objections and comments
with the Applicant before your appointment
3. Be prepared to demonstrate that the applicant’s design
complies with the Building Code and Zoning Resolution
4. Ensure that all objections and comments have been
addressed in the revised drawings and application
5. Know the Dept.’s administrative policies and procedures
Be Prepared
build safe | live safe
Be Prepared
Remember….
An appointment is typically only 20
minutes and the examiner uses part of
this time to record information!
Always arrive on time!
3
build safe | live safe
Cancellations
Contact PENS (311) to cancel an
appointment for any reason
4
build safe | live safe
Enforcement and Tracking
Appointments with Plan Examiners
Neil Adler, P.E.
Chief Plan Examiner
Code and Zoning Representative
Training Module 5.4
build safe | live safe
2
All appointments with Plan Examiners are recorded
in the Plan Examination Notification System (PENS)
and the Buildings Information System (BIS)
• Typically, five (5) appointments will be allowed to resolve
all plan examiner comments and objections on New
Building and Alteration-1 Applications
• Typically, two (2) appointments will be allowed to resolve
all examiner comments and objections on Alteration-2
Applications
Tracking/ Enforcement
Plan Examination Appointments
build safe | live safe
Tracking/ Enforcement
Plan Examination Appointments
• After two (2) appointments with the plan examiner, on any type of
application, if no significant progress toward resolving the objections
has been made, then the Applicant of Record / Registered Design
Professional must attend the next or 3rd appointment.
• If the Applicant of Record does not attend this 3rd appointment with
the filing representative, then this Appointment will be immediately
ended & recorded as “unprepared” in PENS. The filing representative
will be brought to the Chief Plan Examiner (CPE)
• If more than 2 appointments are needed to address the examiners
comments and objections , then the filing representative or Applicant
of Record must first request and receive authorization from the CPE
3
build safe | live safe
Keeping Appointments
• If you appear after 5 minutes of your scheduled
appointment time, you will entered as “late” in PENS
• If you do not show-up for your appointment and did not
call 311 the day before, you will need to reschedule an
appointment and will be marked with an unexcused “no-
show” absence in PENS
4
1
Alteration Applications Cost
Validation
Project Cost Affidavit (PW-3)
Validation
Ravi Patur
Executive Director, Borough Operations
Code and Zoning Representative
Training Module 5.5
2
New Building (NB) Application:
Fees assessed based on total construction floor area (not zoning area)
Alteration Applications:
Fees is based on the construction cost of the project
Reference:
Administrative Section of the 2008 NYC Building Code
• Article 112 outlines the fee schedule of permit fees (Table 28-112.2)
• For alteration permits, Section §28-112.3 of the Code requires the applicant
to provide an “estimated job construction cost”, which must include the “total
value of work”
• Project’s cost estimate “shall include total value of work, including materials,
and labor…”
• The code further establishes that the final valuation “shall be set by the
department” (§28-112.3)
Permit Fee Structure
build safe | live safe
3
Purpose:
Ensure that the Department is collecting applicable fees due to the City for
alteration projects
DOB Operations
• City Audits found under reporting of project costs – resulting in loss
of fees due to the City
• Beginning in 2008, DOB implemented a Cost Affidavit (PW-3) for all
alteration jobs
• Plan Exam units are required to validate the project’s cost prior to
approval, or during audits of pro-cert. jobs
• If project costs are under valued, an objection is issued to revise
the cost on PW-3
• To ensure uniform and consistent cost validation citywide, a Cost
Validation audit and monitoring program was initiated in 2010
Cost Validation
build safe | live safe
4
PW-3 Form
• Required for alteration permit applications with a few exceptions
• Guidelines are available online
• Check Categories of Work
• List work elements with area/units – must reflect the project’s scope
• Must include totals for all categories and job cost
Submission
• Cost Affidavit is required with an application at initial filing, changes,
and for final Sign-off
o Initial: PW-3 Cost Estimate signed by Applicant and Owner
o Changes: PW-3 Cost Estimate signed by Applicant and Owner
o Final: PW-3 Actual Cost signed by Owner
• PW-3 for legalization work – Cost must be in today’s value
• Alt-1 No-work Applications – PW-3 is not required
Cost Affidavit
build safe | live safe
5
Filling the PW-3 Form: Details and Accuracy
Work Categories
Check all pertinent work categories:
• Categories checked must match PW-1
• Must indicate Yes or No for all listed categories
• Under General Construction (OT), make sure to check all applicable
details, including partial demolition
Work Description, Area/Units and Cost
For each work category:
• Describe construction work elements under the category
• Record each work element’s Area or Units
• Fill-in the Unit Cost for each work element and Total cost
• Provide Totals by Category and for the Project’s Cost
• PW-3 Form Instructions have examples
PW-3 Submission
build safe | live safe
6
NB In Conjunction Jobs (to qualify for minimum filing fees)
Application must be an Alt 2 or Alt 3 and reference the NB job number:
• Drawings must show scope of work covered by the NB application
• Must file prior to the issuance of a TCO or CO
Jobs that fail the above criteria, will be assessed fees
Enlargements
Alt 1 or Alt 2 applications must include:
• Cost for partial demolition of existing building
• Cost of alteration work for all affected areas (including cellar)
Legalization
Applications filed to legalize work without a permit:
• PW-3 cost should be calculated as if proposed work is at the time of
submission
• Civil penalty are calculated based on actual value of work
• DOB will not accept $1,000 minimum frequently used
PW-3 Notes
build safe | live safe
7
Plan Reviews and Audits
• Examiners / Auditors will first establish the project’s scope of work at
application review (drawings/documents)
• Will identify various work components essential for the scope as
established
• Compare PW-3 Cost with DOB Valuation
Validation Process
• The Department uses RS Means as standard reference to assess
the value of a project’s work
• Will issue an objection if project cost is under-reported
• To resolve the objection:
1. PW-3 must be revised to show the min. assessed value, OR
2. The Applicant may submit a detailed cost estimate using RS Means,
or other standard cost tool (§28-112.3)
Job Cost Validation
build safe | live safe
8
In FY 2010 the Department established a Cost Validation Unit
The unit is responsible for the following:
Technical Support
• Provide research and technical support in areas of construction
cost and permit fees
• Establish standard methods for cost valuation
• Provide ongoing technical support and training to plan
examiners
Internal Monitoring and Control
• Develop and provide standard guidelines for Plan Examination
for Cost Validation of alteration applications
• Conduct weekly audit of a sample of alteration applications
following approval in boroughs
Cost Validation Unit
build safe | live safe
9
Operations
Thomas Fariello, RA
First Deputy Commissioner
212-566-3248
Kanda Gordon
Associate Commissioner
212-566-3444
Ravi Patur
Executive Director
212-566-3142
Technical Affairs
Marshall Kaminer, PE
Executive Engineer
212-442-0933
DOB Contacts
build safe | live safe
10
11
12
Thank You!
13
Records &
Records Room Operation
Jamie Maule
Service Manager
Code and Zoning Representative
Training Module 8.2 & 8.3
build safe | live safe
Record Retention Requirements
• 2008 Construction Code, Administrative Code
(AC) Section 28-103.14 requires the Department
to keep official records of:
• Applications received;
• Permits and certificates issued;
• Fees collected;
• Reports of inspections; and
• Notices and orders issued.
• Past Codes (1968, 1938) had fewer requirements
concerning how the records kept
2
build safe | live safe
In a Borough Office “Record Room” you may:
• Perform property research
• Obtain microfilm copies and hard copies of microfilmed
documents & drawings
• Obtain Job Folders
• Request & review offsite Job folders
• Request drawings and plans from the BSCAN unit
Filing representative and professional ID must be clear of
any outstanding/missing “permitted” folders
Record Room Operation
3
build safe | live safe
Freedom of Information Act/Law
• Information about “sensitive properties” must be requested
under the Freedom of Information Act/Law (FOIL)
 Sensitive properties - public buildings, a professional
league sports stadium, health facilities, etc.
• Requests for records information about sensitive
properties must be accompanied by an email approval
from the Department’s office of Internal Audits and
Discipline (IAD)
 IAD approval expires after 30 days
4
build safe | live safe
Property Research
You may research a property to:
• Find building records relevant to a current or past Certificate of
Occupancies (CO)
• Find the legal status of a structure
• Find or generate a Letter of No Objection (LNO)
• Find docket books, containing information regarding past violations,
applications, etc.
• Find Curb Cut Cards
• Find Index Card records
• Request updates in the Building Information System (BIS)
• Find an Equipment Use Permit (EUP) card.
5
build safe | live safe
• The C of O defines the legal use of a structure
• Copies of a C of O may be downloaded online from BIS. If the CO is
not available online, you may also go to the borough office and
research:
• Docket books for all pre-BIS filings
• Index cards (Buildings Department Index Card)
• Curb cut cards
• Microfilm records
• Offsite records, turn around time is several weeks from initial
request
6
Researching the
Certificate of Occupancy
build safe | live safe
• The Buildings
Department Index
Card indicates the pre-
BIS (pre-1980’s) jobs
filings and CO
number(s), if available
• Pre-BIS job filings may
not always be listed on
the BIS Property
Profile Overview
7
C of O Supporting Records
Index Card
build safe | live safe
• This curb cut card is an
example of a pre-BIS
system (Pre-1980’s) NB
job filing
• The Docket Book may
indicate a CO
8
C of O Supporting Records
Curb Cut Card
build safe | live safe
Department of Buildings Records
CO from 1931
9
build safe | live safe
Department of Buildings Records
CO from 1980
10
build safe | live safe
Department of Buildings Records
CO from 2013
11
build safe | live safe
• DOB certified copies of the CO are currently available for
$5/per copy
• When a CO is not available, there are other methods
available to get property information that are supplemental
or in addition to a CO, including:
• “I-Cards” (Information Cards)
• Multiple Dwelling (MD) cards that were issued by the
NYC Department of Housing, Preservation &
Development (HPD).
• If a CO was obtained only from borough office records,
the applicant or filing representative should advise the
DOB borough staff to upload the CO to BIS
12
Researching the
Certificate of Occupancy
build safe | live safe
• HPD printout with the Multiple
Dwelling Registration (MDR)
number indicating the number of
units & “I- Cards” are considered
proof of legal use as a multiple
dwelling (MD) or a mixed use
building (residential & commercial)
• The HPD “I-Card” may also
indicate pre-BIS system
applications filed and COs
13
C of O Supporting Records
HPD “I – Card”
build safe | live safe
• What is a Letter of No Objection (LNO)?
• An LNO is another way to describe how the property is
being used
• An LNO is not a substitute for a CO, but is accepted by
some government agencies and attorneys, if a CO is
not available from DOB records
Letter Of No Objection
14
build safe | live safe
Letter of No Objection Process
• The following information is required for LNO application filings:
• Print the “Property Profile Overview” (PPO), “Actions”, and “Job
Filings” screens from BIS
• Copies of curb cut cards
• Copies of Docket books for each NB & Alt listed on action screen
• Copies of Buildings Department Index Cards
• HPD “I” Information card for 3 family or more
• Copies of C of O (as appropriate)
• Review microfilm and offsite database for pre-BIS applications, which
may not be listed on BIS “Actions” screen
• No LNO will be issued if there is an open NB or Alt 1
• Fire Suppression jobs must be signed off prior to applying for LNO
15
build safe | live safe
• Anyone can file for an LNO with
the owner’s authorization
• There may be minor variations
between boroughs in forms, but
procedures are essentially the
same
• In Queens, you may refer to the
Commissioner Compliance
Memorandum, at right
16
Letter Of No Objection
build safe | live safe
• The Buildings
Department Index
Card indicates the pre-
BIS system (pre-
1980’s) jobs filings and
CO number(s), if
available
• Pre-BIS system job
filings may not always
be listed on the BIS
Property Profile
Overview
17
LNO Supporting Records
Index Card
build safe | live safe
• This curb cut card is an
example of a pre-BIS
system (Pre-1980’s) NB
job filing
• The Docket Book may
indicate a C of O
18
LNO Supporting Records
Curb Cut Card
build safe | live safe
• HPD printout with the Multiple
Dwelling Registration (MDR)
number indicating the number of
units & “I- Cards” are considered
proof of legal use as a multiple
dwelling (MD) or a mixed use
building (residential & commercial)
• The HPD “I-Card” may also
indicate pre-BIS system
applications filed and COs
19
LNO Supporting Records
HPD “I – Card”
build safe | live safe
• DOF Building Classification Codes
• In this case Code B1 confirmed a two
family brick dwelling since 1932
20
LNO Supporting Records
DOF Records Prior to 1961
build safe | live safe
• The LNO filing fee must be paid prior to submitting application:
• 1-2-3 family homes & residential garage is $25 for each structure
• 4+ family homes & commercial property is $100 for each structure
• DOB staff will annotate the following information on the LNO slip
issued to customers:
• LNO application number
• 15 business days review process
• 10 business days for review of Resubmittals LNO
• The property address listed
• The Record Room phone number
• The DOB website information
21
LNO Fees
build safe | live safe
When will an LNO be issued?
• If no C of O is available; and
• The submitted property records are “favorable;” then
• DOB can issue an LNO indicating the legal use of the
property
22
When will an LNO be issued?
build safe | live safe
• LNO for two family
dwelling
• No C of O was located
in DOB records
• DOB records support
the current use as a 2-
family dwelling and are
the overriding criteria.
23
build safe | live safe
The following additional information is required when requesting an
LNO for buildings with Children-related special occupancy, with or
without a C of O:
• Hours and/ or dates of operation, number of children per each age group
(under and over 2 years old)
• Layout drawing with floor location, exits and accessory spaces
• A DOB mandatory Field Inspection & report
Examples of buildings with children-related special occupancy include:
• Group family daycare homes
• Family day care homes
• Schools
• After school programs
• Day & summer camps
LNO Special Occupancies
24
build safe | live safe
Microfilm / Microfiche
• Microfilm / Microfiche requests can be submitted for plans, application filings,
surveys, etc.
• To request a Microfiche, complete the Record Request form:
• Check the “Microfilm” box
• Fill in the BLOCK/LOT numbers
• When possible, include the application number(s)
• If the property was previously known with a different block/lot number, please
include this
• Limit one Q-Matic ticket per request form
• There are no Microfiche copies for BSCAN Jobs (Jobs after 2009)
Microfiche and job
folders cannot be
listed on the same
Record Request form
25

