SlideShare a Scribd company logo
1 of 1
Download to read offline
OVERHEAD TRANSMISSION LINE
                                                                                                                                    PROJECT RISK REGISTER
                                                                                                                                                             Risk Qualitative Assesment
SL.                                                                                                                                                                                  P*I   P*I        P*I
       Risk Area            Risk Effect                                        Risk Description                                                                      Performanc                                Risk Rank       Risk Response                        Mitigation Plan
NO                                                                                                                               Probability Cost Impact Time Impact                              Performanc
                                                                                                                                                                       e Impact     Cost   Time
                                                                                                                                                                                                       e

                                                                                                                                                                                                                                                     In such scenario, the review/approval process
                                                  Changes in approved design
       Cost, Time,                                                                                                                                                                                                                                   should be made faster. Decision making
 1                   Delay to project             Foundation design changes after approval and commencement of work                 High        High        High        High        16      16       16                           Eliminate
      Performance                                                                                                                                                                                                                                    should be consistant & faster. Reversal to
                                                  will affect the progress of work
                                                                                                                                                                                                                                                     original scope should be avoided.

                                                  Deviation from the specifications
       Cost, Time,                                Introduction of prokon software for foundation design not mentioned in                                                                                                                             Intoduction of all requirements in the
 2                   Delay to project                                                                                               High      Very High     High        High        20      16        16                          Improve
      Performance                                 the specification and studying of software and implementation leads to                                                                                                                             contract specification itself
                                                  more time and engineering works.

                                                                                                                                                                                                                                                     Eventhogh in accessible mountains the angle
                                                                                                                                                                                                                                                     points shall be properly selected with minium
                                                  Selection Route Alignment with out proper Walk over survey - selection of                                                                                                                          required details of terrain in between and
                                                  route from Google Data- Section of Angle points upto 3.0-4.0 m in straight                                                                                                                         selection of route in such a way to get suitable
                                                  line in hilly area without analysing the the site geographical conditions                                                                                                                          tower postiobns which will reduce benching ,
                                                                                                                                                                                                                                                     length of access roads and thereby
                                                                                                                                                                                                                                                     construction time
                                                                                                                                                                                                                                                     Due to the incompetency of conatrctors
                                                  Selection of comptentent project team who is having previous working                                                                                                                               project team , realistic planning ,
                                                                                                                                                                                                                              Corrective action      identification of project hazards are not
                                                  experience in OHL construction in hilly area.
                                                                                                                                                                                                                                                     happening which are resulting in dealy of
                                                                                                                                                                                                                                                     project
                                                                                                                                                                                                                                                     Propoer machinary deployment , allocation of
                                                  Deployment of sufficient powerful machinaries in work liks access road ,
                                                                                                                                                                                                                              Corrective action      sufficient work front will enhance the
                                                  benching and excvation which are the tough civil work in this hilly area.
                                                                                                                                                                                                                                                     progress of work


                                                                                                                                                                                                                                                     Most of the activities in foundations are
                                                  Absence of materials , Tools and plant like form box shutters and chimney
                                                                                                                                                                                                                              Corrective action      happening in more days due to shortages of
                                                  for founadtion work
                                                                                                                                                                                                                                                     materails

                                                                                                                                                                                                                                                     Implemenation of user friendly or tailor made
                                                  Implemenation of user friendly or tailor made design for the easiness of                                                                                                                           design for the easiness of foundation work
                                                  foundation work (like hauch and trapezoidal base ) results in incaresed                                                                                                                            (like hauch and trapezoidal base ) results in
                                                  preaparatory work which is deaplying completion time                                                                                                                                               incaresed preaparatory work which is
                                                                                                                                                                                                                                                     deaplying completion time
                                                  New comments in subsequent revision of single document                                                                                                                                             All the comments to be given in first
       Cost, Time,
 3                   Delay to project             Passing out new comments in each revision of foundation design may lead           High        Low       Very High     High         8      20        16                          Eliminate          submission and new comments in subsequent
      Performance
                                                  to design cycle delay and delay in execution                                                                                                                                                       submissions to be avoided


                                                  Poor Vendor Support
                                                  Time wasted waiting for response to queries or due to rework arising from                                                                                                                          Efficient tracking of design
       Cost, Time,
 4                   Delay to project             assumptions made by the project team in the interim or the vendor         Very low            High        High        High         4      4         4                           Improve            submission/approvals.Interim changes in
      Performance
                                                  reluctant to accepting the change request due to deviation in client                                                                                                                               design requirements to be avoided.
                                                  requirements.



