1Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
Bubi® or Not to Be?
2Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
Preparing and Launching the Bike Sharing Scheme for
Budapest. Curiosities and lessons learnt
László Vértesy, Virág Bencze-Kovacs
(BKK Centre for Budapest Transport),
Peter Dalos (Trenecon COWI)
Bubi® or Not to Be?
3Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
• Budget: 3.5 mEUR
• EU co-funding: 85 %
• Technical content:
– 15 km2 operational area
– 75 locations
(57 in Pest, 16 in Buda, 1 on Margitsziget)
– Average distance between locations: 320
m
– 1000 bikes, 1500 docking units
Budapest Bike (Bubi)
http://goo.gl/maps/MyKHP
4Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
Project outline
Basic informations about the project environment
• BKK (The Centre for Budapest Transport) is the project developer
BKK is owned by the Municipality of Budapest (100%)
• The 85% of the project is financed by EU fund (only implementation).
• The scheme supplier has to operate the scheme for 5 years.
Special tendering rules: Hungarian public procuration
Timing
2013 spring Open tender
2013 summer Selecting and contacting
the supplyer
2013 autumn Production installation
2014 spring Lauch of the scheme
5Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
Planning
Planing steps:
Step 1: Station network
Step 2: Station sizes
(big or small?)
Step 3: Station location
(on the spot)
boundary conditions
• Number of stations:
75 station
• Number of bycicles:
1000 bike
• Number
of docking stands:
1500 pcs.
• Station distance:
300-500m
6Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
Station sizes
Small, medium, large
Banks, office buildings etc.
Bank=4, office=8…
0-46: small, 47-85 medium, >85 lagre
1. Station size
categories
2. POIs
3. Usage values
for POIs
4. Usage values
for stations
5. Station size limits
by usage values
6. Iteration
7Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
Operation
1. Variability
2. Modular
3. Flexibility
4. Network free
8Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
Planning process
• Desk research
• Feasibility issues
• Impact on the transport policy
• Information Day
• Technical specification
• Crucial barriers
9Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
Desk research • worldwide situation back in 2008
• accessible sources
• expert community
9
10Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
Feasibility study
• financial sources
• organizational issues
• CEE specialties
• target market
• operation model
• feasibility issues
11Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
• road network
• operation model
• legislation
• fare-system
• customer service
• communication
• parking
Integration to transport policy
12Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
Information Days
• 30 vendor/operator
• successful discussion
• constraints of public
procurement
• NGO’s
• districts
• public communication
Invoving stakeholders
13Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
Technical specification
• implementation/operation
• surveillance system
• communication
• development process
• iteration
14Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
Key to success
• ultimate issues
• crucial barriers
• lessons to be
learned
spiltmilkmoms.com
15Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
Cycling Strategy of Budapest
• According to the
Budapest Transport
Development
Masterplan, the declared
goal of the City
of Budapest is to reach
10% of the modal
share of cycling
by 2020.
16Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
Projects
• Bicycle route network development
(accessible, safe and comfortable)
• Bike-friendly inner city, ”light”
measures
• Bubi – bike-sharing scheme
• Supporting interchanges
(bike & public transport)
• Cycling information,
services and promotion
Available budget for the next 4 years:
EUR 800,000/year on average
17Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
Bike-friendly
Bubi area
The planning process in 2013:
• covering 9 districts,
• approximately 100
section of one-way
street,
• 60 signalised
junctions,
• 32 sections of main
roads,
• and 22 zones.
awareness raising
campaign as well.
18Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
Bike-friendly
Bubi area
Main roads Bike lanes, sharrow
Road reconstruction
Correction of the network
Bus+bike
lanes
Every new installation
Depends on the road
layout and traffic
Advanced
stop-lane
Priority of bikes,
increased safety
Helps to cross the
junction and turning
19Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
Bike-friendly
Bubi area
Alapelvek, alapfeladatokOpening one-way
streets for bike
traffic in both
directions
In the whole area, complex
Defining the right of way
Bike-stands, parking Bike parking facitities and B+R
Traffic calming Pedestrian + bike zone
Reducing speed
Eliminate obstacles Ramps, curbs, dead-ends,
short cuts
20Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
Achieved up
to 2013
6,6 km bike path, 2,4 km new cycle lane; 6,5 km bus&bike lane; advisory cycle
lane
12 km, 50 one-strret contraflow 5 Bike-box
21Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest.
László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI)
Bubi® or Not to Be? - Bubi in 2014!
László Vértesy
project manager
Directorate of Strategy,
Development and Investment
Budapesti Közlekedési Központ /
Centre for Budapest Transport
bubi@bkk.hu
Péter Dalos
Transport planner
TRENECON COWI Consultancy.
dal@trenecon.hu
Virág Bencze-Kovács
coordinator for cycling policy
Directorate of Strategy, Development
and Investment
Budapesti Közlekedési Központ /
Centre for Budapest Transport
bicikli@bkk.hu

