2. Our Photo-Voltaic System
• System Power: 18.36 kWp
• Annual Production: 15,790 kWh
• CO2 Avoided: 11.1 Tonnes per year
King Edward VI Community College
3. Performance at 18 January 2012
• 8 Days with Above Expected Yield
• 4 Days with More Than Double
Expected Yield
• January Yield so far: 442.1 kWh
King Edward VI Community College
4. Annual Performance - 2011
• 7 Months with Above Expected Yield
• 2 Months with Close to Expected Yield
• 3 months were not fully monitored
King Edward VI Community College
5. Financing Our Photo-Voltaic System
• System Cost: £64,000
• Grants Provided: £60,000
• Our Costs: £4,000
• Our Feed-In Tariff Income: £6,100 so far
King Edward VI Community College