Stock Requirements
List
by MK Moon
                Page 1
Overview


•Stock requirements list unlike MRP list is a dynamic report giving up-to-date
information about new requirements of that material, such as Planned Independent
Requirements (PIRs), Issue Stock Transfer order, Sales orders and so on.

•A stock requirements list is the most up-to-date report of a given material/ materials.

•Whenever there is a receipt or issue added to the material, the same is updated in
stock requirements list on a real-time basis.




                                                                              Page 2
Different between MRP List


 • The main difference between the MRP list and the stock/requirements list is that
   each time the stock/requirements list is called, the system selects the MRP
   elements and displays the most up-to-date situation.


 • You thus always see the current availability situation of the material in the
   stock/requirements list.


 • Changes that are made after the planning date are displayed directly, so the list is
   therefore dynamic.




                                                                                   Page 3
Planned Independent Requirement(PIR)

• Planned independent requirements are used to perform Demand Management functions.


• These are planned production or sales quantities that are based on forecast procedure (for
  example, Material Forecast or S&OP procedure).


• These numbers are used in MRP to calculate procurement and/or production quantities
  for a material.


• A planned independent requirement contains one planned quantity and one date, or a
  number of planned independent requirements schedule lines, that is, one planned
  quantity split over time according to dates.




                                                                               Page 4
Stock Requirements – Menu Path


                 SAP Menu > Logistic > Production > MRP >
                 Evaluation > Stock Requirements List

                 Or you may use T code MD04 to generate
                 stock requirement list.




                                                Page 5
Transaction Workflow




 Fill in Material Number and Plant Number for which you want to display stock
 requirements list




                                                                        Page 6
Transaction Workflow (Condt.)




 System list out stock requirements list as of real time basis




                                                                 Page 7
Stock Requirement List – Collective
Display

•You want to display the stock/requirements situation for a series of materials in the
stock/requirements list.

•You can use the collective display of the stock/requirements list to check and
process current stock/requirements lists according to various criteria.

SAP Menu > Logistics > Production > MRP > Evaluation > Stock Requirements
List: Collective Display




                                                                              Page 8
Collective Display - menu path

You can use the transaction code MD07 or the following SAP menu path to generate
stock requirements list – collective display.

SAP Menu > Logistics > Production > MRP > Evaluation > Stock Requirements List:
Collective Display




                                                                        Page 9
Transaction workflow (Condt.)




                                Page 10
Transaction workflow (Condt.)

•Use the transaction code MD07 for stock requirements list – collective display.

•Stock requirements list: Initial Screen is displayed.

•Enter the plant, MRP controller and then press Enter.

•The material list appears.

•This includes all the materials that fulfill your selection criteria.




                                                                            Page 11
Transaction workflow (Condt.)




System will list out the list of stock requirements list




                                                           Page 12

Mais conteúdo relacionado

Mais procurados

SAP MM IM Physical inventory -cycle counting
SAP MM IM Physical inventory -cycle countingSAP MM IM Physical inventory -cycle counting
SAP MM IM Physical inventory -cycle countingLokesh Modem
 
Vendor rebate process and settings
Vendor rebate process and settingsVendor rebate process and settings
Vendor rebate process and settingsMohammed Azhad
 
Class PowerPoint PIR
Class PowerPoint PIRClass PowerPoint PIR
Class PowerPoint PIRKellie Abbey
 
Sap Purchase Order Workflow
Sap Purchase Order WorkflowSap Purchase Order Workflow
Sap Purchase Order WorkflowArghadip Kar
 
Sd configuration steps for automatic batch determination in delivery
Sd   configuration steps for automatic batch determination in deliverySd   configuration steps for automatic batch determination in delivery
Sd configuration steps for automatic batch determination in deliveryShivaprakash Shastri Hiremath
 
Production Supply with SAP EWM
Production Supply with SAP EWMProduction Supply with SAP EWM
Production Supply with SAP EWMVictor Cerullo
 
Make to order document
Make to order document Make to order document
Make to order document Hari Krishna
 
SAP MM Business Scenarios
SAP MM  Business ScenariosSAP MM  Business Scenarios
SAP MM Business ScenariosLokesh Modem
 
SAP Sales and Operational Planning -SOP
SAP Sales and Operational Planning -SOPSAP Sales and Operational Planning -SOP
SAP Sales and Operational Planning -SOPAnkit Sharma
 
