1. Insurance Survey Portal
Final Year Project Proposal
Abdul Rehman Aslam
9998
Yasir Mehmood
9994
Supervised By
Ms. Rabia Latif
Submitted for the partial fulfillment of BS Software Engineering Degree to
the Faculty of Engineering
NATIONAL UNIVERSITY OF MODERN LANGUAGES
ISLAMABAD
September 2012
3|Page
2. Table of Contents
Table of Contents.................................................................................................................4
1. INTRODUCTION:..........................................................................................................5
2. BACKGROUND:............................................................................................................5
3. EXISTING SYSTEM:.....................................................................................................5
4. AIMS and objectives:......................................................................................................6
5. PROJECT SPECIFICATIONS:.......................................................................................6
5.1. Operations.................................................................................................................6
Fire Insurance ................................................................................................................................6
Motor Insurance ............................................................................................................................6
Marine Insurance............................................................................................................................6
5.2. Roles.........................................................................................................................6
Admin.............................................................................................................................................6
Users...............................................................................................................................................6
6.PROPOSED SYSTEM FEATURES................................................................................6
6.1 Use case diagrame .....................................................................................................6
6.2 System Prototypes......................................................................................................7
6.3 Non Functional Requirements ..................................................................................9
7. PROPOSED PLAN FOR IMPLEMENTATION:...........................................................9
7.1. System Requirement Specification...........................................................................9
7.2. Analysis:...................................................................................................................9
73. Documentation:..........................................................................................................9
7.4. Web Development....................................................................................................9
7.5. Testing.....................................................................................................................10
7.6. Project Gantt chart..................................................................................................10
8. DELIVERABLE OUTCOME.......................................................................................10
9. RESOURCE REQUIRMENTS.....................................................................................10
9.1. Software Resource Requirements...........................................................................10
Dot Net frame ..............................................................................................................................10
9.2. Hardware Resource Requirements..........................................................................10
RAM: ............................................................................................................................10
Hard Drive............................................................................................................................10
Minimum CPU Requirement....................................................................................................11
10. REFERENCES........................................................................................................12
I.www.igiinsurance.com.pk...............................................................................................12
II.www.agico.com.pk.........................................................................................................12
CERTIFICATION.............................................................................................................13
4
3. 1. INTRODUCTION:
The aim of a project is to develop an online web application and information system that
maintains and manipulates insurance survey record for our valued customer named
Saleem Siddiqui and Co., a leading insurance surveying company with four existing
branches in major cities of Pakistan. The application will allow the company to automate
the record of survey reports of its intended customers for different types of insurance
policies like motor, fire and marine Insurance.
2. BACKGROUND:
In Pakistan, most of the surveying companies keep customer’s record manually and it is
very difficult for them to manipulate or search a specific customer or claim incidence
record. So it is quite a need to develop a system that efficiently handles this record
keeping and manipulating problems.
3. EXISTING SYSTEM:
For surveying companies, there is no such system available that can be used to keep and
maintain record using a fully automated environment.
3.1 Limitations
The company is spread over different branches all over the country, so manually keeping
and maintaining records is limited to local branches of the company. In other words, no
concept of a central record exist
5
4. 4. AIMS and objectives:
The aim of the proposed system is to automate the company in order to generate
computerized reports of different categories of insurance like Fire, Motor and Marine
Insurance.
5. PROJECT SPECIFICATIONS:
The proposed system will maintains the data of the customers for following categories:
5.1. Operations
The company will be able to insert, update and delete the record of a specific
customer for given claims
Fire Insurance
The company will be able to insert, update and delete the record of a specific customer
for a Fire incidence claim
Motor Insurance
The company will be able to insert, update and delete the record of a specific
customer for Motor claim
Marine Insurance
The company will be able to insert, update and delete the record of a specific
customer for a Marine incidence claim.
5.2. Roles
The proposed system will be managed by different types of users with following
rights
Admin
The admin will have complete rights i.e. to add users, delete users, view reports,
delete reports and review his/her or subordinate’s work.
Users
The user will be able to view all information related to the company. He can use a
Login and password assigned to login into system, so he can generate ,view records.
6.PROPOSED SYSTEM FEATURES
6.1 Use case diagrame
6
7. 6.3 Non Functional Requirements
7. PROPOSED PLAN FOR IMPLEMENTATION:
Here is the complete proposed plan for implementation of our system
7.1. System Requirement Specification
Requirements will be gathered within 40 days after starting the project.
7.2. Analysis:
All the analysis will be done on the basis of the requirements gathered. Time
required will be 15 days.
73. Documentation:
Project progress reports will also be submitted and on the completion of the
project, the final report and complete documentation will be submitted almost in
a month.
7.4. Web Development
After the web design phase, development phase will start and it will be
completed within 4 months approximately.
9
8. 7.5. Testing
Our testing phase will start with development phase, unit testing will be done
throughout the development and at the end we will perform system testing.
7.6. Project Gantt chart
Following are the task and their time lines:
Figure 1: Project Gantt chart
8. DELIVERABLE OUTCOME
Deliverable outcome of the project will be in the form of a website, along with the
detailed documentation of the project.
9. RESOURCE REQUIRMENTS
Following are the resources require accomplishing our project
9.1. Software Resource Requirements
Dot Net frame
The Microsoft Visual Studio 2010 will be used as Integrated Developing
Environment (IDE) for the development of proposed system. Visual Studio 2010
is equipped with all essential tools that are required for the development of this
system
9.2. Hardware Resource Requirements
A PC with a windows operating system will be used as hardware resource with
following specifications
RAM:
At least 2 GB of RAM will be required
Hard Drive
20GB of Physical Storage Required
10
10. 10. REFERENCES
I. www.igiinsurance.com.pk
II. www.agico.com.pk
12
11. CERTIFICATION
It is certified that final year project proposal submitted by Abdul-Rehman Aslam, and
Yasir Mehmood for the partial fulfillment of the requirement of “Bachelor’s Degree in
Software engineering is approved”.
Ms. Rabia Latif
Supervisor Signature ___________________
13