Disaster Preparedness Project
2008-2009 AJ&K
Project Duration
 Eight (8) months initially, Then Extended for additional four months.
started from July 2008-June 2009.
Project Goal
 To strengthen the level of Disaster preparedness at Community-and
District levels in Muzaffarabad and Bagh District, AJK.
Selected Area
District Muzaffarabad
 Phagwan Dupatta UC Hattian Dupatta
 Komi Kot UC Komi Kot
District Bagh
 Kharal Abbassian UC Islam Nagar
 Kharal Maldialan UC Islam Nagar
 Malteser International is involve in reconstruction of four BHU’s in
these selected areas with the implementing partner IBC (Turkish)
NGO.
Result 1
 The local authorities, and the local population are able to prepare for
and respond to natural disasters
Result 2
 In the event of an earthquake, the population of four selected
location (reconstruction of BHUs under Malteser International
Management) is enabled to seek safety before the shockwaves
cause damage and endanger lives by the alarm of pre-warning
system. This pre-warning system is called “Secty” which alarm
before one minute of earthquake and its can be hear in 5km of
radius.
Activities for Result 1
 Training of relevant government agencies in concept of Disaster
Preparedness and Risk Reduction.
 Establishment of Disaster Risk Management Committees (DRMC)
at union council level (total of 4 UC’s) and village level.
 Total numbers of DRMC are 25 including 4 on UC and remaining 21
on village levels depend on population of village.
 15-20 members are in UC DRMC and 12-15 members are in
V.DRMC.
 Total number of volunteers in 4 UC’s are 329.
 Training of selected members of the committees in Dip (TOT) to
then train local committees, in:
 Concept of Disaster Preparedness & Risk Management
 First Aid
 Search and Rescue (SAR)
 Provision of First Aid training & Equipment to the local
committees
 Provision of SAR training & Equipment to the local
committees
 Drawing up a Hazard maps of the selected area & providing
map to be use for the Developmental and Disaster
Management plans at UC levels.
Activities for Result 2
 Installation of Earthquake pre-warning system ( 1 each in a total of 4
BHUs)
 Instruction of BHU staff and DRMC's at village level in use and
maintenance of the systems
 Training of the local population in the proper reaction to an
earthquake warning, by organizing an earthquake simulation.
Structure of UC DRMC
President
General Secretary Communication Secretary 1 team leader from each V.DRMC
Structure of Village DRMC
Team Leader
Logistician
3 Groups First Aid
2 Members in 1 Group
2 Group SAR
2 Members in 1 Group
Thank You

Mais conteúdo relacionado

Destaque

Itu social studies lesson plan 1 renaissance
Itu social studies lesson plan 1 renaissanceItu social studies lesson plan 1 renaissance
Itu social studies lesson plan 1 renaissance
bwall6
 
презентация яковлев
презентация яковлевпрезентация яковлев
презентация яковлев
cthutq
 
Itu social studies lesson plan 4 simple machines
Itu social studies lesson plan 4 simple machinesItu social studies lesson plan 4 simple machines
Itu social studies lesson plan 4 simple machines
bwall6
 
Yaşamımızdaki Elektrik
Yaşamımızdaki ElektrikYaşamımızdaki Elektrik
Yaşamımızdaki Elektrik
Ezgimsi
 
Flood Management in Pakistan
Flood Management in PakistanFlood Management in Pakistan
Flood Management in Pakistan
kashif81
 
CRP Presentation
CRP PresentationCRP Presentation
CRP Presentation
kashif81
 

Destaque (15)

Social Media and Crisis Communication: the story of #memstorm
Social Media and Crisis Communication: the story of #memstormSocial Media and Crisis Communication: the story of #memstorm
Social Media and Crisis Communication: the story of #memstorm
 
Itu social studies lesson plan 1 renaissance
Itu social studies lesson plan 1 renaissanceItu social studies lesson plan 1 renaissance
Itu social studies lesson plan 1 renaissance
 
Social Media & Crisis Communications: the story of #memstorm
Social Media & Crisis Communications: the story of #memstormSocial Media & Crisis Communications: the story of #memstorm
Social Media & Crisis Communications: the story of #memstorm
 
