Introduction
TS Cocomo II based estimated sheet is a toolkit for software sizing and estimation. One can estimate the size of work using FP
SLOC. Effort is then estimated using Cocomo II. Effort can then be distributed into different project phases and the project cos
calculated. There is a Rates Sheet for selecting appropriate rate for a specific customer.

FP (Function Points)
Function points are a unit measure for software much like an hour is to measuring time, miles are to measuring distance or Ce
measuring temperature

SLOC
Source Line of Code, one line in a computer program. In many languages, each SLOC ends with a semicolon. SLOC is used i
COCOMO as the basis for estimating software-development time.

Cocomo II
COCOMO is a model designed by Barry Boehm to give an estimate of the number of programmer-months it will take to develo
software product

How to estimate project size using this toolkit?

Pre-requisite of using this sheet is that user should have familiarity of Function Points (FP). He should be aware of FP counting
the FPs sheet for each feature/component of the application estimate the count and complexity of Internal Logical Files (ILF), E
Interface Files (EIF), External Inputs (EI), External Outputs (EO) and External Queries (EQ). There are 3 columns Low, Avg. a
under each category; these columns should have the count of low, average and high complexity components against each app
feature. Guidelines on how to judge complexity are provided in comments of ILF, EIF and other headings at the top. Totals are
automatically calculated.
If there are some features in the applications which doesn't support creation of front-end or maintenance of back-end tables th
cannot measure its size. Example of such features is any special code libraries that are invoked on schedule or through some
means to do certain functions. For such functions estimate the lines of code in SLOC sheet. Provide feature details, the progra
language it will be written in and the estimated LOC count and system will automatically calculate its FPs.

How to estimate effort using this toolkit?
After the FPs and SLOC is estimated go to the effort sheet and estimate the scaling factors and effort multipliers. Guidelines o
select appropriate value for an effort multiplier or the scaling factor are provided in comments of their respective description. A
have selected the appropriate values please check the consolidated size and effort estimates below.
Now the effort is calculated and its time to break this effort into different phases of the project. Please set the percentages in th
Distribution" sheet. Ensure that all percentage should sum to 100%. After setting the percentages please check the effort brea
"Effort Summary" sheet.

How to estimate Cost using this toolkit?
After the size and effort are estimated its time to estimate cost. First go to the "Rates" sheet to select primary and secondary ra
After selecting the factor check what is the rate tier selected by the system. If "Borderline Case" appear next to the selected ra
should double check if the selected rate is appropriate.
After selecting the rate go to the cost sheet and adjust effort to quote. Round the effort numbers if you feel appropriate. Also ch
blended rate is appropriate and competitive.

How to estimate schedule using this toolkit?
After the cost estimation is complete go to the "Plan sheet" to check if the project can be finished in appropriate duration. Adju
Resources, Slacks and Other Factors and then check if the estimated project duration is appropriate and feasible to the client.
schedule is not appropriate then re-adjust resources etc to verify if the required project duration can be achieved.
ILF          EIF          EI           EO           EQ
Features               Comments        Reference   Low Avg High Low Avg High Low Avg High Low Avg High Low
Feature 1                                             0   0    0   0   0    0   1   0    0   0   0    0   0
Feature 2                                             1   0    0   0   0    0   0   1    0   0   0    0   0
Feature 3                                             0   0    0   0   0    0   0   1    0   0   0    0   0
Feature 4                                             0   0    0   0   0    0   2   0    0   0   0    0   0
       Total Artifacts                                1   0    0   0   0    0   3   2    0   0   0    0   0

Total FP                          24
EQ
Avg High    Total FPs
   0    0           3
   0    0          11
   0    0           4
   0    0           6
   0    0
Features    Comments   Reference   Language Estimated SLOC
Feature 5                          Java                  300
Feature 6                          Java                  500
Feature 7                          Java                  100
                                        Total:           900
Total FPs
   5.6604
   9.4340
   1.8868
 16.9811
Cocomo II

PM = A*Size^E*Product(All Effort Multipliers - EM)
Exponent E = B+(0.01*SUM(Scaling Factors))

Scaling Factors
SF                Description                     Level            Value
Maturity          Process Maturity                Nominal              4.68
                  Experience of similar
PREC              Projects                        Very High            1.24
                  Flexibility required in the
FLEX              System                          Very Low                 0
TEAM              Team Conhesiveness              Extremely High           0
                  Project Risk and
RESL              Architectural Complexity        Nominal              2.83

