Implementing WMS and WCL at
Tilburg University
Jola G.B. Prinsen, project manager Library & IT Services
17. GBV Verbundkonferenz, Oldenburg, 28 August 2013
• Tilburg experience
• Early adopter
• Local choices
• LBS3
• Cataloguing in GGC
• Combination with WCL
• Lecture is snapshot
• WMS is developing
(quarterly releases)
• OCLC EMEA is gaining
more experience
In advance…
2
Tilburg University and its library
• Tilburg University
o 5 schools: economics and management, law, social and
behavioral sciences, humanities, catholic theology
o Graduate schools and a business school
o 12,500 students (85 nationalities)
• The library
o Combined with IT Services
o 61 f.t.e. library staff
o One building (950 study places; 580 with PC)
o 1,390,000 volumes; 44,600 circulations (2011)
o History of innovation
3
TiU’s digital library landscape 2012
Cataloguing GGC
Circulation and Acquisition OCLC’s LBS3
Discovery & delivery systems In-house developed iPort and GetIt!
Local databases Like: repository, theses, image databases,
journal article metadata, chapter metadata
Document server Locally stored full text
Link database
Locally developed services OpenURL resolver, loan server, place
locator, etc.
Integration METIS research information system
4
Selection process
517. Verbundkonferenz des GBV 28 August 2013
Rationale for new LMS / discovery service
Digital library landscape Complex
Hardware Outdated, unstable and no longer supported
Library management system LBS3 outdated and no longer supported as
from 1/1/2013 onwards
In-house developed discovery
& delivery system
In-house developed – unable to keep up with
developments
Staff issues Driving force behind in-house systems about
to retire
Increasing pressure to reduce
costs
Maintaining same service level, with less IT
staff
6
Why WMS and WCL? (2011!)
• Suppliers considered: OCLC and ExLibris
• WorldShare – working solution, good interface and
promising new functionality
• WorldCat Local – good integration with WMS, GGC and
Google
• WorldCat as underlying catalogue – more content for end
users
7
Implementation project
817. Verbundkonferenz des GBV 28 August 2013
Project aims
Functional
requirements
Implementation WMS
Implementation
WCL
9
• Head acquisition and
cataloguing
• Head circulation
• Future functional managers
WMS/WCL
• IT specialist LBS3
• IT specialist local databases
• License manager
• Technical project manager
(middleware)
• Head communication
TiU project team
10
Project schedule
11
Project
initiation
6/2011-9/2011
Analysis
9/2011-9/2012
Implementation
WCL
3/2012-8/2012
Implementation
WMS
9/2012-2/2013
Aftercare
9/2012-5/2013
Analysis
1217. Verbundkonferenz des GBV 28 August 2013
Workflow testing
Workflow
analysis
Workflow
testing
Gap
analysis
Impact
analysis
Go / no go
decision
13
152 WMS/WCL gaps
by priority
Blocking
Very
needed
Needed
Wish
Not
prioritized
Gap analysis (status March 2012)
152 WMS/WCL gaps
by solution
Solved!
Workaround
Release
planning
Unknown
14
• End-user service
o Go live only possible at
beginning academic year
• Condition: availability info
(from LBS3) can be made
available in WCL
 Start of implementation phase
WCL  Go!
15
• Business case not (yet) valid
o Host TiU’s LBS3
• Confidence in OCLC
o Visit OCLC Dublin, OH
o Await new releases
 Remain in analysis phase
WMS  No go
16
WCL implementation
1717. Verbundkonferenz des GBV 28 August 2013
Some WCL implementation challenges
• Loading metadata of local databases
o Finding right data load method and route
o Some local databases not loaded
• Activating e-collections
o No tools to compare TiU link database to OCLC WCKBase
o Collections PubGet/WCKBase not always identical to TiU’s
licenses
o E-books must also be activated
18
Go live
» soft launch for library staff
» live for the world
19
WMS implementation
20OCLC Regional Council Meeting 28 August 2013
Requirements analysis (status Nov 2012)
152 requirements
(November 2012)
Met after Feb
2013 release
Workaround
Release
planning
Unknown
21
152 requirements
(March 2012)
Met
Workaround
Release
planning
Unknown
Decision end November 2012
22
WMS Implementation challenges (1)
23
• Acquisitions
