Targets need to be based on real interventions and ‘concrete’Targets need to be based on real interventions and ‘concrete’
activities. Some examples….activities. Some examples….
Process IndicatorsProcess Indicators: legislative reform for sustainable fisheries or: legislative reform for sustainable fisheries or
water qualitywater quality
Stress Reduction IndicatorsStress Reduction Indicators: Sewage treatment systems up and: Sewage treatment systems up and
running; Gear changes/modification in fisheriesrunning; Gear changes/modification in fisheries
Environment/socioeconomic IndicatorsEnvironment/socioeconomic Indicators: By-catch reduced;: By-catch reduced;
catches of threatened species reduced (landingcatches of threatened species reduced (landing
figures/observers); nutrient loads down; nutrient –demanding algalfigures/observers); nutrient loads down; nutrient –demanding algal
levels downlevels down
How to ensure that targets andHow to ensure that targets and
indicators are appropriateindicators are appropriate
Targets should NOT be based on intangeable orTargets should NOT be based on intangeable or
unmeasurable/impractical indicators (some examples!)unmeasurable/impractical indicators (some examples!)
Political will for improving fisheries and water qualityPolitical will for improving fisheries and water quality
approaches raised/improvedapproaches raised/improved
Management practices for stress reduction expandedManagement practices for stress reduction expanded
Improved water quality on coral reefsImproved water quality on coral reefs
Raised quality of life in communitiesRaised quality of life in communities
These are difficult or often impossible to quantify and areThese are difficult or often impossible to quantify and are
subjective in any evaluation processsubjective in any evaluation process
Inappropriate Targets andInappropriate Targets and
Indicators!Indicators!
There are… in terms of the need to focus on transboundaryThere are… in terms of the need to focus on transboundary
deliverables at a regional leveldeliverables at a regional level
These can be hard to quantify because of the need to show aThese can be hard to quantify because of the need to show a
balanced set of deliveries across a number of countries thatbalanced set of deliveries across a number of countries that
should represent an equitable regional effortshould represent an equitable regional effort
As an example, the ASCLME project is dealing with this problemAs an example, the ASCLME project is dealing with this problem
by undertaking a national Marine Ecosystem Diagnostic Analysisby undertaking a national Marine Ecosystem Diagnostic Analysis
(MEDA) in each country first….(MEDA) in each country first….
This is then reflected synergistically in the overall TDAThis is then reflected synergistically in the overall TDA
Are their special challenges thatAre their special challenges that
relate to IW Log Frame design?relate to IW Log Frame design?
This is a logical and effective approach as it provides a clear flowThis is a logical and effective approach as it provides a clear flow
from concept to concrete action….from concept to concrete action….
1.1. Changes in approach, policy and legislation (processChanges in approach, policy and legislation (process
reforms)reforms)
2.2. Actual efforts to deliver these reforms as concrete actionsActual efforts to deliver these reforms as concrete actions
for reducing stresses on the ‘system’for reducing stresses on the ‘system’
Leading to…Leading to…
3.3. Measurable improvements at the ecosystem/biologicalMeasurable improvements at the ecosystem/biological
community/social community/ species levels (which cancommunity/social community/ species levels (which can
feed back to 1. above)feed back to 1. above)
Use of Process, Stress ReductionUse of Process, Stress Reduction
and Environmental/Socioeconomicand Environmental/Socioeconomic
Status indicatorsStatus indicators
A.A. Log Frames are frequently out-of-date at Project InceptionLog Frames are frequently out-of-date at Project Inception
(may be several years old!) therefore….(may be several years old!) therefore….
B.B. Review and revision of Log Frames is often one of the firstReview and revision of Log Frames is often one of the first