Effort Multiplier EM
EM                Description                     Level            Value
                  System reliability,
                  complexity and size
RCPX              indicator                       Very Low              0.6
                  Reusablity cocern with
                  respect to current and
RUSE              future projects                 Nominal                 1
PDIF              Platform Difficulty             Extra Low            0.87
                  Personal capability of
                  team. Like technical
                  capability of Programmers,
PERS              Designers and testers.          High                 0.83
                  Application, Language and
PREX              tool experience                 High                 0.87
                  Using Case tools for
FCIL              development etc                 Nominal                  1
SCED              Schedule Pressure               Nominal                  1

Constants         Value
B                                          0.91
A                                          2.94
E                                             1
EM                                         0.38

Consolidated Size and Effort
Technology        Java
Increase due to
lifecycle                                  0%
SLOC per FP                                 53
SLOC                                      2172
PM                                      2.4023
Man-days                               45.6443
FP from LOC                            40.9811
Hours per FP                            8.9103
SF Scale         PREC          FLEX          TEAM RESL      Maturity
Very Low                6.20          0.00      5.48   0.00      7.80
Low                     4.96          1.01      4.38   1.41      6.24
Nominal                 3.72          2.03      3.29   2.83      4.68
High                    2.48          3.04      2.19   4.24      3.12
Very High               1.24          4.05      1.10   5.65      1.56
Extremely High          0.00          5.07      0.00   7.07      0.00

EM Scale         RCPX          RUSE          PDIF     PERS      PREX      FCIL
Extra Low               0.49          0.95       0.87      2.12      1.59        1.43
Very Low                0.60          0.95       0.87      1.62      1.33        1.30
Low                     0.83          0.95       0.87      1.26      1.22        1.10
Nominal                 1.00          1.00       1.00      1.00      1.00        1.00
High                    1.33          1.07       1.29      0.83      0.87        0.87
Very High               1.91          1.15       1.81      0.63      0.74        0.73
Extremely High          2.72          1.24       2.61      0.50      0.62        0.62
SCED
       1.00
       1.00
       1.00
       1.00
       1.14
       1.43
       1.43
Summary Units
Category             Percentage of Development
Requirements/Design                               25%
Development                                       45%
Test Planning                                      8%
Testing                                           10%
Documentation                                      5%
Deployment                                         1%
Off-shore Management                               5%
On-site Management                                 1%
                                                 100%
Category                      Effort     Comments/Assumptions
                                         Outputs are Technical Design and
                                         Information Architecture doc. Information
                                         Architecture doc will have guidelines for
Requirements/Design Effort         11.41 interface design.
Development Effort                 20.54 Source Code
Test Planning                       3.65 Output are Test Plan and Test Cases
Testing Effort                      4.56 Output is Test Results
                                         Outputs are Deployment and Build
Documentation Effort                2.28 Documents
Deployment Effort                   0.46 Effort to deploy application
                                         Output is Detailed Project Plans, Risk and
Off-shore Management                2.28 Issues tracking, Weekly status reports etc.
                                         Client Communication. Output is usually any
On-site Management Effort           0.46 list of issues or improvement opportunities
               Total Effort        45.64
Rate Tiers
Units                              Low                    Medium                High
Architect/Designer                                   20                    30                     50
Developer (Blended rate for Senior
and Junior Developer)                                15                   20                      30
Testing Lead                                         20                   30                      50
Tester                                               15                   20                      30
Technical Writing Cost                               15                   20                      30
Manager                                              25                   40                      70
On-site Manager                                      60                  100                     150

Primary Rate Factors                                      Weightage             Weighted Value
Customer Buying Orientation      Gold-Standard                              7                     0.7
Hours Availability for
Technology                       Sufficient                                 5                    0.25

Secondary Rate Factors
Customer Type                    One Time Customer                          1                     0.1
Build Domain Competency          Doesn't Matter                             1                    0.05
Build Technology Competency      Doesn't Matter                             2                     0.1
Scope Creep Risk                 High                                       2                     0.2
Payment Pattern                  Delayed Payments                           2                     0.2
                                                                           20                     1.6

