IFPUG Agile Interest Group (IG)
                               Webinar - May 17 2012




              Improving estimates by a 4-
Agile-4-FSM   pieces puzzle


                               Luigi Buglione, Ph.D.
                                     Buglione
              Process Improvement & Measurement Specialist
                                     Industry Business Unit
                                           Engineering.IT




                   www.eng.it
Engineering              At a glance



 _ The first Italian ICT player
   _ more than 730 M/€ revenues          Research and       PA & HC       Finance      Industry        TELCO      Utilities
                                         Development
   _ 1000 clients
   _ 6,300 IT specialists              System Int. &
                                       Consultancy
                                                        %     46            70            54           80            80

                                       Outsourcing      %     35            10            27           10

                                       Software
                                                        %     19            20            19           10            20



                                                                   ERP                 IT Security             ECM



                                                                                    Plant Management
                                                            Managed Operations                           Broadband & Media
                                                                                          System




                                                                         www.eng.it



                                                              www.eng.it
Agile-4-FSM    Goals of the presentation


 G1. Introduce the ‘Agile-4-FSM’ puzzle
 G2. Analyze each piece of the puzzle
 G3. Propose possible solutions for improving estimates




3                 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
Introduction        Some initial questions...


Why does it seem so difficult to apply FSM methods
to Agile projects?

             What about the maturity of my organization in the
             ‘sizing & estimation’ process?

What about NFRs? Do they need to be sized and
managed? Eventually, how?

             Which kind of changes do I need to introduce in my
             Estimation process for achieving better estimates?


4                      IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
Agile-4-FSM         Some pieces of the puzzle...




                                                          2. NFRs

                  1. Requirements




                  3. Size Measures                   4. Estimating &
                                                         Planning




5                      IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
Agile-4-FSM            Piece #1 – Requirements (US – User Stories)
                                      US Title                          Implementation Priority

                                                                                              Relative
Functional                                                                                  Productivity
   Test                                                                                     /Estimation




      High Level
         FUR


                     Functional Req
                         (FUR)



                      Non-functional Reqs
                            (NFR)



                    Org/Project related
                          Reqs

  6                         IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
Agile-4-FSM                           Piece #1 – Requirements (US2)

                                                                                                           Functionality +
                                                                                                                 Q/T
                                                                                                           complementary
                                                                                                               issues




                                                                                                 Type 1 (F/Q/T)
Type 2 (Q/T)



        Architectur
         al/Project-
           related
        issues, not
           strictly
        linked to a
        functionalit
              y



•        US2 – 2°-generation User Stories
            A US writes and ‘sizes’ expressly only FUR, NFRs are implicit, not easily manageable
            At least, two types of US2 can be manage
                    Reference: Buglione L., Meglio Agili o Veloci? Alcune riflessioni sulle stime nei progetti XP, XPM.it,
                     February 2007, URL: www.xpm.it (in Italian)


    7                                        IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
Agile-4-FSM                    Piece #1 – Requirements (US2) – Type1/2

                                                                •     US2 – Type 1
                                                                          This is a typical, complete US
                                                                          It includes the FUR-part (F) as well, after
                                                                           the interplaying between Customer and
                                                                           Provider, the related Q/T parts
                                                                          Its value besides in making visible those
                                                                           NFR parts requiring effort, that otherwise
                                                                           risk to be underestimated, even if taken
                                                                           into account by experience
                                                                          The more you make explicit, the less the
                                                                           probability for a higher estimation error
                                                                          Example: as in the left-side figure
•       US2 – Type 2
          Looking at the typical activities to be run in
           Software Life Cycle, also in iterative SLCs as
           in     Agile      methods,      some       non-
           functional/organizational activities that need
           to be run, sizing zero (0) FPs but can be
           generically classified as Q/T (non-functional)
          Since of course they need effort and must be
           estimated and planned, a different way is
           needed for being expressed
          They can be simply estimated in m/d or – for
           the product NFR-requirements – using e.g.
           The IFPUG SNAP method or an elaboration of
           ISO/IEC 25010:2011 standard
          Example: as in the right-side figure

    8                                 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
Agile-4-FSM                                                    Piece #1 – Requirements (INVEST)
                                                                              0                                           1                                             2                                           3
INVEST              Description
                                                                      Poor /Absent                                      Fair                                         Good                                      Excellent

I -Independent      User Stories should be               The start of construction of                 The completion of such US represents a        US can be produced with any constraint,     US is fully independent, and it can be
                    as independent as                    the US is tied to the completion of at       constraint for starting the construction of   but its release can be constrained to the   realized and released with any constraint
                    possible between them                least another US                             at least another US                           completion of at least another US


N – Negotiable      User Stories should be               US is written with so much details to be     US is written with so much details to be      US is written with an informative           US is written with an informative
                    "open"  as much as                   a technical specification (Design phase),    a functional specification (Analysis          content defining a User Requirement in a    content typical of a high-level need,
                     possible reporting                  not allowing to negotiate any element        phase), not allowing a sufficient             consolidated manner, yet shared between     allowing a series of feedbacks between
                    any relevant details                                                              negotiation                                   Customer and Provider                       Customer and Provider

V - Valuable        User Stories should give a           US functional (F) side does not contain      US functional (F) side expresses mostly       US functional (F) side expresses mostly     US functional (F) side correctly
                    value for end users of the           functionalities requested from the           qualitative (Q) and technical (T)             functional requirements as requested by     expresses only functional requirements
                    solution                             Customer                                     requirements about the system, needs to       the Customer, but includes also             as requested by the Customer
                                                                                                      be more developed on the ‘F’ side             qualitative (Q) and technical (T)
                                                                                                                                                    requirements

E – Estimable       Each User Story must be able         US shows only its Functional (F) side        US shows only its Functional (F) side         US is complete for Q/T issues by the        US shows all useful parts (F/Q/T)
                    to be estimated in terms             filled by the Customer, but without          filled by the Customer, but validated         Provider, but needs to be validated         allowing to size and estimate needed
                    of relative size and effort          sufficient detailed level for allowing the   with the Provider                             jointly with the Customer                   effort, validated by both parts
                                                         Provider filling the Q/T parts

S – Small           Each User Story should be            US has a very large size, and it can         US has a very large size, and it can be       US has a size allowing to be completed      US has a size allowing to be completed
                     sufficiently granular,              not be completed within a Sprint             completed within a Sprint, but it cannot      within a Sprint, jointly with other US,     within a Sprint, jointly with other US,
                    not too high-level defined                                                        allow to create/deliver other US              but it’s so small to create an overhead     assuring a proper balancing between
                                                                                                                                                    about the Testing phase                     development and testing activities

T – Testable        Each User Story must                 US does not include tips about               US includes formal                            US includes indication of                   US includes indication of
                    be formulated trying to stress       Acceptance Tests                             indication on Acceptance                      Acceptance Tests, complete, yet to be       Acceptance Tests, complete and already
                    useful details  for creating tests                                                Tests, still to be completed                  validated                                   validated



