Why have a Project Plan?
• Developing an initial course of action toward a welldefined set of objectives
• A mechanism to aid in detecting variance both in the
planned progress of the work and also in the target
objectives.
• The purpose of a project plan is NOT to predict the
future. You lay out.

• A process that will constantly test this course during its
execution for its match with the current, changing
environment.
Development Planning Models
Economic Planning Model (1935-1971)
Development Planning Model (1972)
Corporate Business Planning Models
Educational Planning Model
Eclectic Model
Source: Miclat (2005)
Development Planning and
Administration
Development administration has always been
one of the central features of the various long and
Medium Term Philippine Development Plans since
the seventies. The paradigm for bureaucratic
reform continues to evolve in various intellectual
and practical debates but government continues its
work amidst all these. Until recently, all Philippine
development plans since the seventies had a
specific chapter devoted solely to development
administration
Eclectic Model
Nine Major Steps
1. Preparation

 Organization and staffing
 Training

2. Environmental
Scanning






External environment
Internal environment
SWOT analysis
Strategic planning framework

3. VMGO, policy,
objective, and target
setting
4. Policy/Strategy
formulation
5. Program/Project Identification
Eclectic Model
Nine Major Steps
6. Investment Programming
7. Budgeting
8. Implementation and
Monitoring

9. Evaluation and Plan Update
Development Administration (1950s to
1960s)
• Development Administration (DA) as a
field of study emerged in 1950s and
1960s with the third world countries as
the focal point
Nef and Dwivedi (1981)
on the other hand,
attributed the concept of
DA to Goswami in 1955
and later popularized by
Riggs and Weidner. They
coined the term
development
administration” to refer
to developing countries
which are largely found in
Asia, Latin America, and
Africa.
Khator (1998) however, argued
that DA was built upon several
critical assumptions that:
(1) development needs are the
most important needs of
developing countries,
(2) the development needs of
developing and developed
countries are inherently
different,
(3) development can be
administered,
(4) developmental know-hows
are transferable; and
(5) the political, social, and
cultural context of
development can be easily
altered
Source: www.ginandjar.com
Two foci in Development
Administration
Likewise, Fred Riggs, in his “Frontiers of
Development,” identified two foci in
development administration: development of
administration and the administration of
development. Most development
administration scholars focused more on the
latter and it subsequently became
synonymous to the administration of
development in third world countries. (Khator
1998)
“Management of Innovation”
Given the situations above, DA maybe
considered as “Management of Innovation”
because it was aimed at helping countries that
are undergoing reconstruction and social
transformation
Administrative Reform
De Guzman (1986) described administrative
reform as one of the core values of DA, and analyzed
the structural and behavioral characteristics of the
Philippine public bureaucracy. He argued that the
“implementation of administrative reform should
have two major dimensions: reforming the
structures of the bureaucracy and reforming the
behavior of those in the bureaucracy.” (De Guzman
1986 as cited in Brillantes 1994: 8)
Project Plan
Development: taking
the results of other
planning processes
(historical information,
organizational policies,
constraints, assumptions)
and putting them into a
consistent, coherent
document—the project
plan

Project Plan
Execution: carrying
out the project plan

Integrated Change
Control: coordinating
changes across the
entire project
Project Plan Development
•

to coordinate all project planning
documents

• to guide project execution

• Project plans assist the project
manager in leading the project team
and assessing project status
• Project performance should be
measured against a baseline plan
Attributes of Project Plans
•
•
•
•

Just as projects are unique, so
are project plans
Plans should be dynamic
Plans should be flexible
Plans should be updated as
changes occur
Plans should first and foremost
guide project execution
Common Elements of
a Project Plan

• Introduction or overview of
the project
• Description of how the project
is organized (Quality of Code)
• Management and technical
processes used on the project
(project structure, use of
tools)
• Work to be done, schedule,
and budget information
(development practices)
Good Project
Planning Key
Two keys to succeed in
good project planning :

Always think about and
say something about
each one of the checklist
areas (and others that
are applicable),
regardless of the size of
the project, the industry
involved, and the
product or service being
produced.

Source: www.flackventures.com

Clearly, the scale of the
plan elements will differ,
depending on project
scope. Plan accordingly.
How Detailed should my Project
Plan be?
Detailed planning versus light
planning. Just-in-time planning
Measurable and testable goals.
• Do planning at a sufficient level of
detail to search out issues and
problems during the early planning
process itself.
• Build into the plan the hooks for
measuring if you are drifting off
course during the plan's execution.
• Finding the sweet-spot for
planning at-a-distance teams and
outsourced services/development
What is Risk?
Risk is a measure of two factors: the
probability of an event occurring, and the
severity of the consequences of that
event. Thus, an event can be either one
that is very likely to occur with moderate
consequences each time it does, or one
that is extremely unlikely but with
catastrophic consequences on each
occurrence.
Removing a risk means either
eliminating the possibility of occurrence of
an event or rending the event completely
harmless when it does occur.
How do keep risk from
disrupting implementation of project?
Start the process early, as soon as one other core
team member is available for brainstorming.
Brainstorm with core team, identifying as many risks as
possible. Use previous product experience, personal
experience, regulatory input, and common sense.
How do keep risk from
disrupting implementation of project?

Create a risk analysis document that, at a
minimum, contains the identified risk, the
event that causes it, a measure of probability,
a measure of severity, and a mitigation or
elimination strategy.
How do I keep Risk from Disrupting
my Project?
Explicitly incorporate the
mitigations into either planned
project process activities or product
requirements. Make the risk analysis
part of the project plan that is agreed
upon by all stakeholders and team
members. Periodically review and
amend the risk analysis with new
information gained from reviews,
inspections, audits, and marketing or
customer input.
Project Plan Execution
• Involves managing
and performing the
work described in the
project plan
• The majority of time
and money is usually
spent on execution
• The application area
of the project directly
affects project
execution because the
products of the project
are produced during
execution
What Went Wrong?
Many people have a poor view of plans based
on past experiences. Senior managers often
require a plan, but then no one follows up on
whether the plan was followed.
For example, one project manager said he
would meet with each project team leader within
two months to review their plans. The project
manager created a detailed schedule for these
reviews. He cancelled the first meeting due to
another business commitment. He rescheduled
the next meeting for unexplained personal reasons.
Two months later, the project manager had still not
met with over half of the project team leaders.
Why should project members feel obligated to
follow their own plans when the project manager
obviously did not follow his?
Important Skills for
Project Execution
• General management
skills like leadership,
communication, and
political skills
• Product skills and
knowledge
• Use of specialized tools
and techniques
Choosing tools
• Having a process
helps choose tools
• Choosing
Inappropriate tool
can do harm
• Build a process if
you don’t have any
Tools and Techniques for Project
Execution
• Work Authorization System - a
method for ensuring that qualified
people do work at the right time
and in the proper sequence
• Status Review Meetings - regularly
scheduled meetings used to
exchange project information
• Project Management Software:
special software to assist in
managing projects
Measuring and Checking
Progress
Build into the plan the activities and
processes that will support dynamic, roundrobin, never-ending measurement during
execution:
Frequent, measurable milestones,
 Periodic testing, reviews, and issue
management that will systematically capture
and measure the delta between requirements
and emerging design
 Periodic testing of the product or system requirements with
marketing or the customer, to see if the target is changing out
from under you,
 Scheduled midcourse corrections of the project plan itself, as
you learn more, and
 Early removal of technical risk through prototypes and testing
Integrated change control
Framework for
involves identifying, evaluating,
Project Integration
and managing changes
Management
throughout the project life cycle
Three main
objectives of change
control:
• Influence the
factors that create
changes to ensure
they are beneficial
• Determine that a
change has
occurred
• Manage actual
changes when and
as they occur
Integrated Change
Control Process

Suggestions for
Managing Integrated
Change Control
 View project
management as a
process of constant
communications and
negotiations
 Plan for change
 Establish a formal
change control system,
including a Change
Control Board (CCB)


