SlideShare uma empresa Scribd logo
1 de 7
RESUME
1
KEVIN BREITER
SENIOR PIPINGDESIGN SPECIALIST
Kevin has 36 years of piping experience in various field construction and piping design
positions.Areas of expertise are brown field design in operating plants,Retrofitting,
Debottlenecking,Fire Restoration,Field Checking and supervision ofvarious field and
office projects.
With his supervision and mentoring ofpiping personal on any given projectand using
good planning,costsaving,designing with piping programs.Coordinating ofall other
disciplines to work together as a team can and will achieve all set goals in the projects.
Kevin drives for flexibility of design,focus on safety, considerations always for
process,maintenance,operations,and construction,helps him make difficultdecisions
easier.I am consistentlyimproving relations with customers and have satisfied them to
the extent of being regarded as an assetto the projects.
Project experience range from single discipline to multi-discipline capital and expense
projects,joint-venture projects,cost-plus,lump sum,with TIC ranging from $50k to $4
Billion.
Expertise in the following
FEED Engineering
Plant Design and Layout
Moduleation of Units
Brown Field Construction and Engineering
Debottlenecking
CostSaving in Engineering and Construction
Relevant Project Experience
Capital Projects, Ft McMurray, Canada
Client: Suncor/Jacobs
Title: Senior Piping Lead
Start/End Dates: July 2013 - Present2016
Scope/Description: The current projects are:
Plant 6, 7, 54, 66 H2 Risk Mitigation (H2 compressors) adding Isolation Stations to all
lines to and from compressors
Polymer Injection systems redesign Rebuild and Debottlenecking for Water Treatment
Plant 34
Plant 4 HVAC System addition of New roof top Systems to upgrade extraction
building.
U2 Coker Occupancy Phase 2 and 3 (New Firewater System throughoutstructure)
P300 RTBPH ISBL Stage 5 and 6 (Tailings Pump System Phase 5 addition) pumps
and CCO piping
De-sulphur ReheatBoiler Replacement(Boiler System Replacement)
EDUCATION/QUALIFICATIONS
Architectural Drafting, VV
Institute, Vancouver 1980
REGISTRATIONS/
CERTIFICATIONS
All field and safety certifications
required
MEMBERSHIPS
AND AFFILIATION
International Powerlifting
Federation (CPU) Canada
AWARDS/HONORS
Commonwealth games Gold and
5 time National powerlifting
champion
LANGUAGES
English
CONTACT
780-953-2209 Cell
780-789-1250 Home
tvsetula@shaw.ca
RESUME
2
Responsibilities:
Position includes managing multiple projects, troubleshooting design,directsupervision and mentorship ofthe piping team.
Conductsite visits,meetregularlywith Sr. managementand customer projectteams.Coordination with all the other
disciplines in the design, scheduling,reviews and end product. Provide ongoing construction supportto the completion of
projects
Capital Projects, Edmonton, Canada
Client: Enbridge/Jacobs
Title: Project Piping Lead
Start/End Dates: January-2011–July-2013
Scope/Description: Line 9B reversal package,Sarnia,Ont.Pipeline Included 9 pump stations piping flow reversals and 1 oil
terminal demolition and rebuild.
Norealis Pipeline,HuskySunrise Project,Edmonton,AB –The projectconsisted ofone new pipe line terminal,additional
storage tanks and equipmentto two existing facilities.
Responsibilities: Position included leading the piping team through piping design. Coordinate with all the other
disciplines,scheduling,clientand managementreviews through to productdelivery.Provided ongoing construction supportto
the completion ofthe project.
Refinery Turnaround, Come By Chance, Newfoundland,Canada
Client: North Atlantic Refining Ltd
Title: Field Engineer/Jacobs
Start/End Dates: February 2010–December-2010
Scope/Description: Work with the field team and operations,maintenence group to assess onsite problems.
Responsibilities: Field design all the construction packages for the turnaround process. Troubleshootmaintenance
issues encountered bythe refinery after a long absence ofturnarounds affected reliability.
Blue Fabrication Shop, Sherwood Park, Canada
Client: AECON-LOCKERBIE
Title: Lead Piping Checker
Start/End Dates: January 2009–February2010
Scope/Description: Overview of the projectand scope:Fire bag 4 co-generation plant /Co-op Refinery Saskatchewan
Responsibilities: Duties included projectdrafting piping lead and drafting checker for all cut sheets from the project
isometrics per standards.
Plant Site, Fort Saskatchewan,Canada
Client: Sherritt-Gordon/Corefco
Title: Tie-in Coordinator
Start/End Dates: March 2008–January2009
Scope/Description: Nickel and CobaltAddition to the existing plantto double production.
Responsibilities: As Tie-in Coordinator Iwas responsible for creating a tracking system in excel that tracked the
progress on the projects 1065 tie-ins in construction and base plantoperations through engineering requirements.Weekly
progress meetings to setpriorities for design teams and review tie-ins in the engineering house with auto plantmodel
reviews for constructability. Coordinate procurementofmaterials,scheduling,and inspection with construction groups for
each of the four plants in the expansion.Field checking and technical checking of all piping tie-ins drawings before final
issue.
RESUME
3
BFW Water Treatment Plant, Ft McMurray, Canada
Client: Suncor-Transalta/Bantrel
Title: Senior designer/Construction representive
Start/End Dates: November 2005–March 2008
Scope/Description: The new BFW Water Treatment Plantdesign was a partial retrofit to an existing larger Transalta
water treatmentfacility with the existing facilities needing complete as -building and partial demolition for new equipmentand
modeling.Integrating the pipe runs from new tie-points through the existing facilities to the new equipmentin the field and
office. Also interconnectpiping for vendor equipmentfrom GE Zenon.
