Environmentally friendly construction method by TLD/Acepac that uses reusable Metal Formwork that shortens construction period due to its ease in setting up and repetitive in nature.
Falcon Invoice Discounting: Unlock Your Business Potential
Green Metal Formwork for construction of hi-rise building
1. METALWORK (SHENZHEN) CO., LTD.
METALWORK (SHENZHEN) CO., LTD.
PRESENTATION
OFFICE RM 1601,BUILDING NO.18,BEAUTIFUL
GARDEN,CENTRAL CITY, LONGGANG,SHENZHEN
TEL +86-755-28900228 FAX +86-755-28913393
EMAIL : ksho@acepac.com.sg
WEB : www.tldsz.com
2. METALWORK (SHENZHEN) CO., LTD.
TLD Metalwork (Shenzhen) Co., Ltd. was established in 1997. Initially we specialized ourselves in fabricating
and supplying high quality architectural metal parts such as stainless steel decorative features, doors and
balustrades to many prestigious projects in Hong Kong. Since the year 2000, we have expanded our products
to include design, fabrication and supply of aluminium formwork systems. Our export markets include Hong
Kong, Macau, Dubai and India where technically sophistricated formwork systems are required.
In order to cope with the increasing demands by our overseas customers for a short lead time delivery period
without compromising the quality of our formwork systems, we have relocated our design and fabrication
facilities to Dongguan with the factory space expanded to 20,000 sq.m. thereby increasing our production
capacity and trail erection space. By erecting the completed formwork panels and accessories at our factory,
we can ensure total accuracy in the design and fabrication of panels accessories prior to packing and shipping
them to project sites overseas.
Our TLD Aluminium Formwork System has below advantages:
1) Material:
a) Aluminium alloy is Light weight, easy to handle and safty;
b) Aluminium Formwork can be reused over 200 times;
c) Low wastage and can be recycled.
2) Construction speed and quality:
a) TLD aluminium formwork can form the complete concrete structure as designed by the customer, it has
unsurpassed construction speed;
b) Will mock-up in TLD facotry and be easy for erecting on customer’s site
c) Aluminium formwork can form high quality finish of the concrete surface
3) Labour and cost:
a) Can use unskilled labour ;
b) Cost effective for mass production.