important activities for the Projectimportant activities for the Project
C.C. This agreement/ approval of a reviewed and revised LogThis agreement/ approval of a reviewed and revised Log
Frame by participating countries and the Project SteeringFrame by participating countries and the Project Steering
Committee can be extremely valuable and critical in buildingCommittee can be extremely valuable and critical in building
country ownership and support (especially as the PSCcountry ownership and support (especially as the PSC
members and National Focal Institutions and theirmembers and National Focal Institutions and their
policies/priorities may have changes since the original Logpolicies/priorities may have changes since the original Log
Frame was designed)Frame was designed)
Some weaknesses in Log FrameSome weaknesses in Log Frame
designdesign
These are a very useful component of the Log Frame but alsoThese are a very useful component of the Log Frame but also
they DO need to be reviewed at Project Inception/Implementationthey DO need to be reviewed at Project Inception/Implementation
along with this rest of the Log Frame for the same reasons asalong with this rest of the Log Frame for the same reasons as
stated in the previous slide (changes over time, countrystated in the previous slide (changes over time, country
agreement and ownership)agreement and ownership)
One clear example would be in the ASCLME Project in theOne clear example would be in the ASCLME Project in the
western Indian Ocean where the original document did not identifywestern Indian Ocean where the original document did not identify
piracy as a risk but which has now become one the greatestpiracy as a risk but which has now become one the greatest
transboundary threats to the projecttransboundary threats to the project
It is important to realise that the Project (and therefore its LogIt is important to realise that the Project (and therefore its Log
Frame) is not written in stone and SHOULD be reviewed fromFrame) is not written in stone and SHOULD be reviewed from
time to time as part of a flexible, evolving and dynamic projecttime to time as part of a flexible, evolving and dynamic project
Risks and AssumptionsRisks and Assumptions
A.A. There is a need to develop some standardised Indicators forThere is a need to develop some standardised Indicators for
certain situations and projects to allow for a more comparablecertain situations and projects to allow for a more comparable
review process. (e.g. LME indicators could focus on the 5review process. (e.g. LME indicators could focus on the 5
modules of the LMEs)modules of the LMEs)
B.B. A review of the Logical Framework Matrix at Inception orA review of the Logical Framework Matrix at Inception or
soon after should be a standard requirement to ensuresoon after should be a standard requirement to ensure
accuracy of evaluation and true country ownershipaccuracy of evaluation and true country ownership
C.C. Part of the mandate of the Mid Term Reviewers should be toPart of the mandate of the Mid Term Reviewers should be to
re-visit the Log Frame with the stakeholders and to advise there-visit the Log Frame with the stakeholders and to advise the
Project on any appropriate modifications or additions to theProject on any appropriate modifications or additions to the
Log Frame to ensure a more accurate and representativeLog Frame to ensure a more accurate and representative
Terminal EvaluationTerminal Evaluation
Better use of Log Frames in ProjectBetter use of Log Frames in Project
Design and ManagementDesign and Management
1.1. On-going ‘progress-chasing’ of deliverables during the ProjectOn-going ‘progress-chasing’ of deliverables during the Project
lifetime using Log Frame indicators (continuous assessmentlifetime using Log Frame indicators (continuous assessment
and fine-tuning)and fine-tuning)
2.2. Post-Project Evaluation of Indicators to ensure sustainabilityPost-Project Evaluation of Indicators to ensure sustainability
of Project objectives and GEF Investmentof Project objectives and GEF Investment
Other improvements to the useOther improvements to the use
of GEF IW Indicatorsof GEF IW Indicators
THANK YOU!THANK YOU!
Effective GEF IW IndicatorsEffective GEF IW Indicators

