Six Sigma DMAIC Project




                      GEAE Account: Madisonville, KY Site




                          Project Leader/Green Belt: Keri Chandler
                          Project Leader Title: Customer Engineer, Certified Green Belt
                          Project Start Date: June 7, 2002

Master Black Belt: Steven Bonacorsi
Six Sigma in Action
                                                            Local Asset Inventory Cycle Time
 Customer Profile – 18,000-Seat Aircraft Engines Manufacturing and Service Company
Business Problem & Impact                                              Process Capability – Before
Madisonville does not have an easy way to track inventory. Thus
                                                                                        USL = 60 seconds
when information is needed, someone must physically establish
                                                                                        Mean = 96.5
equipment location.
                                                                                        StDev = 54.6
Measure & Analyze                                                                       Z_ST = 0.8
Data Collection: Validated repeatability and reproducibility using
A stop watch. Collected 200 data points to see how long it takes
to inventory equipment.
Root Causes/Sources of Variation: Human error with the
manual recording of data.
Improve & Control                                                       Process Capability – After
• Simulated pilots tests were run for each scanner type and
                                                                                         USL = 60 sec
repeated by two technicians to evaluate the best cycle time and
                                                                                         Mean = 29.5
functionality.
                                                                                         StDev = 11.2
• Improved the accuracy with scanned asset details with the
removal of manually recording multiple entries.                                          Z_ST = 4.3


Results/Benefits
• Digitized technology decreased cycle time to < 1 minute
• Benchmarked scanner cycle times, Improving process from
96.5 to 29.5 seconds, to meet customer CTQ <= 60 seconds!


                                    A Total Savings of US $2,240

Mais conteúdo relacionado

Destaque

ERP Case Study - Warehouse Management System
ERP Case Study - Warehouse Management SystemERP Case Study - Warehouse Management System
ERP Case Study - Warehouse Management SystemSharad Srivastava
 
Space and Inventory Managemet Program at Panasonic India Warehouse
Space and Inventory Managemet Program at Panasonic India WarehouseSpace and Inventory Managemet Program at Panasonic India Warehouse
Space and Inventory Managemet Program at Panasonic India WarehouseNavneet Dwivedi
 
Agility Logistics Warehousing & Distribution analysis
Agility Logistics Warehousing & Distribution analysisAgility Logistics Warehousing & Distribution analysis
Agility Logistics Warehousing & Distribution analysisFahad Khalid MBA SCM
 
Cold Storage Warehouse Best Practices: Warehouse Layout Optimization
Cold Storage Warehouse Best Practices: Warehouse Layout OptimizationCold Storage Warehouse Best Practices: Warehouse Layout Optimization
Cold Storage Warehouse Best Practices: Warehouse Layout OptimizationAngela Carver
 
Layout
LayoutLayout
LayoutFNian
 
Warehouse layout design
Warehouse layout designWarehouse layout design
Warehouse layout designchetan mitta
 
RFID on Warehouse Management System
RFID on Warehouse Management SystemRFID on Warehouse Management System
RFID on Warehouse Management SystemCheri Amour Calicdan
 
Case study Zara
Case study Zara Case study Zara
Case study Zara Riitu Jhamb
 

Destaque (11)

Agility
AgilityAgility
Agility
 
ERP Case Study - Warehouse Management System
ERP Case Study - Warehouse Management SystemERP Case Study - Warehouse Management System
ERP Case Study - Warehouse Management System
 
Space and Inventory Managemet Program at Panasonic India Warehouse
Space and Inventory Managemet Program at Panasonic India WarehouseSpace and Inventory Managemet Program at Panasonic India Warehouse
Space and Inventory Managemet Program at Panasonic India Warehouse
 
Agility Logistics Warehousing & Distribution analysis
Agility Logistics Warehousing & Distribution analysisAgility Logistics Warehousing & Distribution analysis
Agility Logistics Warehousing & Distribution analysis
 
Warehouselayout
WarehouselayoutWarehouselayout
Warehouselayout
 
Cold Storage Warehouse Best Practices: Warehouse Layout Optimization
Cold Storage Warehouse Best Practices: Warehouse Layout OptimizationCold Storage Warehouse Best Practices: Warehouse Layout Optimization
Cold Storage Warehouse Best Practices: Warehouse Layout Optimization
 
Layout
LayoutLayout
Layout
 
Warehouse layout design
Warehouse layout designWarehouse layout design
Warehouse layout design
 
RFID on Warehouse Management System
RFID on Warehouse Management SystemRFID on Warehouse Management System
RFID on Warehouse Management System
 
Zara - A case study
Zara - A case studyZara - A case study
Zara - A case study
 
Case study Zara
Case study Zara Case study Zara
Case study Zara
 

Mais de Kevin Egan

E Zsigma 2012 Fall Brochure
E Zsigma 2012 Fall BrochureE Zsigma 2012 Fall Brochure
E Zsigma 2012 Fall BrochureKevin Egan
 