o Serials management – workarounds and staff care
o Adapting workflow
o Staff training
• Circulation
o Connection to our self-service circulation machines
o Depot requests (WCL and workflow changes)
o Configure regulations
o Adapting workflow
o Staff training
WMS Implementation challenges (2)
24
• Interface TiU’s identity management system – WMS
o Manage patron data at TiU and not in cloud
Student data in SIS
Staff data in HR system
Guest data in GuestDB
o Daily update and weekly reload to WMS
o Impossibility to delete patron/circulation data (legal issues)
WMS Implementation challenges (3)
25
• Interface TiU’s financial system SAP – WMS
o WMS: order and receive transactions
o SAP: financial transactions
o Interface is ready, but not in use
o Not possible to enter SAP ID in WMS
WMS Implementation challenges (4)
26
• Data load of Local Holding Records
o Duration of process at OCLC (90 days)
o Difficult to test at TiU (WCL connected to LBS3)
o Limiting test set had profound effect on size transaction test sets
• Data load of vendors, orders, patrons, circulation transactions
o Grab opportunity to clean up data in your old LMS
o Test exceptions
Experiences so far
2717. Verbundkonferenz des GBV 28 August 2013
Biggest workflow changes
• Cataloguing
• Acquisition (especially serials and book series)
• Depot requests
• Interlibrary loan
• Patron registration
• Finance
2827-8-2013
• Check-out: faster
• Check-in: faster
• Check-out holds: faster
• Depot requests: notification of
patrons
• Local ILL titles: creating titles is
faster; more flexible
• Renewal: bulk not possible
• Fines: calculation only after
check-in
• Holds: limited print
functionality; configuration
collection notice
• Patron registration: WMS user
interface could be improved
Circulation
29
• Vendor management • Not possible to change placed orders
• Receive orders without invoice not
possible for approval plans; received
orders are transferred to next year
• Limited publication frequencies in serial
administration
• Claim list is possible, but claiming itself
not yet within WMS
• Not possible to get list of orders placed
within a budget
• Erroneous matching & merging
Acquisition
30
Order process at TiU
 Catalogue in GGC and
add local holding record
 Realtime, TiU symbol
is added to WMS/WCL
 Switch to WMS, select
title and place order
• Large WorldCat database
• Easy to use interface for
inexperienced users
• Integration with Google Books
• Third-party databases can be
integrated in searching
• Integration with social media
• Export to reference managers
• Multi-language interface
• Interface for mobile devices
• Duplicates and matching &
merging problems
• Expert search is limited
• Classification systems biased
toward US systems
• Third-party databases often
only through Z39.50 (slow and
unpredictable)
• No RSS or alerting service
• Problems with depot requests
WorldCat Local
31
• Technical and application
administration by OCLC
• Interface
• No test system, always
connected to production
system
• Fewer configuration
possibilities
• Changes to WMS/WCL not
always consistently
communicated
Functional administration
32
Lessons learned
3317. Verbundkonferenz des GBV 28 August 2013
• Analyzing your workflow is
useful. Grab the opportunity to
improve
• It is difficult to quantify impact
of gaps
• Activating e-collections takes
lot of time
• Agree with OCLC on
(iterative!) process of data
load: specs, tests, acceptance
load, production load
Lessons learned (1)
34
• Spend a lot of time on data
load specs!
• Enrich local metadata with
PPN/OCN, IBSN/ISSN
• Plan time to develop
workarounds
• Combine migration to WCL
and WMS
• Developing interfaces takes
time and requires experts at
both the library and OCLC
• Accept and plan for manual
correction work after migration
Lessons learned (2)
35
• Savings in system
administration resources
• Temporarily: additional
resources in Acquisitions
o Claiming
o LHR changes to be entered
in GGC and WMS
o E-books in GGC and
WCKBase
Expectations
36
Jola Prinsen
Project manager
Tilburg University
Library & IT Services
jola.prinsen@tilburguniversity.edu
Questions? More information?
37