Mais conteúdo relacionado

Destaque

Results based planning and management
Results based planning and managementResults based planning and management
Results based planning and managementBilal Naqeeb
 
Introduction to training guidelines, session plans & role of trainers dr. di...
Introduction to training guidelines, session plans & role of trainers  dr. di...Introduction to training guidelines, session plans & role of trainers  dr. di...
Introduction to training guidelines, session plans & role of trainers dr. di...Vikram Aditya
 
Andy Kirk's Webinar for Tableau (July 2016)
Andy Kirk's Webinar for Tableau (July 2016)Andy Kirk's Webinar for Tableau (July 2016)
Andy Kirk's Webinar for Tableau (July 2016)Andy Kirk
 
Considerations and examples for key performance indicators design
Considerations and examples for key performance indicators designConsiderations and examples for key performance indicators design
Considerations and examples for key performance indicators designJAMSO
 
Project m&e & logframe
Project m&e & logframeProject m&e & logframe
Project m&e & logframeWesley Opaki
 
An Overview of Scenario Planning - Introduction, Overview and Examples
An Overview of Scenario Planning - Introduction, Overview and ExamplesAn Overview of Scenario Planning - Introduction, Overview and Examples
An Overview of Scenario Planning - Introduction, Overview and ExamplesAxiom EPM
 
Capacity Development For Monitoring And Evaluation
Capacity Development For Monitoring And EvaluationCapacity Development For Monitoring And Evaluation
Capacity Development For Monitoring And EvaluationKnowledge Management Center
 
Scenario Building Workshop - How to Build and Use Scenarios
Scenario Building Workshop - How to Build and Use ScenariosScenario Building Workshop - How to Build and Use Scenarios
Scenario Building Workshop - How to Build and Use ScenariosAdam Vigdor Gordon
 
A Guide to Scenario Planning
A Guide to Scenario PlanningA Guide to Scenario Planning
A Guide to Scenario PlanningOlivier Serrat
 
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAKLogical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAKMADHUR VERMA
 
Scenario Planning (an Introduction)
Scenario Planning (an Introduction)Scenario Planning (an Introduction)
Scenario Planning (an Introduction)Steve Puma
 
5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOsTony
 
The 8 Hats of Data Visualisation
The 8 Hats of Data VisualisationThe 8 Hats of Data Visualisation
The 8 Hats of Data VisualisationAndy Kirk
 
Project Management PPT
Project Management PPTProject Management PPT
Project Management PPTbletindia
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project ManagementRodolfo Siles
 

Destaque (18)

GHA Lean UX workshop
GHA Lean UX workshopGHA Lean UX workshop
GHA Lean UX workshop
 
Results based planning and management
Results based planning and managementResults based planning and management
Results based planning and management
 
Introduction to training guidelines, session plans & role of trainers dr. di...
Introduction to training guidelines, session plans & role of trainers  dr. di...Introduction to training guidelines, session plans & role of trainers  dr. di...
Introduction to training guidelines, session plans & role of trainers dr. di...
 
Andy Kirk's Webinar for Tableau (July 2016)
Andy Kirk's Webinar for Tableau (July 2016)Andy Kirk's Webinar for Tableau (July 2016)
Andy Kirk's Webinar for Tableau (July 2016)
 
Considerations and examples for key performance indicators design
Considerations and examples for key performance indicators designConsiderations and examples for key performance indicators design
Considerations and examples for key performance indicators design
 
Project m&e & logframe
Project m&e & logframeProject m&e & logframe
Project m&e & logframe
 
An Overview of Scenario Planning - Introduction, Overview and Examples
An Overview of Scenario Planning - Introduction, Overview and ExamplesAn Overview of Scenario Planning - Introduction, Overview and Examples
An Overview of Scenario Planning - Introduction, Overview and Examples
 
Planning the training session
Planning the training sessionPlanning the training session
Planning the training session
 
Capacity Development For Monitoring And Evaluation
Capacity Development For Monitoring And EvaluationCapacity Development For Monitoring And Evaluation
Capacity Development For Monitoring And Evaluation
 
Scenario Building Workshop - How to Build and Use Scenarios
Scenario Building Workshop - How to Build and Use ScenariosScenario Building Workshop - How to Build and Use Scenarios
Scenario Building Workshop - How to Build and Use Scenarios
 
A Guide to Scenario Planning
A Guide to Scenario PlanningA Guide to Scenario Planning
A Guide to Scenario Planning
 
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAKLogical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAK
 
Scenario Planning (an Introduction)
Scenario Planning (an Introduction)Scenario Planning (an Introduction)
Scenario Planning (an Introduction)
 
5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs
 
The 8 Hats of Data Visualisation
The 8 Hats of Data VisualisationThe 8 Hats of Data Visualisation
The 8 Hats of Data Visualisation
 
