SlideShare uma empresa Scribd logo
1 de 9
Baixar para ler offline
INTERNATIONAL JOURNAL OF ELECTRICAL ENGINEERING
 International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME
                            & TECHNOLOGY (IJEET)

ISSN 0976 – 6545(Print)
ISSN 0976 – 6553(Online)                                                   IJEET
Volume 4, Issue 2, March – April (2013), pp. 37-45
© IAEME: www.iaeme.com/ijeet.asp
Journal Impact Factor (2013): 5.5028 (Calculated by GISI)
                                                                        ©IAEME
www.jifactor.com




           MITIGATION OF SWITCHING OVERVOLTAGE BY
       APPLICATION OF SURGE ARRESTER ON CAPACITOR BANK


           Dr. Mrs. Hina Chandwani1, C. D. Upadhyay2 , Akil Vahora3, Goutam Som4
       1
        Associate Professor, FTE, The M. S. University of Baroda, Vadodara, Gujarat, India
        2
          Reseach Scholar, FTE, The M. S. University of Baroda, Vadodara, Gujarat, India
  3
    Student of Master of Engineering L.D.College of Engineering, Ahmedabad, Gujarat, India
  4
    Student of Master of Engineering L.D.College of Engineering, Ahmedabad, Gujarat, India


  ABSTRACT

          The paper presents the application of surge arresters as a switching overvoltage
  protection of capacitor bank circuit breakers. Based on an existing Medium Voltage-Capacitor
  bank MATLAB power simulink is performed to show the effectiveness of the surge arrester in
  reducing circuit breaker Transient Recovery Voltages and minimizing the probability of
  circuit breaker restrikes. The energy requirements of the surge arresters and the overvoltage
  protection levels of the capacitors for different surge arrester arrangements are calculated.

  KEYWORDS: TRVs, Capacitor Bank, Surge Arrestor, De-energisation

  1.        INTRODUCTION

          Medium voltage capacitor banks are designed for industrial, utility and commercial
  power systems to improve power factor, increase system capacity, reduce harmonic distortion
  and improve voltage regulation.[1,2,3] Capacitor bank switching is one of the most demanding
  operations in MV networks, due to its associated transients. During the opening operation the
  TRVs across the circuit breaker can rise to very high values and that can initiate breaker
  restrikes which in turn generate even higher overvoltage [4, 8]. Consequently, any restrike
  implies additional stress to capacitor and circuit breaker, which reduces their lifetime. If
  multiple restrikes occur, which can damages the capacitor and circuit breaker immediately [6,
  7]. A way to prevent these overvoltages for new switchgears is the installation of modern
  circuit breakers with a low probability of restrike [5]. For users, having old existing

                                               37
International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME

switchgear not suitable for capacitor bank applications, the question is whether the inserting
of surge arresters across the capacitor can minimize the probability of the circuit breaker
restrikes [9, 10]. Based on a real existing installation of a MV-Capacitor bank a study using
the MATLAB power simulink Software was performed in order to evaluate the effectiveness
of the surge arrester application in minimizing the probability of circuit breaker restrikes.

2.     MODELLING

         A case of substation of 220/33 KV, located at Versova, MUMBAI is taken here.
Based on an existing installation of a 33kV, 14.7 MVAR capacitor bank (ungrounded double
wye -connected), a 3-phase model of a MV-Capacitor bank including the network
components (capacitors, reactor, circuit breaker, and transformer) has been developed to
perform an MATLAB power simulink Simulation for the opening operation of the capacitor
bank. A single-line diagram of the substation and capacitor bank is shown in with
all the ratings marked therein




                  Fig.1. The modelling is based on the following conditions:

•The sequence of a three-phase break of capacitive load followed by restrikes in two phases
at t=10 ms (1/2cycle) after current interruption was identified as the decisive case. The
network with isolated neutral and a power frequency of 50Hz was selected as the most severe
case

• The circuit breaker interrupts the high frequency current at the first current zero.
According to figure 2 three arrester arrangements are investigated for phase to phase and
phase to ground. The system neutral Rg was set to zero.


                                             38
International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME

• As a surge arrester model a class 3 gap less surge arrester type with a fixed protection level of U
res(lightning withstand voltage) /Uc(max residual discharge voltage) = 170/85=2.0 (at in(nominal
discharge current) = 10ka) is used
• The magnitude of overvoltages is given in p.u. (per unit) as a multiple of the peak value of the phase
                                                                                 peak
-to-phase voltage




  Fig.2: Equivalent circuit with the arrester arrangements: phase to ground, phase to neutral,
                                          phase to phase

2.1 DE-ENERGISATION OF CAPACITOR BANK
       ENERGISATION

         In order to evaluate the severity of over voltages and to determine the effectiveness of a surge
arrester application, the step by step procedure was simulated for the following cases

2.1.1 Three phase break of capacitive load

         Using the equivalent circuit according Fig.2 for a single stage capacitor bank (S=14.7 MVA)
with no surge arrester connected on the network the Voltage and current characteristics shown in
Fig.4 are obtained. The first pole to-clear is phase b and the circuit breaker SW1 interrupts the current
                                    to                              uit
in Phase b. From the moment the current is interrupted, the charge of the capacitor is trapped and the
voltage remains constant at the value it had at zero current. The recovery voltage across the circuit
breaker for the first pole to clear rises up to 2.8 p.u. This overvoltage is the most severe voltage stress
for the circuit breaker for all investigated cases. As an assumption the circuit breaker is able to
withstand the voltage stress of 2 p.u. without a restrike. In FFT analysis tool of MATLAB we are
getting total harmonic distortion of 71.01% which is very harmful for other system equipment




          Fig. 3 modelling in MATLAB power simulink of capacitor bank system


                                                    39
International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME




              Fig.4 capacitor bank voltage current without surge arrester

2.1.2 Capacitor bank switching with surge arrester

According to figure 5, Surge arrester is connected between phase to phase capacitor bank
reduce the overvoltage same arrangement of surge arrester model in simulink as shown figure
9 which limit to 1.5 p.u. voltage which is in withstand limit of breaker unit




     Figure 5. Modelling in MATLAB power simulink of capacitor bank with surge
                                  arrangement




                                            40
International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME




            Figure6. Capacitor bank voltage and current with surge arrester


2.1.3 Three phase break of capacitive load associated with multiple breaker restrikes

        The same sequence is simulated as in case 1 but as an assumption the circuit breaker
is not able to withstand the voltage stress of 2 p.u. and a two phase restrike occurs at the peak
value of the recovery voltage in phase a and b (Fig.7). A transient current with an oscillation
frequency starts to flow and the voltage across the capacitor swings up to 3 p.u. The circuit
breaker interrupts the current again at the first of its current zeros, with the result that the
voltage across the capacitor remains on the new constant value and voltage across the circuit
breaker SW1 in Phase a and b rises up to 2.3 p.u. In case of further restrikes overvoltages will
raise up to 3.0 p.u. across the capacitors and 4.15 p.u for further restrike. This process of
voltage and current escalation can damage the capacitor and breaker units.