Mais conteúdo relacionado

Mais de Kovács Virág

BKK_Celegyenesben_a_bubi_20130919
BKK_Celegyenesben_a_bubi_20130919BKK_Celegyenesben_a_bubi_20130919
BKK_Celegyenesben_a_bubi_20130919Kovács Virág
 
BKK_VeloCity2013_Budapest_Cycling_City
BKK_VeloCity2013_Budapest_Cycling_CityBKK_VeloCity2013_Budapest_Cycling_City
BKK_VeloCity2013_Budapest_Cycling_CityKovács Virág
 
BKK, Cycling developments in Budapest, 2013 February
BKK, Cycling developments in Budapest, 2013 FebruaryBKK, Cycling developments in Budapest, 2013 February
BKK, Cycling developments in Budapest, 2013 FebruaryKovács Virág
 
Traffic Calming (Voca meeting)
Traffic Calming (Voca meeting)Traffic Calming (Voca meeting)
Traffic Calming (Voca meeting)Kovács Virág
 
R285 Integrating the metropolitan region through cycle network in Budapest
R285 Integrating the metropolitan region through cycle network in BudapestR285 Integrating the metropolitan region through cycle network in Budapest
R285 Integrating the metropolitan region through cycle network in BudapestKovács Virág
 
VC_Cooperation between NGOs and municipalities
VC_Cooperation between NGOs and municipalitiesVC_Cooperation between NGOs and municipalities
VC_Cooperation between NGOs and municipalitiesKovács Virág
 
VC_Cooperation between NGOs and municipalities
VC_Cooperation between NGOs and municipalitiesVC_Cooperation between NGOs and municipalities
VC_Cooperation between NGOs and municipalitiesKovács Virág
 
Cooperation between NGOs and municipalities
Cooperation between NGOs and municipalitiesCooperation between NGOs and municipalities
Cooperation between NGOs and municipalitiesKovács Virág
 
BKK_Budapest komplex kerékpárosbarát fejlesztése 2011
BKK_Budapest komplex kerékpárosbarát fejlesztése 2011BKK_Budapest komplex kerékpárosbarát fejlesztése 2011
BKK_Budapest komplex kerékpárosbarát fejlesztése 2011Kovács Virág
 
MK_A kerékpár és a közösségi közlekedés kapcsolata - Kerékpáros Tervezői Fórum
MK_A kerékpár és a közösségi közlekedés kapcsolata - Kerékpáros Tervezői FórumMK_A kerékpár és a közösségi közlekedés kapcsolata - Kerékpáros Tervezői Fórum
MK_A kerékpár és a közösségi közlekedés kapcsolata - Kerékpáros Tervezői FórumKovács Virág
 