Cont.
Suggestions
for Managing
Integrated
Change
Control

Use good configuration
management
 Define procedures for
making timely decisions on
smaller changes
 Use written and oral
performance reports to help
identify and manage change
 Use project management
and other software to help
manage and communicate
changes
What is project
management?
History of Project Management
• Modern project management began with the
Manhattan Project, which the U.S. military led to
develop the atomic bomb
• In 1917 Henry Gantt developed the Gantt chart as a
tool for scheduling work in job shops
• In 1958, the Navy developed PERT charts
• In the 1970s, the military began using project
management software, as did the construction
industry
• By the 1990s, virtually every industry was using some
form of project management
Project Management Profession
• A 1996 Fortune article called project
management the “number one career choice”
• Professional societies like the Project
Management Institute (PMI) have grown
tremendously
• Average salaries for project managers are over
$81,000
What is Project Management?
Project management is “the application of
knowledge, skills, tools, and techniques to
project activities in order to meet project
requirements” (PMI*, Project
Management Body of Knowledge (PMBOK
Guide), 2000, p. 6)
*The Project Management Institute (PMI) is an international
professional society. Their web site is www.pmi.org.
MCM 1262 IT Project Mgmt

Chap 1 - 35
Project
Management
Knowledge &
skills

Tools & techniques
Core Knowledge Areas
Core Knowledge Areas:
Objectives
Facilitating Knowledge
◦ Scope
Areas: Achievement
◦ Time
◦ Human Resources
◦ Cost
◦ Communication
◦ Quality
◦ Risk
◦ Procurement
◦ Project Integration
Management
• Structure your project properly (use framework if possible)
• Maintain good coding practice in team
• Use tools to increase team efficiency
Time

Scope

Cost

Integration
Quality

Procurement

Communication

Risk

People
The nine knowledge areas of project
management:










Project Integration Management
Project Scope Management
Project Time Management
Project Cost Management
Project Quality Management
Project Human Resource Management
Project Communication Management
Project Risk Management
Project Procurement Management
Project Management Methodology
Initiate

Plan

Initiate –potential projects are identified and
evaluated in terms of importance to the
organization
Plan –scope, time, cost and risk management
planning takes place

Execute

Execute –project plan is followed

Control

Control –project performance is measured
against the project plan

Close

Close –final paper work completed and sign off
by all stakeholders
The Approach to Learning Project
Management
Process Focus
Team Focus
Technology Focus

PM Software
Group Support Technologies
Knowledge Management and Organizational Memory Systems

Global Focus
PM Professional Focus
Nine Project Management
Knowledge Areas
Knowledge areas describe the key competencies
that project managers must develop
– 4 core knowledge areas lead to specific project
objectives (scope, time, cost, and quality)
– 4 facilitating knowledge areas are the means
through which the project objectives are achieved
human resources, communication, risk, and
procurement management
– 1 knowledge area (project integration management)
affects and is affected by all of the other knowledge
areas
MCM 1262 IT Project Mgmt
Chap 1 - 44
Project Stakeholders
• Stakeholders are the people involved in or
affected by project activities
• Stakeholders include
•
•
•
•
•
•

the project sponsor and project team
support staff
customers
users
suppliers
opponents to the project

MCM 1262 IT Project Mgmt

Chap 1 - 45
Project Management Tools and
Techniques
• Project management tools and techniques
assist project managers and their teams in
various aspects of project management
• Some specific ones include
– Project Charter and WBS (scope)
– Gantt charts, network diagrams, critical path analysis,
critical chain scheduling (resource constraint
scheduling)
– Cost estimates and earned value management (cost)

MCM 1262 IT Project Mgmt

Chap 1 - 46
Application of PM
• Project management applies to work as well
as personal projects
• Project management applies to many different
disciplines (IT, construction, finance, sports,
event planning, etc.)
• Project management skills can help in
everyday life
More Advantages of Project
Management*
• Bosses, customers, and other stakeholders do not like
surprises
• Good project management (PM) provides assurance
and reduces risk
• PM provides the tools and environment to plan, monitor,
track, and manage schedules, resources, costs, and
quality
• PM provides a history or metrics base for future
planning as well as good documentation
• Project members learn and grow by working in a crossfunctional team environment
*Knutson, Joan, PM Network, December 1997, p. 13
Project Management Certification
• PMI provides certification as a Project
Management Professional (PMP)
• A PMP has documented sufficient project
experience, agreed to follow a code of ethics,
and passed the PMP exam
• The number of people earning PMP
certification is increasing quickly
More and more people are getting
the Project Management Professional
(PMP) certification - increased by
more than 70 percent from 2004 to
2005.
Growth in PMP Certification
1993-2008
350,000
318,289

300,000
267,367

250,000

# PMPs

221,144

200,000
175,194

150,000
100,000

102,047
76,550
52,443

50,000

40,343

1,000
-

1,900

2,800

4,400

6,415

10,086

18,184

27,052

1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008
Year
That’s why we
have to learn
Project
Management
Project Management Software
• By 2001, there were hundreds of different
products to assist in performing project
management
• Three main categories of tools:
– Low-end tools: Handle single or smaller
–

–

projects well, cost under $200 per user
Midrange tools: Handle multiple projects and
users, cost $200-500 per user, Project 2000
most popular
High-end tools: Also called enterprise project
management software, often licensed on a

per-user basis
What is a project?
• A project is “a temporary endeavor
undertaken to create a unique product,
service, or result” (PMBOK® Guide, Fourth
Edition)
• Other attributes:
 Is developed using progressive elaboration
 Requires resources, often from various areas
 Involves uncertainty

• Operations is work done to sustain the
business
What is a program?
• Program: group of related projects managed in
a coordinated way to obtain benefits and control
not available from managing them individually
(PMBOK® Guide, Fourth Edition)
• Program managers oversee programs and
often act as bosses for project managers
• Examples of common programs in the IT field:
infrastructure, applications development, and
user support
Why Project Management ?
Project Management is an in-demand skill
set and one of the fastest growing
professional disciplines in North America.
Project Management breaks down the chaos
of an overwhelming workload into
manageable elements -scope, time, cost,
quality, human resources, communication,
risk, procurement, and integration of projects
Project Management is the discipline of
organizing and managing resources (i.e. human,
financial & material) in such a way that a project
is completed within defined scope, quality, time
and cost constraints.
◦ The first challenge of project management
is to make sure that a projects delivered
within defined constraints.
◦ The second, more ambitious, challenge is
the optimized allocation and integration of
inputs needed to meet pre-defined
objectives.
Five Process of PM
Key ones in PM:
–
–
–
–

Executive support
User involvement
Experienced project manager
Well defined scope and requirements
Advantages of Using Formal Project
Management Practices
Improvement in customer satisfaction
Better cost performance, higher return on
investment
Better schedule performance, better
allocation of time commitments and better
utilization of resources, higher productivity
Increased quality reducing re-work
Increase in delivering required features
Will make everyone happier (stakeholders,
team members, management)
There are several ways to define
project success
 The project met scope, time, and cost goals
 The project meets or exceeds stakeholders’
expectations
 The results of the project met its main objective,
e.g.,
making or saving a certain amount of money
providing a good return on investment, or
simply delivering the product/services
What the Winners Do?
• Use an integrated project management toolbox
(use standard/advanced PM tools, lots of templates)
• Grow project leaders, emphasizing business and
soft skills
• Develop a streamlined project delivery process
• Measure project health using metrics, like customer
satisfaction or return on investment
Project Manager
Skills

Soft skills:
◦
◦
◦
◦
◦

Leadership
Team building
Negotiation
Conflict management
Organization for self and
others
◦ Communication both oral
and written to both
technical and nontechnical audiences
◦ Change management
◦ Active listening