Responsibilities: Position includes design layoutof the piping portion project,troubleshooting design,direct
supervision and mentorship ofthe piping team.ConductField supervision ofvendor equipmentlayoutdesign in Toronto
facilities to problem solve for all customer requests from Suncor,Transalta,and model reviews.Programs used where Rebis
Autoplant V2 (ACAD 2002), Navisworks Jetstream V5.
Plant 52 Frac Tower C-305 Fire, Ft McMurray, Canada
Client: Suncor/Bantrel
Title: Fire AssessmentTeam Field Piping Lead
Start/End Dates: January 2005–October 2005
Scope/Description: Package up all existing drawing with field markups for the piping,large and small-bore isometrics for
the demolition and construction package for rebuild to vendors and suppliers. Package up all existing drawing with field
markups for the piping,large and small-bore isometrics for the demolition and construction package for rebuild to vendors
and suppliers.
Responsibilities: Assigned to inspectand fix all piping,steel,electrical tray and concrete fire damage to Plant 52 Frac
C-305 tower area.Conductfield confirmations for all front office queries aboutnew design ofthe fire area. Help construction
vendors and QC in various positions atrebuild final stages from inspection to turn over teams.
Depropanizer Unit, Capitol Projects, Ft McMurray, Canada
Client: Suncor/Bantrel
Title: Senior piping Designer
Start/End Dates: September 2003–December 2004
Scope/Description: The projectwas a new Depropanizer Unit Structure #7 and upgrading (retrofitting) in the field the
existing structure #4 area in Plant 52 Site.
Responsibilities: Responsible for the preparation ofequipmentand piping layoutof a new Depropanizer Unit
Structure #7 and upgrading (retrofitting) in the field the existing structure #4 area in Plant 52 Site. Duties also continue d
through detailed design in the Suncor MCU-10 design team in varies other plants. All model work in Rebis.
Joffre Refinery, Red Deer , Canada
Client: Nova/Bantrel
Title: Turnover Coordinator/Senior Field Team Lead/Senior piping Designer
Start/End Dates: July 2001–September 2003
Scope/Description: Responsible for the preparation ofthe front-end capital projectdrawing packages,for PE2 plant
turnarounds for the years 2001, 2002,2003. Also the preparation of front-end capitol projects for E3 plant.Wiith many
projects for maintenance and a12 million dollar propane conversion ofa portion of plant feed stock from natural gas with
truck unloading facilities in each ofthe three ethylene plants (E1,E2, E3) involved with new equipmentin the plants.
Responsibilities: For punching,scheduling and coordinating all turnovers and tracked all jobs.Duties included
coordinating the completion ofcritical deficiencies for all maintenance and capital projects though commissioning. Field
investigation,checking with operation and maintenance personnel. Prepared all sketches and write-ups required for Nova’s
managementteam for projectdesign approval and budgeting. Supplied design package required for capital projects to
increase production two fold.Field and office supervision,preparation and checking ofpiping drawings,field checking,field
measuring and tie-in locations.
RESUME
4
Plant Refinery, Burnaby British Columbia, Canada
Client: Chevron Canada/Bantrel
Title: Senior Piping Designer/Field Draftsman
Start/End Dates: January 2001–July2001
Scope/Description: Preparation of drawings for summer plantmaintenance turnaround small projects and for the
preparation offront-end layout of the refinery new 12 million dollar Iso-Octane unit.
Responsibilities: Involved in field checking,preparing of sketches to locate equipmentvessel fix’s,and fix piping on
fire burned reformer unitto bring back into production. Other duties in the field included redrafting ofas -builds and preparing
orthographic piping drawings to tie into existing equipment. All drawings were completed using Rebis.
Millennium Project, Ft McMurray, Alberta, Canada
Client: Suncor/Bantrel
Title: MCC NightshiftSupervisor/MCC EP Support/Senior Checker/Senior Design Draftsmen
Start/End Dates: January-1999–January-2001
Scope/Description: Scope of the projectwas a 100,000 barrel a day heavy oil production addition,and all new
infostructure addition required to the existing plant.
Responsibilities: MCC NightshiftSupervisor-KB&R module yards for the piping,steel,tracing, insulation trades.MCC
EP Support -responsible for providing answers to engineering questions and problems on module yard site. Provided
material take-offs general arrangementdrawings and inspection for the piping discipline.Senior Checker- responsible for
checking and correcting Plant 55, diesel,naptha,gas-oil hydro treaters isometric drawings and models.Senior Draftsman-
responsible for designing and layoutof underground services for Plant52, DRU,DCU, GRU units.
Vendor Production Site, Airdie, Alberta, Canada
Client: Propak Systems Ltd
Title: Senior Piping Draftsmen/EPC Coordinator
Start/End Dates: February 1994–January1999
Scope/Description: Gas production Units,Gas Plants,equipmentsupplier. Module gas units for Dehydrating,
Refrigeration,Amine Sweetening,Compressing,Separating,Natural Gas systems from the well head to the end user.
Responsibilities: Responsible for layout of piperack piping,structural steel,mechanical coordinator,also with
electrical disciplines, unitpiping and equipmentModulation layouts,fabrication schedules as well as liaison with customers
for EPC concerns.
Oilfield Training School, Nisku, Alberta,Canada.
Client: Reintjes Engineering
Title: Piping/Mechanical Draftsmen
Start/End Dates: June 1993–February1994
Scope/Description: Layout and Design a typical gas plantin training building for Operation trainees.From used,and or
donated equipmentand vessels,valves,controllers to the school.