   •        Evaluate Requirements – The INVEST Grid
                “INVEST” are six criteria from Mike Cohn for evaluating each US/US2
                The INVEST Grid (Buglione, 2007)
                     Create your own definitions over an ordinal scale (e.g. 0-3 as in ISO/IEC 14598-x std)
                Fill cells as in a maturity model for each criterion
                Customer and Provider have to jointly evaluate the achieved level
                US/US2 will pass in production and be assigned to an iteration/Sprint only when the agreed
                 thresholds for the six criteria will be achieved

       9                                                                IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
Agile-4-FSM                  Piece #2 – NFRs




                                                                                         URL:
                                                                                         http://goo.gl/MIJZU



•        NFRs – Non Functional Requirements
          NFR (IFPUG CPM v4.3.1) = Quality reqs + Technical Reqs (IFPUG CPM v4.2.1)
          Quality Reqs = “any requirements relating to software quality as defined in ISO 9126:1991”
          Tech Reqs = “requirements relating to the technology and environment, for the development,
           maintenance, support and execution of the software”
          Non-Functional Reqs = “a software requirement that describes not what the software will
           do but how the software will do it’
          ...SNAP (IFPUG Software Non-functional Assessment Process)


    10                               IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
Agile-4-FSM                                Piece #2 – NFRs

IFPUG CPM v4.3.1 (excerpts)
page 1-2: IFPUG Strategic Decision: "IFPUG’s method for function point
   analysis is an ISO standard and must be conformant to ISO/IEC
   14143-1:2007. The method can measure “functional size” only and
   not “non-functional size”. This does not mean that the
   nonfunctional size cannot, or should not, be measured, only that it
   must be clearly stated as a separate measure (“A Framework
   for Functional Sizing” [IFPUG, 2003]).”
page 4-20: "This maintenance includes a wide range of activities that are
   performed during this phase of the application life cycle, some of
   which involve functional changes that are applicable to FPA” (thus,
   not all types of mainteinance)
page 4-21: Mainteinance requests: "Regardless of duration or level of
   work effort required, it is the type of activity that determines how the
   work is classified. Function Point Analysis should not be used
   to size perfective or corrective maintenance work”


Source::
ITPC, Software Non-functional Assessment Process (SNAP) – Assessment Practice Manual (APM), v1.0, September 2011
ITPC webpage: http://ifpug.org/about/ITperformance.htm




  11                                            IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
Agile-4-FSM                                Piece #2 – NFRs (SNAP)


 NFR unit of measure: SNAP Points (SP)
 Counting base: SCU (SNAP Counting Unit)
 4 categories and 17 sub-categories
      o    C1 – Data Operations (5 sc)
      o    C2 – Interface Design (4 sc)
      o    C3 – Technical Environment (4 sc)
      o    C4 – Architecture (3 sc)
 3 parts in the APM
      o    1 – The method
      o    2 – Examples
      o    3 - Annexes
 Update: H1/2012

Source::
ITPC, Software Non-functional Assessment Process (SNAP) – Assessment Practice Manual (APM), v1.0, September 2011
ITPC webpage: http://ifpug.org/about/ITperformance.htm



 12                                            IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
Agile-4-FSM                   Piece #3 – Size Measures




                        URL:
                        http://goo.gl/Qls7B


                                                          URL:
                                                          http://goo.gl/4UCht




•    Size Measures
      Agile methods (ASD, APM) typically use time-based measures for estimating (Story
       Points, Velocity, ...) and have not a standard definition for being consistently applied
      No/Few historical data also for using analogy estimates
      But the estimation logical chain is...
      Q (quantity)  T (Time: Effort  Duration)  C (Costs)
      FUR can be sized with a FSM method, but facing the requirement granularity issue
      FUR is only one side of the ‘story’
      ‘Functionalize’ NFRs  e.g. http://goo.gl/AWZjU
      Again, not all iterations/Sprints are the same, they plan and release differently


13                                IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
Agile-4-FSM                Piece #4 – Estimating & Planning




               Sprint #1          Sprint #2                       Sprint #3        Sprint #4

•    Estimating & Planning
      Each iteration/Sprint can be managed as a ‘project’ (or a ‘sub-project’) because it has
       different characteristics
      Not all iterations/Sprints are the same, they need to be planned differently
      Type-1 and Type-2 US2 are placed differently within iterations  use different
       productivity levels according to the different balancing of FUR vs NFR related effort
      Nominal productivity’ (FP/Effort)  www.semq.eu/pdf/fsm-prod.pdf

14                             IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
Agile-4-FSM    Piece #4 – Estimating & Planning

                                                                  •    Splitting effort...
                                                                        Separate approx FUR vs
                                                                         NFR-related efforts
                                                                        Increased R2 values
                                                                        Refine your own effort
                                                                         data            gathering
                                                                         introducing some more
                                                                         filters (e.g. # of layers
                                                                         and/or peer components
                                                                          measured)
                                                                        Start using SNAP and/or
                                                                         other         NFR-related
                                                                         approaches!




15                 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
Agile-4-FSM                    Conclusions & Perspectives
•    Agile & Requirements
       FURs represent a large part of User Stories, but not the whole
       NFRs need to be properly represented also in Agile environments, because the effort they take
       US2 is a simple way to start writing them and the INVEST grid could be a way to improve agile
        planning, matching common-sense and a more quantitative view

•    Agile & Sizing measures
       “Q T  C” is the common-sense, logical chain to be followed and ‘Quantity’ cannot be
        skipped
       FSM methods can be easily applied to agile projects, many experiences yet ready and applicable
       ‘One size DOESN’T fits all’...Only FURs are not sufficient for representing the real PROJECT
        effort
       Sizing NFRs is the next challenge  IFPUG SNAP is one possible way to start doing it!
 Agile & Estimating+Planning
       Classifying US2 in Type-1 and Type-2 can help in better allocating resources and schedule
        iterations according to the distribution of FUR vs NFR-related effort
 Some lessons learned
       Agile is based on Experience  Experience means Data  Gather Data and share among the
        organization
       Skill people on better eliciting requirements (e.g. CMMI-DEV RD process, ML3), separating FURs
        and NFRs
       Share experiences and apply common definitions and levels of granularity across the several
        agile project teams, overcomingis prerequisite for reliability
                         Simplicity the ‘Story Point’-syndrome...it’s about Simplicity!
                                                               (Edsger Dijkstra, Mathematician)
16                                 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
Agile-4-FSM    What is (should be) Agile?