Presentation
PresentationPresentation
Presentation
 
презентация яковлев
презентация яковлевпрезентация яковлев
презентация яковлев
 
Itu social studies lesson plan 4 simple machines
Itu social studies lesson plan 4 simple machinesItu social studies lesson plan 4 simple machines
Itu social studies lesson plan 4 simple machines
 
Yaşamımızdaki Elektrik
Yaşamımızdaki ElektrikYaşamımızdaki Elektrik
Yaşamımızdaki Elektrik
 
IT新市場開拓プロジェクトにおけるアジャイル開発 part1
IT新市場開拓プロジェクトにおけるアジャイル開発 part1IT新市場開拓プロジェクトにおけるアジャイル開発 part1
IT新市場開拓プロジェクトにおけるアジャイル開発 part1
 
Flood Management in Pakistan
Flood Management in PakistanFlood Management in Pakistan
Flood Management in Pakistan
 
UI testing frameworks and the Coded UI testing paradigm
UI testing frameworks and the Coded UI testing paradigm UI testing frameworks and the Coded UI testing paradigm
UI testing frameworks and the Coded UI testing paradigm
 
CRP Presentation
CRP PresentationCRP Presentation
CRP Presentation
 
VB Script
VB ScriptVB Script
VB Script
 
Polyfuse
PolyfusePolyfuse
Polyfuse
 
Constraintsand challenges
Constraintsand challengesConstraintsand challenges
Constraintsand challenges
 
Mercadeo agroindustrial
Mercadeo agroindustrialMercadeo agroindustrial
Mercadeo agroindustrial
 

Semelhante a Malteser International

Session 4: EWEA PMI
Session 4: EWEA PMISession 4: EWEA PMI
Session 4: EWEA PMI
IFRCCOMMS
 
2010-09-01-flagship-english(1)
2010-09-01-flagship-english(1)2010-09-01-flagship-english(1)
2010-09-01-flagship-english(1)
Yuri Chakalall
 
06 draft final_chapter three_20140331
06 draft final_chapter three_2014033106 draft final_chapter three_20140331
06 draft final_chapter three_20140331
Tudlo
 
National Disaster Management In Afghanistan
National Disaster Management In AfghanistanNational Disaster Management In Afghanistan
National Disaster Management In Afghanistan
ABU_DRRGroup
 

Semelhante a Malteser International (20)

Lesson Learnt from INA TEWS
Lesson Learnt from INA TEWSLesson Learnt from INA TEWS
Lesson Learnt from INA TEWS
 
Session 4: EWEA PMI
Session 4: EWEA PMISession 4: EWEA PMI
Session 4: EWEA PMI
 
Presentation by js (dm) (1)
Presentation by js (dm) (1)Presentation by js (dm) (1)
Presentation by js (dm) (1)
 
Disaster Management in india
Disaster Management in indiaDisaster Management in india
Disaster Management in india
 
Ppt on Disaster Risk Management and J & K Floods 2014
Ppt on Disaster Risk Management and J & K Floods 2014Ppt on Disaster Risk Management and J & K Floods 2014
Ppt on Disaster Risk Management and J & K Floods 2014
 
5 erakv final_seminar_cbdrrm
5 erakv final_seminar_cbdrrm5 erakv final_seminar_cbdrrm
5 erakv final_seminar_cbdrrm
 
Mcgm Dm Plan & Evacuvation Drill
Mcgm Dm Plan & Evacuvation DrillMcgm Dm Plan & Evacuvation Drill
Mcgm Dm Plan & Evacuvation Drill
 
2010-09-01-flagship-english(1)
2010-09-01-flagship-english(1)2010-09-01-flagship-english(1)
2010-09-01-flagship-english(1)
 
Disaster management in india
Disaster management in indiaDisaster management in india
Disaster management in india
 
06 draft final_chapter three_20140331
06 draft final_chapter three_2014033106 draft final_chapter three_20140331
06 draft final_chapter three_20140331
 
Disaster risk reduction in myanmar
Disaster risk reduction in myanmarDisaster risk reduction in myanmar
Disaster risk reduction in myanmar
 
Critically Evaluate the cyclone preparedness Program (CPP) of Bangladesh. Ela...
Critically Evaluate the cyclone preparedness Program (CPP) of Bangladesh. Ela...Critically Evaluate the cyclone preparedness Program (CPP) of Bangladesh. Ela...
Critically Evaluate the cyclone preparedness Program (CPP) of Bangladesh. Ela...
 