Mais conteúdo relacionado

Destaque

WMS_Presentation_LQ
WMS_Presentation_LQWMS_Presentation_LQ
WMS_Presentation_LQAnirudh K.M
 
Infor 10x Advantage On Air Summit Presentation - Make Better Decisions Faster
Infor 10x Advantage On Air Summit Presentation - Make Better Decisions Faster Infor 10x Advantage On Air Summit Presentation - Make Better Decisions Faster
Infor 10x Advantage On Air Summit Presentation - Make Better Decisions Faster Godlan, Inc
 
How to choose and implement wms
How to choose and implement wmsHow to choose and implement wms
How to choose and implement wmsSubhan Novianda
 
Wms market meetingitaly-processiinnovativi-2016-11-21_v1
Wms market meetingitaly-processiinnovativi-2016-11-21_v1Wms market meetingitaly-processiinnovativi-2016-11-21_v1
Wms market meetingitaly-processiinnovativi-2016-11-21_v1Romualdo Gobbo
 
Logistics management
Logistics management Logistics management
Logistics management Arbaz Khan
 
ROI for Warehouse Management System: The Business Case for a WMS
ROI for Warehouse Management System: The Business Case for a WMSROI for Warehouse Management System: The Business Case for a WMS
ROI for Warehouse Management System: The Business Case for a WMSNet at Work
 
CSCMP 2014: End to End SCM In The Cloud - Supply Chain Exchange II Track 13 -...
CSCMP 2014: End to End SCM In The Cloud - Supply Chain Exchange II Track 13 -...CSCMP 2014: End to End SCM In The Cloud - Supply Chain Exchange II Track 13 -...
CSCMP 2014: End to End SCM In The Cloud - Supply Chain Exchange II Track 13 -...InterimONE
 
Tier 1 WMS in the Cloud
Tier 1 WMS in the CloudTier 1 WMS in the Cloud
Tier 1 WMS in the CloudJoe Vernon
 
WMS Performance Shootout 2010
WMS Performance Shootout 2010WMS Performance Shootout 2010
WMS Performance Shootout 2010Jeff McKenna
 
6 Tips to Avoid a Failed Warehouse Management System (WMS) Implementation
6 Tips to Avoid a Failed Warehouse Management System (WMS) Implementation6 Tips to Avoid a Failed Warehouse Management System (WMS) Implementation
6 Tips to Avoid a Failed Warehouse Management System (WMS) ImplementationCommonwealth Supply Chain Advisors
 
Microsoft dynamics warehouse management system implementation guide
Microsoft dynamics warehouse management system implementation guideMicrosoft dynamics warehouse management system implementation guide
Microsoft dynamics warehouse management system implementation guidePrema Arjinajarn
 
Warehouse Control System vs. Warehouse Management System
Warehouse Control System vs. Warehouse Management SystemWarehouse Control System vs. Warehouse Management System
Warehouse Control System vs. Warehouse Management SystemAL Systems
 
Objectives of Logistics Management
Objectives of Logistics ManagementObjectives of Logistics Management
Objectives of Logistics ManagementKeith Allen
 
Introduction to logistics management
Introduction to logistics managementIntroduction to logistics management
Introduction to logistics managementHirfan Ullah
 

Destaque (15)

WMS_Presentation_LQ
WMS_Presentation_LQWMS_Presentation_LQ
WMS_Presentation_LQ
 
Infor 10x Advantage On Air Summit Presentation - Make Better Decisions Faster
Infor 10x Advantage On Air Summit Presentation - Make Better Decisions Faster Infor 10x Advantage On Air Summit Presentation - Make Better Decisions Faster
Infor 10x Advantage On Air Summit Presentation - Make Better Decisions Faster
 
How to choose and implement wms
How to choose and implement wmsHow to choose and implement wms
How to choose and implement wms
 
Wms market meetingitaly-processiinnovativi-2016-11-21_v1
Wms market meetingitaly-processiinnovativi-2016-11-21_v1Wms market meetingitaly-processiinnovativi-2016-11-21_v1
Wms market meetingitaly-processiinnovativi-2016-11-21_v1
 
Logistics management
Logistics management Logistics management
Logistics management
 
ROI for Warehouse Management System: The Business Case for a WMS
ROI for Warehouse Management System: The Business Case for a WMSROI for Warehouse Management System: The Business Case for a WMS
ROI for Warehouse Management System: The Business Case for a WMS
 
CSCMP 2014: End to End SCM In The Cloud - Supply Chain Exchange II Track 13 -...
CSCMP 2014: End to End SCM In The Cloud - Supply Chain Exchange II Track 13 -...CSCMP 2014: End to End SCM In The Cloud - Supply Chain Exchange II Track 13 -...
CSCMP 2014: End to End SCM In The Cloud - Supply Chain Exchange II Track 13 -...
 
