PLANS & SPECIFICATIONS PROJECT
                                            M / E / P DESIGN




                                         SELECT DESIGN                 SCHEMATIC
                 PROGRAMMING
                                             TEAM                        DESIGN                 A


                Define Need            Architects                Major Systems Definitions
                Define Approach        Mechanical Engineer       Equipment Definitions
                                        Electrical Engineer
                                        C / S Engineer
                                        Space Planners
                                        Lab Planners
                                        Construction Manager
                                        Define Approach
                                        Etc.




JohnLanger Consulting                                                                            Prepared by
   Rev. 1 - 6/9/94                                                                                Mike Daye
   Rev. 2 - 2/19/11                                                                             using MS Visio
PLANS & SPECIFICATIONS PROJECT
                         M / E / P DESIGN




            DESIGN                                   100% DESIGN
A        DEVELOPMENT                                DEVELOPMENT                             B
             10%                                       REVIEW




            M/E/P                                      M/E/P
         COORDINATION                               COORDINATION                           C
        (CONSULTANTS)



       Initial Plans/ Selections                  Refine Plans
       Initial Elevations/ Details                Refine Systems Subscriptions
       Define / Assign Zones                      Develop Initial Systems and Equipment Specifications
       Establish / Coordinate CAD                 Construction Management Review
        Requirements & Protocol                      Coordination With Other Trades
       Construction Manager Review                   Review Design M/E/P Coordination
       Initial Review By Design / Build Fire         Develop Discrete M/E/P Budgets
         Protection Subcontractor                     Constructability Reviews
                                                      Initial Value Engineering
                                                      Preliminary Construction Schedule
                                                   Review Lab Space Planning
                                                   Review Structural Design
                                                   Review Interstitial Spaces
                                                   CAD Coordination
PLANS & SPECIFICATIONS PROJECTS
                                M / E / P DESIGN




    50% Construction                      100% Construction                        (RFP) Request for
B   Document Review                             Issue                                 Proposals
                                                                                                               D


                                                                                      Pre Bid Meetings
                                                                                      Job Site Visits
                                                                                      Design Clarifications
                                                                                      Value Engineering
                                                                                      Addenda
                                                                                      Quality Systems
                                                                                      Safety

          M/E/P                                   M/E/P
C       Coordination                            Coordination


                                                   Finalize Budget
       Review / Refine Plans                      Finalize Schedule
       Refine Equipment Types                     Finalize Specifications
       Review / Refine Specifications             Review / Refine Plans
       Review Structural Design                   Construction Manager
       Review Lab / Space Planning                 Review
       Construction Management Review               Refine / Incorporate Final VE
         Continue Value Engineering                 Refine / Incorporate Constructibility Issues
         Continue Constructibility                  Finalize M / E / P Coordination
             Reviews                               Finalize Interstitial Spaces
         Refine Construction Budget
         Refine Construction Schedule
         Selective Review By M / E/ P
             Subcontractors
       Review / Refine Interstitial Spaces
       Initiate Commissioning Specifications
PLANS & SPECIFICATIONS PROJECTS
                                      M / E / P DESIGN




         CONTRACT
                                                                 FCO &                                OWNER
D         AWARD                  CONSTRUCTION
                                                              COMMISSIONING                         ACCEPTANCE
           & NTP


       Qualifications           RFIs / FQs                     P & ID Punchlist                   Contract Closeout
       Short List               DCN                              HVAC                             Warranty
       Presentation     E       Changer Order Mngt.              Electrical
       Award                    Submittals Review                Mechanical
                                 Shop Drawings Reviews            Fire Protection
                                 Product Substitutions            Data / Telecommunications
                                 Coordination of Subs             Elevators
                                 Process Progress Payments        Emergency Panel
                                 Self-Perform Work                Instrumentation
                                 Inspection & Testing             Life / Safety
                                 As-Builts                      Start Up MTGS
                                 Punchlist                      Verify Operation of Equipment
                                 Coordinate MEP in Walls &      Owner Training
                                  Overhead                       O & M Manuals
                                 Monitor Schedule               Calibration
                                 Punchlists BT GC & MEP         Verification of Installation to Plans
                                  Designers                       and Specifications
                                 Quality Assurance              Complete CAD As-Builts
                                 Safety
PLANS & SPECIFICATIONS
                        M / E / P DESIGN




E




        PRE - CONSTRUCTION
               M/E/P
          COORDINATION


       Complete M/E/P Coordination
         Drawing Overlays
         Conflict Resolution
         Subcontractor Sign-Offs
         Submit to M/E/P Designer(s) for
           Final Review
       Submittals
       RFIs / FQs
       Product Substitution

Mais conteúdo relacionado

Mais procurados

Altarum DC Presentation
Altarum DC PresentationAltarum DC Presentation
Altarum DC Presentation
btharp
 
