2012 Green Building Festival


          EVERGREEN BRICK WORKS

LOW IMPACT DEVELOPMENT (L.I.D.) CASE STUDIES

                OCTOBER 11, 2012



                      Mark Schollen
                      Principal
                      Schollen & Company Inc.


                      Landscape Architecture
                      Urban Design
                      Environmental Restoration
                      L.I.D. Design               1
Low Impact Development (L.I.D.) Case Studies




Building Green Infrastructure Design Essentials

– Multi-disciplinary team
    Engineers
    Architects
    Landscape architects
    Ecologists

– Integrated design process

– Multi-objective based approach

– Commitment to innovation



2012 Green Building Festival                      2
York University Life Sciences Building,
                        Toronto


   Objectives:

   – Achieve restricted discharge rate

   – Encourage infiltration

   – Provide a source of non-portable water for irrigation

   – Achieve LEED® requirements




NXL Architects / SSG Architects
Schollen & Company Inc.
                                                             3
R.V. Anderson Associates
York University Life Sciences Building, Toronto
York University Life Sciences Building, Toronto




   Permeable pavements over rainwater harvesting tank
York University Life Sciences Building, Toronto




   Permeable pavements over plaza over infiltration medium
York University Life Sciences Building, Toronto




               L.I.D. integration with design inspiration
York University Sherman Health Research
            Science Centre, Toronto


   Objectives:

   – Repurpose a former ice rink complex

   – Moderate runoff rates

   – Recycle concrete from ice pad

   – Create an unique ecosystem




NXL Architects
Schollen & Company Inc.
                                              8
R.V. Anderson Associates
York University Sherman Health Research Science Centre,
Toronto
York University Sherman Health Research Science Centre,
Toronto




    Retrofitted and repurposed ice rink complex to create a new research centre building
York University Sherman Health Research Science Centre,
Toronto




    Synthetic alvar / infiltration galley constructed using recycled concrete from ice rink
York University Sherman Health Research Science Centre,
Toronto




    New pedestrian bridge over alvar to enhance connectivity to campus
Edwards Gardens Parking Lot, Toronto
   Kylemore New Yorkton (Deacon Property),
                 Markham


   Objectives:

   – Establish compact medium density community

   – Integrate infiltration galleries to moderate temperature

   – Achieve enhanced water quality through creation of a “forested swamp”




Angus Glen Development
Schollen & Company Inc.
                                                                             13
Stantec Consulting Group
Kylemore New Yorkton (Deacon Property), Markham




                                                        Infiltration Gallery




                                                          Infiltration Basin




                                                  Inlet to Infiltration Basin




                                                          Forested Swamp
Kylemore New Yorkton (Deacon Property), Markham

Considerations:

o Condominium model
  allowed for flexibility to
  integrate solutions
  into streetscapes

o Compact built form
  presented challenges
  and conflicts with
  utilities, fences, etc.

o More integrated
  approach to construction would have been beneficial

o Draft plan approved prior to L.I.D. integration

o SWM techniques are amenities within the community
Edwards Gardens / TBG Sustainable Parking Lot,
                         Toronto


   Objectives:

   – Restore an existing degraded parking lot

   – Integrate SWM – quality and quantity

   – Enhance tree canopy

   – Improve circulation and utility

   – Position as complementary to TBG programs




Schollen & Company Inc.
RV Anderson Associates
City of Toronto
                                                       16
Toronto Botanical Garden
Edwards Gardens / TBG Sustainable Parking Lot, Toronto
Concept Plan
Edwards Gardens / TBG Sustainable Parking Lot, Toronto
Stormwater Management Plan




                                                  2




                 1
                                    2


                     1                   2



                         1                   2




                         1   Biofilter                Subsurface Flow
        Outlet
                         2   Permeable Pavement       Surface Flow
Edwards Gardens / TBG Sustainable Parking Lot, Toronto
Construction Process




    Biofilter inlet and permeable paver   Biofilter installation
    installation
Edwards Gardens / TBG Sustainable Parking Lot, Toronto
Completed Installation




Permeable pavement at entrance   Permeable pavement and biofilter
roundabout
Edwards Gardens / TBG Sustainable Parking Lot, Toronto
Completed Installation




 Permeable pavement parking pads   Extensive plantings to complement
 and walkways                      TBG
Edwards Gardens / TBG Sustainable Parking Lot, Toronto




 Challenges / Lessons Learned:

 – Budget
     Basic resurfacing $800,000
     Sustainable parking lot $1.8 million

 – Timing – relative to TBG programs

 – Need to maintain parking capacity

 – Retrofit project issues
The Great Lakes Chapter of the International Erosion Control Association

                           Honda Canada Campus,
                                 Markham

   Objectives:

   – Minimize reliance on end-of-pipe SWM

   – Optimize efficiency

   – Utilize the landscape as a functional system

   – Address practical considerations

   – Reflect Honda’s corporate mission

   – Achieve LEED Certification



ZAS / HOK Architects
SabourinGreen Infrastructure
   The Kimble & Associates     Ontario Coalition                              23
Schollen & Company Inc.
Honda Canada Campus, Markham
Site Plan




                               Site Area = approx.27 ha
                               Building Area = 27,127m²
Honda Canada Campus, Markham
Stormwater Management Plan
                                                                  OVERFLOW
                                                                  POND



                                   2
                                                                  5
                                                        1             CONTROL
                                                                      MH




                                       RAINWATER
       4                     PDC       HARVESTING
                                       SYSTEM


                                                    2
           R&D

                     3
                         3                                  Key
            OFFICE                                          1. Rainwater
                                                               collection &
                                                               irrigation water
                                                               storage facility
                 3                                          2. Bio-filters –
                                                               Stormwater
   2                                                           runoff
                                                            3. Porous
                                                               pavement
                                                            4. Vegetated
                                                               swales
                                                            5. Overflow
                                                               storage area
Honda Canada Campus, Markham
Biofilter Plan
Honda Canada Campus, Markham
Biofilter Section
Honda Canada Campus, Markham
Selected Site Photos




   Rainwater Harvesting Tank             Natural Drainage




   Permeable Pavement in Parking Lot   Permeable Pavement in Forecourt Roundabout
Honda Canada Campus, Markham
Selected Site Photos




Granular Fitness Path and Drainage Swale




                                           Paving and plants in   Landscaped Outdoor
                                           courtyard              Eating Areas