build safe | live safe
Microfiche Fees
• 11+ microfiche cost 25 cents per “fiche strip”
• A fiche strip contains a series of drawings and documents that can be
viewed on the Microfiche viewer
• There is a viewer located in each borough office in the Public
Access Area
• There are also viewers with photocopying ability in each borough
office, which can produce small (standard letter) size copies
• Customers may purchase a Jamex Card for the amount needed for
small (standard letter) size blowback copies. Each small blowback
copy costs 25 cents per page
• Blowback copies of microfiche drawings & documents that are in
excess of the small (standard letter) size are available at $8 per page
• Additional copies in the same request of the same microfiche
drawing/document are $5 per page
26
build safe | live safe
• The microfiche sheet (below)
is placed under the glass of
the viewer (to the right) for
review
Microfilm / Microfiche
27
build safe | live safe
Job Folder Request
Complete the Record Request form with Job Number and check the
box “ folder”
• Permit folders are recorded in the Expeditor Retention database with
Filing Representatives / Professionals DOB ID.
• Records of all Approved and Disapproved folders are recorded in
the borough office including, which customers (applicant, filing
representative) has the folder and when it was pulled
• Contents of “non-permit” folders may be given to the customers
Microfiche and job
folders cannot be
listed on the same
Record Request form
28

build safe | live safe
Additional Records Search
The Additional Search form (10 business days) can be used if:
• The job folder is not immediately available or cannot be readily found
• The job folder is located in DOB offsite storage
• Information requested is in a pre-BIS job folder or a Block/Lot folder
• The form is signed by the designated DOB records room staff person
and a copy is provided to the customer as a receipt
29
build safe | live safe
Additional Records Search
30
build safe | live safe
BSCAN
1. The BSCAN section in Queens is open on Tuesday and Wednesday from 10:00 am
to 12:00 noon
2. The BSCAN unit scans documents and plans for applications from 2009 and later
• For example in Queens, BIS Job numbers start with “420” (documents and plans)
and “410” (documents only)
3. Applicants or filing representatives cannot submit documents or plans directly to the
BSCAN unit.
4. When submitting application documentation:
• Filing Representatives need to provide three sets of plans when filing
• One set of plans will remain in the BSCAN unit for scanning (DOB copy)
• The other two sets of plans will remain in the job folder for the applicant, filing
representative, etc.
• The documents filed are scanned and available online for public review in the
“virtual folder” in BIS under the application number
5. The BSCAN unit will charge a fee of $8 per copy of any scanned drawing, or other
document that is not in the virtual folder
31
build safe | live safe
Thank you!
32
Code and Zoning Representative
Training Module 9.14
SOLAR POWER
Solar Photovoltaic and the Construction Codes
Tax Abatement
Martin Rebholz, RA
Borough Commissioner
build safe | live safe
2
General Requirements
• Construction and Electrical work permits
• Panel must be listed by a nationally recognized testing laboratory
• NYC-licensed Master Electrician is required for all Electrical
installations
• Applicant must be a registered architect or professional engineer
• Electrical utility interconnection approval
Solar Photovoltaic Panel (PV) installation projects
requires all of the following:
build safe | live safe
3
Construction Application:
• Building and roof structure
• Roof condition/rooftop obstructions
• Drainage conditions
• Product structure, listing and anchorage
• Location of Electric Meter, AC Disconnect, Inverter
Electrical Application:
• Product listing
• Electrical assembly
• Utility connection
Property Tax Abatement Application: (if applicable)
• Form to be filled out in accordance with Department of Buildings
instruction sheet
Information Required
build safe | live safe
4
Types of Application
build safe | live safe
Required Rooftop Information
5
Fire Code Section 504
• A clear path of not less than 6 feet (1829
mm) horizontal width and 9 feet (2743 mm)
in height shall be provided from the front of
the building to the rear of the building and
from one side of the building to the other….
build safe | live safe
6
Required Rooftop Information
build safe | live safe
7
Required Rooftop Information
build safe | live safe
Required Zoning Information
8
Local Law 20 of 2011 - Zone Green
text amendment to the Zoning Resolution
Rooftop Solar PV no longer counts as an additional story
http://www.nyc.gov/html/dcp/html/greenbuildings/index.shtml
build safe | live safe
9
Zone Green: Solar PV As A Permitted Obstruction On Flat Roofs
Street
NON-CONTEXTUAL Zoning
Solar PV panels as Permitted
Obstructions in Non-contextual
zoning districts are now
ALLOWED to penetrate the sky
exposure plane (sloping plane)
CONTEXTUAL Zoning
Solar PV panels as Permitted Obstructions in
Contextual zoning districts are now ALLOWED to
penetrate the maximum height limit (horizontal plane)
Residential and commercial zoning districts with an
A, B, D or X suffix are Contextual zoning districts.
BUILT UNDER
HEIGHT LIMIT
BUILT OVER
HEIGHT LIMIT
MAXIMUM
HEIGHT LIMIT
BUILT UP TO
HEIGHT LIMIT
PRE-EXISTING
Max 4’
Permit Applicant of Record must know allowable building height in proposed zoning district, and must know actual
building height in order to design PV solar system in compliance with NYC zoning regulations
Construction Permit Application
build safe | live safe
10
On slopes greater than 20 degrees, solar panel height shall be limited to 18” measured
perpendicular to roof surface
40º
> 20º
Photo: Department of Buildings
Construction Permit Application
build safe | live safe
11
Construction Permit Application
build safe | live safe
Construction Permit Application
12
Document requirements
• Plot plan locating of the building on the site, pertinent
trees, structures, city services, utilities, hazards
• Site plan, roof plan(s), elevation(s) showing the solar
modules in place, other equipment and structures,
pertinent to or having impact on code compliance of the
system
• Fire Department access for firefighting and maintenance
(Fire Code §504)
• Electrical Diagram
• Location of Meter, AC Disconnect & Inverter – May be a
single line diagram
build safe | live safe
13
Document requirements
• Drawings showing structural work required to provide,
add or reinforcement as necessary to sustain the added
vertical and horizontal loads (Building Code Chapter 16)
• Submit Form TR-1 for special inspections
(structural stability, firestopping)
• Submit Form TR-8 for Energy Code inspections
• Drawings showing roof covering and drainage work
• DEP Asbestos form
• Adjoining building outlines and heights
• ConEd preliminary contract or other proof of coordination
Construction Permit Application
build safe | live safe
Construction Permit Application
14
build safe | live safe
15
Construction Permit Application
build safe | live safe
16
Inspections
• Special Inspections (form TR-1)
• Energy Code Progress Inspections (form TR-8)
• Electrical inspection (by DOB) and sign-off required prior to
Construction sign-off
Construction Permit Application
build safe | live safe
Construction Permit Application
17
Electrical Permit may be e-filed
Must be associated with
construction job number.
NYC Electrical Code § 690.1
• Installations must be listed
by nationally recognized
testing laboratory as
complete assemblies
Electrical inspection by DoB
build safe | live safe
18
Electrical Permit
The solar electric generating system installations must select
(E) Sustainable Energy Installs Solar on Form ED16A
(electrical permit application).
Construction Permit Application
build safe | live safe
19
Definitions
• Applicant of record - the registered design professional who filed the
alteration application
• Alteration application - in this case, the Alt 2 application filed with the
Department
• Applicant for property tax abatement - the owner
• Application for property tax abatement - Form PTA4
• Compliance period - the tax year (July 1-June 30) in which the property
tax abatement begins and the three tax years immediately following, 4
years total
Application for Property Tax Abatement
build safe | live safe
20
Definitions
• Placed in service - affects how the abatement is
calculated, and shall be the latter of:
• The date the system began generating electricity, or
• The date of the Department’s issuance of a letter of
completion for the associated alteration application
Application for Property Tax Abatement
build safe | live safe
21
COMPLIANCE PERIOD
THE TAX ABATEMENT PROGRAM WILL END
IN 2013 2015
March 15, 2013 2015 will be the final deadline to submit
your application.
December 31, 2012 2014 is the final date for “placed in
service”
Application for Property Tax Abatement
build safe | live safe
22
Document requirements
• Plot plan locating of solar power system on the site, trees,
structures, city services, utilities or other potential hazards
• Site plan and/or roof plan(s) and/or elevation(s) showing the
solar modules in place, other equipment and structures,
whether or not related to the system
• Fire Department access for firefighting and maintenance
(Fire Code §504)
• Zoning compliance, including height and setback
requirements
• Electrical drawings
Application for Property Tax Abatement
build safe | live safe
23
All solar tax abatement applications are required to
be submitted via eFiling.
• Job/Project Type must be Alteration 2.
• Directive 14 Acceptance must be requested.
• Applicants must request review under the 2008 NYC
Construction Code.
• Application must be filed as Professional Certification of
Objections
• Work Type of “Other” must be selected, then select from the
dropdown menu next to “Other,” Solar(Tax Abatement)
• You will be able to generate a PW-1 using eFiling
• You cannot claim exemption from Energy Code
Application for Property Tax Abatement
build safe | live safe
24
Application for Property Tax Abatement
• Job/Project type must be Alteration 2
build safe | live safe
25
• Directive 14 Acceptance must be requested
• “Yes” to Owner’s Certification for Directive 14 Job
Application for Property Tax Abatement
build safe | live safe
26
Application for Property Tax Abatement
• Request review under the 2008 NYC Codes
• Check worktype “Other” and “Solar (tax abatement)
build safe | live safe
27
Application for Property Tax Abatement
File for Professional Certification of Objections
build safe | live safe
28
Application for Property Tax Abatement
Step 4: Email the completed PW1 package, signed and
sealed, to:
greenroofandsolar@buildings.nyc.gov
In the package, include the following information:
Email subject: “PW1 attached for job number ###, BBL”
1. Attached please find the PW1 package
2. T-number for the job
3. Any other administrative comments specific to the job
Signatures and NYS Professional Engineer and Registered Architect
seals may be submitted to DOB electronically by methods such as
scanning a hand-affixed seal and/or signature and by placing a digital copy of
the seal and/or signature on an electronic document.
build safe | live safe
29
Application for Property Tax Abatement
Step 5: Make payment.
• The Hub staff will send an email confirmation
containing your job number and request for payment of
filing fees
• Payment can be submitted payment on-line
electronically, by mail or in person, to the borough
manager in the borough where the project is located
• Email the Hub staff after payment is made
• Hub staff will reply to your email when ready for Step
6, submit construction documents
build safe | live safe
30
Step 6: Submit construction documents
electronically for approval via eFile.
• Plans, including electrical 3 line diagram and meter
pan, AC Disconnect and Inverter
• Asbestos reports
• PW3 Cost Affidavit
• TR1 Technical Report – Statement of Responsibility
• TR8 Technical Report – Energy Code Progress
Inspections
• Preliminary PTA-4 identifying applicant information,
job locations, costs, and electric output
Application for Property Tax Abatement
build safe | live safe
31
Step 7: Review by DOB plan examiner and virtual
collaboration with the applicant
Step 8: Project approval and pull permit
Application for Property Tax Abatement
build safe | live safe
32
Construction sign-off and inspections
• PTA4 Property Tax Abatement application
• PW3 cost affidavit
• PW7 Letter of Completion review request
• TR1 & TR8 Technical Reports
• Utility interconnection letter
• Notify Inspection Hub when work is ready for inspection
and amendments filed (if necessary)
• After inspection, DOB will sign-off and
forward tax abatement application to DOF
Application for Property Tax Abatement
build safe | live safe
33
New Process!
DOF will supply confirmation letter of Tax
Abatement to owner including:
• Eligible expenditures
• % of property tax deduction
• Start and end dates of tax abatement
Application for Property Tax Abatement
build safe | live safe
34
Filing for the
Tax Abatement
PTA4
Application for Property Tax Abatement
build safe | live safe
35
Form PTA4: Property Tax Abatement
1. An architect or engineer must certify
a) compliance of the solar electric generating system
with both Title 4-C and 1RCNY §105-02, and
b) the date the system was placed in service.
2. The architect or engineer must complete the
Application Form PTA4, sign and seal the form, and
obtain the signature of the owner (Applicant for Property
Tax Abatement).
Application for Property Tax Abatement
build safe | live safe
36
Application for Property Tax Abatement
Form PTA4: Property Tax Abatement
3. The Applicant must certify the expenditures for the
solar electric generating system:
• Incurred on or after August 5, 2008;
• Do not include interest or finance charges;
• Not incurred using a federal, state or local
grant
The applicant must also certify that the system will be
maintained throughout the compliance period.
build safe | live safe
37
Application for Property Tax Abatement
Form PTA4: Property Tax Abatement
The form must be received by March 15 in order for
the abatement to commence on July 1 of that year.
There will be a separate DOB final construction
inspection by a Department of Buildings inspector for
final signoff and to validate the system is placed in
service.
build safe | live safe
38
Application for Property Tax Abatement
• Within 15 days prior to the last day of the
compliance period, an architect or engineer
must inspect the installation to ensure that it
complies with the requirements of Title 4-C and
DOB rule 1RCNY §105-02.
• The applicant of record shall prepare and
maintain a report of the inspection, and shall
notify DOB if the system is not in compliance.
build safe | live safe
39
Application for Property Tax Abatement
Please email your questions to the Department at:
greenroofandsolar@buildings.nyc.gov
build safe | live safe
40
Thank You!
Application for Property Tax Abatement

