10.034 FRP CATAMARAN
Approval Date: 20 May 1998
Reviewed on : 23 October 2007 Version: 1
Equipment Specification: FRP CATAMARAN Version 1 10.034-1/6
Purpose
The FRP (Fibre Reinforced Plastic) catamaran will be used to execute hydrological
measurements in rivers, canals and reservoirs. Many of the measurements will be made in
very shallow water.
Conditions & Requirements
• The FRP catamaran shall be of such a design that it operates reliably and safely under the
prevailing environmental and hydraulic conditions.
• The boat shall be capable to operate in shallow water where repeatedly the hull may
impact with rock or sediment.
• All materials on the boat exterior and on wet spots inside the boat shall be non-
corrosive.
• The boat shall be very sturdy, unsinkable and shall have an adequate stability.
• The boat shall be easy to operate and maintain.
• The boat shall have an expected technical lifetime of not less than 10 years.
• The boat and the outboard engines shall be capable to operate for at least 6 months
without any major servicing.
• The boat shall have floatation chambers filled with closed cell foam.
• The boat shall be provided with appropriate fenders.
• The boat shall have a cabin to accommodate equipment and staff.
• At port and starboard site the cabin shall have sitting benches with an in-built store cum
board provided underneath.
• The cabin shall have windows and a lockable door.
• An opening of at least 3 x 3 m2
should be provided on deck to carry out hydrological
measurements.
• Access openings are to be provided in each compartment by flush manholes.
• The rear deck shall be provided with an awning.
• The boat shall be supplied with the accessories as needed for effective deployment.
• The boat shall be fitted with two outboard engines (see 10.036).
• The outboard engines shall be operated by a remote control system, located at the stern
side bulkhead of the cabin.
• The control system shall have a starting switch, gear switch and a throttle system for each
engine and a steering wheel and emergency stop switch for simultaneous operation of the
engines.
• The control system shall match the outboard engines.
• Guard-rail and stanchions with detachable chain will be rigged out around the deck-
opening. Suitable guard-rails shall also be provided around the deck.
• Bollards and fairleads are to be provided on the deck for mooring purpose.
• An overhead beam and a winch will be suitably positioned to lower and hoist the
measuring equipment.
• A maintenance manual, related to the type and model of the FRP catamaran, shall be
part of the delivery.
Equipment Specification: FRP CATAMARAN Version 1 10.034-2/6
Specifications
1. Boat
length approx. 8 m
width approx. 3.75 m
draft approx. 0.5 m
free board approx. 0.7 m
bottom shape catamaran
propulsion 2 Nos. of 30 kW (40 HP) outboard engines
carrying capacity 2000 kg
required speed 5 m/s
2. Cabin
length approx. 3 m
height ample sitting height
door lockable
door width >0.8 m
windows glass, possibility to open, closed water tight
3. Boat outfit
anchor matching boat, fitted with 5 chain and rope for water depth of 20
m and current velocity of 5 m/s
echo-sounder indicator type, fitted in the boat
compass magnetic type, fitted in the boat
fenders 4 of Coir type
paddles 4 for rowing
life-jacket for each person on board, also for guests
life-buoy 8 pieces with at least 50 m line, readily available on board
fire extinguisher >5 kg
The fire extinguisher shall be readily accessible in the motor compartment (if any) and in the
cabin
Remarks
For the installation of winches, fitting of survey echo-sounder transducers etc. some local
reinforcements and/or supports may be required. Arrangements shall exist for mounting the
boat outfit (Bracket) and for dropping of the anchor to keep the boat stationary, during flow
measurements. These can only be specified after selection of the survey instruments and other
relevant equipment.
Arrangements shall be made for safe working on the boat.
For Indian bidders, the Registrar of Shipping, Mumbai, shall approve the design and drawing.
For international bidders the design and drawing shall be approved by a national agency in their
country authorised for the purpose and acceptable to the purchaser.
Option
Optionally, the boat may be fitted with an instrument-well for acoustical and other transducers.
Basically, there are two ways to install acoustical transducers, such as echo-sounder and
ADCP, on a boat, viz.:
1. Transducers attached to a bracket at the boat exterior
This method can be used virtually on any available boat. However, the bracket and
transducer are relatively vulnerable and may generate considerable drag. Further, being at
a distance from the boat’s centre, external transducers experience all the pitch and roll
Equipment Specification: FRP CATAMARAN Version 1 10.034-3/6
movements.
2. Transducers in a well inside the boat
Transducers in the well are in direct contact with the water and can execute the acoustic
measurements but are not exposed to the flow of water, hence much more protected. In
particular in case the well is constructed in or close to the boat’s centre, then the transducer
will experience little effect of pitch and roll movements. This increases accuracy and data
quality. The well has to be tailor made and adds to the boat cost. Being inside the boat and
for safety reasons it should be of a sound construction.
To construct a well, a FRP pipe with ID of about 0.4 m could be installed in the centre of the
boat. The well top should be at about board level. The well bottom should be soundly fixed to
the boat bottom. It shall be possible to close the top of the well.
The location and exact size of the well will be specified after selection of the measuring
equipment.
The purchaser may execute his judicious discretion in the choice of configuration and
options.
10.034 FRP CATAMARAN
As per HP-I
Approval Date: 20 May 1998 Version: 1
Equipment Specification: FRP CATAMARAN Version 1 10.034-4/6
Purpose
The FRP (Fibre Reinforced Plastic) catamaran will be used to execute hydrological
measurements in rivers, canals and reservoirs. Many of the measurements will be made in