Responsibilities: Responsible for layout of piping,structural steel,mechanical Vessels,unitpiping and equipment
Modulation layouts.I was involved in field checking,preparation of sketches to locate equipmentvessels,and piping. Other
duties included redrafting ofas-builts and preparing orthographic piping drawings to tie into existing equipmen
Vendor Production Site, Edmonton, Alberta, Canada
Client: Presson Engineering,Edmonton,Alberta,Canada
Title: Piping/Mechanical Draftsmen
Start/End Dates: March 1990–June 1993
Scope/Description: Gas production Units,Gas Plants,equipmentsupplier. Module gas units for Dehydrating,
Refrigeration,Amine Sweetening,Compressing,Separating,Natural Gas systems from the well head to the end user.
RESUME
5
Responsibilities: Responsible for layout of piping,structural steel,mechanical Vessels,unitpiping and equipment
Modulation layouts, fabrication schedule.Other duties complete checking and supervision ofassemblydrawings,ISO, P&IDs,
piping layouts and spooling in the shop. Other duties included updating and troubleshooting ofpiping computer programs
as well as training drafting personnel on CADPIPE.
Vendor Production Site, Edmonton, Alberta, Canada
Client: Thermal Design Engineering Ltd
Title: Piping/Mechanical Draftsmen
Start/End Dates: June 1989–March 1990
Scope/Description: Overhead
Responsibilities: Responsible for upgrading and teaching drafting personnel on conversion from manual drafting to
computer software – AUTOCAD, PETROPIPE, and CADPIPE. I developed a drawing library and an extensive system for
computer-drawn vessels and heatexchangers,process flow diagrams and piping and instrumentdrawings.
Vendor Production Site, Edmonton, Alberta, Canada
Client: Alco Gas And Oil LTD
Title: Piping/Mechanical Draftsmen
Start/End Dates: Janruary 1986–June 1989
Scope/Description: Gas production Units,Gas Plants,equipmentsupplier. Module gas units for Dehydrating,
Refrigeration,Amine Sweetening,Compressing,Separating,Natural Gas systems from the well head to the end user.
Responsibilities: Responsible for layout of piping,structural steel,mechanical Vessels,unitpiping and equipment
Modulation layouts, fabrication schedule.Other duties complete checking and supervision ofassemblydrawings,ISO, P&IDs,
piping layouts and spooling in the shop and field locations. Other duties included updating and troubleshooting ofpiping
computer programs Autocad,Cadpipe,Propipe.
Capital Projects, Edmonton, Alberta, Canada
Client: Abbottsfield Engineering Services Ltd.
Title: Piping/Mechanical Draftsmen
Start/End Dates: February 1985–January1986
Scope/Description: Projects included WolfLake Heavy Oil Project, NorthwestTerritory Power Corporation,and Mar-
Quinn Industries
Responsibilities: For the preparation of mechanical,piping and presentation drawings using both manual and
AUTOCAD drafting.
Valmet Fine Paper Machine Addition, Prince Albert, Saskatchewan,Canada
Client: Weyerhaeuser Canada
Title: Piping/Mechanical Draftsmen
Start/End Dates: June 1984–February1985
Scope/Description: Existing wood mill added a 30 million dollar projectofa finland ValmetFine Paper Machine and all
the Inforstructure to supportit.
Responsibilities: Preparation of piping layouts and fabrication.Generated spool drawings,checked existing drawings
and spools and prepared material lists.Duties included field supervision and field inspection ofpiping for various projects in
the plant. Other duties included field design changes including pipe supports and re-routing.
RESUME
6
Refinery Site, Taylor Flats, British Columbia, Canada
Client: Petro-Canada
Title: Piping/Mechanical Draftsmen
Start/End Dates: November 1980–June 1984
Scope/Description: Involved on the following projects:-$7 million refineryinletrenovation.Three $3 million refinery
turnarounds, $50 million NGL project tie-in to existing facilities,-Approximately 75 other projects connected to equipment,
piping,structural,vessel renovations,etc., valued from $50,000 - $500,000
Responsibilities: For preparation of various drawings including process piping layouts,fabrication spool diagrams,
plot plans,equipmentlayouts,developmentofprocess flow diagrams,structural steel/foundation drawings and
instrumentation/electrical loop diagrams.Other duties included surveying,checking drawings and field inspection. Have a
good working knowledge ofapplicable codes and plantprocesses.Responsible for developmentand set-up ofdrawing index
and filing system,managed drafting departmentbudgets,as well as accounts and purchasing.
Capitol Projects, Fort St John, British Columbia, Canada
Client: City of Fort St John
Title: Civil Draftsmen
Start/End Dates: Janruary 1980–November 1980
Scope/Description: All city projects supporting the city engineering and municipal Manager.
Responsibilities: Preparation of drawings for various municipal construction projects,including sewer,water,arterial
road design,updating and developing city plot plans,topographical maps,legal lotservice plans,subdivision layouts,
services and roads,and presentation drawings etc.
Employment History
Jacobs 2010–Date
Senior Piping Lead
Aecon-Lockerbie 2009–2010
Checker
Sherritt-Gordon/Corefco2008–2009
Tie-in coordinator
Bantrel Engineering 1999–2008
Various Office/ Field Senior Roles
Propak systems Ltd 1994–1999
Senior Draftsman
Reintjes Engineering 1993
Piping Draftsman
Presson Engineering 1990–1993
Piping / Mechanical Draftsman
Thermal design Engineering 1989–1990
Piping / Mechanical Draftsman
Alco Gas and Oil 1986–1989
Piping / Mechanical Draftsman
Abbottsfield Engineering Services Ltd 1985
Piping / Mechanical Draftsman
RESUME
7
Weyerhaeuser Canada Ltd 1984–1985
Piping / Mechanical Draftsman
PetroCanda 1980–1984
Piping / Mechanical Draftsman
City of Fort St John 1980
Civil Draftsman
Reference/s
Upon Request