Project planning and project work plan
Project planning and project work planProject planning and project work plan
Project planning and project work plan
 
Project Management PPT
Project Management PPTProject Management PPT
Project Management PPT
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 

Semelhante a Experience with the Design of Logical Frameworks and the Evaluation of Delivery Based on Quantifiable Targets and Measurable Indicators (IWC5 Presentation)

Application Of Life Cycle Analysis
Application Of Life Cycle AnalysisApplication Of Life Cycle Analysis
Application Of Life Cycle AnalysisBob Prieto
 
Transboundary Diagnostic Anaylsis: The Mediterreanean Region
Transboundary Diagnostic Anaylsis: The Mediterreanean RegionTransboundary Diagnostic Anaylsis: The Mediterreanean Region
Transboundary Diagnostic Anaylsis: The Mediterreanean RegionIwl Pcu
 
Application of life cycle analysis in the capital 07 17 14
Application of life cycle analysis in the capital 07 17 14Application of life cycle analysis in the capital 07 17 14
Application of life cycle analysis in the capital 07 17 14Bob Prieto
 
LIFE CYCLE COST CALCULATION MODELS FOR BUILDINGS
LIFE CYCLE COST CALCULATION MODELS FOR BUILDINGSLIFE CYCLE COST CALCULATION MODELS FOR BUILDINGS
LIFE CYCLE COST CALCULATION MODELS FOR BUILDINGSSharan Thampi J
 
Achievements and results of pilot projects, results and scaling-up
Achievements and results of pilot projects, results and scaling-upAchievements and results of pilot projects, results and scaling-up
Achievements and results of pilot projects, results and scaling-upIwl Pcu
 
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAsset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAdvisian
 
IES offsets & opportunities
IES offsets & opportunitiesIES offsets & opportunities
IES offsets & opportunitiesNam Nguyen
 
ON TIME | ON TARGET: Leasing for Army Transportation Battalion
ON TIME | ON TARGET: Leasing for Army Transportation BattalionON TIME | ON TARGET: Leasing for Army Transportation Battalion
ON TIME | ON TARGET: Leasing for Army Transportation BattalionCurt Cooper
 
WB Session and OP 8
WB Session and OP 8WB Session and OP 8
WB Session and OP 8Iwl Pcu
 
The challenge of infrastructure and long term investment
The challenge of infrastructure and long term investmentThe challenge of infrastructure and long term investment
The challenge of infrastructure and long term investmentBob Prieto
 
Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...
Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...
Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...Bruce McCarthy
 
Traceability: Why Connecting the Dots is Important
Traceability: Why Connecting the Dots is ImportantTraceability: Why Connecting the Dots is Important
Traceability: Why Connecting the Dots is ImportantJennifer Colburn
 
Successfully Achieving And Delivering Results Through Rigorous Project Select...
Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...
Successfully Achieving And Delivering Results Through Rigorous Project Select...shawncarner
 
Pollitt.julie
Pollitt.juliePollitt.julie
Pollitt.julieNASAPMC
 
Svarcas.rita
Svarcas.ritaSvarcas.rita
Svarcas.ritaNASAPMC
 
File 2 extra slide 2
File 2 extra slide 2File 2 extra slide 2
File 2 extra slide 2test prod1
 
File 2 removed 4 slides 2
File 2 removed 4 slides 2File 2 removed 4 slides 2
File 2 removed 4 slides 2test prod1
 
File 2 original copy 2
File 2 original  copy 2File 2 original  copy 2
File 2 original copy 2test prod1
 

Semelhante a Experience with the Design of Logical Frameworks and the Evaluation of Delivery Based on Quantifiable Targets and Measurable Indicators (IWC5 Presentation) (20)

Application Of Life Cycle Analysis
Application Of Life Cycle AnalysisApplication Of Life Cycle Analysis
Application Of Life Cycle Analysis
 