    Figure 7: Three phase break of capacitive load associated with multiple breaker
                                      restrikes


                                               41
International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME

  2.1.4 Three phase break of capacitive load associated with multiple breaker restrikes and
                                    using surge arresters




                                FIG.8A Capacitor voltage




                                 Fig.8B Breaker current
Figure 8 Capacitor bank voltage and current when surge arrester connected to phase to
                                      ground


                                             42
International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME

         The same sequence is simulated as in case 2 but using a surge arrester arrangement
phase to ground. The obtained voltage and current characteristics are shown in Fig.8. The
surge arrester limits the overvoltage across the capacitors at 1.55p.u. In the case of multiple
restrikes this overvoltage level remains constant. A voltage escalation across the capacitor
and thus a capacitor failure is prevented. The transient recovery circuit breaker voltage across
the first pole-to-clear is limited at 2.0p.u. After the first restrike and that mitigates the risk of
further breaker restrikes. A surge arrester arrangement phase to phase also reduce the over
voltage to 1.2 p.u The surge arrester not only protects the capacitor from dangerous
overvoltages but decreases the probability of multiple restrikes of the breaker, too .

2.1.5 Comparison of breaker TRVs and capacitor voltages for the first pole-to-clear phase
         A detailed one-to-one comparison of the cases 2 and 3 for the first pole-to-clear
(Phase c) characteristic shows the effectiveness of a surge arrester application (Fig.6 & 8).
The effect of the TRV-limitation across the capacitor and the circuit breaker starts with the
first restrike. There is no voltage limitation during the opening operation without a restrike.
Therefore, the surge arrester can only reduce the over voltages if a restrike occurs. There is
no benefit for the circuit breaker to reduce the risk of a first restrike, but it mitigates the risk
of multiple restrikes

3.      ENERGY STRESS ON SURGE ARRESTER

       The energy stresses on the surge arresters were calculated for different arrester
arrangements (Fig.2) and different circuit parameters. The following results are obtained

3.1     Energy stress as a function of the three phase capacitor bank size
       A single-stage capacitor bank is used to vary the three-phase bank size in order to
evaluate the effect on the surge arrester energy stress. The grounding conditions of the system
neutral don`t affect the energy stress on the surge arrester. Only In case of a directly-
grounded neutral (Rg = 0) and an arrester arrangement phase to ground a slightly higher
energy of 7% has to take into account.




Fig. 9 Energy stress as a function of capacitor bank size (based on 3 successive restrikes)

In case of a directly-grounded neutral (Rg = 0) and an arrester arrangement phase to ground a
slightly higher energy of 7% has to take into account.

                                                 43
International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME

3.2 PROTECTION CONSIDERATIONS

        The voltage across the capacitor bank for a single stage capacitor bank is determined
as a function of the three phase capacitor size. The resulting voltages depending on the
arrester Positioning are shown in Figure 10.The same capacitor voltage is obtained for
systems with directly-grounded (Rg = 0) as well as ungrounded neutral (Rg = ∞). The effect
of the number of parallel capacitor stages and the number of repeated restrikes on the
capacitor voltage is negligible.




            Fig.10 Resulting capacitor voltages as a function of capacitor size

4.      CONCLUSION

       Based on the computer simulation of the capacitor bank Deenergisation the following
application considerations and conclusions can be drawn:

        In the simulation of the capacitor switching, the mal-effect of over voltage on Circuit
        Breaker can be reduced by implementing surge arresters at an instant.
        Not only the reduction of C.B failure is done but also the risk of multiple restrikes is
        controlled by limiting the TRVs of the C.B

5.      ACKNOWLEDGEMENTS

        For the technical & data support we are thankful to Schneider electrical infrastructure
ltd. Vadodara, India.

REFERENCES

Books

     [1] Ramasamy Natrajan, Power system capacitors ( Taylor & Francis Group, LLC,2005)
     [2] L. Van Der Sluis, Transients in Power Systems (John Wiley & Sons, 2001)
     [3] A. Greenwood, Electrical Transients in Power Systems ( New York: John Wiley &
         Sons, 2nd Ed., 1991)

                                              44
International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME

Journal Papers

   [4] Grebe, T.E., Application of Distribution System Capacitor Banks and Their Impact on
       Power Quality (IEEE Transactions on Industry Applications, 1996,.32(3): P. 714-719)
   [5] Das J. C., Analysis And Control Of Large Shunt Capacitor Bank Switching Transient
       (IEEE Transactions On Industry Application, 2005. 41(6): P.1444-1451)
   [6] D. Rodriguez Sanabria, C. Ramos-Robles, L. Orama Exclusa, Lightning And
       Lightning Arrester Simulation In Electrical Power Distribution Systems (IEEE
       Transaction 2004)
   [7] Sahib Abdoolwadood Ali, Capacitor Banks Switching Transient In Power System
       (Cscanada Energy Science And Technology 2011, Vol. 2, No. 2, 2011, Pp. 62-73)
   [8] Mehdi Nafar, Gevork B Gharehpetian And Taher Niknam , A Novel Parameter
       Estimation Method For Metal Oxide Surge Arrester Models (Indian Academy of
       Sciences Part 6, pp. 941–961. Dec 2011)
   [9] Nilesh S. Mahajan and A. A. Bhole, “Black Box ARC Modeling of High Voltage
       Circuit Breaker Using MATLAB/SIMULINK” International Journal of Electrical
       Engineering & Technology (IJEET), Volume 3, Issue 1, 2012, pp. 69 - 78,
       ISSN Print : 0976-6545, ISSN Online: 0976-6553

Proceedings Papers

   [10] Braun. D., Koeppl G, Transient Recovery Voltages during the Switching Under Out-
      Of-Phase Conditions (International Conference on Power Systems Transients IPST
      2003 in New Orleans, USA)




                                           45

Mais conteúdo relacionado

Mais procurados

Power Circuits and Transforers-Unit 7 Labvolt Student Manual
Power Circuits and Transforers-Unit 7 Labvolt Student ManualPower Circuits and Transforers-Unit 7 Labvolt Student Manual
Power Circuits and Transforers-Unit 7 Labvolt Student Manualphase3-120A
 