Mais conteúdo relacionado

Mais procurados

Revocation of succession certificate
Revocation of succession certificateRevocation of succession certificate
Revocation of succession certificateYasir Hayat
 
Olympic Games of Montreal in 1076
Olympic Games of Montreal in 1076Olympic Games of Montreal in 1076
Olympic Games of Montreal in 1076Mayorga7777
 
Ley 60 juegos de azar y competencias municipales
Ley 60 juegos de azar y competencias municipalesLey 60 juegos de azar y competencias municipales
Ley 60 juegos de azar y competencias municipalesDoctora Edilicia
 
Alienation of Land under NLC 1965
Alienation of Land under NLC 1965Alienation of Land under NLC 1965
Alienation of Land under NLC 1965Intan Muhammad
 
Can a work in a contract be omitted
Can a work in a contract be omittedCan a work in a contract be omitted
Can a work in a contract be omittedAMILA GAYAN
 
Extension of time in construction contracts
Extension of time in construction contractsExtension of time in construction contracts
Extension of time in construction contractsKheng Hoe Advocates
 
Chapter 11 power point
Chapter 11 power pointChapter 11 power point
Chapter 11 power pointmckenziewood
 
Module 1 - What Is A Contract ?
Module 1 -  What Is A Contract ?Module 1 -  What Is A Contract ?
Module 1 - What Is A Contract ?lhchin
 
Torrens Title & Unregistered Interests
Torrens Title & Unregistered InterestsTorrens Title & Unregistered Interests
Torrens Title & Unregistered InterestsKate Galloway
 
FIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementFIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementASHISH KUMAR SINGH
 

Mais procurados (19)

NEC3 programme
NEC3 programmeNEC3 programme
NEC3 programme
 
Revocation of succession certificate
Revocation of succession certificateRevocation of succession certificate
Revocation of succession certificate
 
Olympic Games of Montreal in 1076
Olympic Games of Montreal in 1076Olympic Games of Montreal in 1076
Olympic Games of Montreal in 1076
 
Ley 60 juegos de azar y competencias municipales
Ley 60 juegos de azar y competencias municipalesLey 60 juegos de azar y competencias municipales
Ley 60 juegos de azar y competencias municipales
 
Proportions of concrete
Proportions of concreteProportions of concrete
Proportions of concrete
 
Picnic Interruption
Picnic InterruptionPicnic Interruption
Picnic Interruption
 
Alienation of Land under NLC 1965
Alienation of Land under NLC 1965Alienation of Land under NLC 1965
Alienation of Land under NLC 1965
 
Fundamentals of Construction Contracts - English, ver. 2021
Fundamentals of Construction Contracts - English, ver. 2021Fundamentals of Construction Contracts - English, ver. 2021
Fundamentals of Construction Contracts - English, ver. 2021
 
Can a work in a contract be omitted
Can a work in a contract be omittedCan a work in a contract be omitted
Can a work in a contract be omitted
 
Extension of time in construction contracts
Extension of time in construction contractsExtension of time in construction contracts
Extension of time in construction contracts
 
Chapter 11 power point
Chapter 11 power pointChapter 11 power point
Chapter 11 power point
 
Eot claims hr__may2012
Eot claims hr__may2012Eot claims hr__may2012
Eot claims hr__may2012
 
Module 1 - What Is A Contract ?
Module 1 -  What Is A Contract ?Module 1 -  What Is A Contract ?
Module 1 - What Is A Contract ?
 
Torrens Title & Unregistered Interests
Torrens Title & Unregistered InterestsTorrens Title & Unregistered Interests
Torrens Title & Unregistered Interests
 
Law of Prescription
Law of PrescriptionLaw of Prescription
Law of Prescription
 
Fidic contracts management introduction
Fidic contracts management introductionFidic contracts management introduction
Fidic contracts management introduction
 
FIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementFIDIC-Relevant to Time Management
FIDIC-Relevant to Time Management
 
Payment of Stamp Duty
Payment of Stamp DutyPayment of Stamp Duty
Payment of Stamp Duty
 
Prolongation and HOOH Costs
Prolongation and HOOH CostsProlongation and HOOH Costs
Prolongation and HOOH Costs
 

Semelhante a New York City Department of Buildings Filing rep course_203

New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103Safe Rise
 
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition Revised
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition RevisedLCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition Revised
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition RevisedTom Blefko
 
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition Revised
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition RevisedLCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition Revised
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition RevisedTom Blefko
 
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition Revised
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition RevisedLCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition Revised
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition RevisedTom Blefko
 
Collateral Warranties and Third Party Rights
Collateral Warranties and Third Party RightsCollateral Warranties and Third Party Rights
Collateral Warranties and Third Party RightsFrancis Ho
 
Obtaining Title Insurance on Construction Loans: Avoiding Pitfalls Regarding ...
Obtaining Title Insurance on Construction Loans: Avoiding Pitfalls Regarding ...Obtaining Title Insurance on Construction Loans: Avoiding Pitfalls Regarding ...
Obtaining Title Insurance on Construction Loans: Avoiding Pitfalls Regarding ...Bradley Arant Boult Cummings LLP
 
Construction Contracts: Basics of Contracts and Contract Administration
Construction Contracts:  Basics of Contracts and Contract AdministrationConstruction Contracts:  Basics of Contracts and Contract Administration
Construction Contracts: Basics of Contracts and Contract AdministrationGerald R. (Jerry) Genge
 
FIDIC.RICS CPD Event Singapore 2012.ppt
FIDIC.RICS CPD Event Singapore 2012.pptFIDIC.RICS CPD Event Singapore 2012.ppt
FIDIC.RICS CPD Event Singapore 2012.pptDonaAlisyahSiregar
 
New York City Department of Buildings Filing rep course_101
New York City Department of Buildings Filing rep course_101New York City Department of Buildings Filing rep course_101
New York City Department of Buildings Filing rep course_101Safe Rise
 
Claim Preparation and Project Records - 2014 Olswang Construction Law Conference
Claim Preparation and Project Records - 2014 Olswang Construction Law ConferenceClaim Preparation and Project Records - 2014 Olswang Construction Law Conference
Claim Preparation and Project Records - 2014 Olswang Construction Law ConferenceFrancis Ho
 