17                 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
Agile-4-FSM    Q&A




         Grazie mille per l’attenzione!
          Thanks for your attention!
18                 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
Agile-4-FSM            Contacts




               We care of your problems and we have in mind a solution

                                                                                                            Luigi Buglione

                                                                                                     Industry & Service Dept
                                                                               Process Improvement & Measurement Specialist


                                                                                Via R. Morandi 32   Tel. +39 - 06.8307.4472
                                                                                     00148 Roma     Fax +39 - 06.8307.4200
                                                                                                    Cell. +39 - 335.1214813

                                                                                      www.eng.it      luigi.buglione@eng.it




19                         IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione

Mais conteúdo relacionado

Mais procurados

DIABETES MELLITUS AND DIABETIC EYE DISEASE
DIABETES MELLITUS AND DIABETIC EYE DISEASEDIABETES MELLITUS AND DIABETIC EYE DISEASE
DIABETES MELLITUS AND DIABETIC EYE DISEASEHossein Mirzaie
 
Methodology: feature epic and user story
Methodology:  feature epic and user storyMethodology:  feature epic and user story
Methodology: feature epic and user storyJean-François Nguyen
 
Epidemiology of diabetic retinopathy
Epidemiology of diabetic retinopathyEpidemiology of diabetic retinopathy
Epidemiology of diabetic retinopathyDINESH and SONALEE
 
PMI-ACP Lesson 10 Agile Metrics
PMI-ACP Lesson 10 Agile MetricsPMI-ACP Lesson 10 Agile Metrics
PMI-ACP Lesson 10 Agile MetricsThanh Nguyen
 
Optic atrophy dr.k.srikanth ,19.05.16
Optic atrophy  dr.k.srikanth  ,19.05.16Optic atrophy  dr.k.srikanth  ,19.05.16
Optic atrophy dr.k.srikanth ,19.05.16ophthalmgmcri
 
PMI-ACP Lesson 03 Nugget 2 Agile Planning, Monitoring and Adopting
PMI-ACP Lesson 03 Nugget 2 Agile Planning, Monitoring and AdoptingPMI-ACP Lesson 03 Nugget 2 Agile Planning, Monitoring and Adopting
PMI-ACP Lesson 03 Nugget 2 Agile Planning, Monitoring and AdoptingThanh Nguyen
 
The 5 Levels Planning in Agile
The 5 Levels Planning in AgileThe 5 Levels Planning in Agile
The 5 Levels Planning in AgileDimitri Ponomareff
 
Acceptance criteria
Acceptance criteriaAcceptance criteria
Acceptance criteriaSoftheme
 
10 Things HR Can Do to Help Align an Organization’s Goals
10 Things HR Can Do to Help Align an Organization’s Goals10 Things HR Can Do to Help Align an Organization’s Goals
10 Things HR Can Do to Help Align an Organization’s GoalsHuman Capital Media
 
Product Backlog - Refinement and Prioritization Techniques
Product Backlog - Refinement and Prioritization TechniquesProduct Backlog - Refinement and Prioritization Techniques
Product Backlog - Refinement and Prioritization TechniquesVikash Karuna
 
Multifocal choroiditis
Multifocal choroiditisMultifocal choroiditis
Multifocal choroiditisShruti Laddha
 
Evaluation of Esotropia in children
Evaluation of Esotropia in childrenEvaluation of Esotropia in children
Evaluation of Esotropia in childrensadia yeasmin saki
 

Mais procurados (20)

DIABETES MELLITUS AND DIABETIC EYE DISEASE
DIABETES MELLITUS AND DIABETIC EYE DISEASEDIABETES MELLITUS AND DIABETIC EYE DISEASE
DIABETES MELLITUS AND DIABETIC EYE DISEASE
 
Retinitis pigmentosa
Retinitis pigmentosaRetinitis pigmentosa
Retinitis pigmentosa
 
Methodology: feature epic and user story
Methodology:  feature epic and user storyMethodology:  feature epic and user story
Methodology: feature epic and user story
 
Agile Release & Iteration Planning
Agile Release & Iteration Planning   Agile Release & Iteration Planning
Agile Release & Iteration Planning
 
Epidemiology of diabetic retinopathy
Epidemiology of diabetic retinopathyEpidemiology of diabetic retinopathy
Epidemiology of diabetic retinopathy
 
Epics and User Stories
Epics and User StoriesEpics and User Stories
Epics and User Stories
 
Story of user story
Story of user storyStory of user story
Story of user story
 
PMI-ACP Lesson 10 Agile Metrics
PMI-ACP Lesson 10 Agile MetricsPMI-ACP Lesson 10 Agile Metrics
PMI-ACP Lesson 10 Agile Metrics
 
Optic atrophy dr.k.srikanth ,19.05.16
Optic atrophy  dr.k.srikanth  ,19.05.16Optic atrophy  dr.k.srikanth  ,19.05.16
Optic atrophy dr.k.srikanth ,19.05.16
 
PMI-ACP Lesson 03 Nugget 2 Agile Planning, Monitoring and Adopting
PMI-ACP Lesson 03 Nugget 2 Agile Planning, Monitoring and AdoptingPMI-ACP Lesson 03 Nugget 2 Agile Planning, Monitoring and Adopting
PMI-ACP Lesson 03 Nugget 2 Agile Planning, Monitoring and Adopting
 
The 5 Levels Planning in Agile
The 5 Levels Planning in AgileThe 5 Levels Planning in Agile
The 5 Levels Planning in Agile
 
Acceptance criteria
Acceptance criteriaAcceptance criteria
Acceptance criteria
 
Diabetic retinopathy
Diabetic retinopathyDiabetic retinopathy
Diabetic retinopathy
 
10 Things HR Can Do to Help Align an Organization’s Goals
10 Things HR Can Do to Help Align an Organization’s Goals10 Things HR Can Do to Help Align an Organization’s Goals
10 Things HR Can Do to Help Align an Organization’s Goals
 
Gestão Ágil de tudo: Planejamento backlog
Gestão Ágil de tudo: Planejamento backlogGestão Ágil de tudo: Planejamento backlog
Gestão Ágil de tudo: Planejamento backlog
 
User Stories
User StoriesUser Stories
User Stories
 
Product Backlog - Refinement and Prioritization Techniques
Product Backlog - Refinement and Prioritization TechniquesProduct Backlog - Refinement and Prioritization Techniques
Product Backlog - Refinement and Prioritization Techniques
 
Proptosis
ProptosisProptosis
Proptosis
 
Multifocal choroiditis
Multifocal choroiditisMultifocal choroiditis
Multifocal choroiditis
 
Evaluation of Esotropia in children
Evaluation of Esotropia in childrenEvaluation of Esotropia in children
Evaluation of Esotropia in children
 

Destaque

L4A - Lean for (being) Agile - Some thoughts and tips for a progressive path ...
L4A - Lean for (being) Agile - Some thoughts and tips for a progressive path ...L4A - Lean for (being) Agile - Some thoughts and tips for a progressive path ...
L4A - Lean for (being) Agile - Some thoughts and tips for a progressive path ...Luigi Buglione
 
Agile Lean Conference 2016 - Buglione_Lean for (being) Agile
Agile Lean Conference 2016 - Buglione_Lean for (being) AgileAgile Lean Conference 2016 - Buglione_Lean for (being) Agile
Agile Lean Conference 2016 - Buglione_Lean for (being) AgileAgile Lean Conference
 
Experimental Study Using Functional Size Measurement in Building Estimation M...
Experimental Study Using Functional Size Measurement in Building Estimation M...Experimental Study Using Functional Size Measurement in Building Estimation M...
Experimental Study Using Functional Size Measurement in Building Estimation M...Luigi Buglione
 