MK_Kerékpáros forgalmi és baleseti statisztikák elemzése 2010, László János
MK_Kerékpáros forgalmi és baleseti statisztikák elemzése 2010, László JánosMK_Kerékpáros forgalmi és baleseti statisztikák elemzése 2010, László János
MK_Kerékpáros forgalmi és baleseti statisztikák elemzése 2010, László JánosKovács Virág
 
MK EPOMM - Közbringa fórum 2011
MK EPOMM  - Közbringa fórum 2011MK EPOMM  - Közbringa fórum 2011
MK EPOMM - Közbringa fórum 2011Kovács Virág
 
MK_ Kerékpárral a pesti Duna-parton, Kerékpárosbarát Tervezői Fórum 2010
MK_ Kerékpárral a pesti Duna-parton, Kerékpárosbarát Tervezői Fórum 2010MK_ Kerékpárral a pesti Duna-parton, Kerékpárosbarát Tervezői Fórum 2010
MK_ Kerékpárral a pesti Duna-parton, Kerékpárosbarát Tervezői Fórum 2010Kovács Virág
 
Koppenhágából jöttünk... Egyirányú utcák kétirányú kerékpáros forgalommal -Ke...
Koppenhágából jöttünk... Egyirányú utcák kétirányú kerékpáros forgalommal -Ke...Koppenhágából jöttünk... Egyirányú utcák kétirányú kerékpáros forgalommal -Ke...
Koppenhágából jöttünk... Egyirányú utcák kétirányú kerékpáros forgalommal -Ke...Kovács Virág
 

Mais de Kovács Virág (14)

BKK_Celegyenesben_a_bubi_20130919
BKK_Celegyenesben_a_bubi_20130919BKK_Celegyenesben_a_bubi_20130919
BKK_Celegyenesben_a_bubi_20130919
 
BKK_VeloCity2013_Budapest_Cycling_City
BKK_VeloCity2013_Budapest_Cycling_CityBKK_VeloCity2013_Budapest_Cycling_City
BKK_VeloCity2013_Budapest_Cycling_City
 
BKK, Cycling developments in Budapest, 2013 February
BKK, Cycling developments in Budapest, 2013 FebruaryBKK, Cycling developments in Budapest, 2013 February
BKK, Cycling developments in Budapest, 2013 February
 
Traffic Calming (Voca meeting)
Traffic Calming (Voca meeting)Traffic Calming (Voca meeting)
Traffic Calming (Voca meeting)
 
R285 Integrating the metropolitan region through cycle network in Budapest
R285 Integrating the metropolitan region through cycle network in BudapestR285 Integrating the metropolitan region through cycle network in Budapest
R285 Integrating the metropolitan region through cycle network in Budapest
 
VC_Cooperation between NGOs and municipalities
VC_Cooperation between NGOs and municipalitiesVC_Cooperation between NGOs and municipalities
VC_Cooperation between NGOs and municipalities
 
VC_Cooperation between NGOs and municipalities
VC_Cooperation between NGOs and municipalitiesVC_Cooperation between NGOs and municipalities
VC_Cooperation between NGOs and municipalities
 
Cooperation between NGOs and municipalities
Cooperation between NGOs and municipalitiesCooperation between NGOs and municipalities
Cooperation between NGOs and municipalities
 
BKK_Budapest komplex kerékpárosbarát fejlesztése 2011
BKK_Budapest komplex kerékpárosbarát fejlesztése 2011BKK_Budapest komplex kerékpárosbarát fejlesztése 2011
BKK_Budapest komplex kerékpárosbarát fejlesztése 2011
 
MK_A kerékpár és a közösségi közlekedés kapcsolata - Kerékpáros Tervezői Fórum
MK_A kerékpár és a közösségi közlekedés kapcsolata - Kerékpáros Tervezői FórumMK_A kerékpár és a közösségi közlekedés kapcsolata - Kerékpáros Tervezői Fórum
MK_A kerékpár és a közösségi közlekedés kapcsolata - Kerékpáros Tervezői Fórum
 