Sap pp shop floor control configuration
Sap pp   shop floor control configurationSap pp   shop floor control configuration
Sap pp shop floor control configurationVikranth Ikkalaki
 
Pricing Concept in SAP SD by Venkat Mannam
Pricing Concept in SAP SD by Venkat MannamPricing Concept in SAP SD by Venkat Mannam
Pricing Concept in SAP SD by Venkat MannamVenkat Mannam
 
SAP SD Sales Deal & promotion
SAP SD Sales Deal & promotionSAP SD Sales Deal & promotion
SAP SD Sales Deal & promotionarun_bala1
 
55811936 product-costing-cost-estimation-in-sap
55811936 product-costing-cost-estimation-in-sap55811936 product-costing-cost-estimation-in-sap
55811936 product-costing-cost-estimation-in-sapPepa Pencheva
 

Mais procurados (20)

SAP MM IM Physical inventory -cycle counting
SAP MM IM Physical inventory -cycle countingSAP MM IM Physical inventory -cycle counting
SAP MM IM Physical inventory -cycle counting
 
Sap sd ppt
Sap sd pptSap sd ppt
Sap sd ppt
 
Vendor rebate process and settings
Vendor rebate process and settingsVendor rebate process and settings
Vendor rebate process and settings
 
Class PowerPoint PIR
Class PowerPoint PIRClass PowerPoint PIR
Class PowerPoint PIR
 
Sap Purchase Order Workflow
Sap Purchase Order WorkflowSap Purchase Order Workflow
Sap Purchase Order Workflow
 
SAP Production Planning
SAP Production PlanningSAP Production Planning
SAP Production Planning
 
Sd configuration steps for automatic batch determination in delivery
Sd   configuration steps for automatic batch determination in deliverySd   configuration steps for automatic batch determination in delivery
Sd configuration steps for automatic batch determination in delivery
 
Production Supply with SAP EWM
Production Supply with SAP EWMProduction Supply with SAP EWM
Production Supply with SAP EWM
 
Make to order document
Make to order document Make to order document
Make to order document
 
SAP MM Standard Business Processes
SAP MM Standard Business ProcessesSAP MM Standard Business Processes
SAP MM Standard Business Processes
 
SAP MM Business Scenarios
SAP MM  Business ScenariosSAP MM  Business Scenarios
SAP MM Business Scenarios
 
SAP Sales and Operational Planning -SOP
SAP Sales and Operational Planning -SOPSAP Sales and Operational Planning -SOP
SAP Sales and Operational Planning -SOP
 
Sap pp shop floor control configuration
Sap pp   shop floor control configurationSap pp   shop floor control configuration
Sap pp shop floor control configuration
 
SAP EWM Cross Docking
SAP EWM Cross DockingSAP EWM Cross Docking
SAP EWM Cross Docking
 
SAP MM Essential Master Data
SAP MM Essential Master DataSAP MM Essential Master Data
SAP MM Essential Master Data
 
Pricing Concept in SAP SD by Venkat Mannam
Pricing Concept in SAP SD by Venkat MannamPricing Concept in SAP SD by Venkat Mannam
Pricing Concept in SAP SD by Venkat Mannam
 
Variant material
Variant materialVariant material
Variant material
 
Sap mm tickets
Sap mm ticketsSap mm tickets
Sap mm tickets
 
SAP SD Sales Deal & promotion
SAP SD Sales Deal & promotionSAP SD Sales Deal & promotion
SAP SD Sales Deal & promotion
 
55811936 product-costing-cost-estimation-in-sap
55811936 product-costing-cost-estimation-in-sap55811936 product-costing-cost-estimation-in-sap
55811936 product-costing-cost-estimation-in-sap
 

Destaque

Transaction Md04
Transaction Md04Transaction Md04
Transaction Md04shvax
 
MD04 Report in BW
MD04 Report in BWMD04 Report in BW
MD04 Report in BWtasmc
 
Sap MRP materials requirements planning
Sap MRP materials requirements planningSap MRP materials requirements planning
Sap MRP materials requirements planningnagarajusap06
 
נחל חצץ ונחל דוך - בקעת צין 7/2/2013
נחל חצץ ונחל דוך - בקעת צין 7/2/2013נחל חצץ ונחל דוך - בקעת צין 7/2/2013
נחל חצץ ונחל דוך - בקעת צין 7/2/2013shvax
 
