SlideShare uma empresa Scribd logo
1 de 41
Baixar para ler offline
Managing Innovations




Managing Innovations




                       Copyright 2010          1
Managing Innovations




DESIGN DIRECTIONS helps companies realize their dreams
we design products, graphics, interfaces and perceptions..




                                                      Copyright 2010            2
Managing Innovations




KT WEIR

Micro irrigation dams




                        Copyright 2010          3
Managing Innovations




Current scenario:

• Govt Of India puts in lot of investment to build the micro dams such
  that farmers can get water for irrigation post the monsoon season and
  till the onset of next rains
• Most of the gates get stolen (As MS has a good resale value) or they rust
  with in 2 to 3 years – there by loss to the Government and the farmers.
• Max height of these dams is 5 mts.
• These gates are removed just before monsoon and reinstalled after
  the season is over. Thus prone to theft in this period
• Each gate is 2000 mm X 500 mm X 4 mm thick MS Plates
• Weight of each gate is @ 84 Kgs
• Very heavy and cumbersome to install
• Prone to water leakage due to use of an old and faulty design




                                                          Copyright 2010          4
Managing Innovations




Objective:

•   To design the K T weir gates in a material which would last longer
•   Should be easy to install and idiot proof
•   Should have less value for resale
•   Should be available at a right price point
•   Should look interesting and attractive
•   Should instill confidence that the gates will work as desired




                                                            Copyright 2010          5
Managing Innovations




A typical KT bandhara or KT weir dam



                                       Copyright 2010          6
Managing Innovations




                           Walkway above dam


                           Water at upstream side

                           Concrete dam


                           Flow of water



                           Downstream side




Flow of water at the dam


                                                    Copyright 2010          7
Managing Innovations




                                     Metal channel for
                                     aligning gate
                                     needles




                                     Metal needle




                                     Dam




Dam opening seen from above


                              Copyright 2010             8
Managing Innovations




               Downstream side


                                                                   Dam




                                                                   Metal Needle




     Direction of
     water pressure

                                            Upstream side
A metal gate needle installed at a KT dam


                                                            Copyright 2010          9
Managing Innovations



Standard K T Weir Dam

Seepage of water is a failure




                   Copyright 2010         10
Managing Innovations




Standard K T Weir Gates




                          Copyright 2010         11
Managing Innovations


Standard K T Weir Gates

Seepage of water is a failure




                                Copyright 2010         12
Managing Innovations



Standard K T Weir Gate

Rusting / Pitting




                    Copyright 2010         13
Managing Innovations




Copyright 2010         14
Managing Innovations




Standard K T Weir
Gates

Storage during
monsoon




                    Copyright 2010         15
Managing Innovations


Standard K T Weir
Gates

Difficult to remove
from channels due to
use of cement




                       Copyright 2010         16
Managing Innovations




KT WEIR

Micro irrigation dams

Pictures of the first rotationally molded
prototype


Concept works……………………..




                                    Copyright 2010         17
Managing Innovations




Vertical channel



Gate needle

Sealing


                                                           Water level rises after all
                                                           gate needles are installed




                                          Maximum water head
                                          depends upon no. of
                                          gates needles installed
Concrete dam
                                          (water head of 7.5 m /
                                          15 gate needles is to be
                                          considered for design)




                   Side view of the dam


                                                           Copyright 2010                18
Managing Innovations




                         Water pressure


   Rotomolded Gate
   needle (Design
   to be validated)




                            Support surface




                          @40mm




Channel


                      Water pressure loading on the needle


                                                     Copyright 2010            19
Managing Innovations




Copyright 2010         20
Managing Innovations




Copyright 2010         21
Managing Innovations




Copyright 2010         22
Managing Innovations




Copyright 2010         23
Managing Innovations




Copyright 2010         24
Managing Innovations




Copyright 2010         25
Managing Innovations




Copyright 2010         26
Managing Innovations




Copyright 2010         27
Managing Innovations




Copyright 2010         28
Managing Innovations




Copyright 2010         29
Managing Innovations




Copyright 2010         30
Managing Innovations




Copyright 2010         31
Managing Innovations




Copyright 2010         32
Managing Innovations




second prototype


Material of Construction: LLDPE


Grade - Reliance – LL 36 RA 045 UV




                                     Copyright 2010         33
Managing Innovations




Copyright 2010         34
Managing Innovations




Copyright 2010         35
Managing Innovations




Copyright 2010         36
Managing Innovations




Copyright 2010         37
Managing Innovations




Copyright 2010         38
Managing Innovations




Copyright 2010         39
Managing Innovations




Copyright 2010         40
Managing Innovations




make things as simple as possible, but not simpler
                albert einstein