                     Delay to project &           Dependence of External suppliers                                     May
       Cost, Time,                                miss milestones waiting for deliverables due to delay in vendor approvals,                                                                                                 Adequate control      Timely approval of vendors and design.
 5                   adverse impact in                                                                                            Medium        High        High        High        12      12       12
      Performance                                 design approvals and issue of manufacturing clearance                                                                                                                    measures to be in place Manufacturing clearance to be given in time.
                     project cashflow



                                                  Non availability of approved materials                              The
       Cost, Time,                                                                                                                                                                                                           Adequate control      Take prior approval of multiple parties based
 6                   Delay to project             approved materials will not be readily available or approved vendor may         Very low      High        High        High         4      4         4
      Performance                                                                                                                                                                                                          measures to be in place on their availabilty.
                                                  fail to deliver due to some reasons


                                                  Change in the original route
                                                                                                                                                                                                                                                     Bestowing of approved route during site
       Cost, Time,   Delay to project and         The changes in original tender route and line passing through high hilly
 7                                                                                                                            Very High       Very High   Very High     High        25      25        20                          Eliminate          handing over or properly estimating the
      Performance    huge cost impact             terrain due to objection from Municipality or objection of locals or due to
                                                                                                                                                                                                                                                     possible route during tender stage itself.
                                                  line passing through eco-torism zone


                                                  Scope Variations                                                                                                                                                                                   Scope variations in the interim should be
                     Delay to project &                                                                                                                                                                                     Conscious decision to
       Cost, Time,                                More than 20% increase in the BOQ quantity for activities like benching,                                                                                                                           maximum avoided.In case of scope variations
 7                   adverse impact in                                                                                           Very High    Very High   Very High     High        25      25        20                       accept impact
      Performance                                 tower supply due to change in original route may adversely affect the                                                                                                                              it should be recorded and tracked for
                     project cashflow                                                                                                                                                                                          contractually
                                                  project execution                                                                                                                                                                                  proporationate time and cost implications


                                                  Difficulty in manual survey                                                                                                                                                                        Adoption of LIDAR survey in such terrain
       Cost, Time,
 9                   Delay to project             Difficulty in the conventional manual survey due to hilly terrain conditions      High        High        High        High        16      16       16                           Improve            where manual survey is possible to save time
      Performance
                                                  or non-accessability to locations                                                                                                                                                                  and cost


                                                  Damage in access road due to rain                                  The
       Cost, Time,                                access road to reach the locations may get damaged due to heavy rain                                                                                                                               Application for insurance for such roads
10                   Delay to project                                                                                             Medium        High        High        High        12      12       12                       Corrective action
      Performance                                 affecting the subsequent activities like benching,foundation etc inturn                                                                                                                            which can be claimed under natural calamity
                                                  affecting the overall project schedule


                                                  On transit material risk                                       The                                                                                                                                 Application for insurance in advance and
       Cost, Time,
11                   Delay to project             possibilty of material may get lost or damaged on transit of materials from Medium            High        High        High        12      12       12                       Corrective action      procuring materials through air fright to avoid
      Performance
                                                  source port to destination port                                                                                                                                                                    time delay



                     Delay to project &                                                                                                                                                                                                            Strictly follow the HSE rules,statistics to be
       Cost, Time,                                HSE Non compliance                                                                                                                                                         Adequate control
12                   adverse impact in                                                                                              Low         Low       Very Low      Low          4      2         4                                            maintained regularly. Approved HSE plan
      Performance                                 Non compliance may cause loss of manhours and damage to environment                                                                                                      measures to be in place
                     reputation                                                                                                                                                                                                                    should be strictly implemented



       Cost, Time,                                Availability of Resources                                                                                                                                                                          Resource planning to be done at different
13                   Delay to project                                                                                               Low         Low       Medium        Low          4      6         4                           Improve
      Performance                                 Resources constraints will affect the project milestones                                                                                                                                           stages of the project

                                                                                                                                                                                                                                                     Project control procedures to be
       Cost, Time,                                Project Controlling                                                                                                                                                                                implemented and MIS reports to be be
14                   Delay to project                                                                                               Low         Low         Low         Low          4      4         4                           Improve
      Performance                                 Project control procedures may not be adequate.                                                                                                                                                    generated for monitoring the project
                                                                                                                                                                                                                                                     parameters.

