SlideShare uma empresa Scribd logo
1 de 17
Central Asia Development Group
Toplines for the USAID Community
Development Program
October 2010-October2013
Two Program Goals
Goal 1: Stabilize troubled districts in the South, East and
West of Afghanistan by employing at-risk residents on
infrastructure repair projects

Goal 2: (After Jan 2012) Use infrastructure repair projects
to improve relations between Afghan Government
(GIRoA) stakeholders and local communities in troubled
areas
Light Footprint
3 Years (Oct 2010 to Oct 2013), 19 Provinces, 257
Projects
~120 Expat staff members and 1,000 Afghan staff
members (at peak)
Staff members work directly with community members
in the field without employing arm’s length
subcontractors
Local communities are responsible for security- no
independent security contracts with Dyncorp/ G4S etc.
Where did the program operate?

Image: 2,500+ project worksites
drawn from 257 projects
How did CADG do over those 3 years?
Afghan Residents Employed: 213,488

Person Days Of Work Generated By
Afghan Community Members:
9,930,172

Canals Repaired: 1,188 Miles

Sidewalks Repaired: 8,247,857 ft2

Karez Well Systems Repaired: 2,681

Roads Graveled: 380 Miles

Water Gates Repaired: 817

Roadside Canals Repaired: 259 mi

Flood Protection Walls Repaired:
17,726,020 ft3

Municipal Canals Repaired: 56 Miles

Intakes Repaired: 241

School Buildings Repaired: 36

Check Dams Repaired: 44

Health Center (Clinic, Hospital)
Buildings Repaired: 15

Reservoirs Repaired: 61

Other Buildings (Shop Stalls,
Government Buildings) Repaired: 266
These are fairly big numbers. We put some of
them in context on the next few pages…
Number of Afghan residents
employed: 213,488

Clearing land leading to an intake in
Sharana district, Paktika Province

2010 Population of Irvine, CA:
212,375
Women employed: 2,523

Repairing sidewalks at a Girl’s school in
Nangarhar province
Miles of canals repaired:
1,188 miles

Driving distance from New York
to Kanas City: 1,193 miles
Sidewalks repaired:
8,247,857 ft2

Sidewalk repairs in Qualat
District, Zabul Province

Equivalent number of American
football fields: 143
Water gates repaired: 817
Water gates used to control tides in the
Everglades national park: 150

Restoring a water gate in Nimroz
province
Flood protection walls
repaired: 17,726,020 ft3

Repairing a flood protection wall in
Khost province

Equal to roughly half the volume
of the Empire State Building
Farmland protected by flood
control measures (est.): 842 mi2

Community members in Paktya province
finish repairs to a flood protection wall as
waters overflow in the foreground

Size of Los Angeles, CA: 468.7
square miles
Roads Gravelled: 380 Miles

Leveling a road near a displaced person’s
camp in Zhari district, Kandahar province

Equal to 74% of the streets in
Manhattan, NY (508 mi)
Estimated number of
community members who
received skills training:
60,400

A master mason inspects concrete drain
covers in Zabul province
Total number of buildings
repaired: 317

Repairing the damaged roof on a bazaar
shop stall in Naw Zad, Helmand Province

Number of skyscrapers in
Boston, MA: 336
This program succeeded by keeping itself simple and by focusing
on execution
The approach used in this program should be available to any
development firm willing to work directly and in the field

Mais conteúdo relacionado

Semelhante a An Effective International Development Program

Semelhante a An Effective International Development Program (20)

RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)
 
A CASE STUDY OF BANAWADI VILLAGE OPTIMUM DESIGN AND ESTIMATION OF SEWER NETWORK
A CASE STUDY OF BANAWADI VILLAGE OPTIMUM DESIGN AND ESTIMATION OF SEWER NETWORKA CASE STUDY OF BANAWADI VILLAGE OPTIMUM DESIGN AND ESTIMATION OF SEWER NETWORK
A CASE STUDY OF BANAWADI VILLAGE OPTIMUM DESIGN AND ESTIMATION OF SEWER NETWORK
 
Transportation engineering
Transportation engineering Transportation engineering
Transportation engineering
 
Paul_Kelly.ppt
Paul_Kelly.pptPaul_Kelly.ppt
Paul_Kelly.ppt
 
RV 2014: Performance Measures People can Actually Understand by Hal R. Johnso...
RV 2014: Performance Measures People can Actually Understand by Hal R. Johnso...RV 2014: Performance Measures People can Actually Understand by Hal R. Johnso...
RV 2014: Performance Measures People can Actually Understand by Hal R. Johnso...
 
Inland water transport kochi
Inland water transport kochiInland water transport kochi
Inland water transport kochi
 
2011 City of Buenos Aires Achievements: Sustainable Mobility Plan
2011 City of Buenos Aires Achievements: Sustainable Mobility Plan2011 City of Buenos Aires Achievements: Sustainable Mobility Plan
2011 City of Buenos Aires Achievements: Sustainable Mobility Plan
 
Roadway element design for the Rural area in India.
Roadway element design for the Rural area in India.Roadway element design for the Rural area in India.
Roadway element design for the Rural area in India.
 
Transpot system in India
Transpot system in IndiaTranspot system in India
Transpot system in India
 
Development of a GIS-Based System for Management of Water Distribution Networ...
Development of a GIS-Based System for Management of Water Distribution Networ...Development of a GIS-Based System for Management of Water Distribution Networ...
Development of a GIS-Based System for Management of Water Distribution Networ...
 
