SAP PROJECT
SYSTEMS
.
COURSE TITLE SAP PROJECT SYSTEMS
BATCH START DATE EVERY MONTH 1ST,15TH,30TH WE START NEW BATCHES
PRICING AND
REGISTRATION
EMAIL : itprofessionalsnetwork@gmail.com
CALL US : 001.602.761.7697
COURSE DURATION 30 DAYS ( 2 HRS/DAY) . TOTAL 60HRS
COURSE DELIVERY ONLINE
SAP SERVER ACCESS 2 MONTHS DEDICATED SERVER ACCESS (24/7)
WHO SHOULD
ATTEND
DATA CENTER/INFRASTRUCTURE SPECIALISTS
SAP NETWORK SPECIALISTS
SAP OS SPECIALISTS
STORAGE/SAN SPECIALISTS
SAP DATABASE ADMINISTRATORS
SAP BASIS AND WEB AS EXPERTS
MYSAP.COM COMPONENT SPECIALISTS
SAP FUNCTIONAL SPECIALISTS
SAP ABAP, J2EE, AND OTHER DEVELOPERS
SAP INTEGRATION EXPERTS
HIGH-AVAILABILITY AND DISASTER RECOVERY
SPECIALISTS
SAP TRAINERS
SAP SECURITY SPECIALISTS
FRONT-END OR USER INTERFACE DEPLOYMENT
SPECIALISTS
DOCUMENTATION SPECIALISTS
SAP OPERATIONS/SYSTEMS MANAGEMENT
PROFESSIONALS
SAP HELP DESK ANALYSTS
COURSE DELIVERY
MODEL
ONLINE INSTRUCTOR LED TRAINING COURSE USING CISCO
WEBEX.
SAP PROJECT SYSTEMS COURSE CONTNENT
Organizational Structure
Currencies in the Project System
Multiple Valuation Approaches in
Overhead Cost Controlling
WHAT IS A PROJECT?
 What is a Work Breakdown
Structure?
 What is a Network?
 What is a Work Package?
STRUCTURES
 Organizational Assignments in the
Project System
 Work Breakdown Structure (WBS)
 Network
 Activities
 Relationships
 Subnetworks
 Milestones
 Standard structures
 Project Builder
 Project planning board
 Structure Planning
 Layout of Detail Screens
 Mass Change
 Status Management
 Interfaces to the Project System
DOCUMENTS
 Documents
 PS Texts
 Standard Texts
DATES
 Types of Dates
 Settings for Scheduling Parameters
 Presentation of Dates in the Graphics
 Scheduling Functions
 Dates in the Work Breakdown
Structure (WBS)
 Scheduling the Work Breakdown
Structure
 Network Scheduling
 Scheduling the Overall Network
 Overall Network Scheduling with
Selection Option
 Scheduling with Service/Maintenance
Orders
 Scheduling Results
 Displaying the Error Log
RESOURCES
 Capacity Leveling in the Project
System
 Workforce Planning
MATERIAL
 Procurement via Materials
Requirements Planning
 Direct Procurement
 Item Category
 Procurement Settings
 Managing Stocks of Material
Components
 Material Assignment to Networks
 Exploding the Bill of Material
 Advance Procurement
 Assembly item
CLAIM MANAGEMENT
 Creating and Processing Claims
 Evaluating Claims
 Archiving Claims
 Connecting the Cost Collector to
Claims
COLLABORATIVE ENGINEERING &
PROJECT MANAGEMENT (CEP)
 Creating Folders in Configuration
Management
 Notification of Participants
 External Processing by Participants
 Monitoring
 Transferring Objects to the Original
Structure in the SAP System
 System Settings
PRODUCTION RESOURCES/TOOLS
(PRT)
 Data for Production Resources/Tools
 Creating Material PRTs
 Creating PRT Master Records
 Creating Document PRTs
 Creating Equipment PRTs
 Creating PRTs by Copying
 Deleting PRTs
 Formulas in Production
Resources/Tools
 Replacing PRTs in Standard
Networks
 Classification of Production
Resources/Tools
 Displaying Where-Used Lists for
PRTs
 Assigning PRTs to Activities
 Production Resource/Tool (PRT)
 Activating Requirements
 MRP Element Maintenance
 Copying PS texts into Purchase
Requisitions
 Material Availability Check
 Materials Management in the Project
Builder
 Materials Management in the Project
Planning Board
 Material Assignment to Standard
Networks
 Configurable Material
 Project Stock
 Grouping for Individual Project
Planning
 Bill of Material Transfer
 Delivery from Projects
 Monitoring Dates
 Assembly Processing in the Project
System
 Project-Oriented Procurement
(ProMan)
 Project System (PS)
CONFIRMATION
 Confirmation Directly in the Project
System
 Confirmation via Time Sheets (CATS)
 Decentralized Confirmation using
Microsoft ACCESS
 Confirmation via Intranet (PS-CON)
 Confirmation in External Systems
(PDC)
SIMULATION
 Creating Simulation Versions
 Transfer of Operative Data and
Simulation Data
 Editing Simulation Versions
 Planning Costs, Revenues, and
Payments
 Deleting Simulation Versions
 Evaluating Simulation Versions
Availability Check
COSTS
 Cost Planning
 Orders for Projects
 Project Cost Forecast
 Budget Management for Projects
 Availability Control
 Commitments Management (CO)
 Funds Commitment (Cost Centers,
Internal Orders, Projects)
 Requesting an Adjustment Posting
from the Intranet (AC)
 Automatic and Periodic Allocations
REVENUES AND EARNINGS
 Revenue Planning
 Time-Dependent Status for Results
Analysis
 Billing Plans in WBS Elements
 Project-Related Incoming Orders
 Transfer Prices for Projects
 Sales Pricing and Quotation Creation
 Resource-Related Billing
 CPR and Valuation of Semi-Finished
Constructions
PAYMENTS
 Project Cash Management
 Organizational Units in Project Cash
Management
 Manual Payment Planning
 Calculating the Payment Flow
Automatically
 Recording Actual and Commitment
Payment Data
 Evaluating Payment Data
VERSIONS
 When Are Project Versions Created?
 Profile for Project Versions
 Manually Creating Project Versions
in Networks or
 Project Version Keys
 Project Versions in the Information
System
PROJECT PROGRESS
 Progress analysis
 Progress Analysis Process
 Milestone Trend Analysis (MTA)
 Progress Tracking (PS-PRG-TRC)
WORKFLOW
 Preparation and Customizing
 Standard Tasks in the Project System
 User-Defined Standard Tasks and
Workflow Tasks in Milestones
 Purchase Order Change (PS)
 Configuration Change Management
(PS)
PROJECT INFORMATION SYSTEM
 Working with the Information
System
 Technical Project Reports
 Commercial Project Reports
 Project Summarization
 Transferring Data to EIS
 Transferring Data to the Business
Information Warehouse
 Reports on Resources
THANKYOU
Email : itprofessionalsnetwork@gmail.com
Phone : 001.602.761.7697 Web : http://www.itprofessionalsnetwork.com/
Contact : Mr.Raj (Director Operations)