Disaster management
Disaster managementDisaster management
Disaster management
 
DM Basic Concepts.ppt
DM Basic Concepts.pptDM Basic Concepts.ppt
DM Basic Concepts.ppt
 
Disaster Resilient Toilet
Disaster Resilient ToiletDisaster Resilient Toilet
Disaster Resilient Toilet
 
Ppt on disaster risk management and j & k floods 2014
Ppt on disaster risk management and j & k floods 2014Ppt on disaster risk management and j & k floods 2014
Ppt on disaster risk management and j & k floods 2014
 
National Disaster Management In Afghanistan
National Disaster Management In AfghanistanNational Disaster Management In Afghanistan
National Disaster Management In Afghanistan
 
Central Disaster Management and Mitigation Schemes .pptx
Central Disaster Management and Mitigation Schemes .pptxCentral Disaster Management and Mitigation Schemes .pptx
Central Disaster Management and Mitigation Schemes .pptx
 
1st_sem_gazette_2021.pdf
1st_sem_gazette_2021.pdf1st_sem_gazette_2021.pdf
1st_sem_gazette_2021.pdf
 
Desaster Mgt
Desaster MgtDesaster Mgt
Desaster Mgt
 

Malteser International

  • 2. Project Duration  Eight (8) months initially, Then Extended for additional four months. started from July 2008-June 2009. Project Goal  To strengthen the level of Disaster preparedness at Community-and District levels in Muzaffarabad and Bagh District, AJK.
  • 3. Selected Area District Muzaffarabad  Phagwan Dupatta UC Hattian Dupatta  Komi Kot UC Komi Kot District Bagh  Kharal Abbassian UC Islam Nagar  Kharal Maldialan UC Islam Nagar  Malteser International is involve in reconstruction of four BHU’s in these selected areas with the implementing partner IBC (Turkish) NGO.
  • 4. Result 1  The local authorities, and the local population are able to prepare for and respond to natural disasters
  • 5. Result 2  In the event of an earthquake, the population of four selected location (reconstruction of BHUs under Malteser International Management) is enabled to seek safety before the shockwaves cause damage and endanger lives by the alarm of pre-warning system. This pre-warning system is called “Secty” which alarm before one minute of earthquake and its can be hear in 5km of radius.
  • 6. Activities for Result 1  Training of relevant government agencies in concept of Disaster Preparedness and Risk Reduction.  Establishment of Disaster Risk Management Committees (DRMC) at union council level (total of 4 UC’s) and village level.  Total numbers of DRMC are 25 including 4 on UC and remaining 21 on village levels depend on population of village.  15-20 members are in UC DRMC and 12-15 members are in V.DRMC.  Total number of volunteers in 4 UC’s are 329.  Training of selected members of the committees in Dip (TOT) to then train local committees, in:
  • 7.  Concept of Disaster Preparedness & Risk Management  First Aid  Search and Rescue (SAR)  Provision of First Aid training & Equipment to the local committees  Provision of SAR training & Equipment to the local committees  Drawing up a Hazard maps of the selected area & providing map to be use for the Developmental and Disaster Management plans at UC levels.
  • 8. Activities for Result 2  Installation of Earthquake pre-warning system ( 1 each in a total of 4 BHUs)  Instruction of BHU staff and DRMC's at village level in use and maintenance of the systems  Training of the local population in the proper reaction to an earthquake warning, by organizing an earthquake simulation.
  • 9. Structure of UC DRMC President General Secretary Communication Secretary 1 team leader from each V.DRMC
  • 10. Structure of Village DRMC Team Leader Logistician 3 Groups First Aid 2 Members in 1 Group 2 Group SAR 2 Members in 1 Group