Biofilter
Honda Canada Campus, Markham




Challenges / Lessons Learned:

– Contractor education is key

– Integration of utilities and infrastructure is critical

– Maintenance / management program is essential

– System must be protected during construction
Bill Crothers Secondary School, Markham


   Objectives:

   – Achieve pre to post development water balance

   – Address off-site catchment area contribution

   – Provide water for irrigation

   – Utilize a treatment-train approach

   – Enhance the Rouge River corridor

   – Achieve recreational/educational program requirements



ZAS / HOK Architects
Schaefers Associates
                                                             31
Schollen & Company Inc.
Bill Crothers Secondary School, Markham
Concept Plan
     Site Area = approx.12.25 ha
Bill Crothers Secondary School, Markham
Stormwater Management Strategy
Bill Crothers Secondary School, Markham
Stormwater Management Plan

                  STORMWATER WETLAND
                                                                                                        WETLAND GROUNDWATER
                                                                                                        RECHARGE ATTENUATION
                                                                                                        HABITAT ENHANCEMENT
              STORMWATER
              MANAGEMENT PONDS
              QUALITY AND
              EROSION CONTROL




                                                                       FIELD 1

                                                    FIELD 2

                                                                     UNDERGROUND
                                                                       STORAGE
                                                                      RAINWATER
                                                                      RECYCLING
                                                                        SYSTEM




                                                                                                  FIELD 2



    BIOFILTERS
    QUALITY AND                        ROOF AREA FLOWS
    QUANTITY                           DIRECTLY TO RAINWATER
    TREATMENT                          STORAGE FACILITY
    FOR PARKING
    LOT AREAS
                                                      FLOW
                                                      SPLITTER

                                                                                    VEGETATED SWALE
                                                                                    CONVEYANCE AND TREATMENT
                                                                                    FOR ENTRY ROAD



                                                                 BIOFILTERS                        EXTERNAL DRAINAGE
       SCHOOL                                                    QUALITY AND QUANTITY
       BUILDING                                                  TREATMENT FOR ROADS               2 HA FUTURE URBAN
                          FUTURE HARD
                                                                 AND FORECOURT                     DEVELOPMENT
                          SURFACE COURTS
Bill Crothers Secondary School, Markham
Selected Site Photos




    Storage Pipe Construction      Biofilter




    Parking Lot with Biofilter   Artificial Turf Sports Field and Running Track
                                 with Rainwater Harvesting System Beneath
Bill Crothers Secondary School, Markham




 Challenges / Lessons Learned:

 – Contractor education is key

 – Protection of installations during construction is essential

 – Maintenance – inadequate maintenance can impact function

 – Municipal standards stifle innovation
Edwards Gardens Parking Lot, Toronto
                   Dundas Street Commercial Site,
                            Mississauga


   Objectives:

   – Improve infiltration potential

   – Enhance base flow contribution to Etobicoke Creek

   – Improve extent of natural system along stream corridor

   – Manifest LID technologies as amenities in the landscape

   – Expedite the approval process




Fieldgate Commercial / Smart Centres
Counterpoint Engineering
Schollen & Company Inc.
                                                               37
Terraplan Landscape Architects
Dundas Street Commercial Site, Mississauga
Concept Plan
Dundas Street Commercial Site, Mississauga
Stormwater Management Plan




                                             1   4
                                                        3
                                             1   4




  1   Biofilters                                                    5

  2 Attenuation Pond                                        1
  3 Stormwater Fountain
  4 Interpretive Pavilions            Subsurface Flow
  5 Vegetated Swale                   Surface Flow              2
      Infiltration Tank / Rainwater Harvesting
      Permeable Pavement
Dundas Street Commercial Site, Mississauga
The Avenue – Integrated SWM / Streetscape Design
Dundas Street Commercial Site, Mississauga
Storm Fountain Feature – Concept
Dundas Street Commercial Site, Mississauga
Sections
Dundas Street Commercial Site, Mississauga



 Challenges / Lessons Learned:

 – Reclamation of Brownfields site
     Soil contamination
     Dumped debris

 – Extent of impervious cover – parking and building area

 – Practical commercial requirements:
     Circulation
     Servicing / loading
     Visibility of retail tenants
Residential
                                                                        Low Density
                                                                                                                                            Community
                                                                                                                                            Component




                                                                        depth



                                                           cisterns

                                               pavement
                                                           Rainwater




                                               driveways
                                                           harvesting

                                               Permeable




                               yard swales
                                                                                                                                         L.I.D.




          Rain gardens
                                                                                                                                       Potential




                               Enhanced rear
                                                                                                                                      Techniques




                                                                        Increased topsoil




2012 Green Building Festival
                                                                                                                                        Public




X
                                 X
                                                 X
                                                             X
                                                                          X
                                                                                                                                        Private




X
                                 X
                                                                          X
                                                                                                          Provision for 15% failure rate




                                                             X
                                                                                                   Integration with sump pump system




                                                 X
                                                                                                          Enactment of driveway by-law

                                                                                                               Enactment of tree by-law

                                                                                            Private operation public regulation of outlet
                                                                                                                                                                              Low Impact Development (L.I.D.) Case Studies

                                                                                                                                               Ownership/Operation Scenario




                                                                                                            Public ownership operation




                                 X
                                                                          X




                                                 X                                                             No maintenance required
                                                             X



                                                                                                     Periodic maintenance (5-10 years)


X
                                                                                                                          Litter removal
X
                                                                                                               Landscape maintenance

                                                                                                                      Annual inspection

                                                                                                                   Catchbasin clean-out

                                                                                                                             Winterizing
                                                                                                                                               Maintenance Requirements




                                                                                                                  Clearing of roof drain
         44




                                                                                              Infrequent sediment removal (10 years +)
Density
                                                  Medium

                                                  Residential
                                                                                                                            Community
                                                                                                                            Component




                                                        depth



                                           cisterns




          Biofilters
                               pavement
                                           Rainwater




                               driveways
                                           harvesting

                               Permeable
                                                                                                                         L.I.D.
                                                                                                                       Potential

                                                                                                                      Techniques




                                                        Increased topsoil




2012 Green Building Festival
                                                                                                                       Public
                                                                                                                       Public




X
                                 X
                                             X
                                                          X
                                                                                                                       Private




                                                          X
                                                                                          Provision for 15% failure rate




                                             X
                                                                                   Integration with sump pump system




                                 X
                                                                                          Enactment of driveway by-law