Selected Rate                    High


Buying Orientations              Value                 Description
Price-Oriented                                       0 Price is the main factor in making decision for this project
                                                       Price, quality and other factors combined make the criteria for
Solution-Oriented                                    1 winning project
                                                       Customer is highly focused on quality and project features an
Gold-Standard                                        2 would give it prime importance in making decisions

Hours Availability               Value                 Description
Surplus                                              0 Hours Inventory has many hours free in this technology area
                                                       Hours Inventory has some hours free but technology area is
Sufficient                                           1 utilized more than break-even
Less                                                 2 Hours Inventory has very low hours free in this technology are

Customer Type                    Value                    Description
Good Existing Customer                               0
Existing Customer                                    1
One Time Customer                                    2
Strategic Value Customer                             0

Build Technology Competency      Value                    Description
Yes                                                  0
Doesn't Matter                                       1
Avoid Technology                                     2
Build Domain Competency   Value       Description
Yes                               0
Doesn't Matter                    1
Avoid Domain                      2

Payment Pattern           Value       Description
Upfront Timely Payments           0
Timely Payments                   1
Delayed Payments                  2

Scope Creep Risk          Value       Description
High                              2
Moderate                          1
Low                               0
Selected
                                    50

                                    30
                                    50
                                    30
                                    30
                                    70
                                   150




 g decision for this project
combined make the criteria for

quality and project features and
 n making decisions


s free in this technology area
s free but technology area is

ours free in this technology area
Cost Units
Units                       per hour           per days
Architect/Designer                       50               400
Developer (Blended rate for
Senior and Junior
Developer)                               30                240
Testing Lead                             50                400
Tester                                   30                240
Technical Writing Cost                   30                240
Manager                                  70                560
On-site Manager                         150               1200

Total Project Cost
                           Effort (Days)     Effort (Days)
Category                   Estimated         to Quote       Cost
Requirements/Design Effort             11.4            11.0       $4,400
Development Effort                     20.5            21.0       $5,040
Test Planning                            3.7            4.0       $1,600
Testing Effort                           4.6            5.0       $1,200
Documentation Effort                     2.3            3.0         $720
Deployment Effort                        0.5            1.0         $400
Off-shore Management                     2.3            3.0       $1,680
On-site Management Effort                0.5            1.0       $1,200
                     Total             45.6            49.0      $16,240
                                              Blended Rate        $41.43

Total Support Cost
Man Months                                 1
Man Days                                   5
Category                   Hours per day Total Hours Cost
Designers                              0.5         2.5      $125
Developers                               8          40    $1,200
Testers                                  1           5      $150
Managers                               0.5         2.5      $175
                                                 Total    $1,650
Assumptions

Test Planning, Documentation and Management activities are carried out
in parallel to other main activities of design, development and testing

Resources
Designers                                        1
Developers                                       2
Testers                                          1
Others
Possible Critical Chain Delay in
Development                                    5%
Possible Fixation Delay in
Testing                                       5%
Working days in a month                        21
Ratio of calendar days                       1.48

Project Plan - Waterfall
Phase                          Duration (days) Duration (months)
Requirements/Design Phase                  11.0     0 Month 16 Day
Development Phase                          11.0     0 Month 16 Day
Testing Phase                               5.3      0 Month 8 Day
                         Total             27.3      1 Month 9 Day
                        Slack               3.0
                   Grand Total             30.3    1 Month 14 Day

Iterative Plan
                                                 Iteration Duration
Iterations                                     1 (without Slacks)
1                                           100%                 27.28
2                                             0%                  0.00
3                                             0%                  0.00
4                                             0%                  0.00
5                                             0%                  0.00
Total                                       100%
Slacks
Initial Ramp-up                              0.5
Deployment for testing etc                   0.5
Code/Peer Reviews                              1
Shipment Packaging & Review                    1

Total Slack                                   3




Requirements/Design                Development Testing
                              11.0          11.0      5.3
                               0.0           0.0      0.0
                               0.0           0.0      0.0
                               0.0           0.0      0.0
                               0.0           0.0      0.0

Mais conteúdo relacionado

Destaque

Cocomo II
Cocomo IICocomo II
Cocomo IIActimel
 
Cocomo ii
Cocomo iiCocomo ii
Cocomo iigmjuan
 
software project management Cocomo model
software project management Cocomo modelsoftware project management Cocomo model
software project management Cocomo modelREHMAT ULLAH
 