                                                                                                                                                                                                                                                     Proper tracking system has to be adopted and
       Cost, Time,                                Site Inspection tracking                           The inspection request
15                   Delay in starting activity                                                                                     Low         Low         Low         Low          4      4         4                           Improve            responsible QA/QC engineer ahs to be given
      Performance                                 given for consultant/client for activities may get missed or delayed
                                                                                                                                                                                                                                                     responsibility



                                                  Allocating only 2m working space for benching activities in hilly terrain
       Cost, Time,
16                   Delay to project             The space constarint in tower locations may affect painitng activity in        Very High      High        High        High        20      20        20                          Improve            The painting has to be done after erection
      Performance
                                                  gorund itself




                                                                                                                                                                                                                                                                                  Page 1 of 1

More Related Content

What's hot

Peter Lanfermann Vodafone D2 LTE deployment in Germany
Peter Lanfermann Vodafone D2 LTE deployment in GermanyPeter Lanfermann Vodafone D2 LTE deployment in Germany
Peter Lanfermann Vodafone D2 LTE deployment in GermanyErwann Thomassain
 
HPR Integrated Design - BIM/IPD Proposal Presentation
HPR Integrated Design - BIM/IPD Proposal PresentationHPR Integrated Design - BIM/IPD Proposal Presentation
HPR Integrated Design - BIM/IPD Proposal PresentationJosh Progar
 
Grammier.richard
Grammier.richardGrammier.richard
Grammier.richardNASAPMC
 
Braithwaite Communications Capabilities
Braithwaite Communications CapabilitiesBraithwaite Communications Capabilities
Braithwaite Communications Capabilitiescassoryl
 
Military Armor Protection
Military Armor ProtectionMilitary Armor Protection
Military Armor Protectionjmanthey
 
IDGA's 4th Annual Military Armor Protection Program Agenda
IDGA's 4th Annual Military Armor Protection Program AgendaIDGA's 4th Annual Military Armor Protection Program Agenda
IDGA's 4th Annual Military Armor Protection Program AgendaIDGA
 
Buildings construction-mgt-1
Buildings construction-mgt-1Buildings construction-mgt-1
Buildings construction-mgt-1Qs. Nahinga David
 
Ed.mango
Ed.mangoEd.mango
Ed.mangoNASAPMC
 
G&G Relationship Development 1.Defense
G&G Relationship Development 1.DefenseG&G Relationship Development 1.Defense
G&G Relationship Development 1.DefenseThe G&G Mfg. Co.
 
Critical path method
Critical path methodCritical path method
Critical path methodAnupam Kumar
 
Dornan Engineering Company Brochure
Dornan Engineering Company BrochureDornan Engineering Company Brochure
Dornan Engineering Company BrochureJamiebarlow
 
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 views
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 viewsATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 views
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 viewsSESAR Joint Undertaking
 
Creating Translations New
Creating Translations NewCreating Translations New
Creating Translations NewArtAID
 
Transport Thursday 18 October 2012 Winter Proof Railroad System
Transport Thursday 18 October 2012 Winter Proof Railroad SystemTransport Thursday 18 October 2012 Winter Proof Railroad System
Transport Thursday 18 October 2012 Winter Proof Railroad SystemTU Delft Transport Institute
 
Safie.fayssal
Safie.fayssalSafie.fayssal
Safie.fayssalNASAPMC
 
Carol.scott
Carol.scottCarol.scott
Carol.scottNASAPMC
 
Altarum DC Presentation
Altarum DC PresentationAltarum DC Presentation
Altarum DC Presentationbtharp
 

What's hot (19)

LQB Busniess plan
LQB Busniess planLQB Busniess plan
LQB Busniess plan
 
Peter Lanfermann Vodafone D2 LTE deployment in Germany
Peter Lanfermann Vodafone D2 LTE deployment in GermanyPeter Lanfermann Vodafone D2 LTE deployment in Germany
Peter Lanfermann Vodafone D2 LTE deployment in Germany
 
HPR Integrated Design - BIM/IPD Proposal Presentation
HPR Integrated Design - BIM/IPD Proposal PresentationHPR Integrated Design - BIM/IPD Proposal Presentation
HPR Integrated Design - BIM/IPD Proposal Presentation
 
Grammier.richard
Grammier.richardGrammier.richard
Grammier.richard
 
Upk presentation insync
Upk presentation insync Upk presentation insync
Upk presentation insync
 
Braithwaite Communications Capabilities
Braithwaite Communications CapabilitiesBraithwaite Communications Capabilities
Braithwaite Communications Capabilities
 
Military Armor Protection
Military Armor ProtectionMilitary Armor Protection
Military Armor Protection
 