Construction Futures Wales - NEC3 Workshop - Understanding Works Information...
Construction Futures Wales  - NEC3 Workshop - Understanding Works Information...Construction Futures Wales  - NEC3 Workshop - Understanding Works Information...
Construction Futures Wales - NEC3 Workshop - Understanding Works Information...Rae Davies
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentationJeff B
 
Patrick O'Sullivan Dispute Resolution Boards
Patrick O'Sullivan Dispute Resolution BoardsPatrick O'Sullivan Dispute Resolution Boards
Patrick O'Sullivan Dispute Resolution BoardsResolution Institute
 
Fidic 99 ppt by dr karim
Fidic 99 ppt by dr karimFidic 99 ppt by dr karim
Fidic 99 ppt by dr karimSalama Shurrab
 
20091118 Construction Life cycle completion
20091118 Construction Life cycle completion20091118 Construction Life cycle completion
20091118 Construction Life cycle completionraymond_wan2005
 
Disputes and Claims in Engineering Contracts - 18.07.07.ppt
Disputes and Claims in Engineering Contracts - 18.07.07.pptDisputes and Claims in Engineering Contracts - 18.07.07.ppt
Disputes and Claims in Engineering Contracts - 18.07.07.pptNesrElhandasa1
 

Semelhante a New York City Department of Buildings Filing rep course_203 (20)

New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103
 
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition Revised
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition RevisedLCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition Revised
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition Revised
 
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition Revised
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition RevisedLCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition Revised
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition Revised
 
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition Revised
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition RevisedLCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition Revised
LCAR Unit 21 - Closing the Real Estate Transaction - 14th Edition Revised
 
Collateral Warranties and Third Party Rights
Collateral Warranties and Third Party RightsCollateral Warranties and Third Party Rights
Collateral Warranties and Third Party Rights
 
Obtaining Title Insurance on Construction Loans: Avoiding Pitfalls Regarding ...
Obtaining Title Insurance on Construction Loans: Avoiding Pitfalls Regarding ...Obtaining Title Insurance on Construction Loans: Avoiding Pitfalls Regarding ...
Obtaining Title Insurance on Construction Loans: Avoiding Pitfalls Regarding ...
 
Construction Contracts: Basics of Contracts and Contract Administration
Construction Contracts:  Basics of Contracts and Contract AdministrationConstruction Contracts:  Basics of Contracts and Contract Administration
Construction Contracts: Basics of Contracts and Contract Administration
 
FIDIC.RICS CPD Event Singapore 2012.ppt
FIDIC.RICS CPD Event Singapore 2012.pptFIDIC.RICS CPD Event Singapore 2012.ppt
FIDIC.RICS CPD Event Singapore 2012.ppt
 
CIAC-ADR_PPT.pptx
CIAC-ADR_PPT.pptxCIAC-ADR_PPT.pptx
CIAC-ADR_PPT.pptx
 
New York City Department of Buildings Filing rep course_101
New York City Department of Buildings Filing rep course_101New York City Department of Buildings Filing rep course_101
New York City Department of Buildings Filing rep course_101
 
Claim Preparation and Project Records - 2014 Olswang Construction Law Conference
Claim Preparation and Project Records - 2014 Olswang Construction Law ConferenceClaim Preparation and Project Records - 2014 Olswang Construction Law Conference
Claim Preparation and Project Records - 2014 Olswang Construction Law Conference
 
Chapter 2 [compatibility mode]
Chapter 2 [compatibility mode]Chapter 2 [compatibility mode]
Chapter 2 [compatibility mode]
 
Chapter 2 [compatibility mode]
Chapter 2 [compatibility mode]Chapter 2 [compatibility mode]
Chapter 2 [compatibility mode]
 
Construction Futures Wales - NEC3 Workshop - Understanding Works Information...
Construction Futures Wales  - NEC3 Workshop - Understanding Works Information...Construction Futures Wales  - NEC3 Workshop - Understanding Works Information...
Construction Futures Wales - NEC3 Workshop - Understanding Works Information...
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentation
 
Patrick O'Sullivan Dispute Resolution Boards
Patrick O'Sullivan Dispute Resolution BoardsPatrick O'Sullivan Dispute Resolution Boards
Patrick O'Sullivan Dispute Resolution Boards
 
Fidic 99 ppt by dr karim
Fidic 99 ppt by dr karimFidic 99 ppt by dr karim
Fidic 99 ppt by dr karim
 
20091118 Construction Life cycle completion
20091118 Construction Life cycle completion20091118 Construction Life cycle completion
20091118 Construction Life cycle completion
 
NEC Term Service Contract (TSC)
NEC Term Service Contract (TSC)NEC Term Service Contract (TSC)
NEC Term Service Contract (TSC)
 
Disputes and Claims in Engineering Contracts - 18.07.07.ppt
Disputes and Claims in Engineering Contracts - 18.07.07.pptDisputes and Claims in Engineering Contracts - 18.07.07.ppt
Disputes and Claims in Engineering Contracts - 18.07.07.ppt
 

Mais de Safe Rise

Nfpa standards directory 2016
Nfpa standards directory 2016Nfpa standards directory 2016
Nfpa standards directory 2016Safe Rise
 
Parking page-handout-graphic
Parking page-handout-graphicParking page-handout-graphic
Parking page-handout-graphicSafe Rise
 
World bank ncb works w2 new f&c clause may 2010
World bank ncb works w2 new f&c clause may 2010World bank ncb works w2 new f&c clause may 2010
World bank ncb works w2 new f&c clause may 2010Safe Rise
 
World bank consultants wb srfp _oct_2011_-v1
World bank consultants wb srfp _oct_2011_-v1World bank consultants wb srfp _oct_2011_-v1
World bank consultants wb srfp _oct_2011_-v1Safe Rise
 
The Importance Of The Construction Submittal Process
The Importance Of The Construction Submittal ProcessThe Importance Of The Construction Submittal Process
The Importance Of The Construction Submittal ProcessSafe Rise
 
Emvchipcard flyer
Emvchipcard flyerEmvchipcard flyer
Emvchipcard flyerSafe Rise
 
New York City Department of Buildings Filing rep course_207
New York City Department of Buildings Filing rep course_207New York City Department of Buildings Filing rep course_207
New York City Department of Buildings Filing rep course_207Safe Rise
 
New York City Department of Buildings Filing rep course_206
New York City Department of Buildings Filing rep course_206New York City Department of Buildings Filing rep course_206
New York City Department of Buildings Filing rep course_206Safe Rise
 
New York City Department of Buildings Filing rep course_205
New York City Department of Buildings Filing rep course_205New York City Department of Buildings Filing rep course_205
New York City Department of Buildings Filing rep course_205Safe Rise
 
New York City Department of Buildings Filing rep course_204
New York City Department of Buildings Filing rep course_204New York City Department of Buildings Filing rep course_204
New York City Department of Buildings Filing rep course_204Safe Rise
 
New York City Department of Buildings Filing rep course_202
New York City Department of Buildings Filing rep course_202New York City Department of Buildings Filing rep course_202
New York City Department of Buildings Filing rep course_202Safe Rise
 
New York City Department of Buildings Filing rep course_201
New York City Department of Buildings Filing rep course_201New York City Department of Buildings Filing rep course_201
New York City Department of Buildings Filing rep course_201Safe Rise
 
New York City Department of Buildings Filing rep course_104
New York City Department of Buildings Filing rep course_104New York City Department of Buildings Filing rep course_104
New York City Department of Buildings Filing rep course_104Safe Rise
 
New York City Department of Buildings Filing rep course_102
 New York City Department of Buildings Filing rep course_102 New York City Department of Buildings Filing rep course_102
New York City Department of Buildings Filing rep course_102Safe Rise
 
Mentoring That Works Avoid 6 Common Mistakes
Mentoring That Works Avoid 6 Common MistakesMentoring That Works Avoid 6 Common Mistakes
Mentoring That Works Avoid 6 Common MistakesSafe Rise
 
“EVERYONE” IS NOT A DEMOGRAPHIC A GUIDE TO TARGET MARKETS FOR SMALL BUSINESSES
“EVERYONE” IS NOT A DEMOGRAPHIC A GUIDE TO TARGET MARKETS FOR SMALL BUSINESSES“EVERYONE” IS NOT A DEMOGRAPHIC A GUIDE TO TARGET MARKETS FOR SMALL BUSINESSES
“EVERYONE” IS NOT A DEMOGRAPHIC A GUIDE TO TARGET MARKETS FOR SMALL BUSINESSESSafe Rise
 
Commercial Building Science - Comfortable Environments Through Sustainable De...
Commercial Building Science - Comfortable Environments Through Sustainable De...Commercial Building Science - Comfortable Environments Through Sustainable De...
Commercial Building Science - Comfortable Environments Through Sustainable De...Safe Rise
 
2014 Truth About Real-Time Marketing
2014 Truth About Real-Time Marketing2014 Truth About Real-Time Marketing
2014 Truth About Real-Time MarketingSafe Rise
 
Ag# 342 yeung residence - child bedroom
Ag# 342   yeung residence - child bedroomAg# 342   yeung residence - child bedroom
Ag# 342 yeung residence - child bedroomSafe Rise
 
How to attract customers with facebook
How to attract customers with facebookHow to attract customers with facebook
How to attract customers with facebookSafe Rise
 

Mais de Safe Rise (20)

Nfpa standards directory 2016
Nfpa standards directory 2016Nfpa standards directory 2016
Nfpa standards directory 2016
 
Parking page-handout-graphic
Parking page-handout-graphicParking page-handout-graphic
Parking page-handout-graphic
 
World bank ncb works w2 new f&c clause may 2010
World bank ncb works w2 new f&c clause may 2010World bank ncb works w2 new f&c clause may 2010
World bank ncb works w2 new f&c clause may 2010
 
World bank consultants wb srfp _oct_2011_-v1
World bank consultants wb srfp _oct_2011_-v1World bank consultants wb srfp _oct_2011_-v1
World bank consultants wb srfp _oct_2011_-v1
 
The Importance Of The Construction Submittal Process
The Importance Of The Construction Submittal ProcessThe Importance Of The Construction Submittal Process
The Importance Of The Construction Submittal Process
 
Emvchipcard flyer
Emvchipcard flyerEmvchipcard flyer
Emvchipcard flyer
 
New York City Department of Buildings Filing rep course_207
New York City Department of Buildings Filing rep course_207New York City Department of Buildings Filing rep course_207
New York City Department of Buildings Filing rep course_207
 
New York City Department of Buildings Filing rep course_206
New York City Department of Buildings Filing rep course_206New York City Department of Buildings Filing rep course_206
New York City Department of Buildings Filing rep course_206
 
New York City Department of Buildings Filing rep course_205
New York City Department of Buildings Filing rep course_205New York City Department of Buildings Filing rep course_205
New York City Department of Buildings Filing rep course_205
 
New York City Department of Buildings Filing rep course_204
New York City Department of Buildings Filing rep course_204New York City Department of Buildings Filing rep course_204
New York City Department of Buildings Filing rep course_204
 
New York City Department of Buildings Filing rep course_202
New York City Department of Buildings Filing rep course_202New York City Department of Buildings Filing rep course_202
New York City Department of Buildings Filing rep course_202
 
New York City Department of Buildings Filing rep course_201
New York City Department of Buildings Filing rep course_201New York City Department of Buildings Filing rep course_201
New York City Department of Buildings Filing rep course_201
 
New York City Department of Buildings Filing rep course_104
New York City Department of Buildings Filing rep course_104New York City Department of Buildings Filing rep course_104
New York City Department of Buildings Filing rep course_104
 
New York City Department of Buildings Filing rep course_102
 New York City Department of Buildings Filing rep course_102 New York City Department of Buildings Filing rep course_102
New York City Department of Buildings Filing rep course_102
 
Mentoring That Works Avoid 6 Common Mistakes
Mentoring That Works Avoid 6 Common MistakesMentoring That Works Avoid 6 Common Mistakes
Mentoring That Works Avoid 6 Common Mistakes
 
“EVERYONE” IS NOT A DEMOGRAPHIC A GUIDE TO TARGET MARKETS FOR SMALL BUSINESSES
“EVERYONE” IS NOT A DEMOGRAPHIC A GUIDE TO TARGET MARKETS FOR SMALL BUSINESSES“EVERYONE” IS NOT A DEMOGRAPHIC A GUIDE TO TARGET MARKETS FOR SMALL BUSINESSES
“EVERYONE” IS NOT A DEMOGRAPHIC A GUIDE TO TARGET MARKETS FOR SMALL BUSINESSES
 
Commercial Building Science - Comfortable Environments Through Sustainable De...
Commercial Building Science - Comfortable Environments Through Sustainable De...Commercial Building Science - Comfortable Environments Through Sustainable De...
Commercial Building Science - Comfortable Environments Through Sustainable De...
 