Power Circuits and Transformers-Unit 2 Labvolt Student Manual
Power Circuits and Transformers-Unit 2 Labvolt Student ManualPower Circuits and Transformers-Unit 2 Labvolt Student Manual
Power Circuits and Transformers-Unit 2 Labvolt Student Manualphase3-120A
 
Solar PV Boosting Inverter
Solar PV Boosting InverterSolar PV Boosting Inverter
Solar PV Boosting InverterAM Publications
 
Power Circuits and Transforers-Unit 1 Labvolt Student Manual
Power Circuits and Transforers-Unit 1 Labvolt Student ManualPower Circuits and Transforers-Unit 1 Labvolt Student Manual
Power Circuits and Transforers-Unit 1 Labvolt Student Manualphase3-120A
 
Power Circuits and Transforers-Unit 6 Labvolt Student Manual
Power Circuits and Transforers-Unit 6 Labvolt Student ManualPower Circuits and Transforers-Unit 6 Labvolt Student Manual
Power Circuits and Transforers-Unit 6 Labvolt Student Manualphase3-120A
 
Unit 9 Labvolt Student Manual
Unit 9 Labvolt Student ManualUnit 9 Labvolt Student Manual
Unit 9 Labvolt Student ManualMichaelKeck10
 
Space Vector and Sinusoidal Pulse Width Modulation of Quasi Z-Source Inverter...
Space Vector and Sinusoidal Pulse Width Modulation of Quasi Z-Source Inverter...Space Vector and Sinusoidal Pulse Width Modulation of Quasi Z-Source Inverter...
Space Vector and Sinusoidal Pulse Width Modulation of Quasi Z-Source Inverter...IJPEDS-IAES
 
Photo Voltaic Cell Integrated DVR for Power Quality Improvement
Photo Voltaic Cell Integrated DVR for Power Quality ImprovementPhoto Voltaic Cell Integrated DVR for Power Quality Improvement
Photo Voltaic Cell Integrated DVR for Power Quality ImprovementIJMTST Journal
 
ANALYSIS OF SOLID STATE TRANSFORMER WITH PERMANENT MAGNET SYNCHRONOUS GENERATOR
ANALYSIS OF SOLID STATE TRANSFORMER WITH PERMANENT MAGNET SYNCHRONOUS GENERATORANALYSIS OF SOLID STATE TRANSFORMER WITH PERMANENT MAGNET SYNCHRONOUS GENERATOR
ANALYSIS OF SOLID STATE TRANSFORMER WITH PERMANENT MAGNET SYNCHRONOUS GENERATOREditor IJMTER
 
Pi controller based of multi level upqc using dq0 transformation to improve p...
Pi controller based of multi level upqc using dq0 transformation to improve p...Pi controller based of multi level upqc using dq0 transformation to improve p...
Pi controller based of multi level upqc using dq0 transformation to improve p...eSAT Publishing House
 
Miniature prototype design and implementation of modified multiplier circuit ...
Miniature prototype design and implementation of modified multiplier circuit ...Miniature prototype design and implementation of modified multiplier circuit ...
Miniature prototype design and implementation of modified multiplier circuit ...IAEME Publication
 
Minimization of Power Loss in Distribution System using SVC and STATCOM
Minimization of Power Loss in Distribution System using SVC and STATCOMMinimization of Power Loss in Distribution System using SVC and STATCOM
Minimization of Power Loss in Distribution System using SVC and STATCOMIRJET Journal
 
IRJET- Series Voltage Regulator for Radial DC – Microgrid
IRJET- Series Voltage Regulator for Radial DC – MicrogridIRJET- Series Voltage Regulator for Radial DC – Microgrid
IRJET- Series Voltage Regulator for Radial DC – MicrogridIRJET Journal
 
Voltage Control of Single-Phase Two Winding Self Excited Induction Generator ...
Voltage Control of Single-Phase Two Winding Self Excited Induction Generator ...Voltage Control of Single-Phase Two Winding Self Excited Induction Generator ...
Voltage Control of Single-Phase Two Winding Self Excited Induction Generator ...IJPEDS-IAES
 

Mais procurados (18)

Power Circuits and Transforers-Unit 7 Labvolt Student Manual
Power Circuits and Transforers-Unit 7 Labvolt Student ManualPower Circuits and Transforers-Unit 7 Labvolt Student Manual
Power Circuits and Transforers-Unit 7 Labvolt Student Manual
 
Power Circuits and Transformers-Unit 2 Labvolt Student Manual
Power Circuits and Transformers-Unit 2 Labvolt Student ManualPower Circuits and Transformers-Unit 2 Labvolt Student Manual
Power Circuits and Transformers-Unit 2 Labvolt Student Manual
 
Solar PV Boosting Inverter
Solar PV Boosting InverterSolar PV Boosting Inverter
Solar PV Boosting Inverter
 
Power Circuits and Transforers-Unit 1 Labvolt Student Manual
Power Circuits and Transforers-Unit 1 Labvolt Student ManualPower Circuits and Transforers-Unit 1 Labvolt Student Manual
Power Circuits and Transforers-Unit 1 Labvolt Student Manual
 
Power Circuits and Transforers-Unit 6 Labvolt Student Manual
Power Circuits and Transforers-Unit 6 Labvolt Student ManualPower Circuits and Transforers-Unit 6 Labvolt Student Manual
Power Circuits and Transforers-Unit 6 Labvolt Student Manual
 
Unit 9 Labvolt Student Manual
Unit 9 Labvolt Student ManualUnit 9 Labvolt Student Manual
Unit 9 Labvolt Student Manual
 
Space Vector and Sinusoidal Pulse Width Modulation of Quasi Z-Source Inverter...
Space Vector and Sinusoidal Pulse Width Modulation of Quasi Z-Source Inverter...Space Vector and Sinusoidal Pulse Width Modulation of Quasi Z-Source Inverter...
Space Vector and Sinusoidal Pulse Width Modulation of Quasi Z-Source Inverter...
 
Photo Voltaic Cell Integrated DVR for Power Quality Improvement
Photo Voltaic Cell Integrated DVR for Power Quality ImprovementPhoto Voltaic Cell Integrated DVR for Power Quality Improvement
Photo Voltaic Cell Integrated DVR for Power Quality Improvement
 
ANALYSIS OF SOLID STATE TRANSFORMER WITH PERMANENT MAGNET SYNCHRONOUS GENERATOR
ANALYSIS OF SOLID STATE TRANSFORMER WITH PERMANENT MAGNET SYNCHRONOUS GENERATORANALYSIS OF SOLID STATE TRANSFORMER WITH PERMANENT MAGNET SYNCHRONOUS GENERATOR
ANALYSIS OF SOLID STATE TRANSFORMER WITH PERMANENT MAGNET SYNCHRONOUS GENERATOR
 
Pi controller based of multi level upqc using dq0 transformation to improve p...
Pi controller based of multi level upqc using dq0 transformation to improve p...Pi controller based of multi level upqc using dq0 transformation to improve p...
Pi controller based of multi level upqc using dq0 transformation to improve p...
 