Data Collection Six Sigma Case Study
Data Collection Six Sigma Case StudyData Collection Six Sigma Case Study
Data Collection Six Sigma Case StudyKevin Egan
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case StudyKevin Egan
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case StudyKevin Egan
 
Operating System Six Sigma Case Study
Operating System Six Sigma Case StudyOperating System Six Sigma Case Study
Operating System Six Sigma Case StudyKevin Egan
 
Pc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyPc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyKevin Egan
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudyKevin Egan
 
Sms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudySms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudyKevin Egan
 
Ticket Accuracy Six Sigma Case Study
Ticket Accuracy   Six Sigma Case StudyTicket Accuracy   Six Sigma Case Study
Ticket Accuracy Six Sigma Case StudyKevin Egan
 
Qaa paul nelson
Qaa   paul nelsonQaa   paul nelson
Qaa paul nelsonKevin Egan
 
Pharma iq mediakit1
Pharma iq mediakit1Pharma iq mediakit1
Pharma iq mediakit1Kevin Egan
 
Jack Welch Speak - PEXN
Jack Welch Speak - PEXNJack Welch Speak - PEXN
Jack Welch Speak - PEXNKevin Egan
 
ISLSS Offerings
ISLSS OfferingsISLSS Offerings
ISLSS OfferingsKevin Egan
 

Mais de Kevin Egan (13)

E Zsigma 2012 Fall Brochure
E Zsigma 2012 Fall BrochureE Zsigma 2012 Fall Brochure
E Zsigma 2012 Fall Brochure
 
Data Collection Six Sigma Case Study
Data Collection Six Sigma Case StudyData Collection Six Sigma Case Study
Data Collection Six Sigma Case Study
 
Gillette Six Sigma Case Study
Gillette Six Sigma Case StudyGillette Six Sigma Case Study
Gillette Six Sigma Case Study
 
Image Update Six Sigma Case Study
Image Update Six Sigma Case StudyImage Update Six Sigma Case Study
Image Update Six Sigma Case Study
 
Operating System Six Sigma Case Study
Operating System Six Sigma Case StudyOperating System Six Sigma Case Study
Operating System Six Sigma Case Study
 
Pc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case StudyPc Shipping Improvement Six Sigma Case Study
Pc Shipping Improvement Six Sigma Case Study
 
Serrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case StudySerrver Imaging Six Sigma Case Study
Serrver Imaging Six Sigma Case Study
 
Sms Integration Six Sigma Case Study
Sms Integration Six Sigma Case StudySms Integration Six Sigma Case Study
Sms Integration Six Sigma Case Study
 
Ticket Accuracy Six Sigma Case Study
Ticket Accuracy   Six Sigma Case StudyTicket Accuracy   Six Sigma Case Study
Ticket Accuracy Six Sigma Case Study
 
Qaa paul nelson
Qaa   paul nelsonQaa   paul nelson
Qaa paul nelson
 
Pharma iq mediakit1
Pharma iq mediakit1Pharma iq mediakit1
Pharma iq mediakit1
 
Jack Welch Speak - PEXN
Jack Welch Speak - PEXNJack Welch Speak - PEXN
Jack Welch Speak - PEXN
 
ISLSS Offerings
ISLSS OfferingsISLSS Offerings
ISLSS Offerings
 

Local Asset Inventory Six Sigma Case Study

  • 1. Six Sigma DMAIC Project GEAE Account: Madisonville, KY Site Project Leader/Green Belt: Keri Chandler Project Leader Title: Customer Engineer, Certified Green Belt Project Start Date: June 7, 2002 Master Black Belt: Steven Bonacorsi
  • 2. Six Sigma in Action Local Asset Inventory Cycle Time Customer Profile – 18,000-Seat Aircraft Engines Manufacturing and Service Company Business Problem & Impact Process Capability – Before Madisonville does not have an easy way to track inventory. Thus USL = 60 seconds when information is needed, someone must physically establish Mean = 96.5 equipment location. StDev = 54.6 Measure & Analyze Z_ST = 0.8 Data Collection: Validated repeatability and reproducibility using A stop watch. Collected 200 data points to see how long it takes to inventory equipment. Root Causes/Sources of Variation: Human error with the manual recording of data. Improve & Control Process Capability – After • Simulated pilots tests were run for each scanner type and USL = 60 sec repeated by two technicians to evaluate the best cycle time and Mean = 29.5 functionality. StDev = 11.2 • Improved the accuracy with scanned asset details with the removal of manually recording multiple entries. Z_ST = 4.3 Results/Benefits • Digitized technology decreased cycle time to < 1 minute • Benchmarked scanner cycle times, Improving process from 96.5 to 29.5 seconds, to meet customer CTQ <= 60 seconds! A Total Savings of US $2,240