2014 Truth About Real-Time Marketing
2014 Truth About Real-Time Marketing2014 Truth About Real-Time Marketing
2014 Truth About Real-Time Marketing
 
Ag# 342 yeung residence - child bedroom
Ag# 342   yeung residence - child bedroomAg# 342   yeung residence - child bedroom
Ag# 342 yeung residence - child bedroom
 
How to attract customers with facebook
How to attract customers with facebookHow to attract customers with facebook
How to attract customers with facebook
 

Último

ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxnelietumpap1
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxMaryGraceBautista27
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 

Último (20)

ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptx
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptx
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 

New York City Department of Buildings Filing rep course_203

  • 1. • Determination Requests Filed For Construction Code and Zoning Resolution Issues • Easements and Restrictive Declarations • Flood Zones • PENS Appointment • Resolution of Comments and Objections with a Plan Examiner COURSE 203 Filing Representative Training for Class 2 Code and Zoning Representatives Includes: • Enforcement and Tracking Appointments with Plan Examiners • Alteration Applications Cost Validation • Records and Records Room Operation • Solar Power • Solar Photovoltaic and the Construction Codes • Tax Abatement
  • 2. Determination Requests Filed for Construction Code and Zoning Resolution Issues Ira Gluckman, R.A. Borough Commissioner Code and Zoning Representative Training Module 3.9
  • 3. build safe | live safe 2 • Construction Code Determination Form (CCD1) • Zoning Resolution Determination Form (ZRD1) Types of Determination Requests
  • 4. build safe | live safe When to file a CCD1 form? File Construction Code Determination Form (CCD1) for: • Interpretations or clarifications of Building Code sections; • Variation of Building Code or Rules, per AC 28-103.3; or • Variation of Multiple Dwelling Law (MDL) for Article 7B Buildings, per MDL 277.16. Reminder: Article 7B Buildings under the Multiple Dwelling Law are any buildings which at any time prior to January 1, 1977 was occupied for loft, commercial, institutional, public, community facility or manufacturing purposes that are now occupied in whole or in part for joint living-work quarters for artists or general residential purposes. 3
  • 5. build safe | live safe Variations of Building Code or Rules and Multiple Dwelling Law Variations of the Building Code or Rules, per AC 28-103.3, and variations of the Multiple Dwelling Law, per MDL 277.16, both require: • Practical difficulty stated in detail that is specific to the project; and • Provide analysis as to an equally safe or safer alternative, per NYC Charter Section 645(b)(2). 4
  • 6. build safe | live safe When to file a ZRD1 form? File a Zoning Resolution Determination Form (ZRD1) for: • Interpretations of clarifications of Zoning Resolution sections only Reminder: Requests for variations of the Zoning Resolution must be filed with the Board of Standards and Appeals (BSA) or the Department of City Planning (DCP) 5
  • 7. build safe | live safe When to file a CCD1 or ZRD1 form? The CCD1 and ZRD1 forms should only be used for: • An objection raised by a plan examiner; or • A possible future objection (pre-determination) for an application not yet filed. 6
  • 8. build safe | live safe Procedure in Obtaining a Decision for a Determination Step 1: Filings for CCD1 and ZRD1 are reviewed initially by the Department borough office by: • Borough Commissioner; • Deputy Borough Commissioner; and/or • Code and Zoning Specialist. 7 Borough Office Review Borough Determination Tech Affairs Review Final Determination
  • 9. build safe | live safe Step 2: After the review of the applicant’s determination request, including all plans and supporting documents, by the borough office, one of the following decisions shall be issued: • Approved • Approved with conditions • Denied 8 Procedure in Obtaining a Decision for a Determination Borough Office Review Borough Determination Tech Affairs Review Final Determination
  • 10. build safe | live safe Step 3: If the borough issues a denial, the applicant may submit their requests to Technical Affairs for further clarification or if new information arises that may alter the initial decision in their favor 9 Procedure in Obtaining a Decision for a Determination Borough Office Review Borough Determination Tech Affairs Review Final Determination
  • 11. build safe | live safe Step 4: In submitting requests to Technical Affairs, all documents shall be submitted as scanned documents in PDF format to the email address: TADeterminations@buildings.nyc.gov 10 Procedure in Obtaining a Decision for a Determination Borough Office Review Borough Determination Tech Affairs Review Final Determination
  • 12. build safe | live safe Step 5: Submissions for determinations must include: • Completed CCD1 or ZRD1 form • Copy of the borough office denial • All applicable plans signed and sealed by the applicant • Any supporting documentation 11 Procedure in Obtaining a Decision for a Determination Borough Office Review Borough Determination Tech Affairs Review Final Determination
  • 13. build safe | live safe Step 6: Submitted ZRD1 and CCD1 determination requests are reviewed for completeness (see Step 5). Any incomplete submissions shall be rejected with comments to submit the missing items 12 Procedure in Obtaining a Decision for a Determination Borough Office Review Borough Determination Tech Affairs Review Final Determination
  • 14. build safe | live safe Step 7: Determination requests are reviewed at Technical Affairs by a panel of at least three persons: • Chairperson • Attorney • Plan Examiner 13 Procedure in Obtaining a Decision for a Determination Borough Office Review Borough Determination Tech Affairs Review Final Determination
  • 15. build safe | live safe Step 8: Final decision is issued by the Technical Affairs panel 14 Procedure in Obtaining a Decision for a Determination Borough Office Review Borough Determination Tech Affairs Review Final Determination
  • 16. build safe | live safe CCD1: Construction Code Determination Form 15
  • 17. build safe | live safe 16 CCD1: Construction Code Determination Form
  • 18. build safe | live safe ZRD1: Zoning Resolution Determination Form 17
  • 19. build safe | live safe 18 ZRD1: Zoning Resolution Determination Form
  • 20. build safe | live safe Common Errors in Filing a CCD1 or ZRD1 Determination Request with Technical Affairs Which May Delay the Review 19 Common Errors when Filing a Determination Request
  • 21. build safe | live safe Common Errors when Filing a Determination Request • Submissions do not include a complete copy of the borough denial • Copy of the plan examiner’s objection is not included • Multiple unrelated issues are filed on the same CCD1 or ZRD1 forms • File separate determination requests for each distinct issue 20
  • 22. build safe | live safe Missing information on the CCD1 or ZRD1 forms: • Relevant code or zoning sections not cited • Applicant’s email address is missing • The final decision is emailed to the applicant • For CCD1 forms, the version of the construction code (2008, 1968, or prior to 1968 Code) is not checked-off in Section 4 • For CCD1 forms, the type of request in Section 5 for either an interpretation or a variance is not checked-off 21 Common Errors when Filing a Determination Request
  • 23. build safe | live safe • Submitted plans are not signed and sealed by the applicant, unless filed by an attorney • Determination requests involving a zoning regulation are filed incorrectly on a CCD1 form, and vice versa • Scanned documents and plans are not legible 22 Common Errors when Filing a Determination Request
  • 24. build safe | live safe For variations of the Building Code or the Multiple Dwelling Law, the applicant fails to: • State in detail the practical difficulty that is specific to the project; and • Fails to provide the analysis as to an equally safe or safer alternative, as required by NYC Charter Section 645(b)(2). 23 Common Errors when Filing a Determination Request
  • 25. build safe | live safe Sample Final Determination (ZRD1) 24
  • 26. build safe | live safe 25 Sample Final Determination (ZRD1)
  • 27. build safe | live safe 26 Sample Final Determination (ZRD1)
  • 28. build safe | live safe 27 Sample Final Determination (ZRD1)
  • 29. build safe | live safe 28 Thank You!
  • 30. Easements and Restrictive Declarations Janine Gaylard, Esq. Assistant General Counsel Code and Zoning Representative Training Module 4.2
  • 31. build safe | live safe 2  A Restrictive Declaration is a covenant running with the land that binds the present and future owners of the property.  An Easement is the right to use the real property of another for a specific purpose.  Both are typically required prior to the approval of any applications submitted to the Department of Buildings Definitions
  • 32. build safe | live safe Why do I need an Easement / Restrictive Declaration? • The Department may accept an easement or restrictive declaration as an alternate means of compliance with Code requirements • In addition, compliance with certain provisions of zoning may require the execution of restrictive declarations 3
  • 33. build safe | live safe • A restrictive declaration is usually used when the properties are owned by the same owner. The fee owner is identified as the “Declarant” and signs the agreement • An easement agreement is usually used when there are different owners. The fee owners of the respective parcels are identified as the “grantor” and “grantee.” Both must sign the agreement • It is also acceptable to have a declaration granting an easement where the properties are owned by the same owner • When in doubt, ask your lawyer 4 When Should I Submit an Easement or a Restrictive Declaration?
  • 34. build safe | live safe Signatures • All signatures must be notarized using the: • Individual; • Partnership; or, • Corporate acknowledgement form 5
  • 35. build safe | live safe Long-Term Tenants Can long-term tenants sign? • Long-term tenants may not bind the owners of the parcels, and therefore may not sign the agreement or declaration on behalf of the owner 6
  • 36. build safe | live safe Easement / Restrictive Declaration Approval What is the easiest way to get an easement or restrictive declaration approved? • Use one of the Department’s approved agreement forms available on the Department’s website 7
  • 37. build safe | live safe Approved Agreement Forms The following Department-approved agreement forms can be found on the Department’s website, as specified in Legal / Buildings Bulletin 2008-007: • Caretaker’s Apartment • Driveway / Frontage Space • Egress • Flood Zone (1968 Code) • Flood Zone (2008 Code) • Light and Air 8 • Lot-line Window • Off Site Parking • Party Wall • Plumbing System • Student Dormitory
  • 38. build safe | live safe Light and Air Easement Agreement • The Light and Air Easement Agreement cannot be used between parties with buildings on separate zoning lots to satisfy the provisions of: • The New York City Zoning Resolution; or, • Section 30 of the Multiple Dwelling Law • These provisions require unrestricted light and air to be located on the same zoning lot as the building’s windows 9
  • 39. build safe | live safe Other Types of Agreements • An attorney will need to prepare the agreement when no Department-approved form is available • The form must include a clause describing the specific statutory provision or other requirement being satisfied by the agreement or declaration • Required language is specified on page 3 of the Building Bulletin 2008-007 10
  • 40. build safe | live safe Required Language 1. A “run with the land” clause 2. A metes and bounds description of all affected tax lots; 3. A clause stating that the agreement or declaration “shall not be modified, amended or terminated without the prior written consent of the New York City Department of Buildings” 4. The application number for which the agreement or declaration is required 5. Where necessary to clarify the exact location of the benefited or burdened area (e.g., attach diagrams) 6. A clause stating that a “Failure to comply with the terms of this restrictive declaration or easement agreement may result in the revocation of a building permit or certificate of occupancy” 11