Mais conteúdo relacionado

Mais procurados (20)

Dale Buzzelli Resume
Dale Buzzelli ResumeDale Buzzelli Resume
Dale Buzzelli Resume
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
 
CV D Schroeder 2016
CV D Schroeder 2016CV D Schroeder 2016
CV D Schroeder 2016
 
B Levitt Resume 03_16_2
B Levitt Resume 03_16_2B Levitt Resume 03_16_2
B Levitt Resume 03_16_2
 
Krishna kumar cv
Krishna kumar cvKrishna kumar cv
Krishna kumar cv
 
CV-2015 Rev 0
CV-2015 Rev 0CV-2015 Rev 0
CV-2015 Rev 0
 
Final Design Report
Final Design ReportFinal Design Report
Final Design Report
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Poornesha Shetty-QA QC
Poornesha Shetty-QA QCPoornesha Shetty-QA QC
Poornesha Shetty-QA QC
 
Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
 
Jonathan Hemming CV
Jonathan Hemming CVJonathan Hemming CV
Jonathan Hemming CV
 
Topside
TopsideTopside
Topside
 
Philip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhilip Karow_FinalResumeJL
Philip Karow_FinalResumeJL
 
Jack Oldrin RS2
Jack Oldrin RS2Jack Oldrin RS2
Jack Oldrin RS2
 
CV
CVCV
CV
 
Resume
ResumeResume
Resume
 
New Jersey Projects
New Jersey ProjectsNew Jersey Projects
New Jersey Projects
 
1 re sume 2016 anders engstroem piping & layout
1   re sume 2016 anders engstroem piping & layout1   re sume 2016 anders engstroem piping & layout
1 re sume 2016 anders engstroem piping & layout
 
BGC-CONTRACTING-MAINTENANCE-SERVICES-DPS
BGC-CONTRACTING-MAINTENANCE-SERVICES-DPSBGC-CONTRACTING-MAINTENANCE-SERVICES-DPS
BGC-CONTRACTING-MAINTENANCE-SERVICES-DPS
 
Mohd Mustafa CV
Mohd Mustafa CV Mohd Mustafa CV
Mohd Mustafa CV
 

Destaque

Jacqui slide show
Jacqui slide showJacqui slide show
Jacqui slide show172223081
 
Management in Romania school
Management in Romania schoolManagement in Romania school
Management in Romania schoolOLEtark
 
2010./2011.mācību gads 1.pusgads
2010./2011.mācību gads 1.pusgads2010./2011.mācību gads 1.pusgads
2010./2011.mācību gads 1.pusgadsMalnavas koledža
 
1- صورة الطبيب و الممرض image of doctors & nurses -1
1- صورة الطبيب و الممرض image of doctors & nurses -11- صورة الطبيب و الممرض image of doctors & nurses -1
1- صورة الطبيب و الممرض image of doctors & nurses -1May Haddad MD.MPH
 
Food safety in Vietnam’s livestock sector
Food safety in Vietnam’s livestock sectorFood safety in Vietnam’s livestock sector
Food safety in Vietnam’s livestock sectorILRI
 
Eaton Powerware UPS
Eaton Powerware UPSEaton Powerware UPS
Eaton Powerware UPSHarri Vuorio
 
растительный орнаментT
растительный орнаментTрастительный орнаментT
растительный орнаментTLarisalex61
 
Average Handling Time: 5 Ways to Reduce it in your Call Center
Average Handling Time: 5 Ways to Reduce it in your Call CenterAverage Handling Time: 5 Ways to Reduce it in your Call Center
Average Handling Time: 5 Ways to Reduce it in your Call CenterVipul Srivastav
 
Listing Skill and Types of Listning
Listing Skill and Types of Listning Listing Skill and Types of Listning
Listing Skill and Types of Listning Dixit Gavaniya
 
Analysis of kinetic data
Analysis of kinetic dataAnalysis of kinetic data
Analysis of kinetic dataVineetha Menon
 
Customer Care 5 Predictions for 2017
Customer Care 5 Predictions for 2017Customer Care 5 Predictions for 2017
Customer Care 5 Predictions for 2017Vipul Srivastav
 