X
                                                                                               Enactment of tree by-law

                                                                            Private operation public regulation of outlet
                                                                                                                                                              Low Impact Development (L.I.D.) Case Studies



                                                                                                                               Ownership/Operation Scenario




                                                                                            Public ownership operation
                                                          X


                                                                                               No maintenance required

                                 X
                                             X

                                                                                     Periodic maintenance (5-10 years)


X
                                                                                                          Litter removal

                                                                                               Landscape maintenance
X

                                                                                                      Annual inspection

                                                                                                   Catchbasin clean-out

                                                                                                             Winterizing
                                                                                                                               Maintenance Requirements




                                                                                                  Clearing of roof drain
       45
X




                                                                              Infrequent sediment removal (10 years +)
Live-Work
                                                                                 Mixed-Use /
                                                                                                                                                       Community
                                                                                                                                                       Component




                                                     pavement
                                                                                 Rainwater




                                                     Permeable
                                                                 Biofilters in
                                                                                                                                                    L.I.D.




          canopy cover
                                                                 parking areas
                                                                                                                                                  Potential




          Enhanced tree
                                                                                                                                                 Techniques




                               Parking lot storage
                                                                                 harvesting cisterns




2012 Green Building Festival
                                                                                                                                                  Public
                                                                                                                                                  Public
                                                                                                                                                  Private




                               X
                                                      X
                                                                   X
                                                                                    X




        X
                                                                                    X
                                                                                                                     Provision for 15% failure rate

                                                                                                              Integration with sump pump system




                                                      X


        X
                                                                                                                     Enactment of driveway by-law




                               X
                                                                   X
                                                                                                                          Enactment of tree by-law

                                                                                                       Private operation public regulation of outlet
                                                                                                                                                                                         Low Impact Development (L.I.D.) Case Studies


                                                                                                                                                          Ownership/Operation Scenario




                                                                                                                       Public ownership operation




        X
                                                                                                                          No maintenance required
                                                      X
                                                                                    X




                                                                                                                Periodic maintenance (5-10 years)
                                                                   X




                                                                                                                                     Litter removal

                                                                                                                          Landscape maintenance
                                                                   X




                                                                                                                                 Annual inspection
                               X




                                                                                                                              Catchbasin clean-out

                                                                                                                                        Winterizing
                                                                                                                                                          Maintenance Requirements




                                                                                                                             Clearing of roof drain
46
                                                                   X




                                                                                                         Infrequent sediment removal (10 years +)
Employment
                                                                                                                                                                              Community
                                                                                                                                                                              Component




                               pavement
                                                                                                        Rainwater




                               Permeable
                                                                 Stormwater
                                                                                        Biofilters in
                                                                                                                                                                           L.I.D.




                                                                                        parking areas
                                                                                                                                                                         Potential

                                                                                                                                                                        Techniques




          Roof top storage
                                           Parking lot storage
                                                                                                        harvesting cisterns




                                                                 fountains / features




2012 Green Building Festival
                                                                                                                                                                          Public
                                                                                                                                                                          Public




                                X
                                           X
                                                                    X
                                                                                          X
                                                                                                         X




X
                                                                                                                                                                         Private




                                                                                                         X
                                                                                                                                            Provision for 15% failure rate

                                                                                                                                     Integration with sump pump system




                                X
                                                                                                                                            Enactment of driveway by-law




                                           X
                                                                    X
                                                                                          X




X
                                                                                                                                                 Enactment of tree by-law

                                                                                                                              Private operation public regulation of outlet
                                                                                                                                                                                                                Low Impact Development (L.I.D.) Case Studies

                                                                                                                                                                                 Ownership/Operation Scenario




                                                                                                                                              Public ownership operation

                                                                                                                                                 No maintenance required


                                X
                                                                                                         X




                                                                                                                                       Periodic maintenance (5-10 years)
                                                                    X
                                                                                          X




                                                                                                                                                            Litter removal
                                                                    X
                                                                                          X




                                                                                                                                                 Landscape maintenance
                                                                    X
                                                                                          X




                                                                                                                                                        Annual inspection
                                           X




                                                                                                                                                     Catchbasin clean-out
                                                                    X




                                                                                                                                                               Winterizing
                                                                                                                                                                                 Maintenance Requirements




X




                                                                                                                                                    Clearing of roof drain
        47
                                                                    X
                                                                                          X




                                                                                                                                Infrequent sediment removal (10 years +)
Parks /
                                                                                   Open Space
                                                                                                                                                    Community
                                                                                                                                                    Component




                                   storage
                                                                                   biofilters
                                                                                                                                                 L.I.D.




                                   Sub-surface
                                                                 Integration of
                                                                                   Integration of




                                                 canopy cover
                                                                                                                                               Potential




                                                 Enhanced tree
                                                                                                                                              Techniques




                                                                 surface storage




          to serve streets /
          development areas
          Infiltration galleries

2012 Green Building Festival
                                                                                                                                                Public




        X
                                                   X
                                                                   X



                                    X
                                                                                     X
                                                                                                                                                Public
                                                                                                                                               Private

                                                                                                                  Provision for 15% failure rate

                                                                                                           Integration with sump pump system

                                                                                                                  Enactment of driveway by-law

                                                                                                                       Enactment of tree by-law

                                                                                                    Private operation public regulation of outlet




        X
                                                   X
                                                                   X



                                    X
                                                                                     X
                                                                                                                                                                                      Low Impact Development (L.I.D.) Case Studies

                                                                                                                                                       Ownership/Operation Scenario




                                                   X                                                                Public ownership operation

                                                                                                                       No maintenance required

                                                                                                             Periodic maintenance (5-10 years)

                                                                                                                                  Litter removal

                                                                                                                       Landscape maintenance
        X
                                    X
                                                                                     X




                                                                                                                              Annual inspection

                                                                                                                           Catchbasin clean-out

                                                                                                                                     Winterizing
                                                                                                                                                       Maintenance Requirements




                                                                                                                          Clearing of roof drain
   48
        X
                                                                   X



                                    X
                                                                                     X




                                                                                                      Infrequent sediment removal (10 years +)
Way
                                                                      Rights of
                                                                                                                                  Community
                                                                                                                                  Component




                                    bys
                                                         Enhanced




                                    permeable
                                                         incorporate
                                                                                                                               L.I.D.