Tier 1 WMS in the Cloud
Tier 1 WMS in the CloudTier 1 WMS in the Cloud
Tier 1 WMS in the Cloud
 
WMS Performance Shootout 2010
WMS Performance Shootout 2010WMS Performance Shootout 2010
WMS Performance Shootout 2010
 
6 Tips to Avoid a Failed Warehouse Management System (WMS) Implementation
6 Tips to Avoid a Failed Warehouse Management System (WMS) Implementation6 Tips to Avoid a Failed Warehouse Management System (WMS) Implementation
6 Tips to Avoid a Failed Warehouse Management System (WMS) Implementation
 
Microsoft dynamics warehouse management system implementation guide
Microsoft dynamics warehouse management system implementation guideMicrosoft dynamics warehouse management system implementation guide
Microsoft dynamics warehouse management system implementation guide
 
Warehouse Control System vs. Warehouse Management System
Warehouse Control System vs. Warehouse Management SystemWarehouse Control System vs. Warehouse Management System
Warehouse Control System vs. Warehouse Management System
 
WMS Overview
WMS OverviewWMS Overview
WMS Overview
 
Objectives of Logistics Management
Objectives of Logistics ManagementObjectives of Logistics Management
Objectives of Logistics Management
 
Introduction to logistics management
Introduction to logistics managementIntroduction to logistics management
Introduction to logistics management
 

Semelhante a Jola G.B. Prinsen - Implementing WMS and WCL at Tilburg University

Jola G.B. Prinsen - Implementing a cloud-based library management and search ...
Jola G.B. Prinsen - Implementing a cloud-based library management and search ...Jola G.B. Prinsen - Implementing a cloud-based library management and search ...
Jola G.B. Prinsen - Implementing a cloud-based library management and search ...jprinsen
 
Jola G.B. Prinsen - Implementing WMS and WCL at Tilburg University
Jola G.B. Prinsen - Implementing WMS and WCL at Tilburg UniversityJola G.B. Prinsen - Implementing WMS and WCL at Tilburg University
Jola G.B. Prinsen - Implementing WMS and WCL at Tilburg Universityjprinsen
 
Alma_Implementation_slides_May06_2016
Alma_Implementation_slides_May06_2016Alma_Implementation_slides_May06_2016
Alma_Implementation_slides_May06_2016mahongzn
 
Making the Big Move: Moving to Cloud-Based OCLC’s WorldShare Management Servi...
Making the Big Move: Moving to Cloud-Based OCLC’s WorldShare Management Servi...Making the Big Move: Moving to Cloud-Based OCLC’s WorldShare Management Servi...
Making the Big Move: Moving to Cloud-Based OCLC’s WorldShare Management Servi...Charleston Conference
 
Using Archivemedia to preserve research data
Using Archivemedia to preserve research dataUsing Archivemedia to preserve research data
Using Archivemedia to preserve research dataARDC
 
150310 Implementing Alma for LIBISnet
150310 Implementing Alma for LIBISnet150310 Implementing Alma for LIBISnet
150310 Implementing Alma for LIBISnetJo Rademakers
 
Embracing Changing Technology and New Technical Services Workflows in Migrati...
Embracing Changing Technology and New Technical Services Workflows in Migrati...Embracing Changing Technology and New Technical Services Workflows in Migrati...
Embracing Changing Technology and New Technical Services Workflows in Migrati...NASIG
 
Roadmap for the management of 3 million digital objects. Towards a certified ...
Roadmap for the management of 3 million digital objects. Towards a certified ...Roadmap for the management of 3 million digital objects. Towards a certified ...
Roadmap for the management of 3 million digital objects. Towards a certified ...Leiden University Libraries
 
Jisc Shared Service requirements presentation - 18th November 2015
Jisc Shared Service requirements presentation - 18th November 2015Jisc Shared Service requirements presentation - 18th November 2015
Jisc Shared Service requirements presentation - 18th November 2015Jenny Mitcham
 
