SlideShare a Scribd company logo
1 of 2
Download to read offline
Decision Matrix – Rocking Chair
                                          Criteria
              Complexity Development Materials Longevity Sturdiness   rockability
                         Time
    Ideas                                                                           Totals
              3          5            4          1        2           2             20




1
              4          4            4          2       2            2             18




2
              2          3            3         5         5           5             23




3
              1          1            2         4        4            5             17




4
Scale: The greater, the better
Complexity: 1 most complex, 5 least complex
        A more complex design will be inefficient to build, whereas a less complicated design is
able to be build in must less time.
Development Time: 1 most amount of time, 5 least time
        The less time a product spends on the assembly line, the better. Time is money
Materials: 1 most amount of materials, 5 least amount of materials
        Using less materials would be more environmentally friendly. At the same time, it’s
being cost effective.
Longevity: 1 lasts for a short period of time, 5 lasts for a long period of time
        Having a long-lasting rocking chair means we have a quality product. Cheap construction
would result in a product that does not last long driving customers away.
Sturdiness: 1 not sturdy, 5 very sturdy
        Sturdiness will ultimately result in how safe the chair is. Safety is key when you want a
customer to come back.
Rockability: 1 not a good rocker, 5 very good rocker
        A rocking chair with the wrong leg length to rocker diameter ratio would result in a joke
of a rocking chair. By finding the right middle man, that will weed out the dangerous chair with
too much of a rocker curve as well as the not so rockable chair with a very large rocker diameter

                1                2               3                4
Complexity      Complex          Not complex     More             Most complex
                                                 complex
Development     Least time       Some time       More time        Most time
time
Materials       Least            Some            More             Most
                materials        materials       materials        materials
Longevity       Least            Short           Most             Some
                longevity        longevity       longevity        longevity
Sturdiness      Dangerous        Not very        Sturdy           Very Sturdy
                                 sturdy
Rockability     Does not rock    rocks           Rocks well       Rocks very
                                                                  well


Eric Thompson, Brian Jestice, Sai Bhalerao, Jarrod Juskiewicz, Lauren Logan

More Related Content

More from jestice7882

Rocking chair assembly fea brian j, eric t
Rocking chair assembly fea brian j, eric tRocking chair assembly fea brian j, eric t
Rocking chair assembly fea brian j, eric t
jestice7882
 
Rocking chair assembly fea brian j, eric t
Rocking chair assembly fea brian j, eric tRocking chair assembly fea brian j, eric t
Rocking chair assembly fea brian j, eric t
jestice7882
 
Logan norm.agreement
Logan norm.agreementLogan norm.agreement
Logan norm.agreement
jestice7882
 
Eco project research diane kohlin,john tobias, brian jestice, anthony cairns
Eco project research diane kohlin,john tobias, brian jestice, anthony cairnsEco project research diane kohlin,john tobias, brian jestice, anthony cairns
Eco project research diane kohlin,john tobias, brian jestice, anthony cairns
jestice7882
 
Eco defined problem
Eco defined problemEco defined problem
Eco defined problem
jestice7882
 
Eco project drawings jestice, tobias, cairns, kohlin
Eco project drawings jestice, tobias, cairns, kohlinEco project drawings jestice, tobias, cairns, kohlin
Eco project drawings jestice, tobias, cairns, kohlin
jestice7882
 
Eco project design brief
Eco project design briefEco project design brief
Eco project design brief
jestice7882
 
Eco project decision matrix
Eco project decision matrixEco project decision matrix
Eco project decision matrix
jestice7882
 
Eco project drawings jestice, tobias, cairns, kohlin
Eco project drawings jestice, tobias, cairns, kohlinEco project drawings jestice, tobias, cairns, kohlin
Eco project drawings jestice, tobias, cairns, kohlin
jestice7882
 
Eco project research diane kohlin,john tobias, brian jestice, anthony cairns
Eco project research diane kohlin,john tobias, brian jestice, anthony cairnsEco project research diane kohlin,john tobias, brian jestice, anthony cairns
Eco project research diane kohlin,john tobias, brian jestice, anthony cairns
jestice7882
 
Eco defined problem
Eco defined problemEco defined problem
Eco defined problem
jestice7882
 
Eco defined problem
Eco defined problemEco defined problem
Eco defined problem
jestice7882
 
Eco defined problem
Eco defined problemEco defined problem
Eco defined problem
jestice7882
 
Eco project drawings jestice, tobias, cairns, kohlin
Eco project drawings jestice, tobias, cairns, kohlinEco project drawings jestice, tobias, cairns, kohlin
Eco project drawings jestice, tobias, cairns, kohlin
jestice7882
 