                                                         boulevards /
                                                         greenways to




                                    Integration of




          canopy cover
                                                                                                                             Potential




                    Enhanced tree
                                                                                                                            Techniques




                                                         retention storage



                                    pavement into lay-
                                                         biofilters, swales or




2012 Green Building Festival
                                                                                                                              Public




      X
                                                                 X



                                         X
                                                                                                                              Public
                                                                                                                             Private

                                                                                                Provision for 15% failure rate

                                                                                         Integration with sump pump system

                                                                                                Enactment of driveway by-law

                                                                                                     Enactment of tree by-law

                                                                                  Private operation public regulation of outlet




      X
                                                                 X



                                         X
                                                                                                                                                                    Low Impact Development (L.I.D.) Case Studies

                                                                                                                                     Ownership/Operation Scenario




                                                                                                  Public ownership operation




      X
                                                                                                     No maintenance required

                                                                                           Periodic maintenance (5-10 years)
                                         X

                                                                                                                Litter removal

                                                                                                     Landscape maintenance
                                                                 X




                                                                                                            Annual inspection

                                                                                                         Catchbasin clean-out

                                                                                                                   Winterizing
                                                                                                                                     Maintenance Requirements




                                                                                                        Clearing of roof drain
         49




                                                                                    Infrequent sediment removal (10 years +)
Low Impact Development (L.I.D.) Case Studies



SUMMARY

Key issues with implications on the
application of Green Infrastructure:

– Site conditions

– Integration with municipal standards

– Contractor education

– Maintenance and operation

– Need for monitoring


2012 Green Building Festival                   50
Low Impact Development (L.I.D.) Case Studies



SUMMARY

Green Infrastructure Design Essentials:

– Integrated design process

– Multi-disciplinary team

– Iterative / inclusive methodology

– Creativity / innovation

– Perseverance




2012 Green Building Festival                   51
2012 Green Building Festival


                        EVERGREEN BRICK WORKS

LOW IMPACT DEVELOPMENT (L.I.D.) CASE STUDIES

                                 OCTOBER 11, 2012



                                                RICHMOND HILL • ONTARIO • CANADA:
Mark Schollen                                   30 Wertheim Court, Unit 15
Principal                                       Richmond Hill, Ontario L4B 1B9
                                                Tel: 289-695-0009
Schollen & Company Inc.                         Fax: 289-695-0010
                                                Email: marks@schollenandcompany.com

Landscape Architecture                          SHANGHAI • CHINA:
Urban Design                                    Floor 17, The Regent Asia Business Centre
Environmental Restoration                       No. 19 Wuning Road, Shanghai, 200042
L.I.D. Design                                   Tel: 021-6231-0753                  52

Mais conteúdo relacionado

Mais procurados

Museum of architecture pre-thesis synopsis
Museum of architecture pre-thesis synopsisMuseum of architecture pre-thesis synopsis
Museum of architecture pre-thesis synopsis
ahed sohail
 
Conservation and revitalization of historic buildings
Conservation and revitalization of historic buildingsConservation and revitalization of historic buildings
Conservation and revitalization of historic buildings
ALI HYDER GADHI
 
Casestudy landscape ip park.
Casestudy landscape ip park.Casestudy landscape ip park.
Casestudy landscape ip park.
Antima Kuda
 

Mais procurados (20)

urban design Amritsar the heritage street
urban design Amritsar the heritage streeturban design Amritsar the heritage street
urban design Amritsar the heritage street
 
Urban design portfolio
Urban design portfolioUrban design portfolio
Urban design portfolio
 
Planning of Chandigarh
Planning of ChandigarhPlanning of Chandigarh
Planning of Chandigarh
 
Riverfront development Case study Hoshangabad Thesis
Riverfront development  Case study Hoshangabad Thesis Riverfront development  Case study Hoshangabad Thesis
Riverfront development Case study Hoshangabad Thesis
 
Case Study - Palm Jumeirah
Case Study - Palm JumeirahCase Study - Palm Jumeirah
Case Study - Palm Jumeirah
 
Museum of architecture pre-thesis synopsis
Museum of architecture pre-thesis synopsisMuseum of architecture pre-thesis synopsis
Museum of architecture pre-thesis synopsis
 
Bjarke ingels ppt
Bjarke ingels pptBjarke ingels ppt
Bjarke ingels ppt
 
Radiant city concept of le corbusier
Radiant city concept of le corbusierRadiant city concept of le corbusier
Radiant city concept of le corbusier
 
Integrated Township
Integrated TownshipIntegrated Township
Integrated Township
 
Chandigarh city planning by Le Corbusier
Chandigarh city planning by Le CorbusierChandigarh city planning by Le Corbusier
Chandigarh city planning by Le Corbusier
 
Planning for Open Spaces to make cities Healthy
Planning for Open  Spaces to make cities HealthyPlanning for Open  Spaces to make cities Healthy
Planning for Open Spaces to make cities Healthy
 
Sabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agraSabarmati riverfront case study for development of yamuna riverfront agra
Sabarmati riverfront case study for development of yamuna riverfront agra
 
Auroville - a case study
Auroville - a case studyAuroville - a case study
Auroville - a case study
 
Conservation and revitalization of historic buildings
Conservation and revitalization of historic buildingsConservation and revitalization of historic buildings
Conservation and revitalization of historic buildings
 
Vidyadhar nagar
Vidyadhar nagarVidyadhar nagar
Vidyadhar nagar
 
Mattachery heritage
Mattachery heritageMattachery heritage
Mattachery heritage
 
Sustainable site planning_basics
Sustainable site planning_basicsSustainable site planning_basics
Sustainable site planning_basics
 
Urban Plaza
Urban PlazaUrban Plaza
Urban Plaza
 
Urban park
Urban parkUrban park
Urban park
 
Casestudy landscape ip park.
Casestudy landscape ip park.Casestudy landscape ip park.
Casestudy landscape ip park.
 