COCOMO E COCOMO II
COCOMO E COCOMO IICOCOMO E COCOMO II
COCOMO E COCOMO IIIsraelCunha
 
Analysis concepts and principles
Analysis concepts and principlesAnalysis concepts and principles
Analysis concepts and principlessaurabhshertukde
 
Data Flow Diagram
Data Flow DiagramData Flow Diagram
Data Flow Diagramnethisip13
 
Chapter 4 software project planning
Chapter 4 software project planningChapter 4 software project planning
Chapter 4 software project planningdespicable me
 
Risk mangement
Risk mangementRisk mangement
Risk mangementcollege
 
A Publisher's Survival Guide for the Platform Era
A Publisher's Survival Guide for the Platform EraA Publisher's Survival Guide for the Platform Era
A Publisher's Survival Guide for the Platform EraBloomberg Media
 
Software project-scheduling
Software project-schedulingSoftware project-scheduling
Software project-schedulingsaurabhshertukde
 
Software Risk Management
Software Risk ManagementSoftware Risk Management
Software Risk ManagementGunjan Patel
 
Dfd examples
Dfd examplesDfd examples
Dfd examplesMohit
 
Data Flow Diagrams
Data Flow DiagramsData Flow Diagrams
Data Flow DiagramsSinhaa Yash
 

Destaque (20)

Cocomo II
Cocomo IICocomo II
Cocomo II
 
Cocomo model
Cocomo modelCocomo model
Cocomo model
 
COCOMO II
COCOMO IICOCOMO II
COCOMO II
 
Cocomo ii
Cocomo iiCocomo ii
Cocomo ii
 
USC COCOMO II
USC COCOMO IIUSC COCOMO II
USC COCOMO II
 
software project management Cocomo model
software project management Cocomo modelsoftware project management Cocomo model
software project management Cocomo model
 
COCOMO E COCOMO II
COCOMO E COCOMO IICOCOMO E COCOMO II
COCOMO E COCOMO II
 
Analysis concepts and principles
Analysis concepts and principlesAnalysis concepts and principles
Analysis concepts and principles
 
Data Flow Diagram
Data Flow DiagramData Flow Diagram
Data Flow Diagram
 
Cocomo II
Cocomo IICocomo II
Cocomo II
 
Cohesion & Coupling
Cohesion & Coupling Cohesion & Coupling
Cohesion & Coupling
 
Cocomo
CocomoCocomo
Cocomo
 
Chapter 4 software project planning
Chapter 4 software project planningChapter 4 software project planning
Chapter 4 software project planning
 
Risk mangement
Risk mangementRisk mangement
Risk mangement
 
A Publisher's Survival Guide for the Platform Era
A Publisher's Survival Guide for the Platform EraA Publisher's Survival Guide for the Platform Era
A Publisher's Survival Guide for the Platform Era
 
Software project-scheduling
Software project-schedulingSoftware project-scheduling
Software project-scheduling
 
Software Risk Management
Software Risk ManagementSoftware Risk Management
Software Risk Management
 
Dfd examples
Dfd examplesDfd examples
Dfd examples
 
Analysis modeling
Analysis modelingAnalysis modeling
Analysis modeling
 
Data Flow Diagrams
Data Flow DiagramsData Flow Diagrams
Data Flow Diagrams
 

Semelhante a Estimate software project costs, schedule and resources using Cocomo II

Tackling the Management Challenges of Server Consolidation on Multi-core Systems
Tackling the Management Challenges of Server Consolidation on Multi-core SystemsTackling the Management Challenges of Server Consolidation on Multi-core Systems
Tackling the Management Challenges of Server Consolidation on Multi-core SystemsThe Linux Foundation
 
Auto sre with keptn
Auto sre with keptnAuto sre with keptn
Auto sre with keptnLibbySchulze
 
Software Qualitiy with Sonar Tool 2013_4
Software Qualitiy with Sonar Tool 2013_4Software Qualitiy with Sonar Tool 2013_4
Software Qualitiy with Sonar Tool 2013_4Max Kleiner
 
What is Unit Testing
What is Unit TestingWhat is Unit Testing
What is Unit TestingSadaaki Emura
 
PSP/TSP Training Material
PSP/TSP Training MaterialPSP/TSP Training Material
PSP/TSP Training MaterialSEMP
 