More from jestice7882 (20)

Gantt chart
Gantt chartGantt chart
Gantt chart
 
Rocking chair assembly fea brian j, eric t
Rocking chair assembly fea brian j, eric tRocking chair assembly fea brian j, eric t
Rocking chair assembly fea brian j, eric t
 
Rocking chair
Rocking chairRocking chair
Rocking chair
 
Rocking chair assembly fea brian j, eric t
Rocking chair assembly fea brian j, eric tRocking chair assembly fea brian j, eric t
Rocking chair assembly fea brian j, eric t
 
Logan norm.agreement
Logan norm.agreementLogan norm.agreement
Logan norm.agreement
 
Test
TestTest
Test
 
Test
TestTest
Test
 
Eco project research diane kohlin,john tobias, brian jestice, anthony cairns
Eco project research diane kohlin,john tobias, brian jestice, anthony cairnsEco project research diane kohlin,john tobias, brian jestice, anthony cairns
Eco project research diane kohlin,john tobias, brian jestice, anthony cairns
 
Eco defined problem
Eco defined problemEco defined problem
Eco defined problem
 
Eco project drawings jestice, tobias, cairns, kohlin
Eco project drawings jestice, tobias, cairns, kohlinEco project drawings jestice, tobias, cairns, kohlin
Eco project drawings jestice, tobias, cairns, kohlin
 
Eco project design brief
Eco project design briefEco project design brief
Eco project design brief
 
Eco project decision matrix
Eco project decision matrixEco project decision matrix
Eco project decision matrix
 
Eco project drawings jestice, tobias, cairns, kohlin
Eco project drawings jestice, tobias, cairns, kohlinEco project drawings jestice, tobias, cairns, kohlin
Eco project drawings jestice, tobias, cairns, kohlin
 
Eco project research diane kohlin,john tobias, brian jestice, anthony cairns
Eco project research diane kohlin,john tobias, brian jestice, anthony cairnsEco project research diane kohlin,john tobias, brian jestice, anthony cairns
Eco project research diane kohlin,john tobias, brian jestice, anthony cairns
 
Eco defined problem
Eco defined problemEco defined problem
Eco defined problem
 
Train research
Train researchTrain research
Train research
 
Eco defined problem
Eco defined problemEco defined problem
Eco defined problem
 
Eco defined problem
Eco defined problemEco defined problem
Eco defined problem
 
Eco project drawings jestice, tobias, cairns, kohlin
Eco project drawings jestice, tobias, cairns, kohlinEco project drawings jestice, tobias, cairns, kohlin
Eco project drawings jestice, tobias, cairns, kohlin
 
Test
TestTest
Test
 

Recently uploaded

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Recently uploaded (20)

Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 

Decision matrix thompson

  • 1. Decision Matrix – Rocking Chair Criteria Complexity Development Materials Longevity Sturdiness rockability Time Ideas Totals 3 5 4 1 2 2 20 1 4 4 4 2 2 2 18 2 2 3 3 5 5 5 23 3 1 1 2 4 4 5 17 4
  • 2. Scale: The greater, the better Complexity: 1 most complex, 5 least complex A more complex design will be inefficient to build, whereas a less complicated design is able to be build in must less time. Development Time: 1 most amount of time, 5 least time The less time a product spends on the assembly line, the better. Time is money Materials: 1 most amount of materials, 5 least amount of materials Using less materials would be more environmentally friendly. At the same time, it’s being cost effective. Longevity: 1 lasts for a short period of time, 5 lasts for a long period of time Having a long-lasting rocking chair means we have a quality product. Cheap construction would result in a product that does not last long driving customers away. Sturdiness: 1 not sturdy, 5 very sturdy Sturdiness will ultimately result in how safe the chair is. Safety is key when you want a customer to come back. Rockability: 1 not a good rocker, 5 very good rocker A rocking chair with the wrong leg length to rocker diameter ratio would result in a joke of a rocking chair. By finding the right middle man, that will weed out the dangerous chair with too much of a rocker curve as well as the not so rockable chair with a very large rocker diameter 1 2 3 4 Complexity Complex Not complex More Most complex complex Development Least time Some time More time Most time time Materials Least Some More Most materials materials materials materials Longevity Least Short Most Some longevity longevity longevity longevity Sturdiness Dangerous Not very Sturdy Very Sturdy sturdy Rockability Does not rock rocks Rocks well Rocks very well Eric Thompson, Brian Jestice, Sai Bhalerao, Jarrod Juskiewicz, Lauren Logan