Yes we can! Implementing digitization requests in Alma
Yes we can! Implementing digitization requests in AlmaYes we can! Implementing digitization requests in Alma
Yes we can! Implementing digitization requests in AlmaFrançois Renaville
 
HIKE project presentation
HIKE project presentationHIKE project presentation
HIKE project presentationBen Showers
 
RDM Roadmap to the Future, or: Lords and Ladies of the Data
RDM Roadmap to the Future, or: Lords and Ladies of the DataRDM Roadmap to the Future, or: Lords and Ladies of the Data
RDM Roadmap to the Future, or: Lords and Ladies of the DataRobin Rice
 
RDM Infrastructure components at Lancaster University
RDM Infrastructure components at Lancaster UniversityRDM Infrastructure components at Lancaster University
RDM Infrastructure components at Lancaster UniversityMasud Khokhar
 
Data Lake Acceleration vs. Data Virtualization - What’s the difference?
Data Lake Acceleration vs. Data Virtualization - What’s the difference?Data Lake Acceleration vs. Data Virtualization - What’s the difference?
Data Lake Acceleration vs. Data Virtualization - What’s the difference?Denodo
 
LOTAR-PDES: Engineering digitalization through task automation and reuse in t...
LOTAR-PDES: Engineering digitalization through task automation and reuse in t...LOTAR-PDES: Engineering digitalization through task automation and reuse in t...
LOTAR-PDES: Engineering digitalization through task automation and reuse in t...CARLOS III UNIVERSITY OF MADRID
 
PLNOG 6: Piotr Modzelewski, Bartłomiej Rymarski - Product Catalogue - Case Study
PLNOG 6: Piotr Modzelewski, Bartłomiej Rymarski - Product Catalogue - Case StudyPLNOG 6: Piotr Modzelewski, Bartłomiej Rymarski - Product Catalogue - Case Study
PLNOG 6: Piotr Modzelewski, Bartłomiej Rymarski - Product Catalogue - Case StudyPROIDEA
 
Harness the power of Data in a Big Data Lake
Harness the power of Data in a Big Data LakeHarness the power of Data in a Big Data Lake
Harness the power of Data in a Big Data LakeSaurabh K. Gupta
 

Semelhante a Jola G.B. Prinsen - Implementing WMS and WCL at Tilburg University (20)

Jola G.B. Prinsen - Implementing a cloud-based library management and search ...
Jola G.B. Prinsen - Implementing a cloud-based library management and search ...Jola G.B. Prinsen - Implementing a cloud-based library management and search ...
Jola G.B. Prinsen - Implementing a cloud-based library management and search ...
 
Jola G.B. Prinsen - Implementing WMS and WCL at Tilburg University
Jola G.B. Prinsen - Implementing WMS and WCL at Tilburg UniversityJola G.B. Prinsen - Implementing WMS and WCL at Tilburg University
Jola G.B. Prinsen - Implementing WMS and WCL at Tilburg University
 
Alma_Implementation_slides_May06_2016
Alma_Implementation_slides_May06_2016Alma_Implementation_slides_May06_2016
Alma_Implementation_slides_May06_2016
 
Making the Big Move: Moving to Cloud-Based OCLC’s WorldShare Management Servi...
Making the Big Move: Moving to Cloud-Based OCLC’s WorldShare Management Servi...Making the Big Move: Moving to Cloud-Based OCLC’s WorldShare Management Servi...
Making the Big Move: Moving to Cloud-Based OCLC’s WorldShare Management Servi...
 
Using Archivemedia to preserve research data
Using Archivemedia to preserve research dataUsing Archivemedia to preserve research data
Using Archivemedia to preserve research data
 
150310 Implementing Alma for LIBISnet
150310 Implementing Alma for LIBISnet150310 Implementing Alma for LIBISnet
150310 Implementing Alma for LIBISnet
 
RDM @ KU Leuven: De verbindende kracht van het Research Data Management Compe...
RDM @ KU Leuven: De verbindende kracht van het Research Data Management Compe...RDM @ KU Leuven: De verbindende kracht van het Research Data Management Compe...
RDM @ KU Leuven: De verbindende kracht van het Research Data Management Compe...
 