IDGA's 4th Annual Military Armor Protection Program Agenda
IDGA's 4th Annual Military Armor Protection Program AgendaIDGA's 4th Annual Military Armor Protection Program Agenda
IDGA's 4th Annual Military Armor Protection Program Agenda
 
Buildings construction-mgt-1
Buildings construction-mgt-1Buildings construction-mgt-1
Buildings construction-mgt-1
 
Ed.mango
Ed.mangoEd.mango
Ed.mango
 
G&G Relationship Development 1.Defense
G&G Relationship Development 1.DefenseG&G Relationship Development 1.Defense
G&G Relationship Development 1.Defense
 
Critical path method
Critical path methodCritical path method
Critical path method
 
Dornan Engineering Company Brochure
Dornan Engineering Company BrochureDornan Engineering Company Brochure
Dornan Engineering Company Brochure
 
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 views
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 viewsATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 views
ATC Global 2012 - SESAR Forum - SESAR Releases - Florian Guillermet 21 views
 
Creating Translations New
Creating Translations NewCreating Translations New
Creating Translations New
 
Transport Thursday 18 October 2012 Winter Proof Railroad System
Transport Thursday 18 October 2012 Winter Proof Railroad SystemTransport Thursday 18 October 2012 Winter Proof Railroad System
Transport Thursday 18 October 2012 Winter Proof Railroad System
 
Safie.fayssal
Safie.fayssalSafie.fayssal
Safie.fayssal
 
Carol.scott
Carol.scottCarol.scott
Carol.scott
 
Altarum DC Presentation
Altarum DC PresentationAltarum DC Presentation
Altarum DC Presentation
 

Viewers also liked

6th Kutubu Kundu & Digaso Festival Brochure
6th Kutubu Kundu & Digaso Festival Brochure6th Kutubu Kundu & Digaso Festival Brochure
6th Kutubu Kundu & Digaso Festival BrochureSaina Jeffrey Philyara
 
Aplikom_UNSRI_5.a Jadwal Kuliah_Sherly Anggraini(06081181419005)
Aplikom_UNSRI_5.a Jadwal Kuliah_Sherly Anggraini(06081181419005)Aplikom_UNSRI_5.a Jadwal Kuliah_Sherly Anggraini(06081181419005)
Aplikom_UNSRI_5.a Jadwal Kuliah_Sherly Anggraini(06081181419005)Sherly Anggraini
 
Constituciones mexicanas2
Constituciones mexicanas2Constituciones mexicanas2
Constituciones mexicanas2Nameless RV
 
2012 BCS Champions Alabama Crimson Tide
2012 BCS Champions Alabama Crimson Tide2012 BCS Champions Alabama Crimson Tide
2012 BCS Champions Alabama Crimson TideCece 425
 
VALORIZA CORRETORA - INSTITUCIONAL - BRASIL
VALORIZA CORRETORA - INSTITUCIONAL - BRASILVALORIZA CORRETORA - INSTITUCIONAL - BRASIL
VALORIZA CORRETORA - INSTITUCIONAL - BRASILCristiano Meira
 
Transportforum 2012 session 80 vidareutvecklad miljöbedömningsmetod för långs...
Transportforum 2012 session 80 vidareutvecklad miljöbedömningsmetod för långs...Transportforum 2012 session 80 vidareutvecklad miljöbedömningsmetod för långs...
Transportforum 2012 session 80 vidareutvecklad miljöbedömningsmetod för långs...michel_gabrielsson
 
The Wilds Of Michigan Logo
The Wilds Of Michigan LogoThe Wilds Of Michigan Logo
The Wilds Of Michigan LogoMarkLantz
 
Actionsscript cheat sheet_letter
Actionsscript cheat sheet_letterActionsscript cheat sheet_letter
Actionsscript cheat sheet_letterRadik Setagalih
 
平潭惠安攝影四日遊
平潭惠安攝影四日遊平潭惠安攝影四日遊
平潭惠安攝影四日遊jerryliu1972
 
11. MENSAJE FUENTE EN EL CENTRO DE TU CUERPO
11. MENSAJE FUENTE EN EL CENTRO DE TU CUERPO11. MENSAJE FUENTE EN EL CENTRO DE TU CUERPO
11. MENSAJE FUENTE EN EL CENTRO DE TU CUERPOFEDERICO ALMENARA CHECA
 
Designing Education and Experience Tuesday AM at a Glance
Designing Education and Experience Tuesday AM at a GlanceDesigning Education and Experience Tuesday AM at a Glance
Designing Education and Experience Tuesday AM at a GlanceVelvet Chainsaw Consulting
 