Transboundary Diagnostic Anaylsis: The Mediterreanean Region
Transboundary Diagnostic Anaylsis: The Mediterreanean RegionTransboundary Diagnostic Anaylsis: The Mediterreanean Region
Transboundary Diagnostic Anaylsis: The Mediterreanean Region
 
Application of life cycle analysis in the capital 07 17 14
Application of life cycle analysis in the capital 07 17 14Application of life cycle analysis in the capital 07 17 14
Application of life cycle analysis in the capital 07 17 14
 
LIFE CYCLE COST CALCULATION MODELS FOR BUILDINGS
LIFE CYCLE COST CALCULATION MODELS FOR BUILDINGSLIFE CYCLE COST CALCULATION MODELS FOR BUILDINGS
LIFE CYCLE COST CALCULATION MODELS FOR BUILDINGS
 
Achievements and results of pilot projects, results and scaling-up
Achievements and results of pilot projects, results and scaling-upAchievements and results of pilot projects, results and scaling-up
Achievements and results of pilot projects, results and scaling-up
 
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAsset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
 
Public Sector Life Cycle Costing for Asset Management
Public Sector Life Cycle Costing for Asset ManagementPublic Sector Life Cycle Costing for Asset Management
Public Sector Life Cycle Costing for Asset Management
 
IES offsets & opportunities
IES offsets & opportunitiesIES offsets & opportunities
IES offsets & opportunities
 
ON TIME | ON TARGET: Leasing for Army Transportation Battalion
ON TIME | ON TARGET: Leasing for Army Transportation BattalionON TIME | ON TARGET: Leasing for Army Transportation Battalion
ON TIME | ON TARGET: Leasing for Army Transportation Battalion
 
WB Session and OP 8
WB Session and OP 8WB Session and OP 8
WB Session and OP 8
 
The challenge of infrastructure and long term investment
The challenge of infrastructure and long term investmentThe challenge of infrastructure and long term investment
The challenge of infrastructure and long term investment
 
Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...
Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...
Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...
 
Traceability: Why Connecting the Dots is Important
Traceability: Why Connecting the Dots is ImportantTraceability: Why Connecting the Dots is Important
Traceability: Why Connecting the Dots is Important
 
Successfully Achieving And Delivering Results Through Rigorous Project Select...
Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...
Successfully Achieving And Delivering Results Through Rigorous Project Select...
 
SRD Tools Critical Thresholds Patrick ten Brink of IEEP Presentation 13 Feb 2007
SRD Tools Critical Thresholds Patrick ten Brink of IEEP Presentation 13 Feb 2007SRD Tools Critical Thresholds Patrick ten Brink of IEEP Presentation 13 Feb 2007
SRD Tools Critical Thresholds Patrick ten Brink of IEEP Presentation 13 Feb 2007
 
Pollitt.julie
Pollitt.juliePollitt.julie
Pollitt.julie
 
Svarcas.rita
Svarcas.ritaSvarcas.rita
Svarcas.rita
 
File 2 extra slide 2
File 2 extra slide 2File 2 extra slide 2
File 2 extra slide 2
 
File 2 removed 4 slides 2
File 2 removed 4 slides 2File 2 removed 4 slides 2
File 2 removed 4 slides 2
 
File 2 original copy 2
File 2 original  copy 2File 2 original  copy 2
File 2 original copy 2
 

Mais de Iwl Pcu

Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)Iwl Pcu
 
Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)Iwl Pcu
 
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...Iwl Pcu
 
Understanding the audience (IWC8)
Understanding the audience (IWC8)Understanding the audience (IWC8)
Understanding the audience (IWC8)Iwl Pcu
 
Effective slide designing
Effective slide designingEffective slide designing
Effective slide designingIwl Pcu
 
How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)Iwl Pcu
 
Presentation vs Publication
Presentation vs PublicationPresentation vs Publication
Presentation vs PublicationIwl Pcu
 
Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)Iwl Pcu
 
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 

Mais de Iwl Pcu (20)

Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)
 
Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)
 
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
 
Understanding the audience (IWC8)
Understanding the audience (IWC8)Understanding the audience (IWC8)
Understanding the audience (IWC8)
 