My Dad Won't Buy Me DevOps
My Dad Won't Buy Me DevOpsMy Dad Won't Buy Me DevOps
My Dad Won't Buy Me DevOpsXebiaLabs
 
TGT#16 - Sztuka projektowania testów - Agnieszka Garwolińska
TGT#16 - Sztuka projektowania testów - Agnieszka GarwolińskaTGT#16 - Sztuka projektowania testów - Agnieszka Garwolińska
TGT#16 - Sztuka projektowania testów - Agnieszka GarwolińskaTrójmiejska Grupa Testerska
 
Cross-project defect prediction
Cross-project defect predictionCross-project defect prediction
Cross-project defect predictionThomas Zimmermann
 
Introducing LCS to Digital Design Verification
Introducing LCS to Digital Design VerificationIntroducing LCS to Digital Design Verification
Introducing LCS to Digital Design VerificationDaniele Loiacono
 
Requirements Based Testing
Requirements Based TestingRequirements Based Testing
Requirements Based TestingSSA KPI
 
Requirements & scope
Requirements & scopeRequirements & scope
Requirements & scopeCraig Brown
 
Issre2014 test defectprediction
Issre2014 test defectpredictionIssre2014 test defectprediction
Issre2014 test defectpredictionKim Herzig
 
Rethinking Testing
Rethinking TestingRethinking Testing
Rethinking Testingpdejuan
 
Understand release engineering
Understand release engineeringUnderstand release engineering
Understand release engineeringgaoliang641
 
OpenStack DefCore review 2014
OpenStack DefCore review 2014OpenStack DefCore review 2014
OpenStack DefCore review 2014rhirschfeld
 
Next Generation Architecture Showcase July 2019
Next Generation Architecture Showcase July 2019Next Generation Architecture Showcase July 2019
Next Generation Architecture Showcase July 2019Alan Pearson Mathews
 
Quality of Bug Reports in Open Source
Quality of Bug Reports in Open SourceQuality of Bug Reports in Open Source
Quality of Bug Reports in Open SourceThomas Zimmermann
 

Semelhante a Estimate software project costs, schedule and resources using Cocomo II (20)

Tackling the Management Challenges of Server Consolidation on Multi-core Systems
Tackling the Management Challenges of Server Consolidation on Multi-core SystemsTackling the Management Challenges of Server Consolidation on Multi-core Systems
Tackling the Management Challenges of Server Consolidation on Multi-core Systems
 
Keynote HotSWUp 2012
Keynote HotSWUp 2012Keynote HotSWUp 2012
Keynote HotSWUp 2012
 
Auto sre with keptn
Auto sre with keptnAuto sre with keptn
Auto sre with keptn
 
Software Qualitiy with Sonar Tool 2013_4
Software Qualitiy with Sonar Tool 2013_4Software Qualitiy with Sonar Tool 2013_4
Software Qualitiy with Sonar Tool 2013_4
 
What is Unit Testing
What is Unit TestingWhat is Unit Testing
What is Unit Testing
 
PSP/TSP Training Material
PSP/TSP Training MaterialPSP/TSP Training Material
PSP/TSP Training Material
 
My Dad Won't Buy Me DevOps
My Dad Won't Buy Me DevOpsMy Dad Won't Buy Me DevOps
My Dad Won't Buy Me DevOps
 
TGT#16 - Sztuka projektowania testów - Agnieszka Garwolińska
TGT#16 - Sztuka projektowania testów - Agnieszka GarwolińskaTGT#16 - Sztuka projektowania testów - Agnieszka Garwolińska
TGT#16 - Sztuka projektowania testów - Agnieszka Garwolińska
 
Cross-project defect prediction
Cross-project defect predictionCross-project defect prediction
Cross-project defect prediction
 
Introducing LCS to Digital Design Verification
Introducing LCS to Digital Design VerificationIntroducing LCS to Digital Design Verification
Introducing LCS to Digital Design Verification
 
Requirements Based Testing
Requirements Based TestingRequirements Based Testing
Requirements Based Testing
 
Requirements & scope
Requirements & scopeRequirements & scope
Requirements & scope
 
Issre2014 test defectprediction
Issre2014 test defectpredictionIssre2014 test defectprediction
Issre2014 test defectprediction
 