Destaque (18)

Jacqui slide show
Jacqui slide showJacqui slide show
Jacqui slide show
 
Trailer convetions
Trailer convetionsTrailer convetions
Trailer convetions
 
Management in Romania school
Management in Romania schoolManagement in Romania school
Management in Romania school
 
2010./2011.mācību gads 1.pusgads
2010./2011.mācību gads 1.pusgads2010./2011.mācību gads 1.pusgads
2010./2011.mācību gads 1.pusgads
 
Philip Kachina CV
Philip Kachina CVPhilip Kachina CV
Philip Kachina CV
 
Klonopin .5
Klonopin .5Klonopin .5
Klonopin .5
 
Test
TestTest
Test
 
13 0117 isas
13 0117 isas13 0117 isas
13 0117 isas
 
ผลไม้ต่อสุขภาพ
ผลไม้ต่อสุขภาพผลไม้ต่อสุขภาพ
ผลไม้ต่อสุขภาพ
 
1- صورة الطبيب و الممرض image of doctors & nurses -1
1- صورة الطبيب و الممرض image of doctors & nurses -11- صورة الطبيب و الممرض image of doctors & nurses -1
1- صورة الطبيب و الممرض image of doctors & nurses -1
 
Food safety in Vietnam’s livestock sector
Food safety in Vietnam’s livestock sectorFood safety in Vietnam’s livestock sector
Food safety in Vietnam’s livestock sector
 
Eaton Powerware UPS
Eaton Powerware UPSEaton Powerware UPS
Eaton Powerware UPS
 
растительный орнаментT
растительный орнаментTрастительный орнаментT
растительный орнаментT
 
arquitectura urbana
arquitectura urbanaarquitectura urbana
arquitectura urbana
 
Average Handling Time: 5 Ways to Reduce it in your Call Center
Average Handling Time: 5 Ways to Reduce it in your Call CenterAverage Handling Time: 5 Ways to Reduce it in your Call Center
Average Handling Time: 5 Ways to Reduce it in your Call Center
 
Listing Skill and Types of Listning
Listing Skill and Types of Listning Listing Skill and Types of Listning
Listing Skill and Types of Listning
 
Analysis of kinetic data
Analysis of kinetic dataAnalysis of kinetic data
Analysis of kinetic data
 
Customer Care 5 Predictions for 2017
Customer Care 5 Predictions for 2017Customer Care 5 Predictions for 2017
Customer Care 5 Predictions for 2017
 

Semelhante a Breiter_Kevin_BreiteK_2016 (D)

Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 
Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016Raymond Guo
 
Gagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightGagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightPatrice Gagnon
 
resume lloyd guillory06-28-15
resume lloyd guillory06-28-15resume lloyd guillory06-28-15
resume lloyd guillory06-28-15Lloyd Guillory
 
James Council Resume
James Council ResumeJames Council Resume
James Council ResumeJamescc
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2Sam Marino
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2Sam Marino
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Randy Seperak
 
mahadev prasad resume_feb2016
mahadev prasad resume_feb2016mahadev prasad resume_feb2016
mahadev prasad resume_feb2016Mahadev Prasad
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan IIjohn chan
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian Rowell
 
Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton
 

Semelhante a Breiter_Kevin_BreiteK_2016 (D) (20)

Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016
 
Gagnon Patrice new CV3 light
Gagnon Patrice new CV3 lightGagnon Patrice new CV3 light
Gagnon Patrice new CV3 light
 
resume lloyd guillory06-28-15
resume lloyd guillory06-28-15resume lloyd guillory06-28-15
resume lloyd guillory06-28-15
 
Resume 3-16-15docx
Resume 3-16-15docxResume 3-16-15docx
Resume 3-16-15docx
 
ronald coventry cv n5
ronald coventry cv n5ronald coventry cv n5
ronald coventry cv n5
 
CV17
CV17CV17
CV17
 
James Council Resume
James Council ResumeJames Council Resume
James Council Resume
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16
 
KANNAN RESUME
KANNAN RESUMEKANNAN RESUME
KANNAN RESUME
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
NARESH 3+
NARESH 3+NARESH 3+
NARESH 3+
 
Caro, Jose J 11 9
Caro, Jose J 11 9Caro, Jose J 11 9
Caro, Jose J 11 9
 
mahadev prasad resume_feb2016
mahadev prasad resume_feb2016mahadev prasad resume_feb2016
mahadev prasad resume_feb2016
 
SUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CVSUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CV
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan II
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015
 
Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton - CV December 2016
Cameron Punton - CV December 2016
 

Breiter_Kevin_BreiteK_2016 (D)