Carol.scott
Carol.scottCarol.scott
Carol.scott
NASAPMC
 
Bilardo.vince
Bilardo.vinceBilardo.vince
Bilardo.vince
NASAPMC
 
Bladwin.kristen
Bladwin.kristenBladwin.kristen
Bladwin.kristen
NASAPMC
 
xel_062006_kingplant
xel_062006_kingplantxel_062006_kingplant
xel_062006_kingplant
finance26
 
Vanessa.jeff
Vanessa.jeffVanessa.jeff
Vanessa.jeff
NASAPMC
 
Tim.honeycutt
Tim.honeycuttTim.honeycutt
Tim.honeycutt
NASAPMC
 

Mais procurados (17)

Sparrow
SparrowSparrow
Sparrow
 
Altarum DC Presentation
Altarum DC PresentationAltarum DC Presentation
Altarum DC Presentation
 
G8 Part 1 R2 030709
G8 Part 1 R2 030709G8 Part 1 R2 030709
G8 Part 1 R2 030709
 
Carol.scott
Carol.scottCarol.scott
Carol.scott
 
Adobe MAX 2008
Adobe MAX 2008Adobe MAX 2008
Adobe MAX 2008
 
Iti Services Introduction
Iti Services IntroductionIti Services Introduction
Iti Services Introduction
 
Bilardo.vince
Bilardo.vinceBilardo.vince
Bilardo.vince
 
Bladwin.kristen
Bladwin.kristenBladwin.kristen
Bladwin.kristen
 
Architectural Engineering Construction AEC Projects
Architectural Engineering Construction AEC ProjectsArchitectural Engineering Construction AEC Projects
Architectural Engineering Construction AEC Projects
 
Ram template
Ram templateRam template
Ram template
 
xel_062006_kingplant
xel_062006_kingplantxel_062006_kingplant
xel_062006_kingplant
 
Vanessa.jeff
Vanessa.jeffVanessa.jeff
Vanessa.jeff
 
Ohl project risk register
Ohl project risk registerOhl project risk register
Ohl project risk register
 
Tim.honeycutt
Tim.honeycuttTim.honeycutt
Tim.honeycutt
 
JD
JDJD
JD
 
Pearce Portfolio
Pearce PortfolioPearce Portfolio
Pearce Portfolio
 
Integrated Solutions
Integrated SolutionsIntegrated Solutions
Integrated Solutions
 

Semelhante a Plans andspecificationsmep design

xel_062006_kingplant
xel_062006_kingplantxel_062006_kingplant
xel_062006_kingplant
finance26
 
xel_062006_kingplant
xel_062006_kingplantxel_062006_kingplant
xel_062006_kingplant
finance26
 
Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)
Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)
Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)
IES VE
 
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
Virtual ULI
 
Contract construction-management142
Contract construction-management142Contract construction-management142
Contract construction-management142
rkress61
 
Tabb_Resume
Tabb_ResumeTabb_Resume
Tabb_Resume
mtabb8
 
Program Management
Program ManagementProgram Management
Program Management
btharp
 
Majerowicz
MajerowiczMajerowicz
Majerowicz
NASAPMC
 

Semelhante a Plans andspecificationsmep design (20)

Miros Design Build Approach 3.20.02
Miros Design Build Approach 3.20.02Miros Design Build Approach 3.20.02
Miros Design Build Approach 3.20.02
 
Utilizing Kubotek ECO Manager Product Suite to Reduce Engineering Costs
Utilizing Kubotek ECO Manager Product Suite to Reduce Engineering CostsUtilizing Kubotek ECO Manager Product Suite to Reduce Engineering Costs
Utilizing Kubotek ECO Manager Product Suite to Reduce Engineering Costs
 
Vico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIMVico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIM
 
xel_062006_kingplant
xel_062006_kingplantxel_062006_kingplant
xel_062006_kingplant
 
xel_062006_kingplant
xel_062006_kingplantxel_062006_kingplant
xel_062006_kingplant
 
Value Engineering for Roads & Highways Project
Value Engineering for Roads & Highways ProjectValue Engineering for Roads & Highways Project
Value Engineering for Roads & Highways Project
 
Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)
Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)
Low Energy Design – Sarah Graham (Greenbuild Expo, June 2011)
 
Capture Management Overview
Capture Management OverviewCapture Management Overview
Capture Management Overview
 
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
Innovation for Real Estate: Building Information Modeling (Erin Rae Hoffer) -...
 