PIF or SNAP? That's the Question! Or maybe it's not? - A panel
PIF or SNAP? That's the Question! Or maybe it's not? - A panelPIF or SNAP? That's the Question! Or maybe it's not? - A panel
PIF or SNAP? That's the Question! Or maybe it's not? - A panelLuigi Buglione
 
The missing links in software estimation: Work, Team Loading and Team Power
The missing links in software estimation: Work, Team Loading and Team PowerThe missing links in software estimation: Work, Team Loading and Team Power
The missing links in software estimation: Work, Team Loading and Team PowerLuigi Buglione
 
Software or Service? That’s the question!
Software or Service? That’s the question!Software or Service? That’s the question!
Software or Service? That’s the question!Luigi Buglione
 
Risk Management: Achieving Higher Maturity & Capability Levels through the LE...
Risk Management: Achieving Higher Maturity & Capability Levels through the LE...Risk Management: Achieving Higher Maturity & Capability Levels through the LE...
Risk Management: Achieving Higher Maturity & Capability Levels through the LE...Luigi Buglione
 
Non functional requirements framework
Non functional requirements frameworkNon functional requirements framework
Non functional requirements frameworkwweinmeyer79
 

Destaque (8)

L4A - Lean for (being) Agile - Some thoughts and tips for a progressive path ...
L4A - Lean for (being) Agile - Some thoughts and tips for a progressive path ...L4A - Lean for (being) Agile - Some thoughts and tips for a progressive path ...
L4A - Lean for (being) Agile - Some thoughts and tips for a progressive path ...
 
Agile Lean Conference 2016 - Buglione_Lean for (being) Agile
Agile Lean Conference 2016 - Buglione_Lean for (being) AgileAgile Lean Conference 2016 - Buglione_Lean for (being) Agile
Agile Lean Conference 2016 - Buglione_Lean for (being) Agile
 
Experimental Study Using Functional Size Measurement in Building Estimation M...
Experimental Study Using Functional Size Measurement in Building Estimation M...Experimental Study Using Functional Size Measurement in Building Estimation M...
Experimental Study Using Functional Size Measurement in Building Estimation M...
 
PIF or SNAP? That's the Question! Or maybe it's not? - A panel
PIF or SNAP? That's the Question! Or maybe it's not? - A panelPIF or SNAP? That's the Question! Or maybe it's not? - A panel
PIF or SNAP? That's the Question! Or maybe it's not? - A panel
 
The missing links in software estimation: Work, Team Loading and Team Power
The missing links in software estimation: Work, Team Loading and Team PowerThe missing links in software estimation: Work, Team Loading and Team Power
The missing links in software estimation: Work, Team Loading and Team Power
 
Software or Service? That’s the question!
Software or Service? That’s the question!Software or Service? That’s the question!
Software or Service? That’s the question!
 
Risk Management: Achieving Higher Maturity & Capability Levels through the LE...
Risk Management: Achieving Higher Maturity & Capability Levels through the LE...Risk Management: Achieving Higher Maturity & Capability Levels through the LE...
Risk Management: Achieving Higher Maturity & Capability Levels through the LE...
 
Non functional requirements framework
Non functional requirements frameworkNon functional requirements framework
Non functional requirements framework
 

Semelhante a Agile-4-FSM - Improving estimates by a 4-pieces puzzle

The Metrics Cards. A Balanced Set of Measures ISO/IEC 15504 compliant
The Metrics Cards. A Balanced Set of Measures ISO/IEC 15504 compliantThe Metrics Cards. A Balanced Set of Measures ISO/IEC 15504 compliant
The Metrics Cards. A Balanced Set of Measures ISO/IEC 15504 compliantLuigi Buglione
 
Experimental Study Using Functional Size Measurement in Building Estimation M...
Experimental Study Using Functional Size Measurement in Building Estimation M...Experimental Study Using Functional Size Measurement in Building Estimation M...
Experimental Study Using Functional Size Measurement in Building Estimation M...Luigi Buglione
 
Some thoughts on Productivity in ICT Projects: measurable entities, requireme...
Some thoughts on Productivity in ICT Projects: measurable entities, requireme...Some thoughts on Productivity in ICT Projects: measurable entities, requireme...
Some thoughts on Productivity in ICT Projects: measurable entities, requireme...Luigi Buglione
 
The Significance of IFPUG in Effort Estimation Base Functionality Types
The Significance of IFPUG in Effort Estimation Base Functionality TypesThe Significance of IFPUG in Effort Estimation Base Functionality Types
The Significance of IFPUG in Effort Estimation Base Functionality TypesLuigi Buglione
 
Top Metrics for SPICE-compliant projects
Top Metrics for SPICE-compliant projectsTop Metrics for SPICE-compliant projects
Top Metrics for SPICE-compliant projectsLuigi Buglione
 
IT Competence Framework In Shell SFIA
IT Competence Framework In Shell SFIAIT Competence Framework In Shell SFIA
IT Competence Framework In Shell SFIASFIA User Forum
 
Light Maturity Models (LMM): An Agile Application
Light Maturity Models (LMM): An Agile ApplicationLight Maturity Models (LMM): An Agile Application
Light Maturity Models (LMM): An Agile ApplicationLuigi Buglione
 
Rfid roi-sme pilots presentation and results ueapme august 2012
Rfid roi-sme pilots presentation and results ueapme august 2012Rfid roi-sme pilots presentation and results ueapme august 2012
Rfid roi-sme pilots presentation and results ueapme august 2012UEAPME
 
GeneXus en Mitsubishi Heavy Industries (MHI) – Japón
GeneXus en Mitsubishi Heavy Industries (MHI) – JapónGeneXus en Mitsubishi Heavy Industries (MHI) – Japón
GeneXus en Mitsubishi Heavy Industries (MHI) – JapónGeneXus
 
PIDtuningsoftwareApracticalreview.pdf
PIDtuningsoftwareApracticalreview.pdfPIDtuningsoftwareApracticalreview.pdf
PIDtuningsoftwareApracticalreview.pdfAbdulSalamSagir1
 
Global R&D Service Providers (GSPR) Rating 2012
Global R&D Service Providers (GSPR) Rating 2012Global R&D Service Providers (GSPR) Rating 2012
Global R&D Service Providers (GSPR) Rating 2012Zinnov
 
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test PerspectiveReducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test PerspectivePraveen Srivastava
 
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test PerspectiveReducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test PerspectivePraveen Srivastava
 
Sla Model 2002 Jvk
Sla Model 2002 JvkSla Model 2002 Jvk
Sla Model 2002 JvkDrJVK
 
Long way from ideas and needs to software measurement standards - Failures, s...
Long way from ideas and needs to software measurement standards - Failures, s...Long way from ideas and needs to software measurement standards - Failures, s...
Long way from ideas and needs to software measurement standards - Failures, s...Luigi Buglione
 