Destaque

AECOM Final Presentation for the Green Mobility Challenge
AECOM Final Presentation for the Green Mobility ChallengeAECOM Final Presentation for the Green Mobility Challenge
AECOM Final Presentation for the Green Mobility Challenge
MobilityAuthority
 
Site analysis-example
Site analysis-exampleSite analysis-example
Site analysis-example
Anu PA
 

Destaque (20)

Sustainable Site Design
Sustainable Site DesignSustainable Site Design
Sustainable Site Design
 
Josh's House - Sustainable Landscape Plans
Josh's House - Sustainable Landscape PlansJosh's House - Sustainable Landscape Plans
Josh's House - Sustainable Landscape Plans
 
Architects Q&A
Architects Q&AArchitects Q&A
Architects Q&A
 
Air biofilters, indoor, overview121814
Air biofilters, indoor, overview121814Air biofilters, indoor, overview121814
Air biofilters, indoor, overview121814
 
Mrinalini Hambarde's Presentation in #MultiCulti2014 Event
Mrinalini Hambarde's Presentation in #MultiCulti2014 EventMrinalini Hambarde's Presentation in #MultiCulti2014 Event
Mrinalini Hambarde's Presentation in #MultiCulti2014 Event
 
Greenskyscrapers
Greenskyscrapers Greenskyscrapers
Greenskyscrapers
 
AECOM Final Presentation for the Green Mobility Challenge
AECOM Final Presentation for the Green Mobility ChallengeAECOM Final Presentation for the Green Mobility Challenge
AECOM Final Presentation for the Green Mobility Challenge
 
Green skyscraper's
Green skyscraper'sGreen skyscraper's
Green skyscraper's
 
Landscape Architecture Greening the areas with respect to neighbourhood planning
Landscape Architecture Greening the areas with respect to neighbourhood planningLandscape Architecture Greening the areas with respect to neighbourhood planning
Landscape Architecture Greening the areas with respect to neighbourhood planning
 
Effective Techniques to control gaseous & particulate pollution
Effective Techniques to control gaseous & particulate pollutionEffective Techniques to control gaseous & particulate pollution
Effective Techniques to control gaseous & particulate pollution
 
Biofilters for control of air pollution
Biofilters for control of air pollutionBiofilters for control of air pollution
Biofilters for control of air pollution
 
Biofilter presentation (2)
Biofilter presentation (2)Biofilter presentation (2)
Biofilter presentation (2)
 
LANDSCAPE CASE STUDY
LANDSCAPE CASE STUDYLANDSCAPE CASE STUDY
LANDSCAPE CASE STUDY
 
Biofilters and air pollution controll by aabid mir
Biofilters and air pollution controll by aabid mirBiofilters and air pollution controll by aabid mir
Biofilters and air pollution controll by aabid mir
 
Site Analysis
Site AnalysisSite Analysis
Site Analysis
 
Site analysis presentation
Site analysis presentationSite analysis presentation
Site analysis presentation
 
Site analysis-example
Site analysis-exampleSite analysis-example
Site analysis-example
 
Landscape Design and Principles
Landscape Design and PrinciplesLandscape Design and Principles
Landscape Design and Principles
 
Principle of landscape design
Principle of landscape designPrinciple of landscape design
Principle of landscape design
 
Site Analysis
Site AnalysisSite Analysis
Site Analysis
 

Semelhante a Low-Impact Development Case Study Examples

Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
Nicholas Phelan
 
Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014
Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014
Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014
Joseph Merzlak
 
Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...
Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...
Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...
Sam Stribling
 

Semelhante a Low-Impact Development Case Study Examples (20)

Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
 
ORP FY13 Budget Workshop
ORP FY13 Budget WorkshopORP FY13 Budget Workshop
ORP FY13 Budget Workshop
 
Hydraulic Fracturing: Importance to the Industry
Hydraulic Fracturing: Importance to the IndustryHydraulic Fracturing: Importance to the Industry
Hydraulic Fracturing: Importance to the Industry
 
Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14
 
Enhancing Low Impact Development Designs Using Manufactrured BMP's
Enhancing Low Impact Development Designs Using Manufactrured BMP'sEnhancing Low Impact Development Designs Using Manufactrured BMP's
Enhancing Low Impact Development Designs Using Manufactrured BMP's
 
Stormwater GreenHomeNYC August 2008
Stormwater GreenHomeNYC August 2008Stormwater GreenHomeNYC August 2008
Stormwater GreenHomeNYC August 2008
 
MAPD 2010 - Creating the box
MAPD 2010 - Creating the boxMAPD 2010 - Creating the box
MAPD 2010 - Creating the box
 
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
 
Environmental Site Design (ESD) Presentation
Environmental Site Design (ESD) PresentationEnvironmental Site Design (ESD) Presentation
Environmental Site Design (ESD) Presentation
 
Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014
Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014
Presentation-Orange-County-Great-Park-Storm-Water-Reuse-Pond-System-June-2014
 
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
 
Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...
Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...
Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...
 
100122 Hca Overview
100122 Hca Overview100122 Hca Overview
100122 Hca Overview
 
100122 Hca Overview
100122 Hca Overview100122 Hca Overview
100122 Hca Overview
 
Stormwater Magazine
Stormwater MagazineStormwater Magazine
Stormwater Magazine
 
Feb 11 2014 public meeting show
Feb 11 2014 public meeting showFeb 11 2014 public meeting show
Feb 11 2014 public meeting show
 
Maryland Environmental Site Design Presentation
Maryland Environmental Site Design PresentationMaryland Environmental Site Design Presentation
Maryland Environmental Site Design Presentation
 
Accotink Tributary at Danbury Forest
Accotink Tributary at Danbury ForestAccotink Tributary at Danbury Forest
Accotink Tributary at Danbury Forest
 
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
 
Peyton Run POD Presentation_5_12_21
 Peyton Run POD Presentation_5_12_21 Peyton Run POD Presentation_5_12_21
Peyton Run POD Presentation_5_12_21
 

Mais de Toronto 2030 District

What is "Model" Sustainability? UniverCity's Journey Toward Sustainability T...
What is "Model" Sustainability?  UniverCity's Journey Toward Sustainability T...What is "Model" Sustainability?  UniverCity's Journey Toward Sustainability T...
What is "Model" Sustainability? UniverCity's Journey Toward Sustainability T...
Toronto 2030 District
 

Mais de Toronto 2030 District (20)

GBF2014 - Rob Thornton - Flexible, Local, Resilient Energy Generation
GBF2014 - Rob Thornton - Flexible, Local, Resilient Energy GenerationGBF2014 - Rob Thornton - Flexible, Local, Resilient Energy Generation
GBF2014 - Rob Thornton - Flexible, Local, Resilient Energy Generation
 
GBF2014 - James Voogt - Climate Change & Cities
GBF2014 - James Voogt - Climate Change & CitiesGBF2014 - James Voogt - Climate Change & Cities
GBF2014 - James Voogt - Climate Change & Cities
 