Ad03101770183.
Ad03101770183.Ad03101770183.
Ad03101770183.
 
Miniature prototype design and implementation of modified multiplier circuit ...
Miniature prototype design and implementation of modified multiplier circuit ...Miniature prototype design and implementation of modified multiplier circuit ...
Miniature prototype design and implementation of modified multiplier circuit ...
 
Modeling and Simulation of Three Phase D-SVC for Load Compensation
Modeling and Simulation of Three Phase D-SVC for Load CompensationModeling and Simulation of Three Phase D-SVC for Load Compensation
Modeling and Simulation of Three Phase D-SVC for Load Compensation
 
Minimization of Power Loss in Distribution System using SVC and STATCOM
Minimization of Power Loss in Distribution System using SVC and STATCOMMinimization of Power Loss in Distribution System using SVC and STATCOM
Minimization of Power Loss in Distribution System using SVC and STATCOM
 
F010344049
F010344049F010344049
F010344049
 
A New Structure of Dynamic Voltage Restorer Based on Asymmetrical ī-source In...
A New Structure of Dynamic Voltage Restorer Based on Asymmetrical ī-source In...A New Structure of Dynamic Voltage Restorer Based on Asymmetrical ī-source In...
A New Structure of Dynamic Voltage Restorer Based on Asymmetrical ī-source In...
 
IRJET- Series Voltage Regulator for Radial DC – Microgrid
IRJET- Series Voltage Regulator for Radial DC – MicrogridIRJET- Series Voltage Regulator for Radial DC – Microgrid
IRJET- Series Voltage Regulator for Radial DC – Microgrid
 
Voltage Control of Single-Phase Two Winding Self Excited Induction Generator ...
Voltage Control of Single-Phase Two Winding Self Excited Induction Generator ...Voltage Control of Single-Phase Two Winding Self Excited Induction Generator ...
Voltage Control of Single-Phase Two Winding Self Excited Induction Generator ...
 

Destaque

Experimental investigation on thermal electric and dielectric characterizatio...
Experimental investigation on thermal electric and dielectric characterizatio...Experimental investigation on thermal electric and dielectric characterizatio...
Experimental investigation on thermal electric and dielectric characterizatio...IAEME Publication
 
A premeditated cdm algorithm in cloud computing environment for fpm 2
A premeditated cdm algorithm in cloud computing environment for fpm 2A premeditated cdm algorithm in cloud computing environment for fpm 2
A premeditated cdm algorithm in cloud computing environment for fpm 2IAEME Publication
 
Data security framework for cloud computing networks
Data security framework for cloud computing networksData security framework for cloud computing networks
Data security framework for cloud computing networksIAEME Publication
 
Recommendation system based on association rules applied to consistent behavi...
Recommendation system based on association rules applied to consistent behavi...Recommendation system based on association rules applied to consistent behavi...
Recommendation system based on association rules applied to consistent behavi...IAEME Publication
 
Agent based web service communicating different is’s and platforms
Agent based web service communicating different is’s and platformsAgent based web service communicating different is’s and platforms
Agent based web service communicating different is’s and platformsIAEME Publication
 
Statistical performance analysis of wireless communication in public transports
Statistical performance analysis of wireless communication in public transportsStatistical performance analysis of wireless communication in public transports
Statistical performance analysis of wireless communication in public transportsIAEME Publication
 
A new control methods for offshore grid connected wind energy conversion syst...
A new control methods for offshore grid connected wind energy conversion syst...A new control methods for offshore grid connected wind energy conversion syst...
A new control methods for offshore grid connected wind energy conversion syst...IAEME Publication
 
Employee engagement a theoritical study 2
Employee engagement a theoritical study 2Employee engagement a theoritical study 2
Employee engagement a theoritical study 2IAEME Publication
 
Evaluating the performance of manet routing protocols
Evaluating the performance of manet routing protocolsEvaluating the performance of manet routing protocols
Evaluating the performance of manet routing protocolsIAEME Publication
 
Action event retrieval from cricket video using audio energy feature for event
Action event retrieval from cricket video using audio energy feature for eventAction event retrieval from cricket video using audio energy feature for event
Action event retrieval from cricket video using audio energy feature for eventIAEME Publication
 
Apllictaions of improved gilbert multiplier 2
Apllictaions of improved gilbert multiplier 2Apllictaions of improved gilbert multiplier 2
Apllictaions of improved gilbert multiplier 2IAEME Publication
 
Reliable security in cloud computing environment 2-3-4-5-6
Reliable security in cloud computing environment 2-3-4-5-6Reliable security in cloud computing environment 2-3-4-5-6
Reliable security in cloud computing environment 2-3-4-5-6IAEME Publication
 
Intelligent network selection using fuzzy logic for 4 g wireless networks
Intelligent network selection using fuzzy logic for 4 g wireless networksIntelligent network selection using fuzzy logic for 4 g wireless networks
Intelligent network selection using fuzzy logic for 4 g wireless networksIAEME Publication
 
Enriching search results using ontology
Enriching search results using ontologyEnriching search results using ontology
Enriching search results using ontologyIAEME Publication
 
Trung.Vu_CV
Trung.Vu_CVTrung.Vu_CV
Trung.Vu_CVVu Trung
 
La prehistoria de iván, antonia, alfonso y raúl
La prehistoria de iván, antonia, alfonso y raúlLa prehistoria de iván, antonia, alfonso y raúl
La prehistoria de iván, antonia, alfonso y raúlConchi Cantero H
 
Data Analysis Using Excel PivotTable
Data Analysis Using Excel PivotTableData Analysis Using Excel PivotTable
Data Analysis Using Excel PivotTableHuiChin Teow
 
Espelhos - Uma poética visual
Espelhos - Uma poética visualEspelhos - Uma poética visual
Espelhos - Uma poética visualAlinny Russini
 
Invitacion PAPAZ
Invitacion PAPAZInvitacion PAPAZ
Invitacion PAPAZclacelop
 

Destaque (20)

Experimental investigation on thermal electric and dielectric characterizatio...
Experimental investigation on thermal electric and dielectric characterizatio...Experimental investigation on thermal electric and dielectric characterizatio...
Experimental investigation on thermal electric and dielectric characterizatio...
 