Zi1one Presentation Rev7 Eng(Sep2011)
Zi1one Presentation Rev7 Eng(Sep2011)Zi1one Presentation Rev7 Eng(Sep2011)
Zi1one Presentation Rev7 Eng(Sep2011)Giancarlo Mancinelli
 
Oap planning public
Oap planning publicOap planning public
Oap planning publicfreemteam
 
Towards an Effective Process Improvement Platform: Spago4Q and the QEST nD Mo...
Towards an Effective Process Improvement Platform: Spago4Q and the QEST nD Mo...Towards an Effective Process Improvement Platform: Spago4Q and the QEST nD Mo...
Towards an Effective Process Improvement Platform: Spago4Q and the QEST nD Mo...SpagoWorld
 

Semelhante a Agile-4-FSM - Improving estimates by a 4-pieces puzzle (20)

The Metrics Cards. A Balanced Set of Measures ISO/IEC 15504 compliant
The Metrics Cards. A Balanced Set of Measures ISO/IEC 15504 compliantThe Metrics Cards. A Balanced Set of Measures ISO/IEC 15504 compliant
The Metrics Cards. A Balanced Set of Measures ISO/IEC 15504 compliant
 
Experimental Study Using Functional Size Measurement in Building Estimation M...
Experimental Study Using Functional Size Measurement in Building Estimation M...Experimental Study Using Functional Size Measurement in Building Estimation M...
Experimental Study Using Functional Size Measurement in Building Estimation M...
 
Some thoughts on Productivity in ICT Projects: measurable entities, requireme...
Some thoughts on Productivity in ICT Projects: measurable entities, requireme...Some thoughts on Productivity in ICT Projects: measurable entities, requireme...
Some thoughts on Productivity in ICT Projects: measurable entities, requireme...
 
The Significance of IFPUG in Effort Estimation Base Functionality Types
The Significance of IFPUG in Effort Estimation Base Functionality TypesThe Significance of IFPUG in Effort Estimation Base Functionality Types
The Significance of IFPUG in Effort Estimation Base Functionality Types
 
Top Metrics for SPICE-compliant projects
Top Metrics for SPICE-compliant projectsTop Metrics for SPICE-compliant projects
Top Metrics for SPICE-compliant projects
 
IT Competence Framework In Shell SFIA
IT Competence Framework In Shell SFIAIT Competence Framework In Shell SFIA
IT Competence Framework In Shell SFIA
 
Light Maturity Models (LMM): An Agile Application
Light Maturity Models (LMM): An Agile ApplicationLight Maturity Models (LMM): An Agile Application
Light Maturity Models (LMM): An Agile Application
 
Rfid roi-sme pilots presentation and results ueapme august 2012
Rfid roi-sme pilots presentation and results ueapme august 2012Rfid roi-sme pilots presentation and results ueapme august 2012
Rfid roi-sme pilots presentation and results ueapme august 2012
 
GeneXus en Mitsubishi Heavy Industries (MHI) – Japón
GeneXus en Mitsubishi Heavy Industries (MHI) – JapónGeneXus en Mitsubishi Heavy Industries (MHI) – Japón
GeneXus en Mitsubishi Heavy Industries (MHI) – Japón
 
PIDtuningsoftwareApracticalreview.pdf
PIDtuningsoftwareApracticalreview.pdfPIDtuningsoftwareApracticalreview.pdf
PIDtuningsoftwareApracticalreview.pdf
 
Gwea Framework 1.2 Ea Forum 30 June 09
Gwea Framework 1.2 Ea Forum 30 June 09Gwea Framework 1.2 Ea Forum 30 June 09
Gwea Framework 1.2 Ea Forum 30 June 09
 
Global R&D Service Providers (GSPR) Rating 2012
Global R&D Service Providers (GSPR) Rating 2012Global R&D Service Providers (GSPR) Rating 2012
Global R&D Service Providers (GSPR) Rating 2012
 
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test PerspectiveReducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
 
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test PerspectiveReducing Cycle Time for iDEN Releases – A Development and Test Perspective
Reducing Cycle Time for iDEN Releases – A Development and Test Perspective
 
Sla Model 2002 Jvk
Sla Model 2002 JvkSla Model 2002 Jvk
Sla Model 2002 Jvk
 
Long way from ideas and needs to software measurement standards - Failures, s...
Long way from ideas and needs to software measurement standards - Failures, s...Long way from ideas and needs to software measurement standards - Failures, s...
Long way from ideas and needs to software measurement standards - Failures, s...
 
Zi1one Presentation Rev7 Eng(Sep2011)
Zi1one Presentation Rev7 Eng(Sep2011)Zi1one Presentation Rev7 Eng(Sep2011)
Zi1one Presentation Rev7 Eng(Sep2011)
 
Badiceanu Radu
Badiceanu RaduBadiceanu Radu
Badiceanu Radu
 
Oap planning public
Oap planning publicOap planning public
Oap planning public
 
Towards an Effective Process Improvement Platform: Spago4Q and the QEST nD Mo...
Towards an Effective Process Improvement Platform: Spago4Q and the QEST nD Mo...Towards an Effective Process Improvement Platform: Spago4Q and the QEST nD Mo...
Towards an Effective Process Improvement Platform: Spago4Q and the QEST nD Mo...
 

Mais de Luigi Buglione

DevOps & ITIL: Friends or Foes?
DevOps & ITIL: Friends or Foes?DevOps & ITIL: Friends or Foes?
DevOps & ITIL: Friends or Foes?Luigi Buglione
 
From Software to Service Sustainability: a still Broader Perspective
From Software to Service Sustainability: a still Broader PerspectiveFrom Software to Service Sustainability: a still Broader Perspective
From Software to Service Sustainability: a still Broader PerspectiveLuigi Buglione
 
The Significance of IFPUG Base Functionality Types in Effort Estimation - An ...
The Significance of IFPUG Base Functionality Types in Effort Estimation - An ...The Significance of IFPUG Base Functionality Types in Effort Estimation - An ...
The Significance of IFPUG Base Functionality Types in Effort Estimation - An ...Luigi Buglione
 
A Murphological View on Software Measurement: a serious joke or a funny seri...
A Murphological View on Software Measurement:  a serious joke or a funny seri...A Murphological View on Software Measurement:  a serious joke or a funny seri...
A Murphological View on Software Measurement: a serious joke or a funny seri...Luigi Buglione
 
Do we really re-use our knowledge (or not)?
Do we really re-use our knowledge (or not)?Do we really re-use our knowledge (or not)?
Do we really re-use our knowledge (or not)?Luigi Buglione
 
Balanced Measurement Sets: Criteria for Improving Project Management Practices
Balanced Measurement Sets: Criteria for Improving  Project Management PracticesBalanced Measurement Sets: Criteria for Improving  Project Management Practices
Balanced Measurement Sets: Criteria for Improving Project Management PracticesLuigi Buglione
 
Software Sustainability: a Broader Perspective
Software Sustainability: a Broader PerspectiveSoftware Sustainability: a Broader Perspective
Software Sustainability: a Broader PerspectiveLuigi Buglione
 