Technical Skills:
Project Management software
Level of understanding of the
technology being used in the
project (software, hardware,
network, etc.)
Basic knowledge of the
business
Cost estimating and
budgeting
Copyright © 2010 Pearson Education, Inc.
Publishing as Prentice Hall
Six Basic Functions of Successful PM’s
1. manage project scope –make sure the team works on
what is needed for the project and nothing else
2. manage human resources –the team must work
together, this doesn’t just happen it takes a directed
effort
3. manage communications –this occurs at many levels,
teammates, customers, managers, vendors, and others
4. manage schedule –must keep people on schedule
delivering work on time
5. manage quality –need to make sure that all work
performed meets with customer expected levels of
quality
6. manage costs –must keep an eye on the budget to
make sure all the work can be done and not exceed the
allocated budget
A Project Manager Manages
Projects by:
Setting clear and achievable
objectives
Identifying requirements
Adapting the project to the various
concerns of the stakeholders
Balancing the demands of the triple
constraint
Project Life Cycles
Conceptualization-the development of the
initial goal and technical specifications.
Planning–all detailed specifications,
schedules, schematics, and plans are
developed
Execution–the actual ―work‖ of the
project is performed
Termination–project is transferred to the
customer, resources reassigned, project is
closed out.
Process Groups
Initiating processes–authorizing the beginning or
ending of a project or phase
Planning processes –ensuring that the objectives of
the project are achieved in the most appropriate way
Executing processes –coordinating all resources
(people and material) during the implementation of the
project plan
Controlling processes –monitoring of project
variances from what was planned to actual progress
Closing processes –formal acceptance of the project
or a phase and updating of the project information base
with lessons learned
Copyright © 2010 Pearson
Education, Inc. Publishing
as Prentice Hall
Process Groups
Process groups supply a roadmap to
follow, and the knowledge areas describe
the methods (for example, car, plane,
bus) of how to get to our destination,
which is project success
Execution

Planning

Conceptualization

Termination
Copyright © 2010 Pearson Education, Inc. Publishing
as Prentice Hall
Initiation Phase
The Initiating stage of project management
includes examining the strategic fit for a proposed
project. Before beginning a new project, an
organization must determine that the project fits in with
its strategic goals. Understanding the organization’s
goals can help executives identify certain proposed
projects focusing on mission-critical activities as highpriority, and other projects peripheral to organization
goals as lower priority. During the Initiating stage, an
executive sponsor should be identified. A high-level
evaluation of the project’s business case should be
developed, along with project limitations and technical
and financial requirements.
Project Initiation
• Link a Project to An Underlying Business
Need
• Analyze and Understand the Stakeholders
• Build the Business Case
• Identify Constraints
• Document Assumptions
• Develop a Preliminary Scope Statement
Planning Phase
• Planning –Create the Plan & Assign Resources
• The Planning stage devises a workable scheme to
accomplish the project’s intended goals and
outcomes. In the Planning stage, you identify the
project’s milestones, deliverables, and tasks. This
plan can be your work breakdown structure
(WBS). You develop and refine the schedule, and
identify the resources needed to implement the
project.
Copyright © 2010
Pearson Education, Inc.
Publishing as Prentice
Hall
Project Planning
• The Activities:
• Develop a Work Breakdown Structure(WBS)
• Estimate Resource Requirements
Personnel
TimeLine

Budget
• Determine the Milestones
• Develop the Work‐plan
Execution Phase
Execution-Update and keep track
Controlling–Communicate & Report
The Executing/Controlling stage coordinates
people and other resources to carry out the plan
as defined in the project plan. The deliverables in
this stage focus on managing change, entering
schedule updates, tracking progress, and
communicating project information. Each team
member performs defined tasks within the
project scope, ensuring their contribution to the
project’s success.
Structured Project Management
Identify Risk
◦ Assess
◦ Quantify
◦ Manage
Mitigation Strategies
Contingency Planning
Formal Change Control Processes
Managing Organizational Change
Communications
Expectations
Copyright © 2010 Pearson
Education, Inc. Publishing
as Prentice Hall
Project Execution
The Interrelationships
◦ Planning
◦ Execution
◦ Control
The Constraints
◦ Scope
◦ Schedule
◦ Cost
Project Control
Monitoring and Control
◦ The Work
◦ The Time
◦ The Budget
◦ The Deliverables
◦ The Communications
◦ The Quality
◦ The Completion
Copyright © 2010 Pearson
Education, Inc. Publishing as
Prentice Hall
Closing Phase
The Closing stage includes final details for
completing a project. Resolve any final project
details, and obtain customer acceptance of
final deliverables. Conduct a Lessons Learned
session, recording information about areas for
improvement and best practices. Make any
final updates to the project plan. Finally, archive
the project plan according to your
organization’s project data archival guidelines.
Source: MS Project Quick Reference Guide
Source: MS Project Quick Reference Guide
Managing Expectation
• Identify Stakeholder Requirements
• Deliverables
• On‐going Communications

• Define Roles and Responsibilities
• Manage Expectations
Project Closure
•
•
•
•
•
•

Gain Acceptance for Deliverables
Implement the Transition Plan
Assess the Lessons Learned
Archive Information
Closeout the Team
Conclude the Project
Copyright © 2010 Pearson
Education, Inc. Publishing as
Prentice Hall
MCM 1262 (2009) IT Project Mgmt Advanced
Information Technology Institute
Janet Yu, Frank Lo (2010) Project Management
& Quality Assurance
Anthony Bowen (2010) Basic Project Management
Introduction and Overview of Project Management.

Emran Hasan (2010) Developing better PHP projects
Josefina B. Bitonio (2012) Modern Public
Administrationhttp://www.slideshare.net/jobitonio/m
odern-public-administration
Information Technology Project Management ... –
CengageBrain www.cengagebrain.com.au/
.../schwalbe21758_1111221758_01.01_toc....
Information Technology Project Management ... –
CengageBrain www.cengagebrain.com.au/
.../schwalbe21758_1111221758_01.01_toc....
Kate Pynn (2008) Project Plan Development - A
FlackVentures Training Example.
FlackVentures, Inc
www.ginandjar.com

Mais conteúdo relacionado

Mais procurados

Introduction(Public Fiscal Administration)
Introduction(Public Fiscal Administration)Introduction(Public Fiscal Administration)
Introduction(Public Fiscal Administration)Suzana Vaidya
 
Planning And Project Management
Planning And Project ManagementPlanning And Project Management
Planning And Project ManagementST. JAMES COLLEGE
 
Fiscal administration 2 ppt
Fiscal administration 2 pptFiscal administration 2 ppt
Fiscal administration 2 pptLouie Medinaceli
 
Philippine Government Budgetary Processes
 Philippine Government Budgetary Processes Philippine Government Budgetary Processes
Philippine Government Budgetary ProcessesChristine Liz Jimenea
 
LGU Local Special Bodies & Challenges and Interventions
LGU Local Special Bodies & Challenges and  Interventions  LGU Local Special Bodies & Challenges and  Interventions
LGU Local Special Bodies & Challenges and Interventions Jo Balucanag - Bitonio
 
Privatization of Public Services in the Philippines
Privatization of Public Services in the PhilippinesPrivatization of Public Services in the Philippines
Privatization of Public Services in the PhilippinesRegi Jan Vilches
 
Philippine Rural Development Problems Issues and Directions.pptx
Philippine Rural Development Problems Issues and Directions.pptxPhilippine Rural Development Problems Issues and Directions.pptx
Philippine Rural Development Problems Issues and Directions.pptxJo Balucanag - Bitonio
 
Public Policy & Program Administration
Public Policy & Program AdministrationPublic Policy & Program Administration
Public Policy & Program AdministrationJo Balucanag - Bitonio
 
The nature of bureaucracy in the philippines
The nature of bureaucracy in the philippinesThe nature of bureaucracy in the philippines
The nature of bureaucracy in the philippinesAntonov Anive
 