GBF2014 - Glenn McGillivray - Cities in the Crosshairs
GBF2014 - Glenn McGillivray - Cities in the CrosshairsGBF2014 - Glenn McGillivray - Cities in the Crosshairs
GBF2014 - Glenn McGillivray - Cities in the Crosshairs
 
GBF2014 - Paul Dowsett - Resilient Design
GBF2014 - Paul Dowsett - Resilient DesignGBF2014 - Paul Dowsett - Resilient Design
GBF2014 - Paul Dowsett - Resilient Design
 
GBF2014 - Alec Hay - Planning Climate Resilient Cities
GBF2014 - Alec Hay - Planning Climate Resilient CitiesGBF2014 - Alec Hay - Planning Climate Resilient Cities
GBF2014 - Alec Hay - Planning Climate Resilient Cities
 
Closing The Loops in Malmö, Sweden - Daniel Skog
Closing The Loops in Malmö, Sweden - Daniel SkogClosing The Loops in Malmö, Sweden - Daniel Skog
Closing The Loops in Malmö, Sweden - Daniel Skog
 
Re-Energizing Our Cities: From District to Specific - Integral Group
Re-Energizing Our Cities:  From District to Specific - Integral GroupRe-Energizing Our Cities:  From District to Specific - Integral Group
Re-Energizing Our Cities: From District to Specific - Integral Group
 
Sustainable Cities through an Integrated Approach - Agneta Persson
Sustainable Cities through an Integrated Approach - Agneta PerssonSustainable Cities through an Integrated Approach - Agneta Persson
Sustainable Cities through an Integrated Approach - Agneta Persson
 
Ampersand: A Sustainable Community - Robert Smith
Ampersand:  A Sustainable Community - Robert SmithAmpersand:  A Sustainable Community - Robert Smith
Ampersand: A Sustainable Community - Robert Smith
 
An Emerging Water Management Paradigm - Dr. Khosrow Farabakhsh
An Emerging Water Management Paradigm - Dr. Khosrow FarabakhshAn Emerging Water Management Paradigm - Dr. Khosrow Farabakhsh
An Emerging Water Management Paradigm - Dr. Khosrow Farabakhsh
 
What is "Model" Sustainability? UniverCity's Journey Toward Sustainability T...
What is "Model" Sustainability?  UniverCity's Journey Toward Sustainability T...What is "Model" Sustainability?  UniverCity's Journey Toward Sustainability T...
What is "Model" Sustainability? UniverCity's Journey Toward Sustainability T...
 
B bach energy efficiency in obc2012
B bach energy efficiency in obc2012B bach energy efficiency in obc2012
B bach energy efficiency in obc2012
 
Update on the Enbridge Savings By Design Program
Update on the Enbridge Savings By Design ProgramUpdate on the Enbridge Savings By Design Program
Update on the Enbridge Savings By Design Program
 
Toronto Green Standard & Energy Efficiency
Toronto Green Standard & Energy EfficiencyToronto Green Standard & Energy Efficiency
Toronto Green Standard & Energy Efficiency
 
The Ins & Outs of Energy Efficiency in the Building Code
The Ins & Outs of Energy Efficiency in the Building CodeThe Ins & Outs of Energy Efficiency in the Building Code
The Ins & Outs of Energy Efficiency in the Building Code
 
Stormwater Compliance
Stormwater ComplianceStormwater Compliance
Stormwater Compliance
 
SB-10: The Envelope Ultimatum
SB-10: The Envelope UltimatumSB-10: The Envelope Ultimatum
SB-10: The Envelope Ultimatum
 
National Energy Code for Buildings
National Energy Code for BuildingsNational Energy Code for Buildings
National Energy Code for Buildings
 
Low-Impact Development from the Developer Perspective
Low-Impact Development from the Developer PerspectiveLow-Impact Development from the Developer Perspective
Low-Impact Development from the Developer Perspective
 
IMBYism: LID from the Municipal Perspective
IMBYism:  LID from the Municipal PerspectiveIMBYism:  LID from the Municipal Perspective
IMBYism: LID from the Municipal Perspective
 