A premeditated cdm algorithm in cloud computing environment for fpm 2
A premeditated cdm algorithm in cloud computing environment for fpm 2A premeditated cdm algorithm in cloud computing environment for fpm 2
A premeditated cdm algorithm in cloud computing environment for fpm 2
 
Data security framework for cloud computing networks
Data security framework for cloud computing networksData security framework for cloud computing networks
Data security framework for cloud computing networks
 
Recommendation system based on association rules applied to consistent behavi...
Recommendation system based on association rules applied to consistent behavi...Recommendation system based on association rules applied to consistent behavi...
Recommendation system based on association rules applied to consistent behavi...
 
Agent based web service communicating different is’s and platforms
Agent based web service communicating different is’s and platformsAgent based web service communicating different is’s and platforms
Agent based web service communicating different is’s and platforms
 
Statistical performance analysis of wireless communication in public transports
Statistical performance analysis of wireless communication in public transportsStatistical performance analysis of wireless communication in public transports
Statistical performance analysis of wireless communication in public transports
 
A new control methods for offshore grid connected wind energy conversion syst...
A new control methods for offshore grid connected wind energy conversion syst...A new control methods for offshore grid connected wind energy conversion syst...
A new control methods for offshore grid connected wind energy conversion syst...
 
Employee engagement a theoritical study 2
Employee engagement a theoritical study 2Employee engagement a theoritical study 2
Employee engagement a theoritical study 2
 
Evaluating the performance of manet routing protocols
Evaluating the performance of manet routing protocolsEvaluating the performance of manet routing protocols
Evaluating the performance of manet routing protocols
 
Action event retrieval from cricket video using audio energy feature for event
Action event retrieval from cricket video using audio energy feature for eventAction event retrieval from cricket video using audio energy feature for event
Action event retrieval from cricket video using audio energy feature for event
 
Apllictaions of improved gilbert multiplier 2
Apllictaions of improved gilbert multiplier 2Apllictaions of improved gilbert multiplier 2
Apllictaions of improved gilbert multiplier 2
 
Reliable security in cloud computing environment 2-3-4-5-6
Reliable security in cloud computing environment 2-3-4-5-6Reliable security in cloud computing environment 2-3-4-5-6
Reliable security in cloud computing environment 2-3-4-5-6
 
Intelligent network selection using fuzzy logic for 4 g wireless networks
Intelligent network selection using fuzzy logic for 4 g wireless networksIntelligent network selection using fuzzy logic for 4 g wireless networks
Intelligent network selection using fuzzy logic for 4 g wireless networks
 
Enriching search results using ontology
Enriching search results using ontologyEnriching search results using ontology
Enriching search results using ontology
 
Trung.Vu_CV
Trung.Vu_CVTrung.Vu_CV
Trung.Vu_CV
 
La prehistoria de iván, antonia, alfonso y raúl
La prehistoria de iván, antonia, alfonso y raúlLa prehistoria de iván, antonia, alfonso y raúl
La prehistoria de iván, antonia, alfonso y raúl
 
Data Analysis Using Excel PivotTable
Data Analysis Using Excel PivotTableData Analysis Using Excel PivotTable
Data Analysis Using Excel PivotTable
 
Espelhos - Uma poética visual
Espelhos - Uma poética visualEspelhos - Uma poética visual
Espelhos - Uma poética visual
 
Búsquedadomingo
BúsquedadomingoBúsquedadomingo
Búsquedadomingo
 
Invitacion PAPAZ
Invitacion PAPAZInvitacion PAPAZ
Invitacion PAPAZ
 

Semelhante a Mitigation of switching overvoltage by application of surge arrester on capacitor

Svpwm based 3 level statcom for reactive power management under line-line
Svpwm based 3 level statcom for reactive power management under line-lineSvpwm based 3 level statcom for reactive power management under line-line
Svpwm based 3 level statcom for reactive power management under line-lineIAEME Publication
 
Design & performance of six pulse voltage multipliers 2
Design & performance of six pulse voltage multipliers 2Design & performance of six pulse voltage multipliers 2
Design & performance of six pulse voltage multipliers 2IAEME Publication
 
A Fault Current Limiter Circuit to Improve Transient Stability in Power System
A Fault Current Limiter Circuit to Improve Transient Stability in Power SystemA Fault Current Limiter Circuit to Improve Transient Stability in Power System
A Fault Current Limiter Circuit to Improve Transient Stability in Power SystemIAES-IJPEDS
 
Simulation, control and analysis of hts resistive and power electronic fcl
Simulation, control and analysis of hts resistive and power electronic fclSimulation, control and analysis of hts resistive and power electronic fcl
Simulation, control and analysis of hts resistive and power electronic fclIAEME Publication
 
Comparative analysis of a cascaded seven level and five level mli based distr...
Comparative analysis of a cascaded seven level and five level mli based distr...Comparative analysis of a cascaded seven level and five level mli based distr...
Comparative analysis of a cascaded seven level and five level mli based distr...IAEME Publication
 
Three-phase-to-ground fault and its impact on voltage magnitude
Three-phase-to-ground fault and its impact on voltage magnitudeThree-phase-to-ground fault and its impact on voltage magnitude
Three-phase-to-ground fault and its impact on voltage magnitudeijiert bestjournal
 
IJERD(www.ijerd.com)International Journal of Engineering Research and Develop...
IJERD(www.ijerd.com)International Journal of Engineering Research and Develop...IJERD(www.ijerd.com)International Journal of Engineering Research and Develop...
IJERD(www.ijerd.com)International Journal of Engineering Research and Develop...IJERD Editor
 
Voltage Flicker Analysis and its Mitigation by STATCOM for Power Quality Impr...
Voltage Flicker Analysis and its Mitigation by STATCOM for Power Quality Impr...Voltage Flicker Analysis and its Mitigation by STATCOM for Power Quality Impr...
Voltage Flicker Analysis and its Mitigation by STATCOM for Power Quality Impr...IJMTST Journal
 
IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...
IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...
IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...IRJET Journal
 
IRJET- Fault Location using Discrete Wavelet Transform for Smart Grid Distrib...
IRJET- Fault Location using Discrete Wavelet Transform for Smart Grid Distrib...IRJET- Fault Location using Discrete Wavelet Transform for Smart Grid Distrib...
IRJET- Fault Location using Discrete Wavelet Transform for Smart Grid Distrib...IRJET Journal
 