Transport and communications
Transport and communicationsTransport and communications
Transport and communications
 
Item # 10 - Pedestrian Improvements - Townsend & Ogden
Item # 10 - Pedestrian Improvements - Townsend & OgdenItem # 10 - Pedestrian Improvements - Townsend & Ogden
Item # 10 - Pedestrian Improvements - Townsend & Ogden
 
Phil Lawes
Phil LawesPhil Lawes
Phil Lawes
 
OH Infrastructure Report Card
OH Infrastructure Report CardOH Infrastructure Report Card
OH Infrastructure Report Card
 
Mexico Group April 2014 with NADBank
Mexico Group April 2014 with NADBank Mexico Group April 2014 with NADBank
Mexico Group April 2014 with NADBank
 
City Growth: Case Study of Denver, Colorado
City Growth: Case Study of Denver, ColoradoCity Growth: Case Study of Denver, Colorado
City Growth: Case Study of Denver, Colorado
 
Group 9
Group 9Group 9
Group 9
 
Infrastructure and Economic Development in Kenya
Infrastructure and Economic Development in KenyaInfrastructure and Economic Development in Kenya
Infrastructure and Economic Development in Kenya
 
DEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCAD
DEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCADDEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCAD
DEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCAD
 
ANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJI
ANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJIANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJI
ANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJI
 

Mais de John Boddie (6)

John Boddie Portfolio 2000 2015
John Boddie Portfolio 2000 2015John Boddie Portfolio 2000 2015
John Boddie Portfolio 2000 2015
 
Portfolio 2000 2014
Portfolio 2000 2014Portfolio 2000 2014
Portfolio 2000 2014
 
The Innovation Lifecycle
The Innovation LifecycleThe Innovation Lifecycle
The Innovation Lifecycle
 
Intellectual Property in the Social Networking Space, 2004
Intellectual Property in the Social Networking Space, 2004Intellectual Property in the Social Networking Space, 2004
Intellectual Property in the Social Networking Space, 2004
 
CDP Photos 21 to 27 June 2012 Slideshow
CDP Photos 21 to 27 June 2012 SlideshowCDP Photos 21 to 27 June 2012 Slideshow
CDP Photos 21 to 27 June 2012 Slideshow
 
USAID CDP photos 7 to 13 July 2012 slideshow
USAID CDP photos 7 to 13 July 2012 slideshowUSAID CDP photos 7 to 13 July 2012 slideshow
USAID CDP photos 7 to 13 July 2012 slideshow
 

Último

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 

Último (20)

MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Cyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdfCyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdf
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 

An Effective International Development Program

  • 1. Central Asia Development Group Toplines for the USAID Community Development Program October 2010-October2013
  • 2. Two Program Goals Goal 1: Stabilize troubled districts in the South, East and West of Afghanistan by employing at-risk residents on infrastructure repair projects Goal 2: (After Jan 2012) Use infrastructure repair projects to improve relations between Afghan Government (GIRoA) stakeholders and local communities in troubled areas
  • 3. Light Footprint 3 Years (Oct 2010 to Oct 2013), 19 Provinces, 257 Projects ~120 Expat staff members and 1,000 Afghan staff members (at peak) Staff members work directly with community members in the field without employing arm’s length subcontractors Local communities are responsible for security- no independent security contracts with Dyncorp/ G4S etc.
  • 4. Where did the program operate? Image: 2,500+ project worksites drawn from 257 projects
  • 5. How did CADG do over those 3 years? Afghan Residents Employed: 213,488 Person Days Of Work Generated By Afghan Community Members: 9,930,172 Canals Repaired: 1,188 Miles Sidewalks Repaired: 8,247,857 ft2 Karez Well Systems Repaired: 2,681 Roads Graveled: 380 Miles Water Gates Repaired: 817 Roadside Canals Repaired: 259 mi Flood Protection Walls Repaired: 17,726,020 ft3 Municipal Canals Repaired: 56 Miles Intakes Repaired: 241 School Buildings Repaired: 36 Check Dams Repaired: 44 Health Center (Clinic, Hospital) Buildings Repaired: 15 Reservoirs Repaired: 61 Other Buildings (Shop Stalls, Government Buildings) Repaired: 266
  • 6. These are fairly big numbers. We put some of them in context on the next few pages…
  • 7. Number of Afghan residents employed: 213,488 Clearing land leading to an intake in Sharana district, Paktika Province 2010 Population of Irvine, CA: 212,375
  • 8. Women employed: 2,523 Repairing sidewalks at a Girl’s school in Nangarhar province
  • 9. Miles of canals repaired: 1,188 miles Driving distance from New York to Kanas City: 1,193 miles
  • 10. Sidewalks repaired: 8,247,857 ft2 Sidewalk repairs in Qualat District, Zabul Province Equivalent number of American football fields: 143
  • 11. Water gates repaired: 817 Water gates used to control tides in the Everglades national park: 150 Restoring a water gate in Nimroz province
  • 12. Flood protection walls repaired: 17,726,020 ft3 Repairing a flood protection wall in Khost province Equal to roughly half the volume of the Empire State Building
  • 13. Farmland protected by flood control measures (est.): 842 mi2 Community members in Paktya province finish repairs to a flood protection wall as waters overflow in the foreground Size of Los Angeles, CA: 468.7 square miles
  • 14. Roads Gravelled: 380 Miles Leveling a road near a displaced person’s camp in Zhari district, Kandahar province Equal to 74% of the streets in Manhattan, NY (508 mi)
  • 15. Estimated number of community members who received skills training: 60,400 A master mason inspects concrete drain covers in Zabul province
  • 16. Total number of buildings repaired: 317 Repairing the damaged roof on a bazaar shop stall in Naw Zad, Helmand Province Number of skyscrapers in Boston, MA: 336
  • 17. This program succeeded by keeping itself simple and by focusing on execution The approach used in this program should be available to any development firm willing to work directly and in the field