Embracing Changing Technology and New Technical Services Workflows in Migrati...
Embracing Changing Technology and New Technical Services Workflows in Migrati...Embracing Changing Technology and New Technical Services Workflows in Migrati...
Embracing Changing Technology and New Technical Services Workflows in Migrati...
 
BbW2012 - LN
BbW2012 - LNBbW2012 - LN
BbW2012 - LN
 
Roadmap for the management of 3 million digital objects. Towards a certified ...
Roadmap for the management of 3 million digital objects. Towards a certified ...Roadmap for the management of 3 million digital objects. Towards a certified ...
Roadmap for the management of 3 million digital objects. Towards a certified ...
 
Jisc Shared Service requirements presentation - 18th November 2015
Jisc Shared Service requirements presentation - 18th November 2015Jisc Shared Service requirements presentation - 18th November 2015
Jisc Shared Service requirements presentation - 18th November 2015
 
Yes we can! Implementing digitization requests in Alma
Yes we can! Implementing digitization requests in AlmaYes we can! Implementing digitization requests in Alma
Yes we can! Implementing digitization requests in Alma
 
HIKE project presentation
HIKE project presentationHIKE project presentation
HIKE project presentation
 
DATA WAREHOUSING
DATA WAREHOUSINGDATA WAREHOUSING
DATA WAREHOUSING
 
RDM Roadmap to the Future, or: Lords and Ladies of the Data
RDM Roadmap to the Future, or: Lords and Ladies of the DataRDM Roadmap to the Future, or: Lords and Ladies of the Data
RDM Roadmap to the Future, or: Lords and Ladies of the Data
 
RDM Infrastructure components at Lancaster University
RDM Infrastructure components at Lancaster UniversityRDM Infrastructure components at Lancaster University
RDM Infrastructure components at Lancaster University
 
Data Lake Acceleration vs. Data Virtualization - What’s the difference?
Data Lake Acceleration vs. Data Virtualization - What’s the difference?Data Lake Acceleration vs. Data Virtualization - What’s the difference?
Data Lake Acceleration vs. Data Virtualization - What’s the difference?
 
LOTAR-PDES: Engineering digitalization through task automation and reuse in t...
LOTAR-PDES: Engineering digitalization through task automation and reuse in t...LOTAR-PDES: Engineering digitalization through task automation and reuse in t...
LOTAR-PDES: Engineering digitalization through task automation and reuse in t...
 
PLNOG 6: Piotr Modzelewski, Bartłomiej Rymarski - Product Catalogue - Case Study
PLNOG 6: Piotr Modzelewski, Bartłomiej Rymarski - Product Catalogue - Case StudyPLNOG 6: Piotr Modzelewski, Bartłomiej Rymarski - Product Catalogue - Case Study
PLNOG 6: Piotr Modzelewski, Bartłomiej Rymarski - Product Catalogue - Case Study
 
Harness the power of Data in a Big Data Lake
Harness the power of Data in a Big Data LakeHarness the power of Data in a Big Data Lake
Harness the power of Data in a Big Data Lake
 

Último

Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Angeliki Cooney
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusZilliz
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Zilliz
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024The Digital Insurer
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024The Digital Insurer
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 

Último (20)

Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 

Jola G.B. Prinsen - Implementing WMS and WCL at Tilburg University

  • 1. Implementing WMS and WCL at Tilburg University Jola G.B. Prinsen, project manager Library & IT Services 17. GBV Verbundkonferenz, Oldenburg, 28 August 2013
  • 2. • Tilburg experience • Early adopter • Local choices • LBS3 • Cataloguing in GGC • Combination with WCL • Lecture is snapshot • WMS is developing (quarterly releases) • OCLC EMEA is gaining more experience In advance… 2
  • 3. Tilburg University and its library • Tilburg University o 5 schools: economics and management, law, social and behavioral sciences, humanities, catholic theology o Graduate schools and a business school o 12,500 students (85 nationalities) • The library o Combined with IT Services o 61 f.t.e. library staff o One building (950 study places; 580 with PC) o 1,390,000 volumes; 44,600 circulations (2011) o History of innovation 3
  • 4. TiU’s digital library landscape 2012 Cataloguing GGC Circulation and Acquisition OCLC’s LBS3 Discovery & delivery systems In-house developed iPort and GetIt! Local databases Like: repository, theses, image databases, journal article metadata, chapter metadata Document server Locally stored full text Link database Locally developed services OpenURL resolver, loan server, place locator, etc. Integration METIS research information system 4
  • 6. Rationale for new LMS / discovery service Digital library landscape Complex Hardware Outdated, unstable and no longer supported Library management system LBS3 outdated and no longer supported as from 1/1/2013 onwards In-house developed discovery & delivery system In-house developed – unable to keep up with developments Staff issues Driving force behind in-house systems about to retire Increasing pressure to reduce costs Maintaining same service level, with less IT staff 6
  • 7. Why WMS and WCL? (2011!) • Suppliers considered: OCLC and ExLibris • WorldShare – working solution, good interface and promising new functionality • WorldCat Local – good integration with WMS, GGC and Google • WorldCat as underlying catalogue – more content for end users 7
  • 10. • Head acquisition and cataloguing • Head circulation • Future functional managers WMS/WCL • IT specialist LBS3 • IT specialist local databases • License manager • Technical project manager (middleware) • Head communication TiU project team 10
  • 14. 152 WMS/WCL gaps by priority Blocking Very needed Needed Wish Not prioritized Gap analysis (status March 2012) 152 WMS/WCL gaps by solution Solved! Workaround Release planning Unknown 14
  • 15. • End-user service o Go live only possible at beginning academic year • Condition: availability info (from LBS3) can be made available in WCL  Start of implementation phase WCL  Go! 15
  • 16. • Business case not (yet) valid o Host TiU’s LBS3 • Confidence in OCLC o Visit OCLC Dublin, OH o Await new releases  Remain in analysis phase WMS  No go 16
  • 18. Some WCL implementation challenges • Loading metadata of local databases o Finding right data load method and route o Some local databases not loaded • Activating e-collections o No tools to compare TiU link database to OCLC WCKBase o Collections PubGet/WCKBase not always identical to TiU’s licenses o E-books must also be activated 18
  • 19. Go live » soft launch for library staff » live for the world 19
  • 20. WMS implementation 20OCLC Regional Council Meeting 28 August 2013
  • 21. Requirements analysis (status Nov 2012) 152 requirements (November 2012) Met after Feb 2013 release Workaround Release planning Unknown 21 152 requirements (March 2012) Met Workaround Release planning Unknown
  • 23. WMS Implementation challenges (1) 23 • Acquisitions o Serials management – workarounds and staff care o Adapting workflow o Staff training • Circulation o Connection to our self-service circulation machines o Depot requests (WCL and workflow changes) o Configure regulations o Adapting workflow o Staff training
  • 24. WMS Implementation challenges (2) 24 • Interface TiU’s identity management system – WMS o Manage patron data at TiU and not in cloud Student data in SIS Staff data in HR system Guest data in GuestDB o Daily update and weekly reload to WMS o Impossibility to delete patron/circulation data (legal issues)
  • 25. WMS Implementation challenges (3) 25 • Interface TiU’s financial system SAP – WMS o WMS: order and receive transactions o SAP: financial transactions o Interface is ready, but not in use o Not possible to enter SAP ID in WMS
  • 26. WMS Implementation challenges (4) 26 • Data load of Local Holding Records o Duration of process at OCLC (90 days) o Difficult to test at TiU (WCL connected to LBS3) o Limiting test set had profound effect on size transaction test sets • Data load of vendors, orders, patrons, circulation transactions o Grab opportunity to clean up data in your old LMS o Test exceptions
  • 27. Experiences so far 2717. Verbundkonferenz des GBV 28 August 2013
  • 28. Biggest workflow changes • Cataloguing • Acquisition (especially serials and book series) • Depot requests • Interlibrary loan • Patron registration • Finance 2827-8-2013
  • 29. • Check-out: faster • Check-in: faster • Check-out holds: faster • Depot requests: notification of patrons • Local ILL titles: creating titles is faster; more flexible • Renewal: bulk not possible • Fines: calculation only after check-in • Holds: limited print functionality; configuration collection notice • Patron registration: WMS user interface could be improved Circulation 29
  • 30. • Vendor management • Not possible to change placed orders • Receive orders without invoice not possible for approval plans; received orders are transferred to next year • Limited publication frequencies in serial administration • Claim list is possible, but claiming itself not yet within WMS • Not possible to get list of orders placed within a budget • Erroneous matching & merging Acquisition 30 Order process at TiU  Catalogue in GGC and add local holding record  Realtime, TiU symbol is added to WMS/WCL  Switch to WMS, select title and place order
  • 31. • Large WorldCat database • Easy to use interface for inexperienced users • Integration with Google Books • Third-party databases can be integrated in searching • Integration with social media • Export to reference managers • Multi-language interface • Interface for mobile devices • Duplicates and matching & merging problems • Expert search is limited • Classification systems biased toward US systems • Third-party databases often only through Z39.50 (slow and unpredictable) • No RSS or alerting service • Problems with depot requests WorldCat Local 31
  • 32. • Technical and application administration by OCLC • Interface • No test system, always connected to production system • Fewer configuration possibilities • Changes to WMS/WCL not always consistently communicated Functional administration 32
  • 33. Lessons learned 3317. Verbundkonferenz des GBV 28 August 2013
  • 34. • Analyzing your workflow is useful. Grab the opportunity to improve • It is difficult to quantify impact of gaps • Activating e-collections takes lot of time • Agree with OCLC on (iterative!) process of data load: specs, tests, acceptance load, production load Lessons learned (1) 34
  • 35. • Spend a lot of time on data load specs! • Enrich local metadata with PPN/OCN, IBSN/ISSN • Plan time to develop workarounds • Combine migration to WCL and WMS • Developing interfaces takes time and requires experts at both the library and OCLC • Accept and plan for manual correction work after migration Lessons learned (2) 35
  • 36. • Savings in system administration resources • Temporarily: additional resources in Acquisitions o Claiming o LHR changes to be entered in GGC and WMS o E-books in GGC and WCKBase Expectations 36
  • 37. Jola Prinsen Project manager Tilburg University Library & IT Services jola.prinsen@tilburguniversity.edu Questions? More information? 37