Participatory Planning
Participatory Planning Participatory Planning
Participatory Planning ALJUNDESOYO
 
DPA 102 Philippine Administrative System
DPA 102 Philippine Administrative SystemDPA 102 Philippine Administrative System
DPA 102 Philippine Administrative SystemJo Balucanag - Bitonio
 
Philippine Public Financial Management System and its Role in National Develo...
Philippine Public Financial Management System and its Role in National Develo...Philippine Public Financial Management System and its Role in National Develo...
Philippine Public Financial Management System and its Role in National Develo...O C
 
Public Fiscal Administration
Public Fiscal AdministrationPublic Fiscal Administration
Public Fiscal AdministrationTristan de Mortel
 

Mais procurados (20)

Introduction(Public Fiscal Administration)
Introduction(Public Fiscal Administration)Introduction(Public Fiscal Administration)
Introduction(Public Fiscal Administration)
 
Planning And Project Management
Planning And Project ManagementPlanning And Project Management
Planning And Project Management
 
Ph Budget Government Process
Ph Budget Government ProcessPh Budget Government Process
Ph Budget Government Process
 
Local Development Planning
Local Development PlanningLocal Development Planning
Local Development Planning
 
BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT
BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENTBUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT
BUDGET PROCESS OF THE PHILIPPINE NATIONAL GOVERNMENT
 
Fiscal administration 2 ppt
Fiscal administration 2 pptFiscal administration 2 ppt
Fiscal administration 2 ppt
 
Philippine Government Budgetary Processes
 Philippine Government Budgetary Processes Philippine Government Budgetary Processes
Philippine Government Budgetary Processes
 
Lgu budgeting process
Lgu budgeting processLgu budgeting process
Lgu budgeting process
 
LGU Local Special Bodies & Challenges and Interventions
LGU Local Special Bodies & Challenges and  Interventions  LGU Local Special Bodies & Challenges and  Interventions
LGU Local Special Bodies & Challenges and Interventions
 
Privatization of Public Services in the Philippines
Privatization of Public Services in the PhilippinesPrivatization of Public Services in the Philippines
Privatization of Public Services in the Philippines
 
Philippine Rural Development Problems Issues and Directions.pptx
Philippine Rural Development Problems Issues and Directions.pptxPhilippine Rural Development Problems Issues and Directions.pptx
Philippine Rural Development Problems Issues and Directions.pptx
 
Public Policy & Program Administration
Public Policy & Program AdministrationPublic Policy & Program Administration
Public Policy & Program Administration
 
The nature of bureaucracy in the philippines
The nature of bureaucracy in the philippinesThe nature of bureaucracy in the philippines
The nature of bureaucracy in the philippines
 
Project Implementation
Project ImplementationProject Implementation
Project Implementation
 
project dev't cycle
project dev't cycleproject dev't cycle
project dev't cycle
 
Participatory Planning
Participatory Planning Participatory Planning
Participatory Planning
 
DPA 102 Philippine Administrative System
DPA 102 Philippine Administrative SystemDPA 102 Philippine Administrative System
DPA 102 Philippine Administrative System
 
Local Fiscal Administration
Local Fiscal AdministrationLocal Fiscal Administration
Local Fiscal Administration
 
Philippine Public Financial Management System and its Role in National Develo...
Philippine Public Financial Management System and its Role in National Develo...Philippine Public Financial Management System and its Role in National Develo...
Philippine Public Financial Management System and its Role in National Develo...
 
Public Fiscal Administration
Public Fiscal AdministrationPublic Fiscal Administration
Public Fiscal Administration
 

Destaque

CMC Message and Update
CMC Message and UpdateCMC Message and Update
CMC Message and Updatejo bitonio
 
Common Findings in the Inspection of Cooperatives (Region 1)
Common Findings in the Inspection of Cooperatives (Region 1)Common Findings in the Inspection of Cooperatives (Region 1)
Common Findings in the Inspection of Cooperatives (Region 1)jo bitonio
 
PDEA lectures on Philippine's War on Drug
PDEA lectures on Philippine's War on DrugPDEA lectures on Philippine's War on Drug
PDEA lectures on Philippine's War on Drugjo bitonio
 
2016 RCDC-I Accomplishment Report
2016 RCDC-I Accomplishment Report2016 RCDC-I Accomplishment Report
2016 RCDC-I Accomplishment Reportjo bitonio
 
Mapping of Enterprise Development Support Programs for Agriculture Cooperatives
Mapping of Enterprise Development Support Programs for Agriculture CooperativesMapping of Enterprise Development Support Programs for Agriculture Cooperatives
Mapping of Enterprise Development Support Programs for Agriculture Cooperativesjo bitonio
 
The Role of Local Government in Development
The Role of Local Government in DevelopmentThe Role of Local Government in Development
The Role of Local Government in DevelopmentJo Balucanag - Bitonio
 
Orientation and Physical Working Conditions
Orientation and Physical  Working ConditionsOrientation and Physical  Working Conditions
Orientation and Physical Working ConditionsJo Balucanag - Bitonio
 
The Changing Definitions of Public Administration
The Changing Definitions of Public AdministrationThe Changing Definitions of Public Administration
The Changing Definitions of Public AdministrationJo Balucanag - Bitonio
 

Destaque (15)

CMC Message and Update
CMC Message and UpdateCMC Message and Update
CMC Message and Update
 
Common Findings in the Inspection of Cooperatives (Region 1)
Common Findings in the Inspection of Cooperatives (Region 1)Common Findings in the Inspection of Cooperatives (Region 1)
Common Findings in the Inspection of Cooperatives (Region 1)
 
PDEA lectures on Philippine's War on Drug
PDEA lectures on Philippine's War on DrugPDEA lectures on Philippine's War on Drug
PDEA lectures on Philippine's War on Drug
 
2016 RCDC-I Accomplishment Report
2016 RCDC-I Accomplishment Report2016 RCDC-I Accomplishment Report
2016 RCDC-I Accomplishment Report
 
Mapping of Enterprise Development Support Programs for Agriculture Cooperatives
Mapping of Enterprise Development Support Programs for Agriculture CooperativesMapping of Enterprise Development Support Programs for Agriculture Cooperatives
Mapping of Enterprise Development Support Programs for Agriculture Cooperatives
 
The Internet and Rural Development
The Internet and Rural DevelopmentThe Internet and Rural Development
The Internet and Rural Development
 
The Role of Local Government in Development
The Role of Local Government in DevelopmentThe Role of Local Government in Development
The Role of Local Government in Development
 
Execution of Public law
Execution of Public lawExecution of Public law
Execution of Public law
 
Methods of Research
Methods of Research Methods of Research
Methods of Research
 
Orientation and Physical Working Conditions
Orientation and Physical  Working ConditionsOrientation and Physical  Working Conditions
Orientation and Physical Working Conditions
 
Voluntary sector management
Voluntary sector managementVoluntary sector management
Voluntary sector management
 
Role of NGO
Role of NGORole of NGO
Role of NGO
 
ICT: The organization and Work Part 2
ICT: The organization and Work Part 2ICT: The organization and Work Part 2
ICT: The organization and Work Part 2
 
The Changing Definitions of Public Administration
The Changing Definitions of Public AdministrationThe Changing Definitions of Public Administration
The Changing Definitions of Public Administration
 
Project management
Project managementProject management
Project management
 

Semelhante a Introduction DM 211 Project Development and Management

Project Development Phases and Project Life Cycle.pptx
Project Development Phases and Project Life Cycle.pptxProject Development Phases and Project Life Cycle.pptx
Project Development Phases and Project Life Cycle.pptxJohnChristopherRegui2
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptxHarsimratDeo1
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptxHarsimratDeo1
 
01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-mao01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-maomao-osman73
 
Strategic Management.pptx
Strategic Management.pptxStrategic Management.pptx
Strategic Management.pptxGermelynPea1
 
MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMdAliMujawar1
 
Program or project management process report
Program or project management process report Program or project management process report
Program or project management process report Danes Ganancial
 
Archibald Interfaces Keynote Dynamics2010
Archibald Interfaces Keynote Dynamics2010Archibald Interfaces Keynote Dynamics2010
Archibald Interfaces Keynote Dynamics2010Russell Archibald
 
Project Management
Project ManagementProject Management
Project Managementirfan ali
 
Integrated Project Management
Integrated Project ManagementIntegrated Project Management
Integrated Project ManagementInam Khosa
 
Software Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementSoftware Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementAhsan Rahim
 
Project management slide show
Project management slide showProject management slide show
Project management slide showTanvir Anwar
 
project integration mgmt.pdf
project integration mgmt.pdfproject integration mgmt.pdf
project integration mgmt.pdfIvarsLinde1
 

Semelhante a Introduction DM 211 Project Development and Management (20)

ICT 4109.pdf
ICT 4109.pdfICT 4109.pdf
ICT 4109.pdf
 
Unit 1 PM.pptx
Unit 1 PM.pptxUnit 1 PM.pptx
Unit 1 PM.pptx
 
Project Development Phases and Project Life Cycle.pptx
Project Development Phases and Project Life Cycle.pptxProject Development Phases and Project Life Cycle.pptx
Project Development Phases and Project Life Cycle.pptx
 
INTRO.pptx
INTRO.pptxINTRO.pptx
INTRO.pptx
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-mao01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-mao
 
Strategic Management.pptx
Strategic Management.pptxStrategic Management.pptx
Strategic Management.pptx
 
MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptx
 
Program or project management process report
Program or project management process report Program or project management process report
Program or project management process report
 
Project Management U 1.pptx
Project Management U 1.pptxProject Management U 1.pptx
Project Management U 1.pptx
 
Archibald Interfaces Keynote Dynamics2010
Archibald Interfaces Keynote Dynamics2010Archibald Interfaces Keynote Dynamics2010
Archibald Interfaces Keynote Dynamics2010
 
Project Management
Project ManagementProject Management
Project Management
 
Project management revised
Project management revisedProject management revised
Project management revised
 
Pmbok
PmbokPmbok
Pmbok
 
Integrated Project Management
Integrated Project ManagementIntegrated Project Management
Integrated Project Management
 
Software Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementSoftware Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project Management
 
Project management slide show
Project management slide showProject management slide show
Project management slide show
 
CIB8942.pdf
CIB8942.pdfCIB8942.pdf
CIB8942.pdf
 
project integration mgmt.pdf
project integration mgmt.pdfproject integration mgmt.pdf
project integration mgmt.pdf
 

Mais de Jo Balucanag - Bitonio

Defining Urban, Urbanization & Urbanism
Defining Urban, Urbanization &  UrbanismDefining Urban, Urbanization &  Urbanism
Defining Urban, Urbanization & UrbanismJo Balucanag - Bitonio
 
Lecture on Rural Development Feb 24.pptx
Lecture on Rural Development Feb 24.pptxLecture on Rural Development Feb 24.pptx
Lecture on Rural Development Feb 24.pptxJo Balucanag - Bitonio
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project ProposalJo Balucanag - Bitonio
 
MPA Lecture on Stakeholder Analysis.pptx
MPA Lecture on Stakeholder Analysis.pptxMPA Lecture on Stakeholder Analysis.pptx
MPA Lecture on Stakeholder Analysis.pptxJo Balucanag - Bitonio
 
LEC DEVELOPMENT ISSUES AND CONCERNS.pptx
LEC DEVELOPMENT ISSUES AND CONCERNS.pptxLEC DEVELOPMENT ISSUES AND CONCERNS.pptx
LEC DEVELOPMENT ISSUES AND CONCERNS.pptxJo Balucanag - Bitonio
 
Human beings Cause & Consequence of Devt
Human beings Cause & Consequence of DevtHuman beings Cause & Consequence of Devt
Human beings Cause & Consequence of DevtJo Balucanag - Bitonio
 
MPA 212 Lec Training and Development.pdf
MPA 212 Lec Training and Development.pdfMPA 212 Lec Training and Development.pdf
MPA 212 Lec Training and Development.pdfJo Balucanag - Bitonio
 
MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.
MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.
MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.Jo Balucanag - Bitonio
 
Urban & Metro Admin and Governancges.pdf
Urban & Metro Admin and Governancges.pdfUrban & Metro Admin and Governancges.pdf
Urban & Metro Admin and Governancges.pdfJo Balucanag - Bitonio
 
MPA 210 Lecture : Planning & Budgeting
MPA 210  Lecture :  Planning & BudgetingMPA 210  Lecture :  Planning & Budgeting
MPA 210 Lecture : Planning & BudgetingJo Balucanag - Bitonio
 
SPMS LECTURE :PERFORMANCE AND EVALUATION
SPMS LECTURE :PERFORMANCE AND EVALUATIONSPMS LECTURE :PERFORMANCE AND EVALUATION
SPMS LECTURE :PERFORMANCE AND EVALUATIONJo Balucanag - Bitonio
 
Lecture Maintenance & Development of HR.
Lecture Maintenance & Development of HR.Lecture Maintenance & Development of HR.
Lecture Maintenance & Development of HR.Jo Balucanag - Bitonio
 
Job Analysis, Job Design and Evaluation
Job Analysis, Job Design and  EvaluationJob Analysis, Job Design and  Evaluation
Job Analysis, Job Design and EvaluationJo Balucanag - Bitonio
 
MPA 212 Lecture :COPING WITH STRESS.pptx
MPA 212 Lecture :COPING WITH STRESS.pptxMPA 212 Lecture :COPING WITH STRESS.pptx
MPA 212 Lecture :COPING WITH STRESS.pptxJo Balucanag - Bitonio
 
MPA 212 Lecture : COACHING AND MENTORING
MPA 212 Lecture : COACHING AND MENTORINGMPA 212 Lecture : COACHING AND MENTORING
MPA 212 Lecture : COACHING AND MENTORINGJo Balucanag - Bitonio
 
Lec Volatility, Uncertainty, Complexity
Lec  Volatility, Uncertainty, ComplexityLec  Volatility, Uncertainty, Complexity
Lec Volatility, Uncertainty, ComplexityJo Balucanag - Bitonio
 
HRMD Lec Managing Ethically and Globally
HRMD Lec Managing Ethically and GloballyHRMD Lec Managing Ethically and Globally
HRMD Lec Managing Ethically and GloballyJo Balucanag - Bitonio
 
Lec : Human Resources - Self Confidence
Lec :  Human Resources - Self ConfidenceLec :  Human Resources - Self Confidence
Lec : Human Resources - Self ConfidenceJo Balucanag - Bitonio
 
Lecture : Adaptive Organizational Design
Lecture : Adaptive Organizational DesignLecture : Adaptive Organizational Design
Lecture : Adaptive Organizational DesignJo Balucanag - Bitonio
 

Mais de Jo Balucanag - Bitonio (20)

Defining Urban, Urbanization & Urbanism
Defining Urban, Urbanization &  UrbanismDefining Urban, Urbanization &  Urbanism
Defining Urban, Urbanization & Urbanism
 
Lecture on Rural Development Feb 24.pptx
Lecture on Rural Development Feb 24.pptxLecture on Rural Development Feb 24.pptx
Lecture on Rural Development Feb 24.pptx
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project Proposal
 
MPA Lecture on Stakeholder Analysis.pptx
MPA Lecture on Stakeholder Analysis.pptxMPA Lecture on Stakeholder Analysis.pptx
MPA Lecture on Stakeholder Analysis.pptx
 
LEC DEVELOPMENT ISSUES AND CONCERNS.pptx
LEC DEVELOPMENT ISSUES AND CONCERNS.pptxLEC DEVELOPMENT ISSUES AND CONCERNS.pptx
LEC DEVELOPMENT ISSUES AND CONCERNS.pptx
 
Human beings Cause & Consequence of Devt
Human beings Cause & Consequence of DevtHuman beings Cause & Consequence of Devt
Human beings Cause & Consequence of Devt
 
MPA 211: Lecture on WORK ETHICS. pptx
MPA 211:  Lecture  on  WORK ETHICS. pptxMPA 211:  Lecture  on  WORK ETHICS. pptx
MPA 211: Lecture on WORK ETHICS. pptx
 
MPA 212 Lec Training and Development.pdf
MPA 212 Lec Training and Development.pdfMPA 212 Lec Training and Development.pdf
MPA 212 Lec Training and Development.pdf
 
MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.
MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.
MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.
 