Control of Dvr with Battery Energy Storage System Using Srf Theory
Control of Dvr with Battery Energy Storage System Using Srf TheoryControl of Dvr with Battery Energy Storage System Using Srf Theory
Control of Dvr with Battery Energy Storage System Using Srf TheoryIJERA Editor
 
IRJET- Integrated Variable Resistor using Switched Capacitor Circuit and Volt...
IRJET- Integrated Variable Resistor using Switched Capacitor Circuit and Volt...IRJET- Integrated Variable Resistor using Switched Capacitor Circuit and Volt...
IRJET- Integrated Variable Resistor using Switched Capacitor Circuit and Volt...IRJET Journal
 
Analysis of Voltage Sag on Power Distribution Networks with Different Transfo...
Analysis of Voltage Sag on Power Distribution Networks with Different Transfo...Analysis of Voltage Sag on Power Distribution Networks with Different Transfo...
Analysis of Voltage Sag on Power Distribution Networks with Different Transfo...paperpublications3
 
Frequency control in a microgrid including controllable load
Frequency control in a microgrid including controllable loadFrequency control in a microgrid including controllable load
Frequency control in a microgrid including controllable loadIAEME Publication
 
SRF CONTROLLED DVR FOR COMPENSATION OF BALANCED AND UNBALANCED VOLTAGE DISTUR...
SRF CONTROLLED DVR FOR COMPENSATION OF BALANCED AND UNBALANCED VOLTAGE DISTUR...SRF CONTROLLED DVR FOR COMPENSATION OF BALANCED AND UNBALANCED VOLTAGE DISTUR...
SRF CONTROLLED DVR FOR COMPENSATION OF BALANCED AND UNBALANCED VOLTAGE DISTUR...IAEME Publication
 
IRJET- Generation and Control of Transient Overvoltages in Power System Networks
IRJET- Generation and Control of Transient Overvoltages in Power System NetworksIRJET- Generation and Control of Transient Overvoltages in Power System Networks
IRJET- Generation and Control of Transient Overvoltages in Power System NetworksIRJET Journal
 

Semelhante a Mitigation of switching overvoltage by application of surge arrester on capacitor (20)

Svpwm based 3 level statcom for reactive power management under line-line
Svpwm based 3 level statcom for reactive power management under line-lineSvpwm based 3 level statcom for reactive power management under line-line
Svpwm based 3 level statcom for reactive power management under line-line
 
Design & performance of six pulse voltage multipliers 2
Design & performance of six pulse voltage multipliers 2Design & performance of six pulse voltage multipliers 2
Design & performance of six pulse voltage multipliers 2
 
A Fault Current Limiter Circuit to Improve Transient Stability in Power System
A Fault Current Limiter Circuit to Improve Transient Stability in Power SystemA Fault Current Limiter Circuit to Improve Transient Stability in Power System
A Fault Current Limiter Circuit to Improve Transient Stability in Power System
 
Simulation, control and analysis of hts resistive and power electronic fcl
Simulation, control and analysis of hts resistive and power electronic fclSimulation, control and analysis of hts resistive and power electronic fcl
Simulation, control and analysis of hts resistive and power electronic fcl
 
Comparative analysis of a cascaded seven level and five level mli based distr...
Comparative analysis of a cascaded seven level and five level mli based distr...Comparative analysis of a cascaded seven level and five level mli based distr...
Comparative analysis of a cascaded seven level and five level mli based distr...
 
Three-phase-to-ground fault and its impact on voltage magnitude
Three-phase-to-ground fault and its impact on voltage magnitudeThree-phase-to-ground fault and its impact on voltage magnitude
Three-phase-to-ground fault and its impact on voltage magnitude
 
www.ijerd.com
www.ijerd.comwww.ijerd.com
www.ijerd.com
 
IJERD(www.ijerd.com)International Journal of Engineering Research and Develop...
IJERD(www.ijerd.com)International Journal of Engineering Research and Develop...IJERD(www.ijerd.com)International Journal of Engineering Research and Develop...
IJERD(www.ijerd.com)International Journal of Engineering Research and Develop...
 
www.ijerd.com
www.ijerd.comwww.ijerd.com
www.ijerd.com
 
Voltage Flicker Analysis and its Mitigation by STATCOM for Power Quality Impr...
Voltage Flicker Analysis and its Mitigation by STATCOM for Power Quality Impr...Voltage Flicker Analysis and its Mitigation by STATCOM for Power Quality Impr...
Voltage Flicker Analysis and its Mitigation by STATCOM for Power Quality Impr...
 
IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...
IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...
IRJET- Simulation of Energization and De-Energization of Capacitor Banks and ...
 
Bb4103331337
Bb4103331337Bb4103331337
Bb4103331337
 
IRJET- Fault Location using Discrete Wavelet Transform for Smart Grid Distrib...
IRJET- Fault Location using Discrete Wavelet Transform for Smart Grid Distrib...IRJET- Fault Location using Discrete Wavelet Transform for Smart Grid Distrib...
IRJET- Fault Location using Discrete Wavelet Transform for Smart Grid Distrib...
 
Control of Dvr with Battery Energy Storage System Using Srf Theory
Control of Dvr with Battery Energy Storage System Using Srf TheoryControl of Dvr with Battery Energy Storage System Using Srf Theory
Control of Dvr with Battery Energy Storage System Using Srf Theory
 
IRJET- Integrated Variable Resistor using Switched Capacitor Circuit and Volt...
IRJET- Integrated Variable Resistor using Switched Capacitor Circuit and Volt...IRJET- Integrated Variable Resistor using Switched Capacitor Circuit and Volt...
IRJET- Integrated Variable Resistor using Switched Capacitor Circuit and Volt...
 
Analysis of Voltage Sag on Power Distribution Networks with Different Transfo...
Analysis of Voltage Sag on Power Distribution Networks with Different Transfo...Analysis of Voltage Sag on Power Distribution Networks with Different Transfo...
Analysis of Voltage Sag on Power Distribution Networks with Different Transfo...
 
Frequency control in a microgrid including controllable load
Frequency control in a microgrid including controllable loadFrequency control in a microgrid including controllable load
Frequency control in a microgrid including controllable load
 
SRF CONTROLLED DVR FOR COMPENSATION OF BALANCED AND UNBALANCED VOLTAGE DISTUR...
SRF CONTROLLED DVR FOR COMPENSATION OF BALANCED AND UNBALANCED VOLTAGE DISTUR...SRF CONTROLLED DVR FOR COMPENSATION OF BALANCED AND UNBALANCED VOLTAGE DISTUR...
SRF CONTROLLED DVR FOR COMPENSATION OF BALANCED AND UNBALANCED VOLTAGE DISTUR...
 
