Pre-Fabricated
E-Z
BRIDGE
Built in House
Shipped to Site
Reduced Cost.
Installed!
5. GOALS
1
Expand E-Z Bridge distribution
nationwide
2
Develop E-Z Bridge into nationally
recognized brand
3
Increase sales from 4 to 30 bridges
a year
9. E-Z BRIDGE VS. INDUSTRY AVERAGE
Profit Margin
20%
E-Z Bridge Margin
9%
Industry Average
10. KEYS TO SUCCESS IN BRIDGE CONSTRUCTION INDUSTRY
#1
SUCCES
S
Ability to Secure Bids
#2
Supplier Relationships
#3
Effective Negotiation &
Communication Skills
21. Develop Proposal Template
QUOTATION
20101019LE-EZ
3535 W. 1st St. Eugene OR 97402 ¨Phone 541.744.3838 ¨ Fax 541.744.8956 ¨ www.mohawkmetal.com
130 ft Bridges
20101019LE-EZ
Pre-Engineered Pre-Fabricated Modular EZ Steel Bridges
Qty
Size
Material
Unit Price
One
130’x16’ wide
Four piece modular steel bridge designed for
AASHTO loading, approximate weight 63,594 lbs each 80’ module and 39,747
lbs each 50’ module. To include 2 each 80’ and 2each 50’ long sections that are
8’-8” wide modules for 16’ clear travel way, A588 weathering steel main
beams, A588 Cross ties, Thrie beam 10 gau. Galv. guard rail system, 4 x 12”
CF treated wood deck and 3” x 12” wear surface. All bolts & hardware, PFR
Sole plates and elastomeric bearing pads included. Wooden end walls and
footers included in price as well as four approach rail system for both ends of
bridge and bridge markers. Bridge is stamped by State registered engineer.
FOB Anchorage, AK dock side
$336,102.00
One
130’x28’ wide
Six piece modular steel bridge designed for
AASHTO loading, approximate weight 68,994 lbs each 80’ module and 44,747
lbs each 50’ module. To include 3 each 80’ and 3 each 50’ long sections that
are 9’-8” wide modules for 28’ clear travel way, A588 weathering steel main
beams, A588 Cross ties, Thrie beam 10 gau. Galv. guard rail system, 4 x 12”
DF #1 CF treated wood deck and 3” x 12” DF #1 wear surface. All bolts &
hardware, PFR Sole plates and elastomeric bearing pads included. Wooden
end walls and footers included in price as well as four approach rail system
for both ends of bridge and bridge markers. Bridge is stamped by State
registered engineer.
FOB Anchorage, AK dock side
$496,275.00
CCB 78241
DUNS 011837
FEIN 93-1105398
22. IMPROVE BIDDING PROCESS
Information Architecture
Organization
+
Easy Access!
Communication
emails
Save emails
title attachements
one point of co
31. ADDITIONAL CONSIDERATIONS
Referral
• Insurance
• Bankers
Private Sector (lumber/mining)
• Over-engineering of bridge is prohibitive
• No pedestrian bridge offering
• Lumber industry could be a potential after core
image and communication is strengthened
FEMA
• Could be a possible growth strategy in the future
after taking with customer we found out
32. BREAKDOWN OF COST
Projected Costs
Salary expenses
Proposal template
($42000/year/employee)
New website
7,200
Total Cost
Break Even
130 ft Bridge @ $500,000
x .20 margin = 100,000
2x Bridges= $200,000
168,000
3,200
$178,400
Notas do Editor
Laura
Matt
Option B
LauraE-Z Bridge has steep competition, including such businesses as Big R Bridge, TrueNorth Steel which acquired Roscoe Steel Inc in the past year, and RTI. Each competitor has key resources specific to its business that make it a chief competitor of E-Z Bridge. For instance, Big R Bridge specializes in a diversified product scope including such items as golf course and pedestrian bridges, TrueNorth Steel is known for providing a quality product with fast delivery by owning its own fleet of trucks for transportation, and RTI divides its business within several different industries. However, a major theme that is prominent within most of E-Z Bridge’s competitors is a solid marketing presence, which is mainly based off an updated and easy to understand, state-of-the-art website. After analyzing the competitors, our team has recognized that this quality not only spreads brand awareness to customers, but builds a reliable reputation for the businesses. Our team has therefore taken this insight and applied it to our recommendations that will be explained later on.
Big R Website
130= $500,000 x .20 margin = 100,000 *2 Bridges= $200,000
Improve the Bid Process -Julie Increase the bid win rateFormat Organization Communication CONTENT MANAGEMENT
Current success rate: 20%Submit 120 bids, win 24 BidsImproved success rate: 35%Submit 120 bids, win 42 BidsFeasible? 35%?Industrial average rate is 35%
# of Employees NeededGoal: win 30 bids a yearWith current win Rate 20%, 120 bids would need to be submittedAssuming employees can submit 1 Bid/week (each bid will take a total of 32 hrs (20h/bid and 12h follow up and communication)40hrs/week / 32hrs/bid =1.25 *4 weeks/month = 5 bids/month/person5/month * 12 months/year = 60 bids/year/person 120/60 bids/year/person = 2 PeopleTotal: 2 New Employees
InterviewsBenefits of review processPROFIT ANALYSIS
New Website Laura - past projects- video -quality- newname
6. Conclusion- Current practices are not sustainable- Follow the Balanced Scorecard- Achieve the goal of selling 30 bridges per year.