Buildings construction-mgt-1
Buildings construction-mgt-1Buildings construction-mgt-1
Buildings construction-mgt-1
 
Contract construction-management142
Contract construction-management142Contract construction-management142
Contract construction-management142
 
Shivamtech brochure
Shivamtech brochureShivamtech brochure
Shivamtech brochure
 
ATM Marinas
ATM MarinasATM Marinas
ATM Marinas
 
Tabb_Resume
Tabb_ResumeTabb_Resume
Tabb_Resume
 
Keo Projects
Keo ProjectsKeo Projects
Keo Projects
 
Program Management
Program ManagementProgram Management
Program Management
 
Mano_CV
Mano_CVMano_CV
Mano_CV
 
Majerowicz
MajerowiczMajerowicz
Majerowicz
 
12 19-12 ggu-year_review
12 19-12 ggu-year_review12 19-12 ggu-year_review
12 19-12 ggu-year_review
 
T&T Draft Brochure Rev Dark
T&T Draft Brochure Rev DarkT&T Draft Brochure Rev Dark
T&T Draft Brochure Rev Dark
 

Plans andspecificationsmep design

  • 1. PLANS & SPECIFICATIONS PROJECT M / E / P DESIGN SELECT DESIGN SCHEMATIC PROGRAMMING TEAM DESIGN A  Define Need  Architects  Major Systems Definitions  Define Approach  Mechanical Engineer  Equipment Definitions  Electrical Engineer  C / S Engineer  Space Planners  Lab Planners  Construction Manager  Define Approach  Etc. JohnLanger Consulting Prepared by Rev. 1 - 6/9/94 Mike Daye Rev. 2 - 2/19/11 using MS Visio
  • 2. PLANS & SPECIFICATIONS PROJECT M / E / P DESIGN DESIGN 100% DESIGN A DEVELOPMENT DEVELOPMENT B 10% REVIEW M/E/P M/E/P COORDINATION COORDINATION C (CONSULTANTS)  Initial Plans/ Selections  Refine Plans  Initial Elevations/ Details  Refine Systems Subscriptions  Define / Assign Zones  Develop Initial Systems and Equipment Specifications  Establish / Coordinate CAD  Construction Management Review  Requirements & Protocol  Coordination With Other Trades  Construction Manager Review  Review Design M/E/P Coordination  Initial Review By Design / Build Fire  Develop Discrete M/E/P Budgets Protection Subcontractor  Constructability Reviews  Initial Value Engineering  Preliminary Construction Schedule  Review Lab Space Planning  Review Structural Design  Review Interstitial Spaces  CAD Coordination
  • 3. PLANS & SPECIFICATIONS PROJECTS M / E / P DESIGN 50% Construction 100% Construction (RFP) Request for B Document Review Issue Proposals D  Pre Bid Meetings  Job Site Visits  Design Clarifications  Value Engineering  Addenda  Quality Systems  Safety M/E/P M/E/P C Coordination Coordination  Finalize Budget  Review / Refine Plans  Finalize Schedule  Refine Equipment Types  Finalize Specifications  Review / Refine Specifications  Review / Refine Plans  Review Structural Design  Construction Manager  Review Lab / Space Planning Review  Construction Management Review  Refine / Incorporate Final VE  Continue Value Engineering  Refine / Incorporate Constructibility Issues  Continue Constructibility  Finalize M / E / P Coordination Reviews  Finalize Interstitial Spaces  Refine Construction Budget  Refine Construction Schedule  Selective Review By M / E/ P Subcontractors  Review / Refine Interstitial Spaces  Initiate Commissioning Specifications
  • 4. PLANS & SPECIFICATIONS PROJECTS M / E / P DESIGN CONTRACT FCO & OWNER D AWARD CONSTRUCTION COMMISSIONING ACCEPTANCE & NTP  Qualifications  RFIs / FQs  P & ID Punchlist  Contract Closeout  Short List  DCN  HVAC  Warranty  Presentation E  Changer Order Mngt.  Electrical  Award  Submittals Review  Mechanical  Shop Drawings Reviews  Fire Protection  Product Substitutions  Data / Telecommunications  Coordination of Subs  Elevators  Process Progress Payments  Emergency Panel  Self-Perform Work  Instrumentation  Inspection & Testing  Life / Safety  As-Builts  Start Up MTGS  Punchlist  Verify Operation of Equipment  Coordinate MEP in Walls &  Owner Training Overhead  O & M Manuals  Monitor Schedule  Calibration  Punchlists BT GC & MEP  Verification of Installation to Plans Designers and Specifications  Quality Assurance  Complete CAD As-Builts  Safety
  • 5. PLANS & SPECIFICATIONS M / E / P DESIGN E PRE - CONSTRUCTION M/E/P COORDINATION  Complete M/E/P Coordination  Drawing Overlays  Conflict Resolution  Subcontractor Sign-Offs  Submit to M/E/P Designer(s) for Final Review  Submittals  RFIs / FQs  Product Substitution