Low-Impact Development Case Study Examples

  • 1. 2012 Green Building Festival EVERGREEN BRICK WORKS LOW IMPACT DEVELOPMENT (L.I.D.) CASE STUDIES OCTOBER 11, 2012 Mark Schollen Principal Schollen & Company Inc. Landscape Architecture Urban Design Environmental Restoration L.I.D. Design 1
  • 2. Low Impact Development (L.I.D.) Case Studies Building Green Infrastructure Design Essentials – Multi-disciplinary team  Engineers  Architects  Landscape architects  Ecologists – Integrated design process – Multi-objective based approach – Commitment to innovation 2012 Green Building Festival 2
  • 3. York University Life Sciences Building, Toronto Objectives: – Achieve restricted discharge rate – Encourage infiltration – Provide a source of non-portable water for irrigation – Achieve LEED® requirements NXL Architects / SSG Architects Schollen & Company Inc. 3 R.V. Anderson Associates
  • 4. York University Life Sciences Building, Toronto
  • 5. York University Life Sciences Building, Toronto Permeable pavements over rainwater harvesting tank
  • 6. York University Life Sciences Building, Toronto Permeable pavements over plaza over infiltration medium
  • 7. York University Life Sciences Building, Toronto L.I.D. integration with design inspiration
  • 8. York University Sherman Health Research Science Centre, Toronto Objectives: – Repurpose a former ice rink complex – Moderate runoff rates – Recycle concrete from ice pad – Create an unique ecosystem NXL Architects Schollen & Company Inc. 8 R.V. Anderson Associates
  • 9. York University Sherman Health Research Science Centre, Toronto
  • 10. York University Sherman Health Research Science Centre, Toronto Retrofitted and repurposed ice rink complex to create a new research centre building
  • 11. York University Sherman Health Research Science Centre, Toronto Synthetic alvar / infiltration galley constructed using recycled concrete from ice rink
  • 12. York University Sherman Health Research Science Centre, Toronto New pedestrian bridge over alvar to enhance connectivity to campus
  • 13. Edwards Gardens Parking Lot, Toronto Kylemore New Yorkton (Deacon Property), Markham Objectives: – Establish compact medium density community – Integrate infiltration galleries to moderate temperature – Achieve enhanced water quality through creation of a “forested swamp” Angus Glen Development Schollen & Company Inc. 13 Stantec Consulting Group
  • 14. Kylemore New Yorkton (Deacon Property), Markham Infiltration Gallery Infiltration Basin Inlet to Infiltration Basin Forested Swamp
  • 15. Kylemore New Yorkton (Deacon Property), Markham Considerations: o Condominium model allowed for flexibility to integrate solutions into streetscapes o Compact built form presented challenges and conflicts with utilities, fences, etc. o More integrated approach to construction would have been beneficial o Draft plan approved prior to L.I.D. integration o SWM techniques are amenities within the community
  • 16. Edwards Gardens / TBG Sustainable Parking Lot, Toronto Objectives: – Restore an existing degraded parking lot – Integrate SWM – quality and quantity – Enhance tree canopy – Improve circulation and utility – Position as complementary to TBG programs Schollen & Company Inc. RV Anderson Associates City of Toronto 16 Toronto Botanical Garden
  • 17. Edwards Gardens / TBG Sustainable Parking Lot, Toronto Concept Plan
  • 18. Edwards Gardens / TBG Sustainable Parking Lot, Toronto Stormwater Management Plan 2 1 2 1 2 1 2 1 Biofilter Subsurface Flow Outlet 2 Permeable Pavement Surface Flow
  • 19. Edwards Gardens / TBG Sustainable Parking Lot, Toronto Construction Process Biofilter inlet and permeable paver Biofilter installation installation
  • 20. Edwards Gardens / TBG Sustainable Parking Lot, Toronto Completed Installation Permeable pavement at entrance Permeable pavement and biofilter roundabout
  • 21. Edwards Gardens / TBG Sustainable Parking Lot, Toronto Completed Installation Permeable pavement parking pads Extensive plantings to complement and walkways TBG
  • 22. Edwards Gardens / TBG Sustainable Parking Lot, Toronto Challenges / Lessons Learned: – Budget  Basic resurfacing $800,000  Sustainable parking lot $1.8 million – Timing – relative to TBG programs – Need to maintain parking capacity – Retrofit project issues
  • 23. The Great Lakes Chapter of the International Erosion Control Association Honda Canada Campus, Markham Objectives: – Minimize reliance on end-of-pipe SWM – Optimize efficiency – Utilize the landscape as a functional system – Address practical considerations – Reflect Honda’s corporate mission – Achieve LEED Certification ZAS / HOK Architects SabourinGreen Infrastructure The Kimble & Associates Ontario Coalition 23 Schollen & Company Inc.
  • 24. Honda Canada Campus, Markham Site Plan Site Area = approx.27 ha Building Area = 27,127m²
  • 25. Honda Canada Campus, Markham Stormwater Management Plan OVERFLOW POND 2 5 1 CONTROL MH RAINWATER 4 PDC HARVESTING SYSTEM 2 R&D 3 3 Key OFFICE 1. Rainwater collection & irrigation water storage facility 3 2. Bio-filters – Stormwater 2 runoff 3. Porous pavement 4. Vegetated swales 5. Overflow storage area
  • 26. Honda Canada Campus, Markham Biofilter Plan
  • 27. Honda Canada Campus, Markham Biofilter Section
  • 28. Honda Canada Campus, Markham Selected Site Photos Rainwater Harvesting Tank Natural Drainage Permeable Pavement in Parking Lot Permeable Pavement in Forecourt Roundabout
  • 29. Honda Canada Campus, Markham Selected Site Photos Granular Fitness Path and Drainage Swale Paving and plants in Landscaped Outdoor courtyard Eating Areas Biofilter
  • 30. Honda Canada Campus, Markham Challenges / Lessons Learned: – Contractor education is key – Integration of utilities and infrastructure is critical – Maintenance / management program is essential – System must be protected during construction
  • 31. Bill Crothers Secondary School, Markham Objectives: – Achieve pre to post development water balance – Address off-site catchment area contribution – Provide water for irrigation – Utilize a treatment-train approach – Enhance the Rouge River corridor – Achieve recreational/educational program requirements ZAS / HOK Architects Schaefers Associates 31 Schollen & Company Inc.
  • 32. Bill Crothers Secondary School, Markham Concept Plan Site Area = approx.12.25 ha
  • 33. Bill Crothers Secondary School, Markham Stormwater Management Strategy
  • 34. Bill Crothers Secondary School, Markham Stormwater Management Plan STORMWATER WETLAND WETLAND GROUNDWATER RECHARGE ATTENUATION HABITAT ENHANCEMENT STORMWATER MANAGEMENT PONDS QUALITY AND EROSION CONTROL FIELD 1 FIELD 2 UNDERGROUND STORAGE RAINWATER RECYCLING SYSTEM FIELD 2 BIOFILTERS QUALITY AND ROOF AREA FLOWS QUANTITY DIRECTLY TO RAINWATER TREATMENT STORAGE FACILITY FOR PARKING LOT AREAS FLOW SPLITTER VEGETATED SWALE CONVEYANCE AND TREATMENT FOR ENTRY ROAD BIOFILTERS EXTERNAL DRAINAGE SCHOOL QUALITY AND QUANTITY BUILDING TREATMENT FOR ROADS 2 HA FUTURE URBAN FUTURE HARD AND FORECOURT DEVELOPMENT SURFACE COURTS
  • 35. Bill Crothers Secondary School, Markham Selected Site Photos Storage Pipe Construction Biofilter Parking Lot with Biofilter Artificial Turf Sports Field and Running Track with Rainwater Harvesting System Beneath