Mais conteúdo relacionado

Destaque

Central Nervous System 1
Central Nervous System 1Central Nervous System 1
Central Nervous System 1
MBBS IMS MSU
 
Nervous System
Nervous SystemNervous System
Nervous System
itutor
 

Destaque (10)

Modal Verbs
Modal VerbsModal Verbs
Modal Verbs
 
Gsm architecture
Gsm architectureGsm architecture
Gsm architecture
 
Basic Baking Ingredients and Their Functions
Basic Baking Ingredients and Their FunctionsBasic Baking Ingredients and Their Functions
Basic Baking Ingredients and Their Functions
 
Chapter 1: Fundamentals of Accounting
Chapter 1: Fundamentals of AccountingChapter 1: Fundamentals of Accounting
Chapter 1: Fundamentals of Accounting
 
Types of Lighting and Luminaire
Types of Lighting and LuminaireTypes of Lighting and Luminaire
Types of Lighting and Luminaire
 
K to 12 Bread and Pastry Learning Module
K to 12 Bread and Pastry Learning ModuleK to 12 Bread and Pastry Learning Module
K to 12 Bread and Pastry Learning Module
 
Central Nervous System 1
Central Nervous System 1Central Nervous System 1
Central Nervous System 1
 
The Nervous System Parts And Functions
The Nervous System Parts And FunctionsThe Nervous System Parts And Functions
The Nervous System Parts And Functions
 
Nervous System
Nervous SystemNervous System
Nervous System
 
The Nervous System (Slide Show)
The Nervous System (Slide Show)The Nervous System (Slide Show)
The Nervous System (Slide Show)
 

Último

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 

Último (20)

Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 

sap ps training

  • 2. COURSE TITLE SAP PROJECT SYSTEMS BATCH START DATE EVERY MONTH 1ST,15TH,30TH WE START NEW BATCHES PRICING AND REGISTRATION EMAIL : itprofessionalsnetwork@gmail.com CALL US : 001.602.761.7697 COURSE DURATION 30 DAYS ( 2 HRS/DAY) . TOTAL 60HRS COURSE DELIVERY ONLINE SAP SERVER ACCESS 2 MONTHS DEDICATED SERVER ACCESS (24/7) WHO SHOULD ATTEND DATA CENTER/INFRASTRUCTURE SPECIALISTS SAP NETWORK SPECIALISTS SAP OS SPECIALISTS STORAGE/SAN SPECIALISTS SAP DATABASE ADMINISTRATORS SAP BASIS AND WEB AS EXPERTS MYSAP.COM COMPONENT SPECIALISTS SAP FUNCTIONAL SPECIALISTS SAP ABAP, J2EE, AND OTHER DEVELOPERS SAP INTEGRATION EXPERTS HIGH-AVAILABILITY AND DISASTER RECOVERY SPECIALISTS SAP TRAINERS SAP SECURITY SPECIALISTS FRONT-END OR USER INTERFACE DEPLOYMENT SPECIALISTS DOCUMENTATION SPECIALISTS SAP OPERATIONS/SYSTEMS MANAGEMENT PROFESSIONALS SAP HELP DESK ANALYSTS COURSE DELIVERY MODEL ONLINE INSTRUCTOR LED TRAINING COURSE USING CISCO WEBEX.
  • 3. SAP PROJECT SYSTEMS COURSE CONTNENT Organizational Structure Currencies in the Project System Multiple Valuation Approaches in Overhead Cost Controlling WHAT IS A PROJECT?  What is a Work Breakdown Structure?  What is a Network?  What is a Work Package? STRUCTURES  Organizational Assignments in the Project System  Work Breakdown Structure (WBS)  Network  Activities  Relationships  Subnetworks  Milestones  Standard structures  Project Builder  Project planning board  Structure Planning  Layout of Detail Screens  Mass Change  Status Management  Interfaces to the Project System DOCUMENTS  Documents  PS Texts  Standard Texts DATES  Types of Dates  Settings for Scheduling Parameters  Presentation of Dates in the Graphics  Scheduling Functions  Dates in the Work Breakdown Structure (WBS)  Scheduling the Work Breakdown Structure  Network Scheduling  Scheduling the Overall Network  Overall Network Scheduling with Selection Option  Scheduling with Service/Maintenance Orders  Scheduling Results  Displaying the Error Log RESOURCES  Capacity Leveling in the Project System  Workforce Planning MATERIAL  Procurement via Materials Requirements Planning  Direct Procurement  Item Category  Procurement Settings  Managing Stocks of Material Components  Material Assignment to Networks  Exploding the Bill of Material  Advance Procurement  Assembly item
  • 4. CLAIM MANAGEMENT  Creating and Processing Claims  Evaluating Claims  Archiving Claims  Connecting the Cost Collector to Claims COLLABORATIVE ENGINEERING & PROJECT MANAGEMENT (CEP)  Creating Folders in Configuration Management  Notification of Participants  External Processing by Participants  Monitoring  Transferring Objects to the Original Structure in the SAP System  System Settings PRODUCTION RESOURCES/TOOLS (PRT)  Data for Production Resources/Tools  Creating Material PRTs  Creating PRT Master Records  Creating Document PRTs  Creating Equipment PRTs  Creating PRTs by Copying  Deleting PRTs  Formulas in Production Resources/Tools  Replacing PRTs in Standard Networks  Classification of Production Resources/Tools  Displaying Where-Used Lists for PRTs  Assigning PRTs to Activities  Production Resource/Tool (PRT)  Activating Requirements  MRP Element Maintenance  Copying PS texts into Purchase Requisitions  Material Availability Check  Materials Management in the Project Builder  Materials Management in the Project Planning Board  Material Assignment to Standard Networks  Configurable Material  Project Stock  Grouping for Individual Project Planning  Bill of Material Transfer  Delivery from Projects  Monitoring Dates  Assembly Processing in the Project System  Project-Oriented Procurement (ProMan)  Project System (PS) CONFIRMATION  Confirmation Directly in the Project System  Confirmation via Time Sheets (CATS)  Decentralized Confirmation using Microsoft ACCESS  Confirmation via Intranet (PS-CON)  Confirmation in External Systems (PDC) SIMULATION  Creating Simulation Versions  Transfer of Operative Data and Simulation Data  Editing Simulation Versions  Planning Costs, Revenues, and Payments  Deleting Simulation Versions  Evaluating Simulation Versions
  • 5. Availability Check COSTS  Cost Planning  Orders for Projects  Project Cost Forecast  Budget Management for Projects  Availability Control  Commitments Management (CO)  Funds Commitment (Cost Centers, Internal Orders, Projects)  Requesting an Adjustment Posting from the Intranet (AC)  Automatic and Periodic Allocations REVENUES AND EARNINGS  Revenue Planning  Time-Dependent Status for Results Analysis  Billing Plans in WBS Elements  Project-Related Incoming Orders  Transfer Prices for Projects  Sales Pricing and Quotation Creation  Resource-Related Billing  CPR and Valuation of Semi-Finished Constructions PAYMENTS  Project Cash Management  Organizational Units in Project Cash Management  Manual Payment Planning  Calculating the Payment Flow Automatically  Recording Actual and Commitment Payment Data  Evaluating Payment Data VERSIONS  When Are Project Versions Created?  Profile for Project Versions  Manually Creating Project Versions in Networks or  Project Version Keys  Project Versions in the Information System PROJECT PROGRESS  Progress analysis  Progress Analysis Process  Milestone Trend Analysis (MTA)  Progress Tracking (PS-PRG-TRC) WORKFLOW  Preparation and Customizing  Standard Tasks in the Project System  User-Defined Standard Tasks and Workflow Tasks in Milestones  Purchase Order Change (PS)  Configuration Change Management (PS) PROJECT INFORMATION SYSTEM  Working with the Information System  Technical Project Reports  Commercial Project Reports  Project Summarization  Transferring Data to EIS  Transferring Data to the Business Information Warehouse  Reports on Resources
  • 6. THANKYOU Email : itprofessionalsnetwork@gmail.com Phone : 001.602.761.7697 Web : http://www.itprofessionalsnetwork.com/ Contact : Mr.Raj (Director Operations)