Urban & Metro Admin and Governancges.pdf
Urban & Metro Admin and Governancges.pdfUrban & Metro Admin and Governancges.pdf
Urban & Metro Admin and Governancges.pdf
 
MPA 210 Lecture : Planning & Budgeting
MPA 210  Lecture :  Planning & BudgetingMPA 210  Lecture :  Planning & Budgeting
MPA 210 Lecture : Planning & Budgeting
 
SPMS LECTURE :PERFORMANCE AND EVALUATION
SPMS LECTURE :PERFORMANCE AND EVALUATIONSPMS LECTURE :PERFORMANCE AND EVALUATION
SPMS LECTURE :PERFORMANCE AND EVALUATION
 
Lecture Maintenance & Development of HR.
Lecture Maintenance & Development of HR.Lecture Maintenance & Development of HR.
Lecture Maintenance & Development of HR.
 
Job Analysis, Job Design and Evaluation
Job Analysis, Job Design and  EvaluationJob Analysis, Job Design and  Evaluation
Job Analysis, Job Design and Evaluation
 
MPA 212 Lecture :COPING WITH STRESS.pptx
MPA 212 Lecture :COPING WITH STRESS.pptxMPA 212 Lecture :COPING WITH STRESS.pptx
MPA 212 Lecture :COPING WITH STRESS.pptx
 
MPA 212 Lecture : COACHING AND MENTORING
MPA 212 Lecture : COACHING AND MENTORINGMPA 212 Lecture : COACHING AND MENTORING
MPA 212 Lecture : COACHING AND MENTORING
 
Lec Volatility, Uncertainty, Complexity
Lec  Volatility, Uncertainty, ComplexityLec  Volatility, Uncertainty, Complexity
Lec Volatility, Uncertainty, Complexity
 
HRMD Lec Managing Ethically and Globally
HRMD Lec Managing Ethically and GloballyHRMD Lec Managing Ethically and Globally
HRMD Lec Managing Ethically and Globally
 
Lec : Human Resources - Self Confidence
Lec :  Human Resources - Self ConfidenceLec :  Human Resources - Self Confidence
Lec : Human Resources - Self Confidence
 
Lecture : Adaptive Organizational Design
Lecture : Adaptive Organizational DesignLecture : Adaptive Organizational Design
Lecture : Adaptive Organizational Design
 

Último

Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationRosabel UA
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxleah joy valeriano
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)cama23
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 

Último (20)

Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translation
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 