  • 1. RESUME 1 KEVIN BREITER SENIOR PIPINGDESIGN SPECIALIST Kevin has 36 years of piping experience in various field construction and piping design positions.Areas of expertise are brown field design in operating plants,Retrofitting, Debottlenecking,Fire Restoration,Field Checking and supervision ofvarious field and office projects. With his supervision and mentoring ofpiping personal on any given projectand using good planning,costsaving,designing with piping programs.Coordinating ofall other disciplines to work together as a team can and will achieve all set goals in the projects. Kevin drives for flexibility of design,focus on safety, considerations always for process,maintenance,operations,and construction,helps him make difficultdecisions easier.I am consistentlyimproving relations with customers and have satisfied them to the extent of being regarded as an assetto the projects. Project experience range from single discipline to multi-discipline capital and expense projects,joint-venture projects,cost-plus,lump sum,with TIC ranging from $50k to $4 Billion. Expertise in the following FEED Engineering Plant Design and Layout Moduleation of Units Brown Field Construction and Engineering Debottlenecking CostSaving in Engineering and Construction Relevant Project Experience Capital Projects, Ft McMurray, Canada Client: Suncor/Jacobs Title: Senior Piping Lead Start/End Dates: July 2013 - Present2016 Scope/Description: The current projects are: Plant 6, 7, 54, 66 H2 Risk Mitigation (H2 compressors) adding Isolation Stations to all lines to and from compressors Polymer Injection systems redesign Rebuild and Debottlenecking for Water Treatment Plant 34 Plant 4 HVAC System addition of New roof top Systems to upgrade extraction building. U2 Coker Occupancy Phase 2 and 3 (New Firewater System throughoutstructure) P300 RTBPH ISBL Stage 5 and 6 (Tailings Pump System Phase 5 addition) pumps and CCO piping De-sulphur ReheatBoiler Replacement(Boiler System Replacement) EDUCATION/QUALIFICATIONS Architectural Drafting, VV Institute, Vancouver 1980 REGISTRATIONS/ CERTIFICATIONS All field and safety certifications required MEMBERSHIPS AND AFFILIATION International Powerlifting Federation (CPU) Canada AWARDS/HONORS Commonwealth games Gold and 5 time National powerlifting champion LANGUAGES English CONTACT 780-953-2209 Cell 780-789-1250 Home tvsetula@shaw.ca
  • 2. RESUME 2 Responsibilities: Position includes managing multiple projects, troubleshooting design,directsupervision and mentorship ofthe piping team. Conductsite visits,meetregularlywith Sr. managementand customer projectteams.Coordination with all the other disciplines in the design, scheduling,reviews and end product. Provide ongoing construction supportto the completion of projects Capital Projects, Edmonton, Canada Client: Enbridge/Jacobs Title: Project Piping Lead Start/End Dates: January-2011–July-2013 Scope/Description: Line 9B reversal package,Sarnia,Ont.Pipeline Included 9 pump stations piping flow reversals and 1 oil terminal demolition and rebuild. Norealis Pipeline,HuskySunrise Project,Edmonton,AB –The projectconsisted ofone new pipe line terminal,additional storage tanks and equipmentto two existing facilities. Responsibilities: Position included leading the piping team through piping design. Coordinate with all the other disciplines,scheduling,clientand managementreviews through to productdelivery.Provided ongoing construction supportto the completion ofthe project. Refinery Turnaround, Come By Chance, Newfoundland,Canada Client: North Atlantic Refining Ltd Title: Field Engineer/Jacobs Start/End Dates: February 2010–December-2010 Scope/Description: Work with the field team and operations,maintenence group to assess onsite problems. Responsibilities: Field design all the construction packages for the turnaround process. Troubleshootmaintenance issues encountered bythe refinery after a long absence ofturnarounds affected reliability. Blue Fabrication Shop, Sherwood Park, Canada Client: AECON-LOCKERBIE Title: Lead Piping Checker Start/End Dates: January 2009–February2010 Scope/Description: Overview of the projectand scope:Fire bag 4 co-generation plant /Co-op Refinery Saskatchewan Responsibilities: Duties included projectdrafting piping lead and drafting checker for all cut sheets from the project isometrics per standards. Plant Site, Fort Saskatchewan,Canada Client: Sherritt-Gordon/Corefco Title: Tie-in Coordinator Start/End Dates: March 2008–January2009 Scope/Description: Nickel and CobaltAddition to the existing plantto double production. Responsibilities: As Tie-in Coordinator Iwas responsible for creating a tracking system in excel that tracked the progress on the projects 1065 tie-ins in construction and base plantoperations through engineering requirements.Weekly progress meetings to setpriorities for design teams and review tie-ins in the engineering house with auto plantmodel reviews for constructability. Coordinate procurementofmaterials,scheduling,and inspection with construction groups for each of the four plants in the expansion.Field checking and technical checking of all piping tie-ins drawings before final issue.