               Thank you
       www.designdirections.net
                                           Copyright 2010         41

Mais conteúdo relacionado

Mais procurados (20)

Cross Drainage Works
Cross Drainage WorksCross Drainage Works
Cross Drainage Works
 
weir & barrage
weir & barrageweir & barrage
weir & barrage
 
Design of barrages
Design of barragesDesign of barrages
Design of barrages
 
Energy dissipation - irrigation engineering
Energy dissipation - irrigation engineeringEnergy dissipation - irrigation engineering
Energy dissipation - irrigation engineering
 
minor and micro irrigation
 minor and micro irrigation minor and micro irrigation
minor and micro irrigation
 
Reservior planning
Reservior    planningReservior    planning
Reservior planning
 
Canal Regulation Works
Canal Regulation WorksCanal Regulation Works
Canal Regulation Works
 
Spillways
SpillwaysSpillways
Spillways
 
Canal outlets
Canal outletsCanal outlets
Canal outlets
 
energy dissipator in hydraulic structure
energy dissipator  in  hydraulic structure energy dissipator  in  hydraulic structure
energy dissipator in hydraulic structure
 
Irrigation Enineering Introduction
Irrigation Enineering IntroductionIrrigation Enineering Introduction
Irrigation Enineering Introduction
 
Spillways
SpillwaysSpillways
Spillways
 
Irrigation Engineering
Irrigation EngineeringIrrigation Engineering
Irrigation Engineering
 
Bandhara Irrigation 1to8.pptx
Bandhara Irrigation 1to8.pptxBandhara Irrigation 1to8.pptx
Bandhara Irrigation 1to8.pptx
 
Canal irrigation
Canal irrigationCanal irrigation
Canal irrigation
 
Chapter 4.3 well foundation-final-ppt
Chapter 4.3   well foundation-final-pptChapter 4.3   well foundation-final-ppt
Chapter 4.3 well foundation-final-ppt
 
Chapter 7 spillway and energy dissipators
Chapter 7 spillway and energy dissipatorsChapter 7 spillway and energy dissipators
Chapter 7 spillway and energy dissipators
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
1. reservoirs unit !
1. reservoirs   unit !1. reservoirs   unit !
1. reservoirs unit !
 
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion HeadworkDesign of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
 

Destaque

Menstrual education for girls- Dr. Vikas Chothe
Menstrual education for girls- Dr. Vikas ChotheMenstrual education for girls- Dr. Vikas Chothe
Menstrual education for girls- Dr. Vikas ChotheDr Vikas Chothe
 
Diversion head works ajitha miss
Diversion head works ajitha missDiversion head works ajitha miss
Diversion head works ajitha missSHAMJITH KM
 
Best Small Business Ideas in India to Start Business for 2017-18
Best Small Business Ideas in India to Start Business for 2017-18Best Small Business Ideas in India to Start Business for 2017-18
Best Small Business Ideas in India to Start Business for 2017-18Ajjay Kumar Gupta
 
An Ethiopian Success Story: How Partnerships Save Lives Slides
An Ethiopian Success Story: How Partnerships Save Lives SlidesAn Ethiopian Success Story: How Partnerships Save Lives Slides
An Ethiopian Success Story: How Partnerships Save Lives SlidesRotary International
 
Final project for haydroulic engginering
Final project for haydroulic enggineringFinal project for haydroulic engginering
Final project for haydroulic enggineringkindu melese
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworksJimit Shah
 
Plumbing in Architecture
Plumbing in ArchitecturePlumbing in Architecture
Plumbing in ArchitectureSneha Nagarajan
 
Module 6 module 4 draft sanitary and plumbing layout and details
Module 6   module 4 draft sanitary and plumbing layout and details Module 6   module 4 draft sanitary and plumbing layout and details
Module 6 module 4 draft sanitary and plumbing layout and details Gilbert Bautista
 