Rethinking Testing
Rethinking TestingRethinking Testing
Rethinking Testing
 
Integreation
IntegreationIntegreation
Integreation
 
Understand release engineering
Understand release engineeringUnderstand release engineering
Understand release engineering
 
OpenStack DefCore review 2014
OpenStack DefCore review 2014OpenStack DefCore review 2014
OpenStack DefCore review 2014
 
Next Generation Architecture Showcase July 2019
Next Generation Architecture Showcase July 2019Next Generation Architecture Showcase July 2019
Next Generation Architecture Showcase July 2019
 
ESC - More than Great Software
ESC -  More than Great SoftwareESC -  More than Great Software
ESC - More than Great Software
 
Quality of Bug Reports in Open Source
Quality of Bug Reports in Open SourceQuality of Bug Reports in Open Source
Quality of Bug Reports in Open Source
 

Último

Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.Vinodha Devi
 
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure serviceCall US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure servicePooja Nehwal
 
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...ssifa0344
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptxFinTech Belgium
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfGale Pooley
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptxFinTech Belgium
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfGale Pooley
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceanilsa9823
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfGale Pooley
 
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja Nehwal
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Pooja Nehwal
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptxFinTech Belgium
 
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Pooja Nehwal
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...ssifa0344
 
The Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfThe Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfGale Pooley
 
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptxFinTech Belgium
 
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...dipikadinghjn ( Why You Choose Us? ) Escorts
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escortsranjana rawat
 

Último (20)

Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.
 
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure serviceCall US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
 
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdf
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdf
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdf
 
Veritas Interim Report 1 January–31 March 2024
Veritas Interim Report 1 January–31 March 2024Veritas Interim Report 1 January–31 March 2024
Veritas Interim Report 1 January–31 March 2024
 
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx
 
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
 
The Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfThe Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdf
 