Introduction DM 211 Project Development and Management

  • 1. DM 211 Project Development and Management
  • 2.
  • 3. Why have a Project Plan? • Developing an initial course of action toward a welldefined set of objectives • A mechanism to aid in detecting variance both in the planned progress of the work and also in the target objectives. • The purpose of a project plan is NOT to predict the future. You lay out. • A process that will constantly test this course during its execution for its match with the current, changing environment.
  • 4. Development Planning Models Economic Planning Model (1935-1971) Development Planning Model (1972) Corporate Business Planning Models Educational Planning Model Eclectic Model Source: Miclat (2005)
  • 5. Development Planning and Administration Development administration has always been one of the central features of the various long and Medium Term Philippine Development Plans since the seventies. The paradigm for bureaucratic reform continues to evolve in various intellectual and practical debates but government continues its work amidst all these. Until recently, all Philippine development plans since the seventies had a specific chapter devoted solely to development administration
  • 6. Eclectic Model Nine Major Steps 1. Preparation  Organization and staffing  Training 2. Environmental Scanning     External environment Internal environment SWOT analysis Strategic planning framework 3. VMGO, policy, objective, and target setting 4. Policy/Strategy formulation 5. Program/Project Identification
  • 7. Eclectic Model Nine Major Steps 6. Investment Programming 7. Budgeting 8. Implementation and Monitoring 9. Evaluation and Plan Update
  • 8. Development Administration (1950s to 1960s) • Development Administration (DA) as a field of study emerged in 1950s and 1960s with the third world countries as the focal point Nef and Dwivedi (1981) on the other hand, attributed the concept of DA to Goswami in 1955 and later popularized by Riggs and Weidner. They coined the term development administration” to refer to developing countries which are largely found in Asia, Latin America, and Africa.
  • 9. Khator (1998) however, argued that DA was built upon several critical assumptions that: (1) development needs are the most important needs of developing countries, (2) the development needs of developing and developed countries are inherently different, (3) development can be administered, (4) developmental know-hows are transferable; and (5) the political, social, and cultural context of development can be easily altered Source: www.ginandjar.com
  • 10. Two foci in Development Administration Likewise, Fred Riggs, in his “Frontiers of Development,” identified two foci in development administration: development of administration and the administration of development. Most development administration scholars focused more on the latter and it subsequently became synonymous to the administration of development in third world countries. (Khator 1998)
  • 11. “Management of Innovation” Given the situations above, DA maybe considered as “Management of Innovation” because it was aimed at helping countries that are undergoing reconstruction and social transformation
  • 12. Administrative Reform De Guzman (1986) described administrative reform as one of the core values of DA, and analyzed the structural and behavioral characteristics of the Philippine public bureaucracy. He argued that the “implementation of administrative reform should have two major dimensions: reforming the structures of the bureaucracy and reforming the behavior of those in the bureaucracy.” (De Guzman 1986 as cited in Brillantes 1994: 8)
  • 13. Project Plan Development: taking the results of other planning processes (historical information, organizational policies, constraints, assumptions) and putting them into a consistent, coherent document—the project plan Project Plan Execution: carrying out the project plan Integrated Change Control: coordinating changes across the entire project
  • 14. Project Plan Development • to coordinate all project planning documents • to guide project execution • Project plans assist the project manager in leading the project team and assessing project status • Project performance should be measured against a baseline plan
  • 15. Attributes of Project Plans • • • • Just as projects are unique, so are project plans Plans should be dynamic Plans should be flexible Plans should be updated as changes occur Plans should first and foremost guide project execution
  • 16. Common Elements of a Project Plan • Introduction or overview of the project • Description of how the project is organized (Quality of Code) • Management and technical processes used on the project (project structure, use of tools) • Work to be done, schedule, and budget information (development practices)
  • 17. Good Project Planning Key Two keys to succeed in good project planning : Always think about and say something about each one of the checklist areas (and others that are applicable), regardless of the size of the project, the industry involved, and the product or service being produced. Source: www.flackventures.com Clearly, the scale of the plan elements will differ, depending on project scope. Plan accordingly.
  • 18. How Detailed should my Project Plan be? Detailed planning versus light planning. Just-in-time planning Measurable and testable goals. • Do planning at a sufficient level of detail to search out issues and problems during the early planning process itself. • Build into the plan the hooks for measuring if you are drifting off course during the plan's execution. • Finding the sweet-spot for planning at-a-distance teams and outsourced services/development
  • 19. What is Risk? Risk is a measure of two factors: the probability of an event occurring, and the severity of the consequences of that event. Thus, an event can be either one that is very likely to occur with moderate consequences each time it does, or one that is extremely unlikely but with catastrophic consequences on each occurrence. Removing a risk means either eliminating the possibility of occurrence of an event or rending the event completely harmless when it does occur.
  • 20. How do keep risk from disrupting implementation of project? Start the process early, as soon as one other core team member is available for brainstorming. Brainstorm with core team, identifying as many risks as possible. Use previous product experience, personal experience, regulatory input, and common sense.
  • 21. How do keep risk from disrupting implementation of project? Create a risk analysis document that, at a minimum, contains the identified risk, the event that causes it, a measure of probability, a measure of severity, and a mitigation or elimination strategy.
  • 22. How do I keep Risk from Disrupting my Project? Explicitly incorporate the mitigations into either planned project process activities or product requirements. Make the risk analysis part of the project plan that is agreed upon by all stakeholders and team members. Periodically review and amend the risk analysis with new information gained from reviews, inspections, audits, and marketing or customer input.
  • 23. Project Plan Execution • Involves managing and performing the work described in the project plan • The majority of time and money is usually spent on execution • The application area of the project directly affects project execution because the products of the project are produced during execution
  • 24. What Went Wrong? Many people have a poor view of plans based on past experiences. Senior managers often require a plan, but then no one follows up on whether the plan was followed. For example, one project manager said he would meet with each project team leader within two months to review their plans. The project manager created a detailed schedule for these reviews. He cancelled the first meeting due to another business commitment. He rescheduled the next meeting for unexplained personal reasons. Two months later, the project manager had still not met with over half of the project team leaders. Why should project members feel obligated to follow their own plans when the project manager obviously did not follow his?
  • 25. Important Skills for Project Execution • General management skills like leadership, communication, and political skills • Product skills and knowledge • Use of specialized tools and techniques
  • 26. Choosing tools • Having a process helps choose tools • Choosing Inappropriate tool can do harm • Build a process if you don’t have any
  • 27. Tools and Techniques for Project Execution • Work Authorization System - a method for ensuring that qualified people do work at the right time and in the proper sequence • Status Review Meetings - regularly scheduled meetings used to exchange project information • Project Management Software: special software to assist in managing projects
  • 28. Measuring and Checking Progress Build into the plan the activities and processes that will support dynamic, roundrobin, never-ending measurement during execution: Frequent, measurable milestones,  Periodic testing, reviews, and issue management that will systematically capture and measure the delta between requirements and emerging design  Periodic testing of the product or system requirements with marketing or the customer, to see if the target is changing out from under you,  Scheduled midcourse corrections of the project plan itself, as you learn more, and  Early removal of technical risk through prototypes and testing
  • 29. Integrated change control Framework for involves identifying, evaluating, Project Integration and managing changes Management throughout the project life cycle Three main objectives of change control: • Influence the factors that create changes to ensure they are beneficial • Determine that a change has occurred • Manage actual changes when and as they occur
  • 30. Integrated Change Control Process Suggestions for Managing Integrated Change Control  View project management as a process of constant communications and negotiations  Plan for change  Establish a formal change control system, including a Change Control Board (CCB)
  • 31.  Cont. Suggestions for Managing Integrated Change Control Use good configuration management  Define procedures for making timely decisions on smaller changes  Use written and oral performance reports to help identify and manage change  Use project management and other software to help manage and communicate changes
  • 33. History of Project Management • Modern project management began with the Manhattan Project, which the U.S. military led to develop the atomic bomb • In 1917 Henry Gantt developed the Gantt chart as a tool for scheduling work in job shops • In 1958, the Navy developed PERT charts • In the 1970s, the military began using project management software, as did the construction industry • By the 1990s, virtually every industry was using some form of project management
  • 34. Project Management Profession • A 1996 Fortune article called project management the “number one career choice” • Professional societies like the Project Management Institute (PMI) have grown tremendously • Average salaries for project managers are over $81,000
  • 35. What is Project Management? Project management is “the application of knowledge, skills, tools, and techniques to project activities in order to meet project requirements” (PMI*, Project Management Body of Knowledge (PMBOK Guide), 2000, p. 6) *The Project Management Institute (PMI) is an international professional society. Their web site is www.pmi.org. MCM 1262 IT Project Mgmt Chap 1 - 35
  • 37. Core Knowledge Areas Core Knowledge Areas: Objectives Facilitating Knowledge ◦ Scope Areas: Achievement ◦ Time ◦ Human Resources ◦ Cost ◦ Communication ◦ Quality ◦ Risk ◦ Procurement ◦ Project Integration Management
  • 38. • Structure your project properly (use framework if possible) • Maintain good coding practice in team • Use tools to increase team efficiency
  • 40. The nine knowledge areas of project management:          Project Integration Management Project Scope Management Project Time Management Project Cost Management Project Quality Management Project Human Resource Management Project Communication Management Project Risk Management Project Procurement Management
  • 41.
  • 42. Project Management Methodology Initiate Plan Initiate –potential projects are identified and evaluated in terms of importance to the organization Plan –scope, time, cost and risk management planning takes place Execute Execute –project plan is followed Control Control –project performance is measured against the project plan Close Close –final paper work completed and sign off by all stakeholders
  • 43. The Approach to Learning Project Management Process Focus Team Focus Technology Focus PM Software Group Support Technologies Knowledge Management and Organizational Memory Systems Global Focus PM Professional Focus