An ISO/IEC 33000-compliant Measurement Framework for Software Process Sustain...
An ISO/IEC 33000-compliant Measurement Framework for Software Process Sustain...An ISO/IEC 33000-compliant Measurement Framework for Software Process Sustain...
An ISO/IEC 33000-compliant Measurement Framework for Software Process Sustain...Luigi Buglione
 
Measurement Process: Improving the ISO 15939 Standard
Measurement Process: Improving the ISO 15939 StandardMeasurement Process: Improving the ISO 15939 Standard
Measurement Process: Improving the ISO 15939 StandardLuigi Buglione
 
Sizing The Entire Development Process
Sizing The Entire Development ProcessSizing The Entire Development Process
Sizing The Entire Development ProcessLuigi Buglione
 
The LEGO Strategy: Guidelines for a Profitable Deployment
The LEGO Strategy: Guidelines for a Profitable DeploymentThe LEGO Strategy: Guidelines for a Profitable Deployment
The LEGO Strategy: Guidelines for a Profitable DeploymentLuigi Buglione
 
ICEBERG: a different look at Software Project Management
ICEBERG: a different look at Software Project ManagementICEBERG: a different look at Software Project Management
ICEBERG: a different look at Software Project ManagementLuigi Buglione
 
Improving Measurement Plans from multiple dimensions: Exercising with Balanci...
Improving Measurement Plans from multiple dimensions: Exercising with Balanci...Improving Measurement Plans from multiple dimensions: Exercising with Balanci...
Improving Measurement Plans from multiple dimensions: Exercising with Balanci...Luigi Buglione
 
Leveraging Reuse-related Maturity Issues for Achieving Higher Maturity & Capa...
Leveraging Reuse-related Maturity Issues for Achieving Higher Maturity & Capa...Leveraging Reuse-related Maturity Issues for Achieving Higher Maturity & Capa...
Leveraging Reuse-related Maturity Issues for Achieving Higher Maturity & Capa...Luigi Buglione
 
Derivation of Green Metrics for Software
Derivation of Green Metrics for SoftwareDerivation of Green Metrics for Software
Derivation of Green Metrics for SoftwareLuigi Buglione
 
Software Architects’ Experiences of Quality Requirements: What we Know and ...
Software Architects’ Experiences  of Quality Requirements:  What we Know and ...Software Architects’ Experiences  of Quality Requirements:  What we Know and ...
Software Architects’ Experiences of Quality Requirements: What we Know and ...Luigi Buglione
 
La Resilienza e i Modelli di Maturità
La Resilienza e i Modelli di MaturitàLa Resilienza e i Modelli di Maturità
La Resilienza e i Modelli di MaturitàLuigi Buglione
 
Mapping Automotive SPICE: Achieving Higher Maturity & Capability Levels
Mapping Automotive SPICE: Achieving Higher Maturity & Capability LevelsMapping Automotive SPICE: Achieving Higher Maturity & Capability Levels
Mapping Automotive SPICE: Achieving Higher Maturity & Capability LevelsLuigi Buglione
 
The GP 2.8 Game - – Deploying a Balanced Measurement Plan by the ‘Play’n’Lear...
The GP 2.8 Game - – Deploying a Balanced Measurement Plan by the ‘Play’n’Lear...The GP 2.8 Game - – Deploying a Balanced Measurement Plan by the ‘Play’n’Lear...
The GP 2.8 Game - – Deploying a Balanced Measurement Plan by the ‘Play’n’Lear...Luigi Buglione
 
Tailoring Software Process Capability/Maturity Models for Telemedicine Systems
Tailoring Software Process Capability/Maturity  Models for Telemedicine SystemsTailoring Software Process Capability/Maturity  Models for Telemedicine Systems
Tailoring Software Process Capability/Maturity Models for Telemedicine SystemsLuigi Buglione
 

Mais de Luigi Buglione (20)

DevOps & ITIL: Friends or Foes?
DevOps & ITIL: Friends or Foes?DevOps & ITIL: Friends or Foes?
DevOps & ITIL: Friends or Foes?
 
From Software to Service Sustainability: a still Broader Perspective
From Software to Service Sustainability: a still Broader PerspectiveFrom Software to Service Sustainability: a still Broader Perspective
From Software to Service Sustainability: a still Broader Perspective
 
The Significance of IFPUG Base Functionality Types in Effort Estimation - An ...
The Significance of IFPUG Base Functionality Types in Effort Estimation - An ...The Significance of IFPUG Base Functionality Types in Effort Estimation - An ...
The Significance of IFPUG Base Functionality Types in Effort Estimation - An ...
 
A Murphological View on Software Measurement: a serious joke or a funny seri...
A Murphological View on Software Measurement:  a serious joke or a funny seri...A Murphological View on Software Measurement:  a serious joke or a funny seri...
A Murphological View on Software Measurement: a serious joke or a funny seri...
 
Do we really re-use our knowledge (or not)?
Do we really re-use our knowledge (or not)?Do we really re-use our knowledge (or not)?
Do we really re-use our knowledge (or not)?
 
Balanced Measurement Sets: Criteria for Improving Project Management Practices
Balanced Measurement Sets: Criteria for Improving  Project Management PracticesBalanced Measurement Sets: Criteria for Improving  Project Management Practices
Balanced Measurement Sets: Criteria for Improving Project Management Practices
 
Software Sustainability: a Broader Perspective
Software Sustainability: a Broader PerspectiveSoftware Sustainability: a Broader Perspective
Software Sustainability: a Broader Perspective
 
An ISO/IEC 33000-compliant Measurement Framework for Software Process Sustain...
An ISO/IEC 33000-compliant Measurement Framework for Software Process Sustain...An ISO/IEC 33000-compliant Measurement Framework for Software Process Sustain...
An ISO/IEC 33000-compliant Measurement Framework for Software Process Sustain...
 
Measurement Process: Improving the ISO 15939 Standard
Measurement Process: Improving the ISO 15939 StandardMeasurement Process: Improving the ISO 15939 Standard
Measurement Process: Improving the ISO 15939 Standard
 
Sizing The Entire Development Process
Sizing The Entire Development ProcessSizing The Entire Development Process
Sizing The Entire Development Process
 
The LEGO Strategy: Guidelines for a Profitable Deployment
The LEGO Strategy: Guidelines for a Profitable DeploymentThe LEGO Strategy: Guidelines for a Profitable Deployment
The LEGO Strategy: Guidelines for a Profitable Deployment
 
ICEBERG: a different look at Software Project Management
ICEBERG: a different look at Software Project ManagementICEBERG: a different look at Software Project Management
ICEBERG: a different look at Software Project Management
 
Improving Measurement Plans from multiple dimensions: Exercising with Balanci...
Improving Measurement Plans from multiple dimensions: Exercising with Balanci...Improving Measurement Plans from multiple dimensions: Exercising with Balanci...
Improving Measurement Plans from multiple dimensions: Exercising with Balanci...
 
