9. Project Location & Statistical Data Catchment area : 1,915 km 2 Reservoir Capacity : 8.0 million m 3 Reservoir impounded area : 0.875 km 2 Design Discharge : 69.0 m 3 /s Gross Head : 220 m Plant Factor : 50 % Installed Capacity : 115 MW Annual Energy Output : 547 GWh/year Length of Headrace tunnel : 7.0 km (approx.) Length of Penstock : 2.0 km (approx.) Salient Features of the Project in the Previous Study Peshawar Islamabad Project Site Dam Site Powerstation Site
10. Photo taken in 2005 Dam/Weir Site Intake Site Tail end of Reservoir Ushiri Khwar Panjkora River Powerstation Site