3 star hotel
3  star hotel3  star hotel
3 star hotelusman6789
 
Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)Zairul Zaiky
 

Destaque (20)

Menstrual education for girls- Dr. Vikas Chothe
Menstrual education for girls- Dr. Vikas ChotheMenstrual education for girls- Dr. Vikas Chothe
Menstrual education for girls- Dr. Vikas Chothe
 
Diversion head works ajitha miss
Diversion head works ajitha missDiversion head works ajitha miss
Diversion head works ajitha miss
 
Best Small Business Ideas in India to Start Business for 2017-18
Best Small Business Ideas in India to Start Business for 2017-18Best Small Business Ideas in India to Start Business for 2017-18
Best Small Business Ideas in India to Start Business for 2017-18
 
Rating curve design,practice and problems
Rating curve design,practice and problemsRating curve design,practice and problems
Rating curve design,practice and problems
 
An Ethiopian Success Story: How Partnerships Save Lives Slides
An Ethiopian Success Story: How Partnerships Save Lives SlidesAn Ethiopian Success Story: How Partnerships Save Lives Slides
An Ethiopian Success Story: How Partnerships Save Lives Slides
 
Building finishes
Building finishesBuilding finishes
Building finishes
 
Design of weir on river cauvery near thottilpatti village
Design of weir on river cauvery near thottilpatti villageDesign of weir on river cauvery near thottilpatti village
Design of weir on river cauvery near thottilpatti village
 
Final project for haydroulic engginering
Final project for haydroulic enggineringFinal project for haydroulic engginering
Final project for haydroulic engginering
 
weirs
weirsweirs
weirs
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Diversion headwork
Diversion headwork Diversion headwork
Diversion headwork
 
Types of Irrigation
Types of IrrigationTypes of Irrigation
Types of Irrigation
 
Plumbing in Architecture
Plumbing in ArchitecturePlumbing in Architecture
Plumbing in Architecture
 
Weir and barrage lecture
Weir and barrage lectureWeir and barrage lecture
Weir and barrage lecture
 
Module 6 module 4 draft sanitary and plumbing layout and details
Module 6   module 4 draft sanitary and plumbing layout and details Module 6   module 4 draft sanitary and plumbing layout and details
Module 6 module 4 draft sanitary and plumbing layout and details
 
Floor finish
Floor finishFloor finish
Floor finish
 
3 star hotel
3  star hotel3  star hotel
3 star hotel
 
2. menstrual hygiene management
2. menstrual hygiene management2. menstrual hygiene management
2. menstrual hygiene management
 
Wall finishes
Wall finishesWall finishes
Wall finishes
 
Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)
 

Semelhante a Design of Bandhara / Weir Dam gates using plastic materials_Design Directions_2010

Summary of water vapor reducing admixture technology
Summary of water vapor reducing admixture technologySummary of water vapor reducing admixture technology
Summary of water vapor reducing admixture technologyEd Grabinski, CSI
 
2009 IBS - High Performance Masonry Walls
2009 IBS - High Performance Masonry Walls2009 IBS - High Performance Masonry Walls
2009 IBS - High Performance Masonry Wallsbenjaminobdyke
 
11 mechanisms of corrosion of structural concrete and how to stop them
11 mechanisms of corrosion of structural concrete and how to stop them11 mechanisms of corrosion of structural concrete and how to stop them
11 mechanisms of corrosion of structural concrete and how to stop themMichael Aldred
 
Kryton Concrete Waterproofing | Corporate Brochure 2011
Kryton Concrete Waterproofing | Corporate Brochure 2011Kryton Concrete Waterproofing | Corporate Brochure 2011
Kryton Concrete Waterproofing | Corporate Brochure 2011Kryton International Inc.
 