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
 
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
 

Estimate software project costs, schedule and resources using Cocomo II

  • 1. Introduction TS Cocomo II based estimated sheet is a toolkit for software sizing and estimation. One can estimate the size of work using FP SLOC. Effort is then estimated using Cocomo II. Effort can then be distributed into different project phases and the project cos calculated. There is a Rates Sheet for selecting appropriate rate for a specific customer. FP (Function Points) Function points are a unit measure for software much like an hour is to measuring time, miles are to measuring distance or Ce measuring temperature SLOC Source Line of Code, one line in a computer program. In many languages, each SLOC ends with a semicolon. SLOC is used i COCOMO as the basis for estimating software-development time. Cocomo II COCOMO is a model designed by Barry Boehm to give an estimate of the number of programmer-months it will take to develo software product How to estimate project size using this toolkit? Pre-requisite of using this sheet is that user should have familiarity of Function Points (FP). He should be aware of FP counting the FPs sheet for each feature/component of the application estimate the count and complexity of Internal Logical Files (ILF), E Interface Files (EIF), External Inputs (EI), External Outputs (EO) and External Queries (EQ). There are 3 columns Low, Avg. a under each category; these columns should have the count of low, average and high complexity components against each app feature. Guidelines on how to judge complexity are provided in comments of ILF, EIF and other headings at the top. Totals are automatically calculated. If there are some features in the applications which doesn't support creation of front-end or maintenance of back-end tables th cannot measure its size. Example of such features is any special code libraries that are invoked on schedule or through some means to do certain functions. For such functions estimate the lines of code in SLOC sheet. Provide feature details, the progra language it will be written in and the estimated LOC count and system will automatically calculate its FPs. How to estimate effort using this toolkit? After the FPs and SLOC is estimated go to the effort sheet and estimate the scaling factors and effort multipliers. Guidelines o select appropriate value for an effort multiplier or the scaling factor are provided in comments of their respective description. A have selected the appropriate values please check the consolidated size and effort estimates below. Now the effort is calculated and its time to break this effort into different phases of the project. Please set the percentages in th Distribution" sheet. Ensure that all percentage should sum to 100%. After setting the percentages please check the effort brea "Effort Summary" sheet. How to estimate Cost using this toolkit? After the size and effort are estimated its time to estimate cost. First go to the "Rates" sheet to select primary and secondary ra After selecting the factor check what is the rate tier selected by the system. If "Borderline Case" appear next to the selected ra should double check if the selected rate is appropriate. After selecting the rate go to the cost sheet and adjust effort to quote. Round the effort numbers if you feel appropriate. Also ch blended rate is appropriate and competitive. How to estimate schedule using this toolkit? After the cost estimation is complete go to the "Plan sheet" to check if the project can be finished in appropriate duration. Adju Resources, Slacks and Other Factors and then check if the estimated project duration is appropriate and feasible to the client. schedule is not appropriate then re-adjust resources etc to verify if the required project duration can be achieved.
  • 2. ILF EIF EI EO EQ Features Comments Reference Low Avg High Low Avg High Low Avg High Low Avg High Low Feature 1 0 0 0 0 0 0 1 0 0 0 0 0 0 Feature 2 1 0 0 0 0 0 0 1 0 0 0 0 0 Feature 3 0 0 0 0 0 0 0 1 0 0 0 0 0 Feature 4 0 0 0 0 0 0 2 0 0 0 0 0 0 Total Artifacts 1 0 0 0 0 0 3 2 0 0 0 0 0 Total FP 24
  • 3. EQ Avg High Total FPs 0 0 3 0 0 11 0 0 4 0 0 6 0 0
  • 4. Features Comments Reference Language Estimated SLOC Feature 5 Java 300 Feature 6 Java 500 Feature 7 Java 100 Total: 900
  • 5. Total FPs 5.6604 9.4340 1.8868 16.9811
  • 6. Cocomo II PM = A*Size^E*Product(All Effort Multipliers - EM) Exponent E = B+(0.01*SUM(Scaling Factors)) Scaling Factors SF Description Level Value Maturity Process Maturity Nominal 4.68 Experience of similar PREC Projects Very High 1.24 Flexibility required in the FLEX System Very Low 0 TEAM Team Conhesiveness Extremely High 0 Project Risk and RESL Architectural Complexity Nominal 2.83 Effort Multiplier EM EM Description Level Value System reliability, complexity and size RCPX indicator Very Low 0.6 Reusablity cocern with respect to current and RUSE future projects Nominal 1 PDIF Platform Difficulty Extra Low 0.87 Personal capability of team. Like technical capability of Programmers, PERS Designers and testers. High 0.83 Application, Language and PREX tool experience High 0.87 Using Case tools for FCIL development etc Nominal 1 SCED Schedule Pressure Nominal 1 Constants Value B 0.91 A 2.94 E 1 EM 0.38 Consolidated Size and Effort Technology Java Increase due to lifecycle 0% SLOC per FP 53 SLOC 2172 PM 2.4023 Man-days 45.6443 FP from LOC 40.9811 Hours per FP 8.9103