  • 36. Bill Crothers Secondary School, Markham Challenges / Lessons Learned: – Contractor education is key – Protection of installations during construction is essential – Maintenance – inadequate maintenance can impact function – Municipal standards stifle innovation
  • 37. Edwards Gardens Parking Lot, Toronto Dundas Street Commercial Site, Mississauga Objectives: – Improve infiltration potential – Enhance base flow contribution to Etobicoke Creek – Improve extent of natural system along stream corridor – Manifest LID technologies as amenities in the landscape – Expedite the approval process Fieldgate Commercial / Smart Centres Counterpoint Engineering Schollen & Company Inc. 37 Terraplan Landscape Architects
  • 38. Dundas Street Commercial Site, Mississauga Concept Plan
  • 39. Dundas Street Commercial Site, Mississauga Stormwater Management Plan 1 4 3 1 4 1 Biofilters 5 2 Attenuation Pond 1 3 Stormwater Fountain 4 Interpretive Pavilions Subsurface Flow 5 Vegetated Swale Surface Flow 2 Infiltration Tank / Rainwater Harvesting Permeable Pavement
  • 40. Dundas Street Commercial Site, Mississauga The Avenue – Integrated SWM / Streetscape Design
  • 41. Dundas Street Commercial Site, Mississauga Storm Fountain Feature – Concept
  • 42. Dundas Street Commercial Site, Mississauga Sections
  • 43. Dundas Street Commercial Site, Mississauga Challenges / Lessons Learned: – Reclamation of Brownfields site  Soil contamination  Dumped debris – Extent of impervious cover – parking and building area – Practical commercial requirements:  Circulation  Servicing / loading  Visibility of retail tenants
  • 44. Residential Low Density Community Component depth cisterns pavement Rainwater driveways harvesting Permeable yard swales L.I.D. Rain gardens Potential Enhanced rear Techniques Increased topsoil 2012 Green Building Festival Public X X X X X Private X X X Provision for 15% failure rate X Integration with sump pump system X Enactment of driveway by-law Enactment of tree by-law Private operation public regulation of outlet Low Impact Development (L.I.D.) Case Studies Ownership/Operation Scenario Public ownership operation X X X No maintenance required X Periodic maintenance (5-10 years) X Litter removal X Landscape maintenance Annual inspection Catchbasin clean-out Winterizing Maintenance Requirements Clearing of roof drain 44 Infrequent sediment removal (10 years +)
  • 45. Density Medium Residential Community Component depth cisterns Biofilters pavement Rainwater driveways harvesting Permeable L.I.D. Potential Techniques Increased topsoil 2012 Green Building Festival Public Public X X X X Private X Provision for 15% failure rate X Integration with sump pump system X Enactment of driveway by-law X Enactment of tree by-law Private operation public regulation of outlet Low Impact Development (L.I.D.) Case Studies Ownership/Operation Scenario Public ownership operation X No maintenance required X X Periodic maintenance (5-10 years) X Litter removal Landscape maintenance X Annual inspection Catchbasin clean-out Winterizing Maintenance Requirements Clearing of roof drain 45 X Infrequent sediment removal (10 years +)
  • 46. Live-Work Mixed-Use / Community Component pavement Rainwater Permeable Biofilters in L.I.D. canopy cover parking areas Potential Enhanced tree Techniques Parking lot storage harvesting cisterns 2012 Green Building Festival Public Public Private X X X X X X Provision for 15% failure rate Integration with sump pump system X X Enactment of driveway by-law X X Enactment of tree by-law Private operation public regulation of outlet Low Impact Development (L.I.D.) Case Studies Ownership/Operation Scenario Public ownership operation X No maintenance required X X Periodic maintenance (5-10 years) X Litter removal Landscape maintenance X Annual inspection X Catchbasin clean-out Winterizing Maintenance Requirements Clearing of roof drain 46 X Infrequent sediment removal (10 years +)
  • 47. Employment Community Component pavement Rainwater Permeable Stormwater Biofilters in L.I.D. parking areas Potential Techniques Roof top storage Parking lot storage harvesting cisterns fountains / features 2012 Green Building Festival Public Public X X X X X X Private X Provision for 15% failure rate Integration with sump pump system X Enactment of driveway by-law X X X X Enactment of tree by-law Private operation public regulation of outlet Low Impact Development (L.I.D.) Case Studies Ownership/Operation Scenario Public ownership operation No maintenance required X X Periodic maintenance (5-10 years) X X Litter removal X X Landscape maintenance X X Annual inspection X Catchbasin clean-out X Winterizing Maintenance Requirements X Clearing of roof drain 47 X X Infrequent sediment removal (10 years +)
  • 48. Parks / Open Space Community Component storage biofilters L.I.D. Sub-surface Integration of Integration of canopy cover Potential Enhanced tree Techniques surface storage to serve streets / development areas Infiltration galleries 2012 Green Building Festival Public X X X X X Public Private Provision for 15% failure rate Integration with sump pump system Enactment of driveway by-law Enactment of tree by-law Private operation public regulation of outlet X X X X X Low Impact Development (L.I.D.) Case Studies Ownership/Operation Scenario X Public ownership operation No maintenance required Periodic maintenance (5-10 years) Litter removal Landscape maintenance X X X Annual inspection Catchbasin clean-out Winterizing Maintenance Requirements Clearing of roof drain 48 X X X X Infrequent sediment removal (10 years +)
  • 49. Way Rights of Community Component bys Enhanced permeable incorporate L.I.D. boulevards / greenways to Integration of canopy cover Potential Enhanced tree Techniques retention storage pavement into lay- biofilters, swales or 2012 Green Building Festival Public X X X Public Private Provision for 15% failure rate Integration with sump pump system Enactment of driveway by-law Enactment of tree by-law Private operation public regulation of outlet X X X Low Impact Development (L.I.D.) Case Studies Ownership/Operation Scenario Public ownership operation X No maintenance required Periodic maintenance (5-10 years) X Litter removal Landscape maintenance X Annual inspection Catchbasin clean-out Winterizing Maintenance Requirements Clearing of roof drain 49 Infrequent sediment removal (10 years +)
  • 50. Low Impact Development (L.I.D.) Case Studies SUMMARY Key issues with implications on the application of Green Infrastructure: – Site conditions – Integration with municipal standards – Contractor education – Maintenance and operation – Need for monitoring 2012 Green Building Festival 50
  • 51. Low Impact Development (L.I.D.) Case Studies SUMMARY Green Infrastructure Design Essentials: – Integrated design process – Multi-disciplinary team – Iterative / inclusive methodology – Creativity / innovation – Perseverance 2012 Green Building Festival 51
  • 52. 2012 Green Building Festival EVERGREEN BRICK WORKS LOW IMPACT DEVELOPMENT (L.I.D.) CASE STUDIES OCTOBER 11, 2012 RICHMOND HILL • ONTARIO • CANADA: Mark Schollen 30 Wertheim Court, Unit 15 Principal Richmond Hill, Ontario L4B 1B9 Tel: 289-695-0009 Schollen & Company Inc. Fax: 289-695-0010 Email: marks@schollenandcompany.com Landscape Architecture SHANGHAI • CHINA: Urban Design Floor 17, The Regent Asia Business Centre Environmental Restoration No. 19 Wuning Road, Shanghai, 200042 L.I.D. Design Tel: 021-6231-0753 52