CC Mining Applications
CC Mining ApplicationsCC Mining Applications
CC Mining ApplicationsChristiane Cyr
 
Essay On Self Compacting Concrete
Essay On Self Compacting ConcreteEssay On Self Compacting Concrete
Essay On Self Compacting ConcreteJacqueline Thomas
 
Adsc products presentation_3.17.10[1]
Adsc products presentation_3.17.10[1]Adsc products presentation_3.17.10[1]
Adsc products presentation_3.17.10[1]DennisConTech
 
CMS DIP Presentation 18
CMS DIP Presentation 18CMS DIP Presentation 18
CMS DIP Presentation 18presentimage
 
Production Buoyancy - Ichthys LNG Project (McDermotts) _ Matrix Composites an...
Production Buoyancy - Ichthys LNG Project (McDermotts) _ Matrix Composites an...Production Buoyancy - Ichthys LNG Project (McDermotts) _ Matrix Composites an...
Production Buoyancy - Ichthys LNG Project (McDermotts) _ Matrix Composites an...Myke P
 
Jan 5 Tempe Town Lake Dam Replacement - long version
Jan 5 Tempe Town Lake Dam Replacement - long versionJan 5 Tempe Town Lake Dam Replacement - long version
Jan 5 Tempe Town Lake Dam Replacement - long versionCity of Tempe, Arizona
 
Morocco Mall Post Tensioned Concrete Case Study
Morocco Mall Post Tensioned Concrete Case StudyMorocco Mall Post Tensioned Concrete Case Study
Morocco Mall Post Tensioned Concrete Case StudyCCL Concrete
 
Asbestos Removal London Case Study – Financial
Asbestos Removal London Case Study – FinancialAsbestos Removal London Case Study – Financial
Asbestos Removal London Case Study – FinancialSimply Marcomms
 
John V. Costa Project Portfolio 041519
John V. Costa Project Portfolio 041519John V. Costa Project Portfolio 041519
John V. Costa Project Portfolio 041519John V. Costa, MSME
 

Semelhante a Design of Bandhara / Weir Dam gates using plastic materials_Design Directions_2010 (20)

Watershell Catalogue Specto Ct August 2009
Watershell Catalogue Specto Ct August 2009Watershell Catalogue Specto Ct August 2009
Watershell Catalogue Specto Ct August 2009
 
Summary of water vapor reducing admixture technology
Summary of water vapor reducing admixture technologySummary of water vapor reducing admixture technology
Summary of water vapor reducing admixture technology
 
Krystol Magazine 17.1
Krystol Magazine 17.1Krystol Magazine 17.1
Krystol Magazine 17.1
 
2009 IBS - High Performance Masonry Walls
2009 IBS - High Performance Masonry Walls2009 IBS - High Performance Masonry Walls
2009 IBS - High Performance Masonry Walls
 
11 mechanisms of corrosion of structural concrete and how to stop them
11 mechanisms of corrosion of structural concrete and how to stop them11 mechanisms of corrosion of structural concrete and how to stop them
11 mechanisms of corrosion of structural concrete and how to stop them
 
Kryton Concrete Waterproofing | Corporate Brochure 2011
Kryton Concrete Waterproofing | Corporate Brochure 2011Kryton Concrete Waterproofing | Corporate Brochure 2011
Kryton Concrete Waterproofing | Corporate Brochure 2011
 
Krytoncorporatebrochure2011
Krytoncorporatebrochure2011Krytoncorporatebrochure2011
Krytoncorporatebrochure2011
 
CC Mining Applications
CC Mining ApplicationsCC Mining Applications
CC Mining Applications
 
Essay On Self Compacting Concrete
Essay On Self Compacting ConcreteEssay On Self Compacting Concrete
Essay On Self Compacting Concrete
 
Adsc products presentation_3.17.10[1]
Adsc products presentation_3.17.10[1]Adsc products presentation_3.17.10[1]
Adsc products presentation_3.17.10[1]
 
CMS DIP Presentation 18
CMS DIP Presentation 18CMS DIP Presentation 18
CMS DIP Presentation 18
 
Production Buoyancy - Ichthys LNG Project (McDermotts) _ Matrix Composites an...
Production Buoyancy - Ichthys LNG Project (McDermotts) _ Matrix Composites an...Production Buoyancy - Ichthys LNG Project (McDermotts) _ Matrix Composites an...
Production Buoyancy - Ichthys LNG Project (McDermotts) _ Matrix Composites an...
 