Viewers also liked (20)

Test
TestTest
Test
 
6th Kutubu Kundu & Digaso Festival Brochure
6th Kutubu Kundu & Digaso Festival Brochure6th Kutubu Kundu & Digaso Festival Brochure
6th Kutubu Kundu & Digaso Festival Brochure
 
Aplikom_UNSRI_5.a Jadwal Kuliah_Sherly Anggraini(06081181419005)
Aplikom_UNSRI_5.a Jadwal Kuliah_Sherly Anggraini(06081181419005)Aplikom_UNSRI_5.a Jadwal Kuliah_Sherly Anggraini(06081181419005)
Aplikom_UNSRI_5.a Jadwal Kuliah_Sherly Anggraini(06081181419005)
 
Constituciones mexicanas2
Constituciones mexicanas2Constituciones mexicanas2
Constituciones mexicanas2
 
Presentation1
Presentation1Presentation1
Presentation1
 
2012 BCS Champions Alabama Crimson Tide
2012 BCS Champions Alabama Crimson Tide2012 BCS Champions Alabama Crimson Tide
2012 BCS Champions Alabama Crimson Tide
 
VALORIZA CORRETORA - INSTITUCIONAL - BRASIL
VALORIZA CORRETORA - INSTITUCIONAL - BRASILVALORIZA CORRETORA - INSTITUCIONAL - BRASIL
VALORIZA CORRETORA - INSTITUCIONAL - BRASIL
 
Transportforum 2012 session 80 vidareutvecklad miljöbedömningsmetod för långs...
Transportforum 2012 session 80 vidareutvecklad miljöbedömningsmetod för långs...Transportforum 2012 session 80 vidareutvecklad miljöbedömningsmetod för långs...
Transportforum 2012 session 80 vidareutvecklad miljöbedömningsmetod för långs...
 
The Wilds Of Michigan Logo
The Wilds Of Michigan LogoThe Wilds Of Michigan Logo
The Wilds Of Michigan Logo
 
Ronak cv
Ronak cvRonak cv
Ronak cv
 
12.LA PARABOLA DEL SEMBRADOR
12.LA PARABOLA DEL SEMBRADOR12.LA PARABOLA DEL SEMBRADOR
12.LA PARABOLA DEL SEMBRADOR
 
Actionsscript cheat sheet_letter
Actionsscript cheat sheet_letterActionsscript cheat sheet_letter
Actionsscript cheat sheet_letter
 
Ficha 6 repaso
Ficha 6 repasoFicha 6 repaso
Ficha 6 repaso
 
平潭惠安攝影四日遊
平潭惠安攝影四日遊平潭惠安攝影四日遊
平潭惠安攝影四日遊
 
Presentación1
Presentación1Presentación1
Presentación1
 
No soal 36
No soal 36No soal 36
No soal 36
 
11. MENSAJE FUENTE EN EL CENTRO DE TU CUERPO
11. MENSAJE FUENTE EN EL CENTRO DE TU CUERPO11. MENSAJE FUENTE EN EL CENTRO DE TU CUERPO
11. MENSAJE FUENTE EN EL CENTRO DE TU CUERPO
 
Designing Education and Experience Tuesday AM at a Glance
Designing Education and Experience Tuesday AM at a GlanceDesigning Education and Experience Tuesday AM at a Glance
Designing Education and Experience Tuesday AM at a Glance
 
56 3 g. agosto 2011
56 3 g. agosto 201156 3 g. agosto 2011
56 3 g. agosto 2011
 
Alcançand..
Alcançand..Alcançand..
Alcançand..
 

Similar to Ohl project risk register

Project Excellence Risk Management K
Project Excellence Risk Management KProject Excellence Risk Management K
Project Excellence Risk Management KSteveSussman
 
Major Project Management
Major Project ManagementMajor Project Management
Major Project ManagementAssystem
 
Cost Engineering in the process industry
Cost Engineering in the process industryCost Engineering in the process industry
Cost Engineering in the process industryNesma
 
Competitive Bid Process
Competitive Bid ProcessCompetitive Bid Process
Competitive Bid Processxulxin2009
 
Gonzalez.matthew
Gonzalez.matthewGonzalez.matthew
Gonzalez.matthewNASAPMC
 
Gonzalez.matthew
Gonzalez.matthewGonzalez.matthew
Gonzalez.matthewNASAPMC
 
xel_062006_kingplant
xel_062006_kingplantxel_062006_kingplant
xel_062006_kingplantfinance26
 
xel_062006_kingplant
xel_062006_kingplantxel_062006_kingplant
xel_062006_kingplantfinance26
 