  • 3. RESUME 3 BFW Water Treatment Plant, Ft McMurray, Canada Client: Suncor-Transalta/Bantrel Title: Senior designer/Construction representive Start/End Dates: November 2005–March 2008 Scope/Description: The new BFW Water Treatment Plantdesign was a partial retrofit to an existing larger Transalta water treatmentfacility with the existing facilities needing complete as -building and partial demolition for new equipmentand modeling.Integrating the pipe runs from new tie-points through the existing facilities to the new equipmentin the field and office. Also interconnectpiping for vendor equipmentfrom GE Zenon. Responsibilities: Position includes design layoutof the piping portion project,troubleshooting design,direct supervision and mentorship ofthe piping team.ConductField supervision ofvendor equipmentlayoutdesign in Toronto facilities to problem solve for all customer requests from Suncor,Transalta,and model reviews.Programs used where Rebis Autoplant V2 (ACAD 2002), Navisworks Jetstream V5. Plant 52 Frac Tower C-305 Fire, Ft McMurray, Canada Client: Suncor/Bantrel Title: Fire AssessmentTeam Field Piping Lead Start/End Dates: January 2005–October 2005 Scope/Description: Package up all existing drawing with field markups for the piping,large and small-bore isometrics for the demolition and construction package for rebuild to vendors and suppliers. Package up all existing drawing with field markups for the piping,large and small-bore isometrics for the demolition and construction package for rebuild to vendors and suppliers. Responsibilities: Assigned to inspectand fix all piping,steel,electrical tray and concrete fire damage to Plant 52 Frac C-305 tower area.Conductfield confirmations for all front office queries aboutnew design ofthe fire area. Help construction vendors and QC in various positions atrebuild final stages from inspection to turn over teams. Depropanizer Unit, Capitol Projects, Ft McMurray, Canada Client: Suncor/Bantrel Title: Senior piping Designer Start/End Dates: September 2003–December 2004 Scope/Description: The projectwas a new Depropanizer Unit Structure #7 and upgrading (retrofitting) in the field the existing structure #4 area in Plant 52 Site. Responsibilities: Responsible for the preparation ofequipmentand piping layoutof a new Depropanizer Unit Structure #7 and upgrading (retrofitting) in the field the existing structure #4 area in Plant 52 Site. Duties also continue d through detailed design in the Suncor MCU-10 design team in varies other plants. All model work in Rebis. Joffre Refinery, Red Deer , Canada Client: Nova/Bantrel Title: Turnover Coordinator/Senior Field Team Lead/Senior piping Designer Start/End Dates: July 2001–September 2003 Scope/Description: Responsible for the preparation ofthe front-end capital projectdrawing packages,for PE2 plant turnarounds for the years 2001, 2002,2003. Also the preparation of front-end capitol projects for E3 plant.Wiith many projects for maintenance and a12 million dollar propane conversion ofa portion of plant feed stock from natural gas with truck unloading facilities in each ofthe three ethylene plants (E1,E2, E3) involved with new equipmentin the plants. Responsibilities: For punching,scheduling and coordinating all turnovers and tracked all jobs.Duties included coordinating the completion ofcritical deficiencies for all maintenance and capital projects though commissioning. Field investigation,checking with operation and maintenance personnel. Prepared all sketches and write-ups required for Nova’s managementteam for projectdesign approval and budgeting. Supplied design package required for capital projects to increase production two fold.Field and office supervision,preparation and checking ofpiping drawings,field checking,field measuring and tie-in locations.
  • 4. RESUME 4 Plant Refinery, Burnaby British Columbia, Canada Client: Chevron Canada/Bantrel Title: Senior Piping Designer/Field Draftsman Start/End Dates: January 2001–July2001 Scope/Description: Preparation of drawings for summer plantmaintenance turnaround small projects and for the preparation offront-end layout of the refinery new 12 million dollar Iso-Octane unit. Responsibilities: Involved in field checking,preparing of sketches to locate equipmentvessel fix’s,and fix piping on fire burned reformer unitto bring back into production. Other duties in the field included redrafting ofas -builds and preparing orthographic piping drawings to tie into existing equipment. All drawings were completed using Rebis. Millennium Project, Ft McMurray, Alberta, Canada Client: Suncor/Bantrel Title: MCC NightshiftSupervisor/MCC EP Support/Senior Checker/Senior Design Draftsmen Start/End Dates: January-1999–January-2001 Scope/Description: Scope of the projectwas a 100,000 barrel a day heavy oil production addition,and all new infostructure addition required to the existing plant. Responsibilities: MCC NightshiftSupervisor-KB&R module yards for the piping,steel,tracing, insulation trades.MCC EP Support -responsible for providing answers to engineering questions and problems on module yard site. Provided material take-offs general arrangementdrawings and inspection for the piping discipline.Senior Checker- responsible for checking and correcting Plant 55, diesel,naptha,gas-oil hydro treaters isometric drawings and models.Senior Draftsman- responsible for designing and layoutof underground services for Plant52, DRU,DCU, GRU units. Vendor Production Site, Airdie, Alberta, Canada Client: Propak Systems Ltd Title: Senior Piping Draftsmen/EPC Coordinator Start/End Dates: February 1994–January1999 Scope/Description: Gas production Units,Gas Plants,equipmentsupplier. Module gas units for Dehydrating, Refrigeration,Amine Sweetening,Compressing,Separating,Natural Gas systems from the well head to the end user. Responsibilities: Responsible for layout of piperack piping,structural steel,mechanical coordinator,also with electrical disciplines, unitpiping and equipmentModulation layouts,fabrication schedules as well as liaison with customers for EPC concerns. Oilfield Training School, Nisku, Alberta,Canada. Client: Reintjes Engineering Title: Piping/Mechanical Draftsmen Start/End Dates: June 1993–February1994 Scope/Description: Layout and Design a typical gas plantin training building for Operation trainees.From used,and or donated equipmentand vessels,valves,controllers to the school. Responsibilities: Responsible for layout of piping,structural steel,mechanical Vessels,unitpiping and equipment Modulation layouts.I was involved in field checking,preparation of sketches to locate equipmentvessels,and piping. Other duties included redrafting ofas-builts and preparing orthographic piping drawings to tie into existing equipmen Vendor Production Site, Edmonton, Alberta, Canada Client: Presson Engineering,Edmonton,Alberta,Canada Title: Piping/Mechanical Draftsmen Start/End Dates: March 1990–June 1993 Scope/Description: Gas production Units,Gas Plants,equipmentsupplier. Module gas units for Dehydrating, Refrigeration,Amine Sweetening,Compressing,Separating,Natural Gas systems from the well head to the end user.