Bp36398403
Bp36398403Bp36398403
Bp36398403
 
IRJET- Generation and Control of Transient Overvoltages in Power System Networks
IRJET- Generation and Control of Transient Overvoltages in Power System NetworksIRJET- Generation and Control of Transient Overvoltages in Power System Networks
IRJET- Generation and Control of Transient Overvoltages in Power System Networks
 

Mais de IAEME Publication

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME Publication
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...IAEME Publication
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSIAEME Publication
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSIAEME Publication
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSIAEME Publication
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSIAEME Publication
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOIAEME Publication
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IAEME Publication
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYIAEME Publication
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...IAEME Publication
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEIAEME Publication
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...IAEME Publication
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...IAEME Publication
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...IAEME Publication
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...IAEME Publication
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...IAEME Publication
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...IAEME Publication
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...IAEME Publication
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...IAEME Publication
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTIAEME Publication
 

Mais de IAEME Publication (20)

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdf
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
 

Mitigation of switching overvoltage by application of surge arrester on capacitor

  • 1. INTERNATIONAL JOURNAL OF ELECTRICAL ENGINEERING International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME & TECHNOLOGY (IJEET) ISSN 0976 – 6545(Print) ISSN 0976 – 6553(Online) IJEET Volume 4, Issue 2, March – April (2013), pp. 37-45 © IAEME: www.iaeme.com/ijeet.asp Journal Impact Factor (2013): 5.5028 (Calculated by GISI) ©IAEME www.jifactor.com MITIGATION OF SWITCHING OVERVOLTAGE BY APPLICATION OF SURGE ARRESTER ON CAPACITOR BANK Dr. Mrs. Hina Chandwani1, C. D. Upadhyay2 , Akil Vahora3, Goutam Som4 1 Associate Professor, FTE, The M. S. University of Baroda, Vadodara, Gujarat, India 2 Reseach Scholar, FTE, The M. S. University of Baroda, Vadodara, Gujarat, India 3 Student of Master of Engineering L.D.College of Engineering, Ahmedabad, Gujarat, India 4 Student of Master of Engineering L.D.College of Engineering, Ahmedabad, Gujarat, India ABSTRACT The paper presents the application of surge arresters as a switching overvoltage protection of capacitor bank circuit breakers. Based on an existing Medium Voltage-Capacitor bank MATLAB power simulink is performed to show the effectiveness of the surge arrester in reducing circuit breaker Transient Recovery Voltages and minimizing the probability of circuit breaker restrikes. The energy requirements of the surge arresters and the overvoltage protection levels of the capacitors for different surge arrester arrangements are calculated. KEYWORDS: TRVs, Capacitor Bank, Surge Arrestor, De-energisation 1. INTRODUCTION Medium voltage capacitor banks are designed for industrial, utility and commercial power systems to improve power factor, increase system capacity, reduce harmonic distortion and improve voltage regulation.[1,2,3] Capacitor bank switching is one of the most demanding operations in MV networks, due to its associated transients. During the opening operation the TRVs across the circuit breaker can rise to very high values and that can initiate breaker restrikes which in turn generate even higher overvoltage [4, 8]. Consequently, any restrike implies additional stress to capacitor and circuit breaker, which reduces their lifetime. If multiple restrikes occur, which can damages the capacitor and circuit breaker immediately [6, 7]. A way to prevent these overvoltages for new switchgears is the installation of modern circuit breakers with a low probability of restrike [5]. For users, having old existing 37
  • 2. International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME switchgear not suitable for capacitor bank applications, the question is whether the inserting of surge arresters across the capacitor can minimize the probability of the circuit breaker restrikes [9, 10]. Based on a real existing installation of a MV-Capacitor bank a study using the MATLAB power simulink Software was performed in order to evaluate the effectiveness of the surge arrester application in minimizing the probability of circuit breaker restrikes. 2. MODELLING A case of substation of 220/33 KV, located at Versova, MUMBAI is taken here. Based on an existing installation of a 33kV, 14.7 MVAR capacitor bank (ungrounded double wye -connected), a 3-phase model of a MV-Capacitor bank including the network components (capacitors, reactor, circuit breaker, and transformer) has been developed to perform an MATLAB power simulink Simulation for the opening operation of the capacitor bank. A single-line diagram of the substation and capacitor bank is shown in with all the ratings marked therein Fig.1. The modelling is based on the following conditions: •The sequence of a three-phase break of capacitive load followed by restrikes in two phases at t=10 ms (1/2cycle) after current interruption was identified as the decisive case. The network with isolated neutral and a power frequency of 50Hz was selected as the most severe case • The circuit breaker interrupts the high frequency current at the first current zero. According to figure 2 three arrester arrangements are investigated for phase to phase and phase to ground. The system neutral Rg was set to zero. 38
  • 3. International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME • As a surge arrester model a class 3 gap less surge arrester type with a fixed protection level of U res(lightning withstand voltage) /Uc(max residual discharge voltage) = 170/85=2.0 (at in(nominal discharge current) = 10ka) is used • The magnitude of overvoltages is given in p.u. (per unit) as a multiple of the peak value of the phase peak -to-phase voltage Fig.2: Equivalent circuit with the arrester arrangements: phase to ground, phase to neutral, phase to phase 2.1 DE-ENERGISATION OF CAPACITOR BANK ENERGISATION In order to evaluate the severity of over voltages and to determine the effectiveness of a surge arrester application, the step by step procedure was simulated for the following cases 2.1.1 Three phase break of capacitive load Using the equivalent circuit according Fig.2 for a single stage capacitor bank (S=14.7 MVA) with no surge arrester connected on the network the Voltage and current characteristics shown in Fig.4 are obtained. The first pole to-clear is phase b and the circuit breaker SW1 interrupts the current to uit in Phase b. From the moment the current is interrupted, the charge of the capacitor is trapped and the voltage remains constant at the value it had at zero current. The recovery voltage across the circuit breaker for the first pole to clear rises up to 2.8 p.u. This overvoltage is the most severe voltage stress for the circuit breaker for all investigated cases. As an assumption the circuit breaker is able to withstand the voltage stress of 2 p.u. without a restrike. In FFT analysis tool of MATLAB we are getting total harmonic distortion of 71.01% which is very harmful for other system equipment Fig. 3 modelling in MATLAB power simulink of capacitor bank system 39