Cost Engineering Principles Of Cost Estimating
Cost Engineering Principles Of Cost EstimatingCost Engineering Principles Of Cost Estimating
Cost Engineering Principles Of Cost EstimatingMartin van Vliet
 
PRINCE2 + AGILE = SUCCESS
PRINCE2 + AGILE = SUCCESSPRINCE2 + AGILE = SUCCESS
PRINCE2 + AGILE = SUCCESSJens Hoffmann
 
Matt.gonzales
Matt.gonzalesMatt.gonzales
Matt.gonzalesNASAPMC
 
Enterprise Project Management
Enterprise Project ManagementEnterprise Project Management
Enterprise Project ManagementMartin Mehalchin
 
Leanconstructionintrocomprehensive 1214493943663065 8
Leanconstructionintrocomprehensive 1214493943663065 8Leanconstructionintrocomprehensive 1214493943663065 8
Leanconstructionintrocomprehensive 1214493943663065 8Gord Uhlich
 
InduSoft OPC UA Webinar with Genesis RTS
InduSoft OPC UA Webinar with Genesis RTSInduSoft OPC UA Webinar with Genesis RTS
InduSoft OPC UA Webinar with Genesis RTSAVEVA
 

Similar to Ohl project risk register (19)

Project Excellence Risk Management K
Project Excellence Risk Management KProject Excellence Risk Management K
Project Excellence Risk Management K
 
Major Project Management
Major Project ManagementMajor Project Management
Major Project Management
 
Cost Engineering in the process industry
Cost Engineering in the process industryCost Engineering in the process industry
Cost Engineering in the process industry
 
Competitive Bid Process
Competitive Bid ProcessCompetitive Bid Process
Competitive Bid Process
 
Gonzalez.matthew
Gonzalez.matthewGonzalez.matthew
Gonzalez.matthew
 
Gonzalez.matthew
Gonzalez.matthewGonzalez.matthew
Gonzalez.matthew
 
4epcm
4epcm4epcm
4epcm
 
Vendor Risk Management
Vendor Risk ManagementVendor Risk Management
Vendor Risk Management
 
xel_062006_kingplant
xel_062006_kingplantxel_062006_kingplant
xel_062006_kingplant
 
xel_062006_kingplant
xel_062006_kingplantxel_062006_kingplant
xel_062006_kingplant
 
Cost Engineering Principles Of Cost Estimating
Cost Engineering Principles Of Cost EstimatingCost Engineering Principles Of Cost Estimating
Cost Engineering Principles Of Cost Estimating
 
PRINCE2 + AGILE = SUCCESS
PRINCE2 + AGILE = SUCCESSPRINCE2 + AGILE = SUCCESS
PRINCE2 + AGILE = SUCCESS
 
Matt.gonzales
Matt.gonzalesMatt.gonzales
Matt.gonzales
 
Enterprise Project Management
Enterprise Project ManagementEnterprise Project Management
Enterprise Project Management
 
Sto 3 Day Course Presentation
Sto 3 Day Course PresentationSto 3 Day Course Presentation
Sto 3 Day Course Presentation
 
Leanconstructionintrocomprehensive 1214493943663065 8
Leanconstructionintrocomprehensive 1214493943663065 8Leanconstructionintrocomprehensive 1214493943663065 8
Leanconstructionintrocomprehensive 1214493943663065 8
 
Vendor risk management 2013
Vendor risk management 2013Vendor risk management 2013
Vendor risk management 2013
 
InduSoft OPC UA Webinar with Genesis RTS
InduSoft OPC UA Webinar with Genesis RTSInduSoft OPC UA Webinar with Genesis RTS
InduSoft OPC UA Webinar with Genesis RTS
 
Project Management
Project ManagementProject Management
Project Management
 

More from Lahmeyer International, UAE

Techniquescontrolledblasting 091217003405-phpapp01
Techniquescontrolledblasting 091217003405-phpapp01Techniquescontrolledblasting 091217003405-phpapp01
Techniquescontrolledblasting 091217003405-phpapp01Lahmeyer International, UAE
 
Design of transmission lines in india a review of multiple swing angle
Design of transmission lines in india  a review of multiple swing angleDesign of transmission lines in india  a review of multiple swing angle
Design of transmission lines in india a review of multiple swing angleLahmeyer International, UAE
 