  • 41. build safe | live safe Procedure for Professional Certification Submission • For professionally certified applications, the P.E. / R.A. must state on the Department’s POC3 form the statutory requirement being satisfied by the easement/declaration. Then the P.E./R.A has two choices: 1. The P.E./R.A. may use one of the Department’s approved forms and certify that the agreement conforms in all respects to one of Department’s approved forms 2. The P.E./R.A. may use an agreement that does not conform in all respects to a DOB approved form and request that DOB Legal review the agreement by submitting the POC3 form identifying the applicable statutory provision with the proposed agreement to DOB Legal 12
  • 42. build safe | live safe Procedure for Plan Examination Submission If the Agreement is an Approved Form: • Applications that require plan examination may be submitted to the borough office for review and approval • The plan examiner will perform a technical review to determine whether the agreement or declaration satisfies the applicable objection or statutory requirement 13
  • 43. build safe | live safe If Agreement is not an Approved Form: • The agreement must be referred to the DOB General Counsel’s Office via the Borough Plan Examination Unit along with the objection identifying the applicable statutory requirement or need for the agreement • Agreements cannot be submitted to the General Counsel’s Office directly, this will only delay review • General Counsel’s Office requires the Borough Plan Exam referral as confirmation that a plan examiner has performed the necessary technical review to determine whether the agreement, if approved as to form, is an acceptable technical means of satisfying the statutory requirement 14 Procedure for Plan Examination Submission
  • 44. build safe | live safe • The Department’s General Counsel’s Office will either approve your agreement as acceptable to form or identify issues that need to be corrected. • Once General Counsel approves your agreement as to form, you must then record it 15 General Counsel Review
  • 45. build safe | live safe Recording the Agreement • Agreements should be recorded prior to approval • An application may not be approved until proof of the recording of the easement agreement or restrictive declaration has been submitted to the Borough Office • For specific recording instructions see page 5 of Legal / Buildings Bulletin 2008-007 for recording instructions 16
  • 46. build safe | live safe Certificate of Occupancy Where an application will result in the issuance of a Certificate of Occupancy, the Certificate of Occupancy must include: • Reference to the type of easement agreement or restrictive declaration • The city register numbers issued by the Office of the City Register, or if in Richmond County, the reel and page numbers 17
  • 47. build safe | live safe CCD1: Construction Code Determination Form • There may be situations where DOB will approve an easement / restrictive declaration where an applicant is unable to comply with all of the requirements set forth in the Buildings Bulletin • A CCD1 Construction Code Determination Form must be submitted in these instances and include a proposal that provides a safe and legally binding alternative 18
  • 48. build safe | live safe 19 Thank You!
  • 49. Flood Zones Joseph Ackroyd Acting Director, Engineering Code and Zoning Representative Training Module 4.4
  • 50. build safe | live safe Permit Application Requirements • Per BC G104.3 site plans shall delineate the flood hazard area, including the delineation of the base and design flood elevation • Applications should include a “FIRMette” printed from FEMAs Map Service Center to support the site plan 2
  • 51. build safe | live safe FEMAs Map Service Center 3
  • 52. build safe | live safe FIRMette Printed from FEMA Map Service Center 4
  • 53. build safe | live safe Repairs and Alterations Substantial Improvement • If the cost of an alteration exceeds 50% of the market value of the structure the project is substantial improvement. • Per BC G102.1, Item 8, substantially improved buildings must be brought into full compliance with Appendix G. 5
  • 54. build safe | live safe Substantial Improvement Per 1RCNY 3606-01 any alteration that exceeds $40,000 that is not a substantial improvement must include: • Calculations of the Market Value of the Structure • Calculation of Construction Costs • A statement by the applicant 6
  • 55. build safe | live safe Repairs and Alterations §3606-01 Determinations of Market Value and Substantial Improvement Two acceptable methods to determine market value: • Assessment roll option • Appraisal option 7
  • 56. build safe | live safe Repairs/Alterations/Reconstructions Requirements for Substantially Improved Structures Like New: No basements (for residential buildings) • Elevate lowest floor • Adequately anchor the structure (uplift & lateral displacement) • Below the DFE: solely for building access, parking and storage • Flood openings in enclosed spaces below the DFE • Flood resistant materials used up to the DFE • Electrical, plumbing, heating/air conditioning components are elevated above DFE or design to prohibit accumulation of water, FEMA 348 • Above ground tanks are anchored or elevated above DFE 8
  • 57. build safe | live safe Thank you! 9
  • 58. PENS Appointments Lisa Lewis Director, Customer Service Code and Zoning Representative Training Module 5.2
  • 59. What we do? • Walk in customer service • Telephone customer service • Follow up customer service 2 Customer Service Unit build safe | live safe
  • 60. 3 The Plan Examination Notification System (PENS) is a system that allows plan examination customers to schedule appointments with Plan Examiners using an electronic system. Plan Examination Notification System (PENS) build safe | live safe
  • 61. 4 For all appointments a PENS ID & Password is required Contacting 311: • Plan Review appointments Manual: • PER 11 form Emergency: • Fax PER 11 form Borough Office • Manual Requests • Fax manual requests Plan Examination Scheduling Options build safe | live safe
  • 64. DO • Remember your user ID and Password • Use the correct job number and document number • Be honest with the PENS Coordinator DON’T • Schedule erroneous appointments • Cancel appointments on the same day • Schedule same day appointments • Send requests for appointments that can be made through 311 • Send multiple requests for the same job. build safe | live safe 7 PENS Best Practices
  • 65. Resolution of Comments and Objections with a Plan Examiner Neil Adler, P.E. Chief Plan Examiner Code and Zoning Representative Training Module 5.3
  • 66. 2 How a Filing Representative Can Best Prepare for an Appointment: 1. Understand all of the drawings and the design of the Licensed Professional Applicant 2. Review all of the examiner’s objections and comments with the Applicant before your appointment 3. Be prepared to demonstrate that the applicant’s design complies with the Building Code and Zoning Resolution 4. Ensure that all objections and comments have been addressed in the revised drawings and application 5. Know the Dept.’s administrative policies and procedures Be Prepared build safe | live safe
  • 67. Be Prepared Remember…. An appointment is typically only 20 minutes and the examiner uses part of this time to record information! Always arrive on time! 3 build safe | live safe
  • 68. Cancellations Contact PENS (311) to cancel an appointment for any reason 4 build safe | live safe
  • 69. Enforcement and Tracking Appointments with Plan Examiners Neil Adler, P.E. Chief Plan Examiner Code and Zoning Representative Training Module 5.4
  • 70. build safe | live safe 2 All appointments with Plan Examiners are recorded in the Plan Examination Notification System (PENS) and the Buildings Information System (BIS) • Typically, five (5) appointments will be allowed to resolve all plan examiner comments and objections on New Building and Alteration-1 Applications • Typically, two (2) appointments will be allowed to resolve all examiner comments and objections on Alteration-2 Applications Tracking/ Enforcement Plan Examination Appointments
  • 71. build safe | live safe Tracking/ Enforcement Plan Examination Appointments • After two (2) appointments with the plan examiner, on any type of application, if no significant progress toward resolving the objections has been made, then the Applicant of Record / Registered Design Professional must attend the next or 3rd appointment. • If the Applicant of Record does not attend this 3rd appointment with the filing representative, then this Appointment will be immediately ended & recorded as “unprepared” in PENS. The filing representative will be brought to the Chief Plan Examiner (CPE) • If more than 2 appointments are needed to address the examiners comments and objections , then the filing representative or Applicant of Record must first request and receive authorization from the CPE 3
  • 72. build safe | live safe Keeping Appointments • If you appear after 5 minutes of your scheduled appointment time, you will entered as “late” in PENS • If you do not show-up for your appointment and did not call 311 the day before, you will need to reschedule an appointment and will be marked with an unexcused “no- show” absence in PENS 4
  • 73. 1 Alteration Applications Cost Validation Project Cost Affidavit (PW-3) Validation Ravi Patur Executive Director, Borough Operations Code and Zoning Representative Training Module 5.5
  • 74. 2 New Building (NB) Application: Fees assessed based on total construction floor area (not zoning area) Alteration Applications: Fees is based on the construction cost of the project Reference: Administrative Section of the 2008 NYC Building Code • Article 112 outlines the fee schedule of permit fees (Table 28-112.2) • For alteration permits, Section §28-112.3 of the Code requires the applicant to provide an “estimated job construction cost”, which must include the “total value of work” • Project’s cost estimate “shall include total value of work, including materials, and labor…” • The code further establishes that the final valuation “shall be set by the department” (§28-112.3) Permit Fee Structure build safe | live safe
  • 75. 3 Purpose: Ensure that the Department is collecting applicable fees due to the City for alteration projects DOB Operations • City Audits found under reporting of project costs – resulting in loss of fees due to the City • Beginning in 2008, DOB implemented a Cost Affidavit (PW-3) for all alteration jobs • Plan Exam units are required to validate the project’s cost prior to approval, or during audits of pro-cert. jobs • If project costs are under valued, an objection is issued to revise the cost on PW-3 • To ensure uniform and consistent cost validation citywide, a Cost Validation audit and monitoring program was initiated in 2010 Cost Validation build safe | live safe
  • 76. 4 PW-3 Form • Required for alteration permit applications with a few exceptions • Guidelines are available online • Check Categories of Work • List work elements with area/units – must reflect the project’s scope • Must include totals for all categories and job cost Submission • Cost Affidavit is required with an application at initial filing, changes, and for final Sign-off o Initial: PW-3 Cost Estimate signed by Applicant and Owner o Changes: PW-3 Cost Estimate signed by Applicant and Owner o Final: PW-3 Actual Cost signed by Owner • PW-3 for legalization work – Cost must be in today’s value • Alt-1 No-work Applications – PW-3 is not required Cost Affidavit build safe | live safe
  • 77. 5 Filling the PW-3 Form: Details and Accuracy Work Categories Check all pertinent work categories: • Categories checked must match PW-1 • Must indicate Yes or No for all listed categories • Under General Construction (OT), make sure to check all applicable details, including partial demolition Work Description, Area/Units and Cost For each work category: • Describe construction work elements under the category • Record each work element’s Area or Units • Fill-in the Unit Cost for each work element and Total cost • Provide Totals by Category and for the Project’s Cost • PW-3 Form Instructions have examples PW-3 Submission build safe | live safe
  • 78. 6 NB In Conjunction Jobs (to qualify for minimum filing fees) Application must be an Alt 2 or Alt 3 and reference the NB job number: • Drawings must show scope of work covered by the NB application • Must file prior to the issuance of a TCO or CO Jobs that fail the above criteria, will be assessed fees Enlargements Alt 1 or Alt 2 applications must include: • Cost for partial demolition of existing building • Cost of alteration work for all affected areas (including cellar) Legalization Applications filed to legalize work without a permit: • PW-3 cost should be calculated as if proposed work is at the time of submission • Civil penalty are calculated based on actual value of work • DOB will not accept $1,000 minimum frequently used PW-3 Notes build safe | live safe