Leveraging Reuse-related Maturity Issues for Achieving Higher Maturity & Capa...
Leveraging Reuse-related Maturity Issues for Achieving Higher Maturity & Capa...Leveraging Reuse-related Maturity Issues for Achieving Higher Maturity & Capa...
Leveraging Reuse-related Maturity Issues for Achieving Higher Maturity & Capa...
 
Derivation of Green Metrics for Software
Derivation of Green Metrics for SoftwareDerivation of Green Metrics for Software
Derivation of Green Metrics for Software
 
Software Architects’ Experiences of Quality Requirements: What we Know and ...
Software Architects’ Experiences  of Quality Requirements:  What we Know and ...Software Architects’ Experiences  of Quality Requirements:  What we Know and ...
Software Architects’ Experiences of Quality Requirements: What we Know and ...
 
La Resilienza e i Modelli di Maturità
La Resilienza e i Modelli di MaturitàLa Resilienza e i Modelli di Maturità
La Resilienza e i Modelli di Maturità
 
Mapping Automotive SPICE: Achieving Higher Maturity & Capability Levels
Mapping Automotive SPICE: Achieving Higher Maturity & Capability LevelsMapping Automotive SPICE: Achieving Higher Maturity & Capability Levels
Mapping Automotive SPICE: Achieving Higher Maturity & Capability Levels
 
The GP 2.8 Game - – Deploying a Balanced Measurement Plan by the ‘Play’n’Lear...
The GP 2.8 Game - – Deploying a Balanced Measurement Plan by the ‘Play’n’Lear...The GP 2.8 Game - – Deploying a Balanced Measurement Plan by the ‘Play’n’Lear...
The GP 2.8 Game - – Deploying a Balanced Measurement Plan by the ‘Play’n’Lear...
 
Tailoring Software Process Capability/Maturity Models for Telemedicine Systems
Tailoring Software Process Capability/Maturity  Models for Telemedicine SystemsTailoring Software Process Capability/Maturity  Models for Telemedicine Systems
Tailoring Software Process Capability/Maturity Models for Telemedicine Systems
 

Último

08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 

Último (20)

