Millau Viaduct is a cable-stayed bridge that spans the valley of the River Tarn near Millau in southern France.
It is the Tallest bridge in the world.
The Presentation contains the importance of the Project, technology used and few challenges faced during construction in management terms.
Short & Sweet :)
3. Need Of the Project
Traffic Problems
Travel Time Reduced Between Spain &
France.
4. Outcome of Studies done by GoF
Eastern Option
Western Option
Route N9
Median Option
High Solution
Low Solution
5. Partners in the Construction of the Millau Viaduct
Particulars Partners Involved
Conceding authority République Française
Concessionaire Compagnie Eiffage du Viaduc de Millau (CEVM)
Designer Michel Virlogeux
Architect Norman Foster
Preliminary draft SETRA
Client Setec, SNCF
Design EEG Simescol, Foster and Partners, Société d'études R.
Foucault et Associés, SOGELERG
Structural engineering Greisch, EEG Simescol, Tháles E et C, Serf,
STOA Eiffage, Arcadis.
Main contractor Eiffage TP
Concrete works Eiffage Construction
Steel construction Eiffel Construction Métallique
Steel supplier Dillinger Hütte GTS
Stay cables Freyssinet International
Roadway cover studies Appia
Formwor& scaffolding PERI GmbH
Hydraulics Enerpac
6. Consortium of Firms
Advantages
Better Quality
Better Focus
Possible reduction in project
duration
Involvement of experts
Sharing of risks
Disadvantages
Co-Ordination
Control
Communication
7. BOT Model
Involvement of private sector improves efficiency
Private sector ensures timely completion of project, so as to earn profits
Ensures proper execution of work.
Minimize cost & time over-runs.
Provides superior project management skills as compared to
government bureaucrats.
Use of latest technology
Good quality material used in order to minimize operating and
maintaining costs.
9. Planning
Six Months of Preparatory phase
Decision to use Steel instead of Concrete
Operating Procedures & Checklists distributed among Project
Managers, workers & partners
Location of concrete manufacturing & Deck Fabricating Plant decided
after careful planning
Build several roads for transportation within the site
Proper storage management
Safety & Environment.
10. Challenges Faced
Weather
Building Tallest Bridge Piers
in the world
Freeway on top of Piers
Erecting Steel Pylons
Foundation Problems
caused by Porous
limestone
Local Protest at Millau.