Effective slide designing
Effective slide designingEffective slide designing
Effective slide designing
 
How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)
 
Presentation vs Publication
Presentation vs PublicationPresentation vs Publication
Presentation vs Publication
 
Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)
 
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
 
TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10
 
TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 

Experience with the Design of Logical Frameworks and the Evaluation of Delivery Based on Quantifiable Targets and Measurable Indicators (IWC5 Presentation)

  • 1. EXPERIENCE WITH THE DESIGN OF LOGICALEXPERIENCE WITH THE DESIGN OF LOGICAL FRAMEWORKS AND THE EVALUATION OFFRAMEWORKS AND THE EVALUATION OF DELIVERY BASED ON QUANTIFIABLE TARGETSDELIVERY BASED ON QUANTIFIABLE TARGETS AND MEASURABLE INDICATORSAND MEASURABLE INDICATORS David VousdenDavid Vousden Effective GEF IW IndicatorsEffective GEF IW Indicators
  • 2. Targets need to be based on real interventions and ‘concrete’Targets need to be based on real interventions and ‘concrete’ activities. Some examples….activities. Some examples…. Process IndicatorsProcess Indicators: legislative reform for sustainable fisheries or: legislative reform for sustainable fisheries or water qualitywater quality Stress Reduction IndicatorsStress Reduction Indicators: Sewage treatment systems up and: Sewage treatment systems up and running; Gear changes/modification in fisheriesrunning; Gear changes/modification in fisheries Environment/socioeconomic IndicatorsEnvironment/socioeconomic Indicators: By-catch reduced;: By-catch reduced; catches of threatened species reduced (landingcatches of threatened species reduced (landing figures/observers); nutrient loads down; nutrient –demanding algalfigures/observers); nutrient loads down; nutrient –demanding algal levels downlevels down How to ensure that targets andHow to ensure that targets and indicators are appropriateindicators are appropriate
  • 3. Targets should NOT be based on intangeable orTargets should NOT be based on intangeable or unmeasurable/impractical indicators (some examples!)unmeasurable/impractical indicators (some examples!) Political will for improving fisheries and water qualityPolitical will for improving fisheries and water quality approaches raised/improvedapproaches raised/improved Management practices for stress reduction expandedManagement practices for stress reduction expanded Improved water quality on coral reefsImproved water quality on coral reefs Raised quality of life in communitiesRaised quality of life in communities These are difficult or often impossible to quantify and areThese are difficult or often impossible to quantify and are subjective in any evaluation processsubjective in any evaluation process Inappropriate Targets andInappropriate Targets and Indicators!Indicators!
  • 4. There are… in terms of the need to focus on transboundaryThere are… in terms of the need to focus on transboundary deliverables at a regional leveldeliverables at a regional level These can be hard to quantify because of the need to show aThese can be hard to quantify because of the need to show a balanced set of deliveries across a number of countries thatbalanced set of deliveries across a number of countries that should represent an equitable regional effortshould represent an equitable regional effort As an example, the ASCLME project is dealing with this problemAs an example, the ASCLME project is dealing with this problem by undertaking a national Marine Ecosystem Diagnostic Analysisby undertaking a national Marine Ecosystem Diagnostic Analysis (MEDA) in each country first….(MEDA) in each country first…. This is then reflected synergistically in the overall TDAThis is then reflected synergistically in the overall TDA Are their special challenges thatAre their special challenges that relate to IW Log Frame design?relate to IW Log Frame design?
  • 5. This is a logical and effective approach as it provides a clear flowThis is a logical and effective approach as it provides a clear flow from concept to concrete action….from concept to concrete action…. 1.1. Changes in approach, policy and legislation (processChanges in approach, policy and legislation (process reforms)reforms) 2.2. Actual efforts to deliver these reforms as concrete actionsActual efforts to deliver these reforms as concrete actions for reducing stresses on the ‘system’for reducing stresses on the ‘system’ Leading to…Leading to… 3.3. Measurable improvements at the ecosystem/biologicalMeasurable improvements at the ecosystem/biological community/social community/ species levels (which cancommunity/social community/ species levels (which can feed back to 1. above)feed back to 1. above) Use of Process, Stress ReductionUse of Process, Stress Reduction and Environmental/Socioeconomicand Environmental/Socioeconomic Status indicatorsStatus indicators