  • 4. International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME Fig.4 capacitor bank voltage current without surge arrester 2.1.2 Capacitor bank switching with surge arrester According to figure 5, Surge arrester is connected between phase to phase capacitor bank reduce the overvoltage same arrangement of surge arrester model in simulink as shown figure 9 which limit to 1.5 p.u. voltage which is in withstand limit of breaker unit Figure 5. Modelling in MATLAB power simulink of capacitor bank with surge arrangement 40
  • 5. International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME Figure6. Capacitor bank voltage and current with surge arrester 2.1.3 Three phase break of capacitive load associated with multiple breaker restrikes The same sequence is simulated as in case 1 but as an assumption the circuit breaker is not able to withstand the voltage stress of 2 p.u. and a two phase restrike occurs at the peak value of the recovery voltage in phase a and b (Fig.7). A transient current with an oscillation frequency starts to flow and the voltage across the capacitor swings up to 3 p.u. The circuit breaker interrupts the current again at the first of its current zeros, with the result that the voltage across the capacitor remains on the new constant value and voltage across the circuit breaker SW1 in Phase a and b rises up to 2.3 p.u. In case of further restrikes overvoltages will raise up to 3.0 p.u. across the capacitors and 4.15 p.u for further restrike. This process of voltage and current escalation can damage the capacitor and breaker units. Figure 7: Three phase break of capacitive load associated with multiple breaker restrikes 41
  • 6. International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME 2.1.4 Three phase break of capacitive load associated with multiple breaker restrikes and using surge arresters FIG.8A Capacitor voltage Fig.8B Breaker current Figure 8 Capacitor bank voltage and current when surge arrester connected to phase to ground 42
  • 7. International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME The same sequence is simulated as in case 2 but using a surge arrester arrangement phase to ground. The obtained voltage and current characteristics are shown in Fig.8. The surge arrester limits the overvoltage across the capacitors at 1.55p.u. In the case of multiple restrikes this overvoltage level remains constant. A voltage escalation across the capacitor and thus a capacitor failure is prevented. The transient recovery circuit breaker voltage across the first pole-to-clear is limited at 2.0p.u. After the first restrike and that mitigates the risk of further breaker restrikes. A surge arrester arrangement phase to phase also reduce the over voltage to 1.2 p.u The surge arrester not only protects the capacitor from dangerous overvoltages but decreases the probability of multiple restrikes of the breaker, too . 2.1.5 Comparison of breaker TRVs and capacitor voltages for the first pole-to-clear phase A detailed one-to-one comparison of the cases 2 and 3 for the first pole-to-clear (Phase c) characteristic shows the effectiveness of a surge arrester application (Fig.6 & 8). The effect of the TRV-limitation across the capacitor and the circuit breaker starts with the first restrike. There is no voltage limitation during the opening operation without a restrike. Therefore, the surge arrester can only reduce the over voltages if a restrike occurs. There is no benefit for the circuit breaker to reduce the risk of a first restrike, but it mitigates the risk of multiple restrikes 3. ENERGY STRESS ON SURGE ARRESTER The energy stresses on the surge arresters were calculated for different arrester arrangements (Fig.2) and different circuit parameters. The following results are obtained 3.1 Energy stress as a function of the three phase capacitor bank size A single-stage capacitor bank is used to vary the three-phase bank size in order to evaluate the effect on the surge arrester energy stress. The grounding conditions of the system neutral don`t affect the energy stress on the surge arrester. Only In case of a directly- grounded neutral (Rg = 0) and an arrester arrangement phase to ground a slightly higher energy of 7% has to take into account. Fig. 9 Energy stress as a function of capacitor bank size (based on 3 successive restrikes) In case of a directly-grounded neutral (Rg = 0) and an arrester arrangement phase to ground a slightly higher energy of 7% has to take into account. 43
  • 8. International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME 3.2 PROTECTION CONSIDERATIONS The voltage across the capacitor bank for a single stage capacitor bank is determined as a function of the three phase capacitor size. The resulting voltages depending on the arrester Positioning are shown in Figure 10.The same capacitor voltage is obtained for systems with directly-grounded (Rg = 0) as well as ungrounded neutral (Rg = ∞). The effect of the number of parallel capacitor stages and the number of repeated restrikes on the capacitor voltage is negligible. Fig.10 Resulting capacitor voltages as a function of capacitor size 4. CONCLUSION Based on the computer simulation of the capacitor bank Deenergisation the following application considerations and conclusions can be drawn: In the simulation of the capacitor switching, the mal-effect of over voltage on Circuit Breaker can be reduced by implementing surge arresters at an instant. Not only the reduction of C.B failure is done but also the risk of multiple restrikes is controlled by limiting the TRVs of the C.B 5. ACKNOWLEDGEMENTS For the technical & data support we are thankful to Schneider electrical infrastructure ltd. Vadodara, India. REFERENCES Books [1] Ramasamy Natrajan, Power system capacitors ( Taylor & Francis Group, LLC,2005) [2] L. Van Der Sluis, Transients in Power Systems (John Wiley & Sons, 2001) [3] A. Greenwood, Electrical Transients in Power Systems ( New York: John Wiley & Sons, 2nd Ed., 1991) 44
  • 9. International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME Journal Papers [4] Grebe, T.E., Application of Distribution System Capacitor Banks and Their Impact on Power Quality (IEEE Transactions on Industry Applications, 1996,.32(3): P. 714-719) [5] Das J. C., Analysis And Control Of Large Shunt Capacitor Bank Switching Transient (IEEE Transactions On Industry Application, 2005. 41(6): P.1444-1451) [6] D. Rodriguez Sanabria, C. Ramos-Robles, L. Orama Exclusa, Lightning And Lightning Arrester Simulation In Electrical Power Distribution Systems (IEEE Transaction 2004) [7] Sahib Abdoolwadood Ali, Capacitor Banks Switching Transient In Power System (Cscanada Energy Science And Technology 2011, Vol. 2, No. 2, 2011, Pp. 62-73) [8] Mehdi Nafar, Gevork B Gharehpetian And Taher Niknam , A Novel Parameter Estimation Method For Metal Oxide Surge Arrester Models (Indian Academy of Sciences Part 6, pp. 941–961. Dec 2011) [9] Nilesh S. Mahajan and A. A. Bhole, “Black Box ARC Modeling of High Voltage Circuit Breaker Using MATLAB/SIMULINK” International Journal of Electrical Engineering & Technology (IJEET), Volume 3, Issue 1, 2012, pp. 69 - 78, ISSN Print : 0976-6545, ISSN Online: 0976-6553 Proceedings Papers [10] Braun. D., Koeppl G, Transient Recovery Voltages during the Switching Under Out- Of-Phase Conditions (International Conference on Power Systems Transients IPST 2003 in New Orleans, USA) 45