  • 5. RESUME 5 Responsibilities: Responsible for layout of piping,structural steel,mechanical Vessels,unitpiping and equipment Modulation layouts, fabrication schedule.Other duties complete checking and supervision ofassemblydrawings,ISO, P&IDs, piping layouts and spooling in the shop. Other duties included updating and troubleshooting ofpiping computer programs as well as training drafting personnel on CADPIPE. Vendor Production Site, Edmonton, Alberta, Canada Client: Thermal Design Engineering Ltd Title: Piping/Mechanical Draftsmen Start/End Dates: June 1989–March 1990 Scope/Description: Overhead Responsibilities: Responsible for upgrading and teaching drafting personnel on conversion from manual drafting to computer software – AUTOCAD, PETROPIPE, and CADPIPE. I developed a drawing library and an extensive system for computer-drawn vessels and heatexchangers,process flow diagrams and piping and instrumentdrawings. Vendor Production Site, Edmonton, Alberta, Canada Client: Alco Gas And Oil LTD Title: Piping/Mechanical Draftsmen Start/End Dates: Janruary 1986–June 1989 Scope/Description: Gas production Units,Gas Plants,equipmentsupplier. Module gas units for Dehydrating, Refrigeration,Amine Sweetening,Compressing,Separating,Natural Gas systems from the well head to the end user. Responsibilities: Responsible for layout of piping,structural steel,mechanical Vessels,unitpiping and equipment Modulation layouts, fabrication schedule.Other duties complete checking and supervision ofassemblydrawings,ISO, P&IDs, piping layouts and spooling in the shop and field locations. Other duties included updating and troubleshooting ofpiping computer programs Autocad,Cadpipe,Propipe. Capital Projects, Edmonton, Alberta, Canada Client: Abbottsfield Engineering Services Ltd. Title: Piping/Mechanical Draftsmen Start/End Dates: February 1985–January1986 Scope/Description: Projects included WolfLake Heavy Oil Project, NorthwestTerritory Power Corporation,and Mar- Quinn Industries Responsibilities: For the preparation of mechanical,piping and presentation drawings using both manual and AUTOCAD drafting. Valmet Fine Paper Machine Addition, Prince Albert, Saskatchewan,Canada Client: Weyerhaeuser Canada Title: Piping/Mechanical Draftsmen Start/End Dates: June 1984–February1985 Scope/Description: Existing wood mill added a 30 million dollar projectofa finland ValmetFine Paper Machine and all the Inforstructure to supportit. Responsibilities: Preparation of piping layouts and fabrication.Generated spool drawings,checked existing drawings and spools and prepared material lists.Duties included field supervision and field inspection ofpiping for various projects in the plant. Other duties included field design changes including pipe supports and re-routing.
  • 6. RESUME 6 Refinery Site, Taylor Flats, British Columbia, Canada Client: Petro-Canada Title: Piping/Mechanical Draftsmen Start/End Dates: November 1980–June 1984 Scope/Description: Involved on the following projects:-$7 million refineryinletrenovation.Three $3 million refinery turnarounds, $50 million NGL project tie-in to existing facilities,-Approximately 75 other projects connected to equipment, piping,structural,vessel renovations,etc., valued from $50,000 - $500,000 Responsibilities: For preparation of various drawings including process piping layouts,fabrication spool diagrams, plot plans,equipmentlayouts,developmentofprocess flow diagrams,structural steel/foundation drawings and instrumentation/electrical loop diagrams.Other duties included surveying,checking drawings and field inspection. Have a good working knowledge ofapplicable codes and plantprocesses.Responsible for developmentand set-up ofdrawing index and filing system,managed drafting departmentbudgets,as well as accounts and purchasing. Capitol Projects, Fort St John, British Columbia, Canada Client: City of Fort St John Title: Civil Draftsmen Start/End Dates: Janruary 1980–November 1980 Scope/Description: All city projects supporting the city engineering and municipal Manager. Responsibilities: Preparation of drawings for various municipal construction projects,including sewer,water,arterial road design,updating and developing city plot plans,topographical maps,legal lotservice plans,subdivision layouts, services and roads,and presentation drawings etc. Employment History Jacobs 2010–Date Senior Piping Lead Aecon-Lockerbie 2009–2010 Checker Sherritt-Gordon/Corefco2008–2009 Tie-in coordinator Bantrel Engineering 1999–2008 Various Office/ Field Senior Roles Propak systems Ltd 1994–1999 Senior Draftsman Reintjes Engineering 1993 Piping Draftsman Presson Engineering 1990–1993 Piping / Mechanical Draftsman Thermal design Engineering 1989–1990 Piping / Mechanical Draftsman Alco Gas and Oil 1986–1989 Piping / Mechanical Draftsman Abbottsfield Engineering Services Ltd 1985 Piping / Mechanical Draftsman
  • 7. RESUME 7 Weyerhaeuser Canada Ltd 1984–1985 Piping / Mechanical Draftsman PetroCanda 1980–1984 Piping / Mechanical Draftsman City of Fort St John 1980 Civil Draftsman Reference/s Upon Request