Counter mesaures aginst liquefaction induced settlemnt for ohl
Counter mesaures aginst liquefaction induced settlemnt for ohlCounter mesaures aginst liquefaction induced settlemnt for ohl
Counter mesaures aginst liquefaction induced settlemnt for ohlLahmeyer International, UAE
 

More from Lahmeyer International, UAE (20)

Techniquescontrolledblasting 091217003405-phpapp01
Techniquescontrolledblasting 091217003405-phpapp01Techniquescontrolledblasting 091217003405-phpapp01
Techniquescontrolledblasting 091217003405-phpapp01
 
AP88 & AP91 shifting proposal
AP88 & AP91 shifting proposalAP88 & AP91 shifting proposal
AP88 & AP91 shifting proposal
 
Design of transmission lines in india a review of multiple swing angle
Design of transmission lines in india  a review of multiple swing angleDesign of transmission lines in india  a review of multiple swing angle
Design of transmission lines in india a review of multiple swing angle
 
Guide to sampling concrete
Guide to sampling concreteGuide to sampling concrete
Guide to sampling concrete
 
Guide to sampling concrete
Guide to sampling concreteGuide to sampling concrete
Guide to sampling concrete
 
Use of bentonite
Use of bentoniteUse of bentonite
Use of bentonite
 
Gb137
Gb137Gb137
Gb137
 
Counter mesaures aginst liquefaction induced settlemnt for ohl
Counter mesaures aginst liquefaction induced settlemnt for ohlCounter mesaures aginst liquefaction induced settlemnt for ohl
Counter mesaures aginst liquefaction induced settlemnt for ohl
 
Copy of stub setting
Copy of stub settingCopy of stub setting
Copy of stub setting
 
Copy of stub setting
Copy of stub settingCopy of stub setting
Copy of stub setting
 
Copy of prop setting calculations final
Copy of prop setting calculations finalCopy of prop setting calculations final
Copy of prop setting calculations final
 
Copy of stub setting 2
Copy of stub setting 2Copy of stub setting 2
Copy of stub setting 2
 
Copy of stub setting
Copy of stub settingCopy of stub setting
Copy of stub setting
 
Copy of prop setting calculations final
Copy of prop setting calculations finalCopy of prop setting calculations final
Copy of prop setting calculations final
 
Copy of stub setting 3
Copy of stub setting 3Copy of stub setting 3
Copy of stub setting 3
 
Copy of stub setting 1
Copy of stub setting 1Copy of stub setting 1
Copy of stub setting 1
 
Copy of prop setting calculations final
Copy of prop setting calculations finalCopy of prop setting calculations final
Copy of prop setting calculations final
 
Copy of stub setting 1
Copy of stub setting 1Copy of stub setting 1
Copy of stub setting 1
 
Copy of stub setting
Copy of stub settingCopy of stub setting
Copy of stub setting
 
Copy of prop setting calculations final
Copy of prop setting calculations finalCopy of prop setting calculations final
Copy of prop setting calculations final
 

Recently uploaded

Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfOverkill Security
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusZilliz
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 

Recently uploaded (20)

Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 

Ohl project risk register

  • 1. OVERHEAD TRANSMISSION LINE PROJECT RISK REGISTER Risk Qualitative Assesment SL. P*I P*I P*I Risk Area Risk Effect Risk Description Performanc Risk Rank Risk Response Mitigation Plan NO Probability Cost Impact Time Impact Performanc e Impact Cost Time e In such scenario, the review/approval process Changes in approved design Cost, Time, should be made faster. Decision making 1 Delay to project Foundation design changes after approval and commencement of work High High High High 16 16 16 Eliminate Performance should be consistant & faster. Reversal to will affect the progress of work original scope should be avoided. Deviation from the specifications Cost, Time, Introduction of prokon software for foundation design not mentioned in Intoduction of all requirements in the 2 Delay to project High Very High High High 20 16 16 Improve Performance the specification and studying of software and implementation leads to contract specification itself more time and engineering works. Eventhogh in accessible mountains the angle points shall be properly selected with minium Selection Route Alignment with out proper Walk over survey - selection of required details of terrain in between and route from Google Data- Section of Angle points upto 3.0-4.0 m in straight selection of route in such a way to get suitable line in hilly area without analysing the the site geographical conditions tower postiobns which will reduce benching , length of access roads and thereby construction time Due to the incompetency of conatrctors Selection of comptentent project team who is having previous working project team , realistic planning , Corrective action identification of project hazards are not experience in OHL construction in hilly area. happening which are resulting in dealy of project Propoer machinary deployment , allocation of Deployment of sufficient powerful machinaries in work liks access road , Corrective action sufficient work front will enhance the benching and excvation which are the tough civil work in this hilly area. progress of work Most of the activities in foundations are Absence of materials , Tools and plant like form box shutters and chimney Corrective action happening in more days due to shortages of for founadtion work materails Implemenation of user friendly or tailor made Implemenation of user friendly or tailor made design for the easiness of design for the easiness of foundation work foundation work (like hauch and trapezoidal base ) results in incaresed (like hauch and trapezoidal base ) results in preaparatory work which is deaplying completion time incaresed preaparatory work which is deaplying completion time New comments in subsequent revision of single document All the comments to be given in first Cost, Time, 3 Delay to project Passing out new comments in each revision of foundation design may lead High Low Very High High 8 20 16 Eliminate submission and new comments in subsequent Performance to design cycle delay and delay in execution submissions to be avoided Poor Vendor Support Time wasted waiting for response to queries or due to rework arising from Efficient tracking of design Cost, Time, 4 Delay to project assumptions made by the project team in the interim or the vendor Very low High High High 4 4 4 Improve submission/approvals.Interim changes in Performance reluctant to accepting the change request due to deviation in client design requirements to be avoided. requirements. Delay to project & Dependence of External suppliers May Cost, Time, miss milestones waiting for deliverables due to delay in vendor approvals, Adequate control Timely approval of vendors and design. 5 adverse impact in Medium High High High 12 12 12 Performance design approvals and issue of manufacturing clearance measures to be in place Manufacturing clearance to be given in time. project cashflow Non availability of approved materials The Cost, Time, Adequate control Take prior approval of multiple parties based 6 Delay to project approved materials will not be readily available or approved vendor may Very low High High High 4 4 4 Performance measures to be in place on their availabilty. fail to deliver due to some reasons Change in the original route Bestowing of approved route during site Cost, Time, Delay to project and The changes in original tender route and line passing through high hilly 7 Very High Very High Very High High 25 25 20 Eliminate handing over or properly estimating the Performance huge cost impact terrain due to objection from Municipality or objection of locals or due to possible route during tender stage itself. line passing through eco-torism zone Scope Variations Scope variations in the interim should be Delay to project & Conscious decision to Cost, Time, More than 20% increase in the BOQ quantity for activities like benching, maximum avoided.In case of scope variations 7 adverse impact in Very High Very High Very High High 25 25 20 accept impact Performance tower supply due to change in original route may adversely affect the it should be recorded and tracked for project cashflow contractually project execution proporationate time and cost implications Difficulty in manual survey Adoption of LIDAR survey in such terrain Cost, Time, 9 Delay to project Difficulty in the conventional manual survey due to hilly terrain conditions High High High High 16 16 16 Improve where manual survey is possible to save time Performance or non-accessability to locations and cost Damage in access road due to rain The Cost, Time, access road to reach the locations may get damaged due to heavy rain Application for insurance for such roads 10 Delay to project Medium High High High 12 12 12 Corrective action Performance affecting the subsequent activities like benching,foundation etc inturn which can be claimed under natural calamity affecting the overall project schedule On transit material risk The Application for insurance in advance and Cost, Time, 11 Delay to project possibilty of material may get lost or damaged on transit of materials from Medium High High High 12 12 12 Corrective action procuring materials through air fright to avoid Performance source port to destination port time delay Delay to project & Strictly follow the HSE rules,statistics to be Cost, Time, HSE Non compliance Adequate control 12 adverse impact in Low Low Very Low Low 4 2 4 maintained regularly. Approved HSE plan Performance Non compliance may cause loss of manhours and damage to environment measures to be in place reputation should be strictly implemented Cost, Time, Availability of Resources Resource planning to be done at different 13 Delay to project Low Low Medium Low 4 6 4 Improve Performance Resources constraints will affect the project milestones stages of the project Project control procedures to be Cost, Time, Project Controlling implemented and MIS reports to be be 14 Delay to project Low Low Low Low 4 4 4 Improve Performance Project control procedures may not be adequate. generated for monitoring the project parameters. Proper tracking system has to be adopted and Cost, Time, Site Inspection tracking The inspection request 15 Delay in starting activity Low Low Low Low 4 4 4 Improve responsible QA/QC engineer ahs to be given Performance given for consultant/client for activities may get missed or delayed responsibility Allocating only 2m working space for benching activities in hilly terrain Cost, Time, 16 Delay to project The space constarint in tower locations may affect painitng activity in Very High High High High 20 20 20 Improve The painting has to be done after erection Performance gorund itself Page 1 of 1