3. METALWORK (SHENZHEN) CO., LTD.
Human Resources
1 Management 14
a Manager 3
b Financial & Administrative 3
c Marketing & Business 6
d QA &QC 2
2 Designer 18
3 Project & Operators 118
Total 150
20. METALWORK (SHENZHEN) CO., LTD.
Introduction of aluminum system formwork
1 Aluminum system formwork installation on construction site
2 Aluminum formwork system process
1 Design
2 Fabrication
3 Mock-up
4 Transportation
23. METALWORK (SHENZHEN) CO., LTD.
2 Aluminum formwork system process
1 Aluminum system design
-a key-Plan -c Shop Drawing
-b Shell Drawing -d Erection Drawing
a. key-Plan c. Shop Drawing
b. Shell Drawing d. Erection Drawing
24. METALWORK (SHENZHEN) CO., LTD.
2 Aluminum formwork system process
2 Aluminum formwork fabrication
Hardness Testing
Fusion
Formulated Aluminum
Rod
Chemical Components
Inspection
Raw Material
Extruding Heating the Aluminum
Extruded Profile Rod
29. METALWORK (SHENZHEN) CO., LTD.
Procedures upon completion of trial assembly
Trial assembly completed
System formwork numbering to panels
System formwork numbering to drawings
Dismantle as per unit and discipline
Packing
Transport to construction site
Site storage
Site lift and installation
30. METALWORK (SHENZHEN) CO., LTD.
Aluminum System Formwork – 4 days cycle
1) Day 1 --- 07 : 00~10:00
Lifting up Re-bar
2) Day 1 --- 08 : 00~14:00
Striking Wall Panel
3) Day 1 --- 09 : 00~17:00
Install Wall Panel
4) Day 1 --- 09 : 00~15:00
Fixing E&M Holes
5) Day 1 --- 16 : 00~Day 2 09:00
Striking Deck Panel
6) Day 1 --- 17 : 00~
7) Day 2 --- 08 : 00~15:00
Install Slab & Bay-Window
8) Day 2 --- 14 : 00~Day 3 17:00
Rebar Fixing For Slab
9) Day 2 --- 16 : 00~Day 3 17:00
Fixing E&M Conduit
10) Day 3 --- 08 : 00 ~ 18 : 00
Rebar Fixing For Slab
11) Day 4 --- 08 : 00 ~ 17 : 00
Concrete
3 Sets 6 Sets
35. METALWORK (SHENZHEN) CO., LTD.
Job Reference For System Formwork
Design, Supply & Install of Alum System Formwork for
Alum. System
Tseung Kuan O Extension Proposed Property 06/2003 08/2004
Formwork
Development at Hang Hou Station Area 38b
Design, Supply & Installation of System Formwork,
Alum. System
Installation of Precast Fascade & Concreting for Tiu Keng 02/2004 07/2005
Formwork
Leng Station Development, HK
Design, Supply of System Formwork for Proposed Alum. System
Residentail and Commercial Development at Area 55B, Formwork 04/2004 09/2004
Tseung Kwan O.T.K.O.T.L.75, Sai Kung, N.T.,HK
Alum. System
Design, Supply of System Formwork for Wynn Resorts
Formwork & Steel 10/2004 08/2005
Macau
System Formwork
Supply of Aluminium beam for ShangHai Alum. Beam 05/2005 07/2005
Design, Supply& Installation of System Formwork for Alum. System
Residential Development at Lot R+R1,Rua Central Da Formwork 09/2005 05/2006
Areia Preta,Macau
Design, Supply of Aluminium System Formwork for Alum. System
(P408FZ) Lob & Shopping Arcade, JAFZA Shouth Formwork 12/2005 08/2006
Plot NOS. SZS10212 & SZS10213,Dubai
36. METALWORK (SHENZHEN) CO., LTD.
Job Reference For System Formwork
Design, Supply of Aluminium System Formwork for Golf Tower Alum. System
Formwork 06/2006 09/2006
III The Views Plot 34 Emaar Properties PJSC, Dubai
Design, Supply & Installation of System Formwork, Installation
Alum. System
of Precast Fascade & Concreting for Proposed Residential
Formwork & Steel 08/2006 01/2008
Development On Tseung Kwan O Town Lot 70,Area 86,Site
System Formwork
F,HK
Design, Supply of System Formwork for Sports City Profile Alum. System
Residence Tower / Bermuda Views Tower, Dubai Formwork 08/2007 12/2007
Design, Supply& Installation of System Formwork for Alum. System
Formwork 06/2007 12/2007
Venetian Cotai Parcel 2 Serviced Apartment Tower Macau
Design, Supply& Installation of System Formwork ,Installation Alum. System
of Precast Fascade for Tai Wan maintenance center property Formwork 08/2007 11/2008
development, Sha tin town lot NO. 529 ,HK
Design, Supply of System Formwork for XL Tower/Bussiness Alum. System
Tower, Dubai Formwork 01/2008 06/2008
Design, Supply of System Formwork for Wynn Resorts Alum. System
Macau-Diamond Suites, Macau Formwork 04/2008 03/2009
37. METALWORK (SHENZHEN) CO., LTD.
Job Reference For System Formwork
Shun Hing Centre Stainless Steel Wash Basin 2005
Metro Harbour View Aluminium Formwork 2001
Sorrento Automatic Lifting Frame 2002
Tseung Kwan O Hang Hau MTR Station Aluminium Formwork 2002
Cyberport Stainless Steel Connecting Components 2003
Mass Transit Railway Stations Formwork Steel Components 2003
Nam Cheong Street Public Health Laboratory Mobile Scaffolding 2003
Complex
Queen Mary Hospital Stainless Steel Brackets 2003
Hang Hau MTR Station DreamCity Aluminium Formwork 2003
Central North MTR Station Aluminium Formwork 2003
Tiu Keng Leng MTR Station Aluminium Formwork 2003
Hong Kong University Memorial Hall Mobile Scaffolding 2003
Stainless Steel balustrade, Skylight and
Royal Cliff, Repulse Bay 2004
Doors
International Finance Centre III Aluminium Lamp Channel 2004
Les Saisons Mobile Scaffolding 2004
Hong Kong Housing Society Stainless Steel Waste Treatment System 2005
Tseung Kwan O DreamCity T1-6 Aluminium Formwork 2006
Property Development at Tai Wai KCR Aluminium Formwork 2007
38. METALWORK (SHENZHEN) CO., LTD.
Job Reference For System Formwork
Wynn Casino Aluminium formwork 2004
Lacite Aluminium Formwork 2006
The Venetian Macao-Resort-Hotel Aluminium Formwork 2007
Parking Meter System Powder-coated Steel components 2004
Stainless Steel & Aluminium Elliptical
University of Michigan 2005
Columns
Stainless Steel Connectors for Glazed
IOWA State Public Library 2005
Curtain Wall
JAFZ Tower Aluminium Formwork 2006
GOLF Tower III Aluminium Formwork 2006
Residential Tower at Dubai Sports City Aluminium Formwork 2007
Business Bay Aluminium Formwork 2007
XL Tower Aluminium Formwork 2007
Lanco Hills Technology Park Residential Towers Aluminium Formwork 2008
Steel Structure for Facade, Lift Shaft and
Staircase Landing and Stringers,
Baden-Baden Museum 2008
Aluminium Stepping and Stainless Steel
Guardrail and Barrier
King Abdullah University of Science & Technology Stainless Steel Studs 2008