Notas do Editor

  1. 134 f.t.e. LIS total
  2. Selectieproceszomer 2010-zomer 2011Eisenaanleverancier:Deliver to several Dutch university librariesBelong to international top of UL suppliersDeliver hosted solutions (short-term)Work actively on cloud solutions (long-term)Developing partner – fits TiU: we’ve always been innovative
  3. TiU was a pain in the * ;-)We discovered more problems and missing functionality, than other 80 WMS librariesActually, OCLC is very glad, as a colleague libraries
  4. Workflowanalyse:AcquisitionCirculationDiscovery & deliveryManagement information3rd party integrationFinancial information (SAP)Lendomats (SIP2)Identity management (TiU’s IDM)Gap analysisGaps between current functionality and WMS/WCL functionalityImpact analysisImpact on stakeholders (where possible quantified)Workaround? Effort involvedPriority (must have, need to have, nice to have)Solution on OCLC’s roadmap?
  5. Blocking = must have to go live (summer 2012)Very needed = must have before 1/2013Needed = must have before 1/2014Wish = nice to haveVery diverse gapsClaiming not possibleNumber of positions for budget code
  6. Gaps between current functionality and future functionality (WMS + WCL)Opgelost = ‘voor go live’We compromised more towards the end
  7. Op basis van testresultatenFunctionelebeschrijving van feb release
  8. Wijzijneerstebibliotheek die koppelingmaakt met extern IDM en met SAP (2-way authentication not yet possible)
  9. Wijzijneerstebibliotheek die koppelingmaakt met extern IDM en met SAP
  10. Adapt to the system
  11. Kick off meeting: let library director communicate about project, project’s priority, rationale behind choice for the system, and business case
  12. Kick off meeting: let library director communicate about project, project’s priority, rationale behind choice for the system, and business case
  13. Renewing for ILL libraries – Nov 2013Claiming journal issues – May 2013Changes in copy and item specific notes, call number and shelving location in GGC and WMS – within some months temporary solution; within a year structural solution
  14. WMS aftercare:Identify and solve problems (mainly LHR)Prioritize requirements (new and existing)Transfer to line organizationTalk to colleague librariesPhase out local systemsSAP interface + BO report