  • 79. 7 Plan Reviews and Audits • Examiners / Auditors will first establish the project’s scope of work at application review (drawings/documents) • Will identify various work components essential for the scope as established • Compare PW-3 Cost with DOB Valuation Validation Process • The Department uses RS Means as standard reference to assess the value of a project’s work • Will issue an objection if project cost is under-reported • To resolve the objection: 1. PW-3 must be revised to show the min. assessed value, OR 2. The Applicant may submit a detailed cost estimate using RS Means, or other standard cost tool (§28-112.3) Job Cost Validation build safe | live safe
  • 80. 8 In FY 2010 the Department established a Cost Validation Unit The unit is responsible for the following: Technical Support • Provide research and technical support in areas of construction cost and permit fees • Establish standard methods for cost valuation • Provide ongoing technical support and training to plan examiners Internal Monitoring and Control • Develop and provide standard guidelines for Plan Examination for Cost Validation of alteration applications • Conduct weekly audit of a sample of alteration applications following approval in boroughs Cost Validation Unit build safe | live safe
  • 81. 9 Operations Thomas Fariello, RA First Deputy Commissioner 212-566-3248 Kanda Gordon Associate Commissioner 212-566-3444 Ravi Patur Executive Director 212-566-3142 Technical Affairs Marshall Kaminer, PE Executive Engineer 212-442-0933 DOB Contacts build safe | live safe
  • 82. 10
  • 83. 11
  • 84. 12
  • 86. Records & Records Room Operation Jamie Maule Service Manager Code and Zoning Representative Training Module 8.2 & 8.3
  • 87. build safe | live safe Record Retention Requirements • 2008 Construction Code, Administrative Code (AC) Section 28-103.14 requires the Department to keep official records of: • Applications received; • Permits and certificates issued; • Fees collected; • Reports of inspections; and • Notices and orders issued. • Past Codes (1968, 1938) had fewer requirements concerning how the records kept 2
  • 88. build safe | live safe In a Borough Office “Record Room” you may: • Perform property research • Obtain microfilm copies and hard copies of microfilmed documents & drawings • Obtain Job Folders • Request & review offsite Job folders • Request drawings and plans from the BSCAN unit Filing representative and professional ID must be clear of any outstanding/missing “permitted” folders Record Room Operation 3
  • 89. build safe | live safe Freedom of Information Act/Law • Information about “sensitive properties” must be requested under the Freedom of Information Act/Law (FOIL)  Sensitive properties - public buildings, a professional league sports stadium, health facilities, etc. • Requests for records information about sensitive properties must be accompanied by an email approval from the Department’s office of Internal Audits and Discipline (IAD)  IAD approval expires after 30 days 4
  • 90. build safe | live safe Property Research You may research a property to: • Find building records relevant to a current or past Certificate of Occupancies (CO) • Find the legal status of a structure • Find or generate a Letter of No Objection (LNO) • Find docket books, containing information regarding past violations, applications, etc. • Find Curb Cut Cards • Find Index Card records • Request updates in the Building Information System (BIS) • Find an Equipment Use Permit (EUP) card. 5
  • 91. build safe | live safe • The C of O defines the legal use of a structure • Copies of a C of O may be downloaded online from BIS. If the CO is not available online, you may also go to the borough office and research: • Docket books for all pre-BIS filings • Index cards (Buildings Department Index Card) • Curb cut cards • Microfilm records • Offsite records, turn around time is several weeks from initial request 6 Researching the Certificate of Occupancy
  • 92. build safe | live safe • The Buildings Department Index Card indicates the pre- BIS (pre-1980’s) jobs filings and CO number(s), if available • Pre-BIS job filings may not always be listed on the BIS Property Profile Overview 7 C of O Supporting Records Index Card
  • 93. build safe | live safe • This curb cut card is an example of a pre-BIS system (Pre-1980’s) NB job filing • The Docket Book may indicate a CO 8 C of O Supporting Records Curb Cut Card
  • 94. build safe | live safe Department of Buildings Records CO from 1931 9
  • 95. build safe | live safe Department of Buildings Records CO from 1980 10
  • 96. build safe | live safe Department of Buildings Records CO from 2013 11
  • 97. build safe | live safe • DOB certified copies of the CO are currently available for $5/per copy • When a CO is not available, there are other methods available to get property information that are supplemental or in addition to a CO, including: • “I-Cards” (Information Cards) • Multiple Dwelling (MD) cards that were issued by the NYC Department of Housing, Preservation & Development (HPD). • If a CO was obtained only from borough office records, the applicant or filing representative should advise the DOB borough staff to upload the CO to BIS 12 Researching the Certificate of Occupancy
  • 98. build safe | live safe • HPD printout with the Multiple Dwelling Registration (MDR) number indicating the number of units & “I- Cards” are considered proof of legal use as a multiple dwelling (MD) or a mixed use building (residential & commercial) • The HPD “I-Card” may also indicate pre-BIS system applications filed and COs 13 C of O Supporting Records HPD “I – Card”
  • 99. build safe | live safe • What is a Letter of No Objection (LNO)? • An LNO is another way to describe how the property is being used • An LNO is not a substitute for a CO, but is accepted by some government agencies and attorneys, if a CO is not available from DOB records Letter Of No Objection 14
  • 100. build safe | live safe Letter of No Objection Process • The following information is required for LNO application filings: • Print the “Property Profile Overview” (PPO), “Actions”, and “Job Filings” screens from BIS • Copies of curb cut cards • Copies of Docket books for each NB & Alt listed on action screen • Copies of Buildings Department Index Cards • HPD “I” Information card for 3 family or more • Copies of C of O (as appropriate) • Review microfilm and offsite database for pre-BIS applications, which may not be listed on BIS “Actions” screen • No LNO will be issued if there is an open NB or Alt 1 • Fire Suppression jobs must be signed off prior to applying for LNO 15
  • 101. build safe | live safe • Anyone can file for an LNO with the owner’s authorization • There may be minor variations between boroughs in forms, but procedures are essentially the same • In Queens, you may refer to the Commissioner Compliance Memorandum, at right 16 Letter Of No Objection
  • 102. build safe | live safe • The Buildings Department Index Card indicates the pre- BIS system (pre- 1980’s) jobs filings and CO number(s), if available • Pre-BIS system job filings may not always be listed on the BIS Property Profile Overview 17 LNO Supporting Records Index Card
  • 103. build safe | live safe • This curb cut card is an example of a pre-BIS system (Pre-1980’s) NB job filing • The Docket Book may indicate a C of O 18 LNO Supporting Records Curb Cut Card
  • 104. build safe | live safe • HPD printout with the Multiple Dwelling Registration (MDR) number indicating the number of units & “I- Cards” are considered proof of legal use as a multiple dwelling (MD) or a mixed use building (residential & commercial) • The HPD “I-Card” may also indicate pre-BIS system applications filed and COs 19 LNO Supporting Records HPD “I – Card”
  • 105. build safe | live safe • DOF Building Classification Codes • In this case Code B1 confirmed a two family brick dwelling since 1932 20 LNO Supporting Records DOF Records Prior to 1961
  • 106. build safe | live safe • The LNO filing fee must be paid prior to submitting application: • 1-2-3 family homes & residential garage is $25 for each structure • 4+ family homes & commercial property is $100 for each structure • DOB staff will annotate the following information on the LNO slip issued to customers: • LNO application number • 15 business days review process • 10 business days for review of Resubmittals LNO • The property address listed • The Record Room phone number • The DOB website information 21 LNO Fees
  • 107. build safe | live safe When will an LNO be issued? • If no C of O is available; and • The submitted property records are “favorable;” then • DOB can issue an LNO indicating the legal use of the property 22 When will an LNO be issued?
  • 108. build safe | live safe • LNO for two family dwelling • No C of O was located in DOB records • DOB records support the current use as a 2- family dwelling and are the overriding criteria. 23
  • 109. build safe | live safe The following additional information is required when requesting an LNO for buildings with Children-related special occupancy, with or without a C of O: • Hours and/ or dates of operation, number of children per each age group (under and over 2 years old) • Layout drawing with floor location, exits and accessory spaces • A DOB mandatory Field Inspection & report Examples of buildings with children-related special occupancy include: • Group family daycare homes • Family day care homes • Schools • After school programs • Day & summer camps LNO Special Occupancies 24
  • 110. build safe | live safe Microfilm / Microfiche • Microfilm / Microfiche requests can be submitted for plans, application filings, surveys, etc. • To request a Microfiche, complete the Record Request form: • Check the “Microfilm” box • Fill in the BLOCK/LOT numbers • When possible, include the application number(s) • If the property was previously known with a different block/lot number, please include this • Limit one Q-Matic ticket per request form • There are no Microfiche copies for BSCAN Jobs (Jobs after 2009) Microfiche and job folders cannot be listed on the same Record Request form 25 
  • 111. build safe | live safe Microfiche Fees • 11+ microfiche cost 25 cents per “fiche strip” • A fiche strip contains a series of drawings and documents that can be viewed on the Microfiche viewer • There is a viewer located in each borough office in the Public Access Area • There are also viewers with photocopying ability in each borough office, which can produce small (standard letter) size copies • Customers may purchase a Jamex Card for the amount needed for small (standard letter) size blowback copies. Each small blowback copy costs 25 cents per page • Blowback copies of microfiche drawings & documents that are in excess of the small (standard letter) size are available at $8 per page • Additional copies in the same request of the same microfiche drawing/document are $5 per page 26
  • 112. build safe | live safe • The microfiche sheet (below) is placed under the glass of the viewer (to the right) for review Microfilm / Microfiche 27
  • 113. build safe | live safe Job Folder Request Complete the Record Request form with Job Number and check the box “ folder” • Permit folders are recorded in the Expeditor Retention database with Filing Representatives / Professionals DOB ID. • Records of all Approved and Disapproved folders are recorded in the borough office including, which customers (applicant, filing representative) has the folder and when it was pulled • Contents of “non-permit” folders may be given to the customers Microfiche and job folders cannot be listed on the same Record Request form 28 
  • 114. build safe | live safe Additional Records Search The Additional Search form (10 business days) can be used if: • The job folder is not immediately available or cannot be readily found • The job folder is located in DOB offsite storage • Information requested is in a pre-BIS job folder or a Block/Lot folder • The form is signed by the designated DOB records room staff person and a copy is provided to the customer as a receipt 29
  • 115. build safe | live safe Additional Records Search 30
  • 116. build safe | live safe BSCAN 1. The BSCAN section in Queens is open on Tuesday and Wednesday from 10:00 am to 12:00 noon 2. The BSCAN unit scans documents and plans for applications from 2009 and later • For example in Queens, BIS Job numbers start with “420” (documents and plans) and “410” (documents only) 3. Applicants or filing representatives cannot submit documents or plans directly to the BSCAN unit. 4. When submitting application documentation: • Filing Representatives need to provide three sets of plans when filing • One set of plans will remain in the BSCAN unit for scanning (DOB copy) • The other two sets of plans will remain in the job folder for the applicant, filing representative, etc. • The documents filed are scanned and available online for public review in the “virtual folder” in BIS under the application number 5. The BSCAN unit will charge a fee of $8 per copy of any scanned drawing, or other document that is not in the virtual folder 31