Jan 5 Tempe Town Lake Dam Replacement - long version
Jan 5 Tempe Town Lake Dam Replacement - long versionJan 5 Tempe Town Lake Dam Replacement - long version
Jan 5 Tempe Town Lake Dam Replacement - long version
 
Krystol Magazine 18.1
Krystol Magazine 18.1Krystol Magazine 18.1
Krystol Magazine 18.1
 
Multi-technology approach concrete - 20200602 mp (low)
Multi-technology approach concrete - 20200602 mp (low)Multi-technology approach concrete - 20200602 mp (low)
Multi-technology approach concrete - 20200602 mp (low)
 
Morocco Mall Post Tensioned Concrete Case Study
Morocco Mall Post Tensioned Concrete Case StudyMorocco Mall Post Tensioned Concrete Case Study
Morocco Mall Post Tensioned Concrete Case Study
 
Krystol Magazine 16.2
Krystol Magazine 16.2Krystol Magazine 16.2
Krystol Magazine 16.2
 
Asbestos Removal London Case Study – Financial
Asbestos Removal London Case Study – FinancialAsbestos Removal London Case Study – Financial
Asbestos Removal London Case Study – Financial
 
field visit to Victoria dam
field visit to Victoria damfield visit to Victoria dam
field visit to Victoria dam
 
John V. Costa Project Portfolio 041519
John V. Costa Project Portfolio 041519John V. Costa Project Portfolio 041519
John V. Costa Project Portfolio 041519
 

Mais de India Water Portal

Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdfCase study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdfIndia Water Portal
 
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...India Water Portal
 
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...India Water Portal
 
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...India Water Portal
 
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...India Water Portal
 
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...India Water Portal
 
Suno bolo - standard operating procedure
Suno bolo -  standard operating procedureSuno bolo -  standard operating procedure
Suno bolo - standard operating procedureIndia Water Portal
 
Water budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuantharWater budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuantharIndia Water Portal
 
Participatory research appraisal
Participatory research appraisalParticipatory research appraisal
Participatory research appraisalIndia Water Portal
 
Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...India Water Portal
 
Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020India Water Portal
 
Spring hydrogeology and its classification
Spring hydrogeology and its classificationSpring hydrogeology and its classification
Spring hydrogeology and its classificationIndia Water Portal
 
Introduction: Groundwater aquifers
Introduction: Groundwater aquifersIntroduction: Groundwater aquifers
Introduction: Groundwater aquifersIndia Water Portal
 
Atal Bhujal Yojana: Capacity building
Atal Bhujal Yojana: Capacity buildingAtal Bhujal Yojana: Capacity building
Atal Bhujal Yojana: Capacity buildingIndia Water Portal
 

Mais de India Water Portal (20)

Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdfCase study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
 
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
 
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
 
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
 
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
 
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
 
Suno bolo - standard operating procedure
Suno bolo -  standard operating procedureSuno bolo -  standard operating procedure
Suno bolo - standard operating procedure
 
Jal Jeevan Mission, Karnataka
Jal Jeevan Mission, KarnatakaJal Jeevan Mission, Karnataka
Jal Jeevan Mission, Karnataka
 
Water budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuantharWater budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuanthar
 
Water quality
Water qualityWater quality
Water quality
 
Understanding geology
Understanding geologyUnderstanding geology
Understanding geology
 
Springshed treatment measures
Springshed treatment measuresSpringshed treatment measures
Springshed treatment measures
 
Participatory research appraisal
Participatory research appraisalParticipatory research appraisal
Participatory research appraisal
 
Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...
 
Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020
 
Spring mapping manual
Spring mapping manualSpring mapping manual
Spring mapping manual
 
Spring hydrogeology and its classification
Spring hydrogeology and its classificationSpring hydrogeology and its classification
Spring hydrogeology and its classification
 
Introduction to aquifers
Introduction to aquifersIntroduction to aquifers
Introduction to aquifers
 
Introduction: Groundwater aquifers
Introduction: Groundwater aquifersIntroduction: Groundwater aquifers
Introduction: Groundwater aquifers
 
Atal Bhujal Yojana: Capacity building
Atal Bhujal Yojana: Capacity buildingAtal Bhujal Yojana: Capacity building
Atal Bhujal Yojana: Capacity building
 

Último

Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 

Último (20)

Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 

Design of Bandhara / Weir Dam gates using plastic materials_Design Directions_2010