MK_Kerékpáros forgalmi és baleseti statisztikák elemzése 2010, László János
MK_Kerékpáros forgalmi és baleseti statisztikák elemzése 2010, László JánosMK_Kerékpáros forgalmi és baleseti statisztikák elemzése 2010, László János
MK_Kerékpáros forgalmi és baleseti statisztikák elemzése 2010, László János
 
MK EPOMM - Közbringa fórum 2011
MK EPOMM  - Közbringa fórum 2011MK EPOMM  - Közbringa fórum 2011
MK EPOMM - Közbringa fórum 2011
 
MK_ Kerékpárral a pesti Duna-parton, Kerékpárosbarát Tervezői Fórum 2010
MK_ Kerékpárral a pesti Duna-parton, Kerékpárosbarát Tervezői Fórum 2010MK_ Kerékpárral a pesti Duna-parton, Kerékpárosbarát Tervezői Fórum 2010
MK_ Kerékpárral a pesti Duna-parton, Kerékpárosbarát Tervezői Fórum 2010
 
Koppenhágából jöttünk... Egyirányú utcák kétirányú kerékpáros forgalommal -Ke...
Koppenhágából jöttünk... Egyirányú utcák kétirányú kerékpáros forgalommal -Ke...Koppenhágából jöttünk... Egyirányú utcák kétirányú kerékpáros forgalommal -Ke...
Koppenhágából jöttünk... Egyirányú utcák kétirányú kerékpáros forgalommal -Ke...
 

Último

PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree ttt fff
 
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...Yantram Animation Studio Corporation
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxmapanig881
 
定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一
定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一
定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一Fi ss
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubaikojalkojal131
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfAayushChavan5
 
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改yuu sss
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degreeyuu sss
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCRdollysharma2066
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girlsssuser7cb4ff
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdfvaibhavkanaujia
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIyuj
 
Design and Managing Service in the field of tourism and hospitality industry
Design and Managing Service in the field of tourism and hospitality industryDesign and Managing Service in the field of tourism and hospitality industry
Design and Managing Service in the field of tourism and hospitality industryrioverosanniejoy
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case StudySophia Viganò
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一z xss
 

Último (20)

PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
Unveiling the Future: Columbus, Ohio Condominiums Through the Lens of 3D Arch...
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptx
 
定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一
定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一
定制(CQU文凭证书)中央昆士兰大学毕业证成绩单原版一比一
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdf
 
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girls
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdf
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AI
 
Design and Managing Service in the field of tourism and hospitality industry
Design and Managing Service in the field of tourism and hospitality industryDesign and Managing Service in the field of tourism and hospitality industry
Design and Managing Service in the field of tourism and hospitality industry
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case Study
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
 

BKK_VeloCity2013_Bubi_or_not_to_be (Budapest Bike-shareing)