Sap afs-tables-and-tcodes-list
Sap afs-tables-and-tcodes-listSap afs-tables-and-tcodes-list
Sap afs-tables-and-tcodes-listSanjeev Malik
 
Logistics management
Logistics managementLogistics management
Logistics managementAziza Faryal
 
Milk run distribution
Milk run distributionMilk run distribution
Milk run distributionHammaduddin
 
Restaurant facilities and equipment
Restaurant facilities and equipmentRestaurant facilities and equipment
Restaurant facilities and equipmentRavi Dandotiya
 

Destaque (11)

Transaction Md04
Transaction Md04Transaction Md04
Transaction Md04
 
MD04 Report in BW
MD04 Report in BWMD04 Report in BW
MD04 Report in BW
 
Sap MRP materials requirements planning
Sap MRP materials requirements planningSap MRP materials requirements planning
Sap MRP materials requirements planning
 
נחל חצץ ונחל דוך - בקעת צין 7/2/2013
נחל חצץ ונחל דוך - בקעת צין 7/2/2013נחל חצץ ונחל דוך - בקעת צין 7/2/2013
נחל חצץ ונחל דוך - בקעת צין 7/2/2013
 
ATP
ATPATP
ATP
 
Sap afs-tables-and-tcodes-list
Sap afs-tables-and-tcodes-listSap afs-tables-and-tcodes-list
Sap afs-tables-and-tcodes-list
 
Logistics management
Logistics managementLogistics management
Logistics management
 
Milk run distribution
Milk run distributionMilk run distribution
Milk run distribution
 
Restaurant facilities and equipment
Restaurant facilities and equipmentRestaurant facilities and equipment
Restaurant facilities and equipment
 
Planned order release
Planned order releasePlanned order release
Planned order release
 
Lot Sizing Techniques
Lot Sizing TechniquesLot Sizing Techniques
Lot Sizing Techniques
 

Semelhante a Stock requirements list md04

17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-infoMBA, MSc, Alberto Castellano
 
Material Requirements planning system 01Page to 04 Page
Material Requirements planning system                      01Page to 04 PageMaterial Requirements planning system                      01Page to 04 Page
Material Requirements planning system 01Page to 04 PageHasibul Islam
 
sap-purchasing-end-user-manual-introductory-training.pdf
sap-purchasing-end-user-manual-introductory-training.pdfsap-purchasing-end-user-manual-introductory-training.pdf
sap-purchasing-end-user-manual-introductory-training.pdfTapera Mangezi,PMP®
 
Material Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxMaterial Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxIrelynJasmin
 
Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Snehav Sharma
 
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBSession 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBDrDeeptiSharma12
 
SAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna NookellaSAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna Nookellamuralikrishnanookella
 
IT for Production & Manufacturing
IT for Production & ManufacturingIT for Production & Manufacturing
IT for Production & ManufacturingPantit Sirapobthada
 
MATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESSMATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESSNEHA GAUTAM
 
Top 25 SAP MM Interview Questions & Answers | IQ Online Training
Top 25 SAP MM Interview Questions & Answers | IQ Online TrainingTop 25 SAP MM Interview Questions & Answers | IQ Online Training
Top 25 SAP MM Interview Questions & Answers | IQ Online TrainingIQ Online Training
 
MRP IN SERVICES & ERP
MRP IN SERVICES & ERPMRP IN SERVICES & ERP
MRP IN SERVICES & ERPMaria AL
 

Semelhante a Stock requirements list md04 (20)

MRP & ERP.pdf
MRP & ERP.pdfMRP & ERP.pdf
MRP & ERP.pdf
 
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
17085700 sap-pp-materials-requirement-planning-http-sapdocs-info
 
14457092-Oracle-Planning.pptx
14457092-Oracle-Planning.pptx14457092-Oracle-Planning.pptx
14457092-Oracle-Planning.pptx
 
Lect 6.ppt
Lect 6.pptLect 6.ppt
Lect 6.ppt
 
Material Requirements planning system 01Page to 04 Page
Material Requirements planning system                      01Page to 04 PageMaterial Requirements planning system                      01Page to 04 Page
Material Requirements planning system 01Page to 04 Page
 
sap-purchasing-end-user-manual-introductory-training.pdf
sap-purchasing-end-user-manual-introductory-training.pdfsap-purchasing-end-user-manual-introductory-training.pdf
sap-purchasing-end-user-manual-introductory-training.pdf
 