  • 7. SF Scale PREC FLEX TEAM RESL Maturity Very Low 6.20 0.00 5.48 0.00 7.80 Low 4.96 1.01 4.38 1.41 6.24 Nominal 3.72 2.03 3.29 2.83 4.68 High 2.48 3.04 2.19 4.24 3.12 Very High 1.24 4.05 1.10 5.65 1.56 Extremely High 0.00 5.07 0.00 7.07 0.00 EM Scale RCPX RUSE PDIF PERS PREX FCIL Extra Low 0.49 0.95 0.87 2.12 1.59 1.43 Very Low 0.60 0.95 0.87 1.62 1.33 1.30 Low 0.83 0.95 0.87 1.26 1.22 1.10 Nominal 1.00 1.00 1.00 1.00 1.00 1.00 High 1.33 1.07 1.29 0.83 0.87 0.87 Very High 1.91 1.15 1.81 0.63 0.74 0.73 Extremely High 2.72 1.24 2.61 0.50 0.62 0.62
  • 8.
  • 9. SCED 1.00 1.00 1.00 1.00 1.14 1.43 1.43
  • 10. Summary Units Category Percentage of Development Requirements/Design 25% Development 45% Test Planning 8% Testing 10% Documentation 5% Deployment 1% Off-shore Management 5% On-site Management 1% 100%
  • 11. Category Effort Comments/Assumptions Outputs are Technical Design and Information Architecture doc. Information Architecture doc will have guidelines for Requirements/Design Effort 11.41 interface design. Development Effort 20.54 Source Code Test Planning 3.65 Output are Test Plan and Test Cases Testing Effort 4.56 Output is Test Results Outputs are Deployment and Build Documentation Effort 2.28 Documents Deployment Effort 0.46 Effort to deploy application Output is Detailed Project Plans, Risk and Off-shore Management 2.28 Issues tracking, Weekly status reports etc. Client Communication. Output is usually any On-site Management Effort 0.46 list of issues or improvement opportunities Total Effort 45.64
  • 12. Rate Tiers Units Low Medium High Architect/Designer 20 30 50 Developer (Blended rate for Senior and Junior Developer) 15 20 30 Testing Lead 20 30 50 Tester 15 20 30 Technical Writing Cost 15 20 30 Manager 25 40 70 On-site Manager 60 100 150 Primary Rate Factors Weightage Weighted Value Customer Buying Orientation Gold-Standard 7 0.7 Hours Availability for Technology Sufficient 5 0.25 Secondary Rate Factors Customer Type One Time Customer 1 0.1 Build Domain Competency Doesn't Matter 1 0.05 Build Technology Competency Doesn't Matter 2 0.1 Scope Creep Risk High 2 0.2 Payment Pattern Delayed Payments 2 0.2 20 1.6 Selected Rate High Buying Orientations Value Description Price-Oriented 0 Price is the main factor in making decision for this project Price, quality and other factors combined make the criteria for Solution-Oriented 1 winning project Customer is highly focused on quality and project features an Gold-Standard 2 would give it prime importance in making decisions Hours Availability Value Description Surplus 0 Hours Inventory has many hours free in this technology area Hours Inventory has some hours free but technology area is Sufficient 1 utilized more than break-even Less 2 Hours Inventory has very low hours free in this technology are Customer Type Value Description Good Existing Customer 0 Existing Customer 1 One Time Customer 2 Strategic Value Customer 0 Build Technology Competency Value Description Yes 0 Doesn't Matter 1 Avoid Technology 2
  • 13. Build Domain Competency Value Description Yes 0 Doesn't Matter 1 Avoid Domain 2 Payment Pattern Value Description Upfront Timely Payments 0 Timely Payments 1 Delayed Payments 2 Scope Creep Risk Value Description High 2 Moderate 1 Low 0
  • 14. Selected 50 30 50 30 30 70 150 g decision for this project combined make the criteria for quality and project features and n making decisions s free in this technology area s free but technology area is ours free in this technology area
  • 15.
  • 16. Cost Units Units per hour per days Architect/Designer 50 400 Developer (Blended rate for Senior and Junior Developer) 30 240 Testing Lead 50 400 Tester 30 240 Technical Writing Cost 30 240 Manager 70 560 On-site Manager 150 1200 Total Project Cost Effort (Days) Effort (Days) Category Estimated to Quote Cost Requirements/Design Effort 11.4 11.0 $4,400 Development Effort 20.5 21.0 $5,040 Test Planning 3.7 4.0 $1,600 Testing Effort 4.6 5.0 $1,200 Documentation Effort 2.3 3.0 $720 Deployment Effort 0.5 1.0 $400 Off-shore Management 2.3 3.0 $1,680 On-site Management Effort 0.5 1.0 $1,200 Total 45.6 49.0 $16,240 Blended Rate $41.43 Total Support Cost Man Months 1 Man Days 5 Category Hours per day Total Hours Cost Designers 0.5 2.5 $125 Developers 8 40 $1,200 Testers 1 5 $150 Managers 0.5 2.5 $175 Total $1,650
  • 17. Assumptions Test Planning, Documentation and Management activities are carried out in parallel to other main activities of design, development and testing Resources Designers 1 Developers 2 Testers 1 Others Possible Critical Chain Delay in Development 5% Possible Fixation Delay in Testing 5% Working days in a month 21 Ratio of calendar days 1.48 Project Plan - Waterfall Phase Duration (days) Duration (months) Requirements/Design Phase 11.0 0 Month 16 Day Development Phase 11.0 0 Month 16 Day Testing Phase 5.3 0 Month 8 Day Total 27.3 1 Month 9 Day Slack 3.0 Grand Total 30.3 1 Month 14 Day Iterative Plan Iteration Duration Iterations 1 (without Slacks) 1 100% 27.28 2 0% 0.00 3 0% 0.00 4 0% 0.00 5 0% 0.00 Total 100%
  • 18. Slacks Initial Ramp-up 0.5 Deployment for testing etc 0.5 Code/Peer Reviews 1 Shipment Packaging & Review 1 Total Slack 3 Requirements/Design Development Testing 11.0 11.0 5.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0