  • 1. 1Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) Bubi® or Not to Be?
  • 2. 2Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) Preparing and Launching the Bike Sharing Scheme for Budapest. Curiosities and lessons learnt László Vértesy, Virág Bencze-Kovacs (BKK Centre for Budapest Transport), Peter Dalos (Trenecon COWI) Bubi® or Not to Be?
  • 3. 3Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) • Budget: 3.5 mEUR • EU co-funding: 85 % • Technical content: – 15 km2 operational area – 75 locations (57 in Pest, 16 in Buda, 1 on Margitsziget) – Average distance between locations: 320 m – 1000 bikes, 1500 docking units Budapest Bike (Bubi) http://goo.gl/maps/MyKHP
  • 4. 4Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) Project outline Basic informations about the project environment • BKK (The Centre for Budapest Transport) is the project developer BKK is owned by the Municipality of Budapest (100%) • The 85% of the project is financed by EU fund (only implementation). • The scheme supplier has to operate the scheme for 5 years. Special tendering rules: Hungarian public procuration Timing 2013 spring Open tender 2013 summer Selecting and contacting the supplyer 2013 autumn Production installation 2014 spring Lauch of the scheme
  • 5. 5Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) Planning Planing steps: Step 1: Station network Step 2: Station sizes (big or small?) Step 3: Station location (on the spot) boundary conditions • Number of stations: 75 station • Number of bycicles: 1000 bike • Number of docking stands: 1500 pcs. • Station distance: 300-500m
  • 6. 6Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) Station sizes Small, medium, large Banks, office buildings etc. Bank=4, office=8… 0-46: small, 47-85 medium, >85 lagre 1. Station size categories 2. POIs 3. Usage values for POIs 4. Usage values for stations 5. Station size limits by usage values 6. Iteration
  • 7. 7Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) Operation 1. Variability 2. Modular 3. Flexibility 4. Network free
  • 8. 8Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) Planning process • Desk research • Feasibility issues • Impact on the transport policy • Information Day • Technical specification • Crucial barriers
  • 9. 9Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) Desk research • worldwide situation back in 2008 • accessible sources • expert community 9
  • 10. 10Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) Feasibility study • financial sources • organizational issues • CEE specialties • target market • operation model • feasibility issues
  • 11. 11Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) • road network • operation model • legislation • fare-system • customer service • communication • parking Integration to transport policy
  • 12. 12Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) Information Days • 30 vendor/operator • successful discussion • constraints of public procurement • NGO’s • districts • public communication Invoving stakeholders
  • 13. 13Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) Technical specification • implementation/operation • surveillance system • communication • development process • iteration
  • 14. 14Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) Key to success • ultimate issues • crucial barriers • lessons to be learned spiltmilkmoms.com
  • 15. 15Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) Cycling Strategy of Budapest • According to the Budapest Transport Development Masterplan, the declared goal of the City of Budapest is to reach 10% of the modal share of cycling by 2020.
  • 16. 16Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) Projects • Bicycle route network development (accessible, safe and comfortable) • Bike-friendly inner city, ”light” measures • Bubi – bike-sharing scheme • Supporting interchanges (bike & public transport) • Cycling information, services and promotion Available budget for the next 4 years: EUR 800,000/year on average
  • 17. 17Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) Bike-friendly Bubi area The planning process in 2013: • covering 9 districts, • approximately 100 section of one-way street, • 60 signalised junctions, • 32 sections of main roads, • and 22 zones. awareness raising campaign as well.
  • 18. 18Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) Bike-friendly Bubi area Main roads Bike lanes, sharrow Road reconstruction Correction of the network Bus+bike lanes Every new installation Depends on the road layout and traffic Advanced stop-lane Priority of bikes, increased safety Helps to cross the junction and turning
  • 19. 19Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) Bike-friendly Bubi area Alapelvek, alapfeladatokOpening one-way streets for bike traffic in both directions In the whole area, complex Defining the right of way Bike-stands, parking Bike parking facitities and B+R Traffic calming Pedestrian + bike zone Reducing speed Eliminate obstacles Ramps, curbs, dead-ends, short cuts
  • 20. 20Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) Achieved up to 2013 6,6 km bike path, 2,4 km new cycle lane; 6,5 km bus&bike lane; advisory cycle lane 12 km, 50 one-strret contraflow 5 Bike-box
  • 21. 21Bubi® or Not to Be? Preparing and Launching the Bike Sharing Scheme for Budapest. László Vértesy, Virág Bencze-Kovacs, (BKK), Peter Dalos (Trenecon COWI) Bubi® or Not to Be? - Bubi in 2014! László Vértesy project manager Directorate of Strategy, Development and Investment Budapesti Közlekedési Központ / Centre for Budapest Transport bubi@bkk.hu Péter Dalos Transport planner TRENECON COWI Consultancy. dal@trenecon.hu Virág Bencze-Kovács coordinator for cycling policy Directorate of Strategy, Development and Investment Budapesti Közlekedési Központ / Centre for Budapest Transport bicikli@bkk.hu