Material Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptxMaterial Requirements Planning (MRP).pptx
Material Requirements Planning (MRP).pptx
 
(Mrp 1) Prsntation Slides
(Mrp 1) Prsntation Slides(Mrp 1) Prsntation Slides
(Mrp 1) Prsntation Slides
 
MRP- Lecture PPT.pptx
MRP- Lecture PPT.pptxMRP- Lecture PPT.pptx
MRP- Lecture PPT.pptx
 
Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)
 
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBSession 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
 
MRP.pptx
MRP.pptxMRP.pptx
MRP.pptx
 
SAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna NookellaSAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna Nookella
 
IT for Production & Manufacturing
IT for Production & ManufacturingIT for Production & Manufacturing
IT for Production & Manufacturing
 
VCP Workshop
VCP WorkshopVCP Workshop
VCP Workshop
 
Erp chapter 3
Erp chapter 3Erp chapter 3
Erp chapter 3
 
MATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESSMATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESS
 
Top 25 SAP MM Interview Questions & Answers | IQ Online Training
Top 25 SAP MM Interview Questions & Answers | IQ Online TrainingTop 25 SAP MM Interview Questions & Answers | IQ Online Training
Top 25 SAP MM Interview Questions & Answers | IQ Online Training
 
MRP IN SERVICES & ERP
MRP IN SERVICES & ERPMRP IN SERVICES & ERP
MRP IN SERVICES & ERP
 
Sap mrp
Sap mrpSap mrp
Sap mrp
 

Stock requirements list md04

  • 2. Overview •Stock requirements list unlike MRP list is a dynamic report giving up-to-date information about new requirements of that material, such as Planned Independent Requirements (PIRs), Issue Stock Transfer order, Sales orders and so on. •A stock requirements list is the most up-to-date report of a given material/ materials. •Whenever there is a receipt or issue added to the material, the same is updated in stock requirements list on a real-time basis. Page 2
  • 3. Different between MRP List • The main difference between the MRP list and the stock/requirements list is that each time the stock/requirements list is called, the system selects the MRP elements and displays the most up-to-date situation. • You thus always see the current availability situation of the material in the stock/requirements list. • Changes that are made after the planning date are displayed directly, so the list is therefore dynamic. Page 3
  • 4. Planned Independent Requirement(PIR) • Planned independent requirements are used to perform Demand Management functions. • These are planned production or sales quantities that are based on forecast procedure (for example, Material Forecast or S&OP procedure). • These numbers are used in MRP to calculate procurement and/or production quantities for a material. • A planned independent requirement contains one planned quantity and one date, or a number of planned independent requirements schedule lines, that is, one planned quantity split over time according to dates. Page 4
  • 5. Stock Requirements – Menu Path SAP Menu > Logistic > Production > MRP > Evaluation > Stock Requirements List Or you may use T code MD04 to generate stock requirement list. Page 5
  • 6. Transaction Workflow Fill in Material Number and Plant Number for which you want to display stock requirements list Page 6
  • 7. Transaction Workflow (Condt.) System list out stock requirements list as of real time basis Page 7
  • 8. Stock Requirement List – Collective Display •You want to display the stock/requirements situation for a series of materials in the stock/requirements list. •You can use the collective display of the stock/requirements list to check and process current stock/requirements lists according to various criteria. SAP Menu > Logistics > Production > MRP > Evaluation > Stock Requirements List: Collective Display Page 8
  • 9. Collective Display - menu path You can use the transaction code MD07 or the following SAP menu path to generate stock requirements list – collective display. SAP Menu > Logistics > Production > MRP > Evaluation > Stock Requirements List: Collective Display Page 9
  • 11. Transaction workflow (Condt.) •Use the transaction code MD07 for stock requirements list – collective display. •Stock requirements list: Initial Screen is displayed. •Enter the plant, MRP controller and then press Enter. •The material list appears. •This includes all the materials that fulfill your selection criteria. Page 11
  • 12. Transaction workflow (Condt.) System will list out the list of stock requirements list Page 12