  • 117. build safe | live safe Thank you! 32
  • 118. Code and Zoning Representative Training Module 9.14 SOLAR POWER Solar Photovoltaic and the Construction Codes Tax Abatement Martin Rebholz, RA Borough Commissioner
  • 119. build safe | live safe 2 General Requirements • Construction and Electrical work permits • Panel must be listed by a nationally recognized testing laboratory • NYC-licensed Master Electrician is required for all Electrical installations • Applicant must be a registered architect or professional engineer • Electrical utility interconnection approval Solar Photovoltaic Panel (PV) installation projects requires all of the following:
  • 120. build safe | live safe 3 Construction Application: • Building and roof structure • Roof condition/rooftop obstructions • Drainage conditions • Product structure, listing and anchorage • Location of Electric Meter, AC Disconnect, Inverter Electrical Application: • Product listing • Electrical assembly • Utility connection Property Tax Abatement Application: (if applicable) • Form to be filled out in accordance with Department of Buildings instruction sheet Information Required
  • 121. build safe | live safe 4 Types of Application
  • 122. build safe | live safe Required Rooftop Information 5 Fire Code Section 504 • A clear path of not less than 6 feet (1829 mm) horizontal width and 9 feet (2743 mm) in height shall be provided from the front of the building to the rear of the building and from one side of the building to the other….
  • 123. build safe | live safe 6 Required Rooftop Information
  • 124. build safe | live safe 7 Required Rooftop Information
  • 125. build safe | live safe Required Zoning Information 8 Local Law 20 of 2011 - Zone Green text amendment to the Zoning Resolution Rooftop Solar PV no longer counts as an additional story http://www.nyc.gov/html/dcp/html/greenbuildings/index.shtml
  • 126. build safe | live safe 9 Zone Green: Solar PV As A Permitted Obstruction On Flat Roofs Street NON-CONTEXTUAL Zoning Solar PV panels as Permitted Obstructions in Non-contextual zoning districts are now ALLOWED to penetrate the sky exposure plane (sloping plane) CONTEXTUAL Zoning Solar PV panels as Permitted Obstructions in Contextual zoning districts are now ALLOWED to penetrate the maximum height limit (horizontal plane) Residential and commercial zoning districts with an A, B, D or X suffix are Contextual zoning districts. BUILT UNDER HEIGHT LIMIT BUILT OVER HEIGHT LIMIT MAXIMUM HEIGHT LIMIT BUILT UP TO HEIGHT LIMIT PRE-EXISTING Max 4’ Permit Applicant of Record must know allowable building height in proposed zoning district, and must know actual building height in order to design PV solar system in compliance with NYC zoning regulations Construction Permit Application
  • 127. build safe | live safe 10 On slopes greater than 20 degrees, solar panel height shall be limited to 18” measured perpendicular to roof surface 40º > 20º Photo: Department of Buildings Construction Permit Application
  • 128. build safe | live safe 11 Construction Permit Application
  • 129. build safe | live safe Construction Permit Application 12 Document requirements • Plot plan locating of the building on the site, pertinent trees, structures, city services, utilities, hazards • Site plan, roof plan(s), elevation(s) showing the solar modules in place, other equipment and structures, pertinent to or having impact on code compliance of the system • Fire Department access for firefighting and maintenance (Fire Code §504) • Electrical Diagram • Location of Meter, AC Disconnect & Inverter – May be a single line diagram
  • 130. build safe | live safe 13 Document requirements • Drawings showing structural work required to provide, add or reinforcement as necessary to sustain the added vertical and horizontal loads (Building Code Chapter 16) • Submit Form TR-1 for special inspections (structural stability, firestopping) • Submit Form TR-8 for Energy Code inspections • Drawings showing roof covering and drainage work • DEP Asbestos form • Adjoining building outlines and heights • ConEd preliminary contract or other proof of coordination Construction Permit Application
  • 131. build safe | live safe Construction Permit Application 14
  • 132. build safe | live safe 15 Construction Permit Application
  • 133. build safe | live safe 16 Inspections • Special Inspections (form TR-1) • Energy Code Progress Inspections (form TR-8) • Electrical inspection (by DOB) and sign-off required prior to Construction sign-off Construction Permit Application
  • 134. build safe | live safe Construction Permit Application 17 Electrical Permit may be e-filed Must be associated with construction job number. NYC Electrical Code § 690.1 • Installations must be listed by nationally recognized testing laboratory as complete assemblies Electrical inspection by DoB
  • 135. build safe | live safe 18 Electrical Permit The solar electric generating system installations must select (E) Sustainable Energy Installs Solar on Form ED16A (electrical permit application). Construction Permit Application
  • 136. build safe | live safe 19 Definitions • Applicant of record - the registered design professional who filed the alteration application • Alteration application - in this case, the Alt 2 application filed with the Department • Applicant for property tax abatement - the owner • Application for property tax abatement - Form PTA4 • Compliance period - the tax year (July 1-June 30) in which the property tax abatement begins and the three tax years immediately following, 4 years total Application for Property Tax Abatement
  • 137. build safe | live safe 20 Definitions • Placed in service - affects how the abatement is calculated, and shall be the latter of: • The date the system began generating electricity, or • The date of the Department’s issuance of a letter of completion for the associated alteration application Application for Property Tax Abatement
  • 138. build safe | live safe 21 COMPLIANCE PERIOD THE TAX ABATEMENT PROGRAM WILL END IN 2013 2015 March 15, 2013 2015 will be the final deadline to submit your application. December 31, 2012 2014 is the final date for “placed in service” Application for Property Tax Abatement
  • 139. build safe | live safe 22 Document requirements • Plot plan locating of solar power system on the site, trees, structures, city services, utilities or other potential hazards • Site plan and/or roof plan(s) and/or elevation(s) showing the solar modules in place, other equipment and structures, whether or not related to the system • Fire Department access for firefighting and maintenance (Fire Code §504) • Zoning compliance, including height and setback requirements • Electrical drawings Application for Property Tax Abatement
  • 140. build safe | live safe 23 All solar tax abatement applications are required to be submitted via eFiling. • Job/Project Type must be Alteration 2. • Directive 14 Acceptance must be requested. • Applicants must request review under the 2008 NYC Construction Code. • Application must be filed as Professional Certification of Objections • Work Type of “Other” must be selected, then select from the dropdown menu next to “Other,” Solar(Tax Abatement) • You will be able to generate a PW-1 using eFiling • You cannot claim exemption from Energy Code Application for Property Tax Abatement
  • 141. build safe | live safe 24 Application for Property Tax Abatement • Job/Project type must be Alteration 2
  • 142. build safe | live safe 25 • Directive 14 Acceptance must be requested • “Yes” to Owner’s Certification for Directive 14 Job Application for Property Tax Abatement
  • 143. build safe | live safe 26 Application for Property Tax Abatement • Request review under the 2008 NYC Codes • Check worktype “Other” and “Solar (tax abatement)
  • 144. build safe | live safe 27 Application for Property Tax Abatement File for Professional Certification of Objections
  • 145. build safe | live safe 28 Application for Property Tax Abatement Step 4: Email the completed PW1 package, signed and sealed, to: greenroofandsolar@buildings.nyc.gov In the package, include the following information: Email subject: “PW1 attached for job number ###, BBL” 1. Attached please find the PW1 package 2. T-number for the job 3. Any other administrative comments specific to the job Signatures and NYS Professional Engineer and Registered Architect seals may be submitted to DOB electronically by methods such as scanning a hand-affixed seal and/or signature and by placing a digital copy of the seal and/or signature on an electronic document.
  • 146. build safe | live safe 29 Application for Property Tax Abatement Step 5: Make payment. • The Hub staff will send an email confirmation containing your job number and request for payment of filing fees • Payment can be submitted payment on-line electronically, by mail or in person, to the borough manager in the borough where the project is located • Email the Hub staff after payment is made • Hub staff will reply to your email when ready for Step 6, submit construction documents
  • 147. build safe | live safe 30 Step 6: Submit construction documents electronically for approval via eFile. • Plans, including electrical 3 line diagram and meter pan, AC Disconnect and Inverter • Asbestos reports • PW3 Cost Affidavit • TR1 Technical Report – Statement of Responsibility • TR8 Technical Report – Energy Code Progress Inspections • Preliminary PTA-4 identifying applicant information, job locations, costs, and electric output Application for Property Tax Abatement
  • 148. build safe | live safe 31 Step 7: Review by DOB plan examiner and virtual collaboration with the applicant Step 8: Project approval and pull permit Application for Property Tax Abatement
  • 149. build safe | live safe 32 Construction sign-off and inspections • PTA4 Property Tax Abatement application • PW3 cost affidavit • PW7 Letter of Completion review request • TR1 & TR8 Technical Reports • Utility interconnection letter • Notify Inspection Hub when work is ready for inspection and amendments filed (if necessary) • After inspection, DOB will sign-off and forward tax abatement application to DOF Application for Property Tax Abatement
  • 150. build safe | live safe 33 New Process! DOF will supply confirmation letter of Tax Abatement to owner including: • Eligible expenditures • % of property tax deduction • Start and end dates of tax abatement Application for Property Tax Abatement
  • 151. build safe | live safe 34 Filing for the Tax Abatement PTA4 Application for Property Tax Abatement
  • 152. build safe | live safe 35 Form PTA4: Property Tax Abatement 1. An architect or engineer must certify a) compliance of the solar electric generating system with both Title 4-C and 1RCNY §105-02, and b) the date the system was placed in service. 2. The architect or engineer must complete the Application Form PTA4, sign and seal the form, and obtain the signature of the owner (Applicant for Property Tax Abatement). Application for Property Tax Abatement
  • 153. build safe | live safe 36 Application for Property Tax Abatement Form PTA4: Property Tax Abatement 3. The Applicant must certify the expenditures for the solar electric generating system: • Incurred on or after August 5, 2008; • Do not include interest or finance charges; • Not incurred using a federal, state or local grant The applicant must also certify that the system will be maintained throughout the compliance period.
  • 154. build safe | live safe 37 Application for Property Tax Abatement Form PTA4: Property Tax Abatement The form must be received by March 15 in order for the abatement to commence on July 1 of that year. There will be a separate DOB final construction inspection by a Department of Buildings inspector for final signoff and to validate the system is placed in service.
  • 155. build safe | live safe 38 Application for Property Tax Abatement • Within 15 days prior to the last day of the compliance period, an architect or engineer must inspect the installation to ensure that it complies with the requirements of Title 4-C and DOB rule 1RCNY §105-02. • The applicant of record shall prepare and maintain a report of the inspection, and shall notify DOB if the system is not in compliance.
  • 156. build safe | live safe 39 Application for Property Tax Abatement Please email your questions to the Department at: greenroofandsolar@buildings.nyc.gov
  • 157. build safe | live safe 40 Thank You! Application for Property Tax Abatement