  • 44. Nine Project Management Knowledge Areas Knowledge areas describe the key competencies that project managers must develop – 4 core knowledge areas lead to specific project objectives (scope, time, cost, and quality) – 4 facilitating knowledge areas are the means through which the project objectives are achieved human resources, communication, risk, and procurement management – 1 knowledge area (project integration management) affects and is affected by all of the other knowledge areas MCM 1262 IT Project Mgmt Chap 1 - 44
  • 45. Project Stakeholders • Stakeholders are the people involved in or affected by project activities • Stakeholders include • • • • • • the project sponsor and project team support staff customers users suppliers opponents to the project MCM 1262 IT Project Mgmt Chap 1 - 45
  • 46. Project Management Tools and Techniques • Project management tools and techniques assist project managers and their teams in various aspects of project management • Some specific ones include – Project Charter and WBS (scope) – Gantt charts, network diagrams, critical path analysis, critical chain scheduling (resource constraint scheduling) – Cost estimates and earned value management (cost) MCM 1262 IT Project Mgmt Chap 1 - 46
  • 47. Application of PM • Project management applies to work as well as personal projects • Project management applies to many different disciplines (IT, construction, finance, sports, event planning, etc.) • Project management skills can help in everyday life
  • 48. More Advantages of Project Management* • Bosses, customers, and other stakeholders do not like surprises • Good project management (PM) provides assurance and reduces risk • PM provides the tools and environment to plan, monitor, track, and manage schedules, resources, costs, and quality • PM provides a history or metrics base for future planning as well as good documentation • Project members learn and grow by working in a crossfunctional team environment *Knutson, Joan, PM Network, December 1997, p. 13
  • 49. Project Management Certification • PMI provides certification as a Project Management Professional (PMP) • A PMP has documented sufficient project experience, agreed to follow a code of ethics, and passed the PMP exam • The number of people earning PMP certification is increasing quickly
  • 50. More and more people are getting the Project Management Professional (PMP) certification - increased by more than 70 percent from 2004 to 2005.
  • 51. Growth in PMP Certification 1993-2008 350,000 318,289 300,000 267,367 250,000 # PMPs 221,144 200,000 175,194 150,000 100,000 102,047 76,550 52,443 50,000 40,343 1,000 - 1,900 2,800 4,400 6,415 10,086 18,184 27,052 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 Year
  • 52. That’s why we have to learn Project Management
  • 53. Project Management Software • By 2001, there were hundreds of different products to assist in performing project management • Three main categories of tools: – Low-end tools: Handle single or smaller – – projects well, cost under $200 per user Midrange tools: Handle multiple projects and users, cost $200-500 per user, Project 2000 most popular High-end tools: Also called enterprise project management software, often licensed on a per-user basis
  • 54. What is a project? • A project is “a temporary endeavor undertaken to create a unique product, service, or result” (PMBOK® Guide, Fourth Edition) • Other attributes:  Is developed using progressive elaboration  Requires resources, often from various areas  Involves uncertainty • Operations is work done to sustain the business
  • 55. What is a program? • Program: group of related projects managed in a coordinated way to obtain benefits and control not available from managing them individually (PMBOK® Guide, Fourth Edition) • Program managers oversee programs and often act as bosses for project managers • Examples of common programs in the IT field: infrastructure, applications development, and user support
  • 56. Why Project Management ? Project Management is an in-demand skill set and one of the fastest growing professional disciplines in North America. Project Management breaks down the chaos of an overwhelming workload into manageable elements -scope, time, cost, quality, human resources, communication, risk, procurement, and integration of projects
  • 57. Project Management is the discipline of organizing and managing resources (i.e. human, financial & material) in such a way that a project is completed within defined scope, quality, time and cost constraints. ◦ The first challenge of project management is to make sure that a projects delivered within defined constraints. ◦ The second, more ambitious, challenge is the optimized allocation and integration of inputs needed to meet pre-defined objectives.
  • 59. Key ones in PM: – – – – Executive support User involvement Experienced project manager Well defined scope and requirements
  • 60. Advantages of Using Formal Project Management Practices Improvement in customer satisfaction Better cost performance, higher return on investment Better schedule performance, better allocation of time commitments and better utilization of resources, higher productivity Increased quality reducing re-work Increase in delivering required features Will make everyone happier (stakeholders, team members, management)
  • 61. There are several ways to define project success  The project met scope, time, and cost goals  The project meets or exceeds stakeholders’ expectations  The results of the project met its main objective, e.g., making or saving a certain amount of money providing a good return on investment, or simply delivering the product/services
  • 62. What the Winners Do? • Use an integrated project management toolbox (use standard/advanced PM tools, lots of templates) • Grow project leaders, emphasizing business and soft skills • Develop a streamlined project delivery process • Measure project health using metrics, like customer satisfaction or return on investment
  • 63. Project Manager Skills Soft skills: ◦ ◦ ◦ ◦ ◦ Leadership Team building Negotiation Conflict management Organization for self and others ◦ Communication both oral and written to both technical and nontechnical audiences ◦ Change management ◦ Active listening Technical Skills: Project Management software Level of understanding of the technology being used in the project (software, hardware, network, etc.) Basic knowledge of the business Cost estimating and budgeting Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
  • 64. Six Basic Functions of Successful PM’s 1. manage project scope –make sure the team works on what is needed for the project and nothing else 2. manage human resources –the team must work together, this doesn’t just happen it takes a directed effort 3. manage communications –this occurs at many levels, teammates, customers, managers, vendors, and others 4. manage schedule –must keep people on schedule delivering work on time 5. manage quality –need to make sure that all work performed meets with customer expected levels of quality 6. manage costs –must keep an eye on the budget to make sure all the work can be done and not exceed the allocated budget
  • 65. A Project Manager Manages Projects by: Setting clear and achievable objectives Identifying requirements Adapting the project to the various concerns of the stakeholders Balancing the demands of the triple constraint
  • 66.
  • 67.
  • 68.
  • 69. Project Life Cycles Conceptualization-the development of the initial goal and technical specifications. Planning–all detailed specifications, schedules, schematics, and plans are developed Execution–the actual ―work‖ of the project is performed Termination–project is transferred to the customer, resources reassigned, project is closed out.
  • 70. Process Groups Initiating processes–authorizing the beginning or ending of a project or phase Planning processes –ensuring that the objectives of the project are achieved in the most appropriate way Executing processes –coordinating all resources (people and material) during the implementation of the project plan Controlling processes –monitoring of project variances from what was planned to actual progress Closing processes –formal acceptance of the project or a phase and updating of the project information base with lessons learned
  • 71. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
  • 72.
  • 73.
  • 74. Process Groups Process groups supply a roadmap to follow, and the knowledge areas describe the methods (for example, car, plane, bus) of how to get to our destination, which is project success
  • 75. Execution Planning Conceptualization Termination Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
  • 76. Initiation Phase The Initiating stage of project management includes examining the strategic fit for a proposed project. Before beginning a new project, an organization must determine that the project fits in with its strategic goals. Understanding the organization’s goals can help executives identify certain proposed projects focusing on mission-critical activities as highpriority, and other projects peripheral to organization goals as lower priority. During the Initiating stage, an executive sponsor should be identified. A high-level evaluation of the project’s business case should be developed, along with project limitations and technical and financial requirements.
  • 77. Project Initiation • Link a Project to An Underlying Business Need • Analyze and Understand the Stakeholders • Build the Business Case • Identify Constraints • Document Assumptions • Develop a Preliminary Scope Statement
  • 78.
  • 79. Planning Phase • Planning –Create the Plan & Assign Resources • The Planning stage devises a workable scheme to accomplish the project’s intended goals and outcomes. In the Planning stage, you identify the project’s milestones, deliverables, and tasks. This plan can be your work breakdown structure (WBS). You develop and refine the schedule, and identify the resources needed to implement the project.
  • 80. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
  • 81. Project Planning • The Activities: • Develop a Work Breakdown Structure(WBS) • Estimate Resource Requirements Personnel TimeLine Budget • Determine the Milestones • Develop the Work‐plan
  • 82. Execution Phase Execution-Update and keep track Controlling–Communicate & Report The Executing/Controlling stage coordinates people and other resources to carry out the plan as defined in the project plan. The deliverables in this stage focus on managing change, entering schedule updates, tracking progress, and communicating project information. Each team member performs defined tasks within the project scope, ensuring their contribution to the project’s success.
  • 83. Structured Project Management Identify Risk ◦ Assess ◦ Quantify ◦ Manage Mitigation Strategies Contingency Planning Formal Change Control Processes Managing Organizational Change Communications Expectations
  • 84. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
  • 85. Project Execution The Interrelationships ◦ Planning ◦ Execution ◦ Control The Constraints ◦ Scope ◦ Schedule ◦ Cost
  • 86. Project Control Monitoring and Control ◦ The Work ◦ The Time ◦ The Budget ◦ The Deliverables ◦ The Communications ◦ The Quality ◦ The Completion
  • 87. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
  • 88. Closing Phase The Closing stage includes final details for completing a project. Resolve any final project details, and obtain customer acceptance of final deliverables. Conduct a Lessons Learned session, recording information about areas for improvement and best practices. Make any final updates to the project plan. Finally, archive the project plan according to your organization’s project data archival guidelines. Source: MS Project Quick Reference Guide Source: MS Project Quick Reference Guide
  • 89. Managing Expectation • Identify Stakeholder Requirements • Deliverables • On‐going Communications • Define Roles and Responsibilities • Manage Expectations
  • 90. Project Closure • • • • • • Gain Acceptance for Deliverables Implement the Transition Plan Assess the Lessons Learned Archive Information Closeout the Team Conclude the Project
  • 91. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall
  • 92.
  • 93. MCM 1262 (2009) IT Project Mgmt Advanced Information Technology Institute Janet Yu, Frank Lo (2010) Project Management & Quality Assurance Anthony Bowen (2010) Basic Project Management Introduction and Overview of Project Management. Emran Hasan (2010) Developing better PHP projects Josefina B. Bitonio (2012) Modern Public Administrationhttp://www.slideshare.net/jobitonio/m odern-public-administration Information Technology Project Management ... – CengageBrain www.cengagebrain.com.au/ .../schwalbe21758_1111221758_01.01_toc....
  • 94. Information Technology Project Management ... – CengageBrain www.cengagebrain.com.au/ .../schwalbe21758_1111221758_01.01_toc.... Kate Pynn (2008) Project Plan Development - A FlackVentures Training Example. FlackVentures, Inc www.ginandjar.com