08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 

Agile-4-FSM - Improving estimates by a 4-pieces puzzle

  • 1. IFPUG Agile Interest Group (IG) Webinar - May 17 2012 Improving estimates by a 4- Agile-4-FSM pieces puzzle Luigi Buglione, Ph.D. Buglione Process Improvement & Measurement Specialist Industry Business Unit Engineering.IT www.eng.it
  • 2. Engineering At a glance _ The first Italian ICT player _ more than 730 M/€ revenues Research and PA & HC Finance Industry TELCO Utilities Development _ 1000 clients _ 6,300 IT specialists System Int. & Consultancy % 46 70 54 80 80 Outsourcing % 35 10 27 10 Software % 19 20 19 10 20 ERP IT Security ECM Plant Management Managed Operations Broadband & Media System www.eng.it www.eng.it
  • 3. Agile-4-FSM Goals of the presentation  G1. Introduce the ‘Agile-4-FSM’ puzzle  G2. Analyze each piece of the puzzle  G3. Propose possible solutions for improving estimates 3 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
  • 4. Introduction Some initial questions... Why does it seem so difficult to apply FSM methods to Agile projects? What about the maturity of my organization in the ‘sizing & estimation’ process? What about NFRs? Do they need to be sized and managed? Eventually, how? Which kind of changes do I need to introduce in my Estimation process for achieving better estimates? 4 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
  • 5. Agile-4-FSM Some pieces of the puzzle... 2. NFRs 1. Requirements 3. Size Measures 4. Estimating & Planning 5 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
  • 6. Agile-4-FSM Piece #1 – Requirements (US – User Stories) US Title Implementation Priority Relative Functional Productivity Test /Estimation High Level FUR Functional Req (FUR) Non-functional Reqs (NFR) Org/Project related Reqs 6 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
  • 7. Agile-4-FSM Piece #1 – Requirements (US2) Functionality + Q/T complementary issues Type 1 (F/Q/T) Type 2 (Q/T) Architectur al/Project- related issues, not strictly linked to a functionalit y • US2 – 2°-generation User Stories  A US writes and ‘sizes’ expressly only FUR, NFRs are implicit, not easily manageable  At least, two types of US2 can be manage  Reference: Buglione L., Meglio Agili o Veloci? Alcune riflessioni sulle stime nei progetti XP, XPM.it, February 2007, URL: www.xpm.it (in Italian) 7 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
  • 8. Agile-4-FSM Piece #1 – Requirements (US2) – Type1/2 • US2 – Type 1  This is a typical, complete US  It includes the FUR-part (F) as well, after the interplaying between Customer and Provider, the related Q/T parts  Its value besides in making visible those NFR parts requiring effort, that otherwise risk to be underestimated, even if taken into account by experience  The more you make explicit, the less the probability for a higher estimation error  Example: as in the left-side figure • US2 – Type 2  Looking at the typical activities to be run in Software Life Cycle, also in iterative SLCs as in Agile methods, some non- functional/organizational activities that need to be run, sizing zero (0) FPs but can be generically classified as Q/T (non-functional)  Since of course they need effort and must be estimated and planned, a different way is needed for being expressed  They can be simply estimated in m/d or – for the product NFR-requirements – using e.g. The IFPUG SNAP method or an elaboration of ISO/IEC 25010:2011 standard  Example: as in the right-side figure 8 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
  • 9. Agile-4-FSM Piece #1 – Requirements (INVEST) 0 1 2 3 INVEST Description Poor /Absent Fair Good Excellent I -Independent User Stories should be The start of construction of The completion of such US represents a US can be produced with any constraint, US is fully independent, and it can be as independent as the US is tied to the completion of at constraint for starting the construction of but its release can be constrained to the realized and released with any constraint possible between them least another US at least another US completion of at least another US N – Negotiable User Stories should be US is written with so much details to be US is written with so much details to be US is written with an informative US is written with an informative "open"  as much as a technical specification (Design phase), a functional specification (Analysis content defining a User Requirement in a content typical of a high-level need,  possible reporting not allowing to negotiate any element phase), not allowing a sufficient consolidated manner, yet shared between allowing a series of feedbacks between any relevant details negotiation Customer and Provider Customer and Provider V - Valuable User Stories should give a US functional (F) side does not contain US functional (F) side expresses mostly US functional (F) side expresses mostly US functional (F) side correctly value for end users of the functionalities requested from the qualitative (Q) and technical (T) functional requirements as requested by expresses only functional requirements solution Customer requirements about the system, needs to the Customer, but includes also as requested by the Customer be more developed on the ‘F’ side qualitative (Q) and technical (T) requirements E – Estimable Each User Story must be able US shows only its Functional (F) side US shows only its Functional (F) side US is complete for Q/T issues by the US shows all useful parts (F/Q/T) to be estimated in terms filled by the Customer, but without filled by the Customer, but validated Provider, but needs to be validated allowing to size and estimate needed of relative size and effort sufficient detailed level for allowing the with the Provider jointly with the Customer effort, validated by both parts Provider filling the Q/T parts S – Small Each User Story should be US has a very large size, and it can US has a very large size, and it can be US has a size allowing to be completed US has a size allowing to be completed  sufficiently granular,  not be completed within a Sprint completed within a Sprint, but it cannot within a Sprint, jointly with other US, within a Sprint, jointly with other US, not too high-level defined allow to create/deliver other US but it’s so small to create an overhead assuring a proper balancing between about the Testing phase development and testing activities T – Testable Each User Story must US does not include tips about US includes formal US includes indication of US includes indication of be formulated trying to stress Acceptance Tests indication on Acceptance  Acceptance Tests, complete, yet to be Acceptance Tests, complete and already useful details  for creating tests Tests, still to be completed validated validated • Evaluate Requirements – The INVEST Grid  “INVEST” are six criteria from Mike Cohn for evaluating each US/US2  The INVEST Grid (Buglione, 2007)  Create your own definitions over an ordinal scale (e.g. 0-3 as in ISO/IEC 14598-x std)  Fill cells as in a maturity model for each criterion  Customer and Provider have to jointly evaluate the achieved level  US/US2 will pass in production and be assigned to an iteration/Sprint only when the agreed thresholds for the six criteria will be achieved 9 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
  • 10. Agile-4-FSM Piece #2 – NFRs URL: http://goo.gl/MIJZU • NFRs – Non Functional Requirements  NFR (IFPUG CPM v4.3.1) = Quality reqs + Technical Reqs (IFPUG CPM v4.2.1)  Quality Reqs = “any requirements relating to software quality as defined in ISO 9126:1991”  Tech Reqs = “requirements relating to the technology and environment, for the development, maintenance, support and execution of the software”  Non-Functional Reqs = “a software requirement that describes not what the software will do but how the software will do it’  ...SNAP (IFPUG Software Non-functional Assessment Process) 10 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
  • 11. Agile-4-FSM Piece #2 – NFRs IFPUG CPM v4.3.1 (excerpts) page 1-2: IFPUG Strategic Decision: "IFPUG’s method for function point analysis is an ISO standard and must be conformant to ISO/IEC 14143-1:2007. The method can measure “functional size” only and not “non-functional size”. This does not mean that the nonfunctional size cannot, or should not, be measured, only that it must be clearly stated as a separate measure (“A Framework for Functional Sizing” [IFPUG, 2003]).” page 4-20: "This maintenance includes a wide range of activities that are performed during this phase of the application life cycle, some of which involve functional changes that are applicable to FPA” (thus, not all types of mainteinance) page 4-21: Mainteinance requests: "Regardless of duration or level of work effort required, it is the type of activity that determines how the work is classified. Function Point Analysis should not be used to size perfective or corrective maintenance work” Source:: ITPC, Software Non-functional Assessment Process (SNAP) – Assessment Practice Manual (APM), v1.0, September 2011 ITPC webpage: http://ifpug.org/about/ITperformance.htm 11 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
  • 12. Agile-4-FSM Piece #2 – NFRs (SNAP)  NFR unit of measure: SNAP Points (SP)  Counting base: SCU (SNAP Counting Unit)  4 categories and 17 sub-categories o C1 – Data Operations (5 sc) o C2 – Interface Design (4 sc) o C3 – Technical Environment (4 sc) o C4 – Architecture (3 sc)  3 parts in the APM o 1 – The method o 2 – Examples o 3 - Annexes  Update: H1/2012 Source:: ITPC, Software Non-functional Assessment Process (SNAP) – Assessment Practice Manual (APM), v1.0, September 2011 ITPC webpage: http://ifpug.org/about/ITperformance.htm 12 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
  • 13. Agile-4-FSM Piece #3 – Size Measures URL: http://goo.gl/Qls7B URL: http://goo.gl/4UCht • Size Measures  Agile methods (ASD, APM) typically use time-based measures for estimating (Story Points, Velocity, ...) and have not a standard definition for being consistently applied  No/Few historical data also for using analogy estimates  But the estimation logical chain is...  Q (quantity)  T (Time: Effort  Duration)  C (Costs)  FUR can be sized with a FSM method, but facing the requirement granularity issue  FUR is only one side of the ‘story’  ‘Functionalize’ NFRs  e.g. http://goo.gl/AWZjU  Again, not all iterations/Sprints are the same, they plan and release differently 13 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
  • 14. Agile-4-FSM Piece #4 – Estimating & Planning Sprint #1 Sprint #2 Sprint #3 Sprint #4 • Estimating & Planning  Each iteration/Sprint can be managed as a ‘project’ (or a ‘sub-project’) because it has different characteristics  Not all iterations/Sprints are the same, they need to be planned differently  Type-1 and Type-2 US2 are placed differently within iterations  use different productivity levels according to the different balancing of FUR vs NFR related effort  Nominal productivity’ (FP/Effort)  www.semq.eu/pdf/fsm-prod.pdf 14 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
  • 15. Agile-4-FSM Piece #4 – Estimating & Planning • Splitting effort...  Separate approx FUR vs NFR-related efforts  Increased R2 values  Refine your own effort data gathering introducing some more filters (e.g. # of layers and/or peer components measured)  Start using SNAP and/or other NFR-related approaches! 15 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
  • 16. Agile-4-FSM Conclusions & Perspectives • Agile & Requirements  FURs represent a large part of User Stories, but not the whole  NFRs need to be properly represented also in Agile environments, because the effort they take  US2 is a simple way to start writing them and the INVEST grid could be a way to improve agile planning, matching common-sense and a more quantitative view • Agile & Sizing measures  “Q T  C” is the common-sense, logical chain to be followed and ‘Quantity’ cannot be skipped  FSM methods can be easily applied to agile projects, many experiences yet ready and applicable  ‘One size DOESN’T fits all’...Only FURs are not sufficient for representing the real PROJECT effort  Sizing NFRs is the next challenge  IFPUG SNAP is one possible way to start doing it!  Agile & Estimating+Planning  Classifying US2 in Type-1 and Type-2 can help in better allocating resources and schedule iterations according to the distribution of FUR vs NFR-related effort  Some lessons learned  Agile is based on Experience  Experience means Data  Gather Data and share among the organization  Skill people on better eliciting requirements (e.g. CMMI-DEV RD process, ML3), separating FURs and NFRs  Share experiences and apply common definitions and levels of granularity across the several agile project teams, overcomingis prerequisite for reliability Simplicity the ‘Story Point’-syndrome...it’s about Simplicity! (Edsger Dijkstra, Mathematician) 16 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
  • 17. Agile-4-FSM What is (should be) Agile? 17 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
  • 18. Agile-4-FSM Q&A Grazie mille per l’attenzione! Thanks for your attention! 18 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione
  • 19. Agile-4-FSM Contacts We care of your problems and we have in mind a solution Luigi Buglione Industry & Service Dept Process Improvement & Measurement Specialist Via R. Morandi 32 Tel. +39 - 06.8307.4472 00148 Roma Fax +39 - 06.8307.4200 Cell. +39 - 335.1214813 www.eng.it luigi.buglione@eng.it 19 IFPUG Agile IG – May 17, 2012 – © 2012 L.Buglione