  • 6. A.A. Log Frames are frequently out-of-date at Project InceptionLog Frames are frequently out-of-date at Project Inception (may be several years old!) therefore….(may be several years old!) therefore…. B.B. Review and revision of Log Frames is often one of the firstReview and revision of Log Frames is often one of the first important activities for the Projectimportant activities for the Project C.C. This agreement/ approval of a reviewed and revised LogThis agreement/ approval of a reviewed and revised Log Frame by participating countries and the Project SteeringFrame by participating countries and the Project Steering Committee can be extremely valuable and critical in buildingCommittee can be extremely valuable and critical in building country ownership and support (especially as the PSCcountry ownership and support (especially as the PSC members and National Focal Institutions and theirmembers and National Focal Institutions and their policies/priorities may have changes since the original Logpolicies/priorities may have changes since the original Log Frame was designed)Frame was designed) Some weaknesses in Log FrameSome weaknesses in Log Frame designdesign
  • 7. These are a very useful component of the Log Frame but alsoThese are a very useful component of the Log Frame but also they DO need to be reviewed at Project Inception/Implementationthey DO need to be reviewed at Project Inception/Implementation along with this rest of the Log Frame for the same reasons asalong with this rest of the Log Frame for the same reasons as stated in the previous slide (changes over time, countrystated in the previous slide (changes over time, country agreement and ownership)agreement and ownership) One clear example would be in the ASCLME Project in theOne clear example would be in the ASCLME Project in the western Indian Ocean where the original document did not identifywestern Indian Ocean where the original document did not identify piracy as a risk but which has now become one the greatestpiracy as a risk but which has now become one the greatest transboundary threats to the projecttransboundary threats to the project It is important to realise that the Project (and therefore its LogIt is important to realise that the Project (and therefore its Log Frame) is not written in stone and SHOULD be reviewed fromFrame) is not written in stone and SHOULD be reviewed from time to time as part of a flexible, evolving and dynamic projecttime to time as part of a flexible, evolving and dynamic project Risks and AssumptionsRisks and Assumptions
  • 8. A.A. There is a need to develop some standardised Indicators forThere is a need to develop some standardised Indicators for certain situations and projects to allow for a more comparablecertain situations and projects to allow for a more comparable review process. (e.g. LME indicators could focus on the 5review process. (e.g. LME indicators could focus on the 5 modules of the LMEs)modules of the LMEs) B.B. A review of the Logical Framework Matrix at Inception orA review of the Logical Framework Matrix at Inception or soon after should be a standard requirement to ensuresoon after should be a standard requirement to ensure accuracy of evaluation and true country ownershipaccuracy of evaluation and true country ownership C.C. Part of the mandate of the Mid Term Reviewers should be toPart of the mandate of the Mid Term Reviewers should be to re-visit the Log Frame with the stakeholders and to advise there-visit the Log Frame with the stakeholders and to advise the Project on any appropriate modifications or additions to theProject on any appropriate modifications or additions to the Log Frame to ensure a more accurate and representativeLog Frame to ensure a more accurate and representative Terminal EvaluationTerminal Evaluation Better use of Log Frames in ProjectBetter use of Log Frames in Project Design and ManagementDesign and Management
  • 9. 1.1. On-going ‘progress-chasing’ of deliverables during the ProjectOn-going ‘progress-chasing’ of deliverables during the Project lifetime using Log Frame indicators (continuous assessmentlifetime using Log Frame indicators (continuous assessment and fine-tuning)and fine-tuning) 2.2. Post-Project Evaluation of Indicators to ensure sustainabilityPost-Project Evaluation of Indicators to ensure sustainability of Project objectives and GEF Investmentof Project objectives and GEF Investment Other improvements to the useOther improvements to the use of GEF IW Indicatorsof GEF IW Indicators