very shallow water.
Conditions & Requirements
• The FRP catamaran shall be of such a design that it operates reliably and safely under the
prevailing environmental and hydraulic conditions.
• The boat shall be capable to operate in shallow water where repeatedly the hull may
impact with rock or sediment.
• All materials on the boat exterior and on wet spots inside the boat shall be non-
corrosive.
• The boat shall be very sturdy, unsinkable and shall have an adequate stability.
• The boat shall be easy to operate and maintain.
• The boat shall have an expected technical lifetime of not less than 10 years.
• The boat and the outboard engines shall be capable to operate for at least 6 months
without any major servicing.
• The boat shall have floatation chambers filled with closed cell foam.
• The boat shall be provided with appropriate fenders.
• The boat shall have a cabin to accommodate equipment and staff.
• At port and starboard site the cabin shall have sitting benches with an in-built store cum
board provided underneath.
• The cabin shall have windows and a lockable door.
• An opening of at least 3 x 3 m2
should be provided on deck to carry out hydrological
measurements.
• Access openings are to be provided in each compartment by flush manholes.
• The rear deck shall be provided with an awning.
• The boat shall be supplied with the accessories as needed for effective deployment.
• The boat shall be fitted with two outboard engines (see 10.036).
• The outboard engines shall be operated by a remote control system, located at the stern
side bulkhead of the cabin.
• The control system shall have a starting switch, gear switch and a throttle system for each
engine and a steering wheel and emergency stop switch for simultaneous operation of the
engines.
• The control system shall match the outboard engines.
• Guard-rail and stanchions with detachable chain will be rigged out around the deck-
opening. Suitable guard-rails shall also be provided around the deck.
• Bollards and fairleads are to be provided on the deck for mooring purpose.
• An overhead beam and a winch will be suitably positioned to lower and hoist the
measuring equipment.
• A maintenance manual, related to the type and model of the FRP catamaran, shall be
part of the delivery.
Equipment Specification: FRP CATAMARAN Version 1 10.034-5/6
Specifications
4. Boat
length approx. 8 m
width approx. 3.75 m
draft approx. 0.5 m
free board approx. 0.7 m
bottom shape catamaran
propulsion 2 Nos. of 30 kW (40 HP) outboard engines
carrying capacity 2000 kg
required speed 5 m/s
5. Cabin
length approx. 3 m
height ample sitting height
door lockable
door width >0.8 m
windows glass, possibility to open, closed water tight
6. Boat outfit
anchor matching boat, fitted with 5 chain and rope for water depth of 20
m and current velocity of 5 m/s
echo-sounder indicator type, fitted in the boat
compass magnetic type, fitted in the boat
fenders 4 of Coir type
paddles 4 for rowing
life-jacket for each person on board, also for guests
life-buoy 8 pieces with at least 50 m line, readily available on board
fire extinguisher >5 kg
The fire extinguisher shall be readily accessible in the motor compartment (if any) and in the
cabin
Remarks
For the installation of winches, fitting of survey echo-sounder transducers etc. some local
reinforcements and/or supports may be required. Arrangements shall exist for mounting the
boat outfit (Bracket) and for dropping of the anchor to keep the boat stationary, during flow
measurements. These can only be specified after selection of the survey instruments and other
relevant equipment.
Arrangements shall be made for safe working on the boat.
For Indian bidders, the Registrar of Shipping, Mumbai, shall approve the design and drawing.
For international bidders the design and drawing shall be approved by a national agency in their
country authorised for the purpose and acceptable to the purchaser.
Option
Optionally, the boat may be fitted with an instrument-well for acoustical and other transducers.
Basically, there are two ways to install acoustical transducers, such as echo-sounder and
ADCP, on a boat, viz.:
3. Transducers attached to a bracket at the boat exterior
This method can be used virtually on any available boat. However, the bracket and
transducer are relatively vulnerable and may generate considerable drag. Further, being at
a distance from the boat’s centre, external transducers experience all the pitch and roll
Equipment Specification: FRP CATAMARAN Version 1 10.034-6/6
movements.
4. Transducers in a well inside the boat
Transducers in the well are in direct contact with the water and can execute the acoustic
measurements but are not exposed to the flow of water, hence much more protected. In
particular in case the well is constructed in or close to the boat’s centre, then the transducer
will experience little effect of pitch and roll movements. This increases accuracy and data
quality. The well has to be tailor made and adds to the boat cost. Being inside the boat and
for safety reasons it should be of a sound construction.
To construct a well, a FRP pipe with ID of about 0.4 m could be installed in the centre of the
boat. The well top should be at about board level. The well bottom should be soundly fixed to
the boat bottom. It shall be possible to close the top of the well.
The location and exact size of the well will be specified after selection of the measuring
equipment.
The purchaser may execute his judicious discretion in the choice of configuration and
options.

Mais conteúdo relacionado

Mais procurados

Multi hull vessels
Multi hull vesselsMulti hull vessels
Multi hull vesselsNitin Sharma
 
Transocean offshore operation 2
Transocean   offshore operation 2Transocean   offshore operation 2
Transocean offshore operation 2Steffones K
 
Ship Construction (Structure Part)
Ship Construction (Structure Part)Ship Construction (Structure Part)
Ship Construction (Structure Part)Marine Study
 
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2Zaharah Kasim
 
What should i expect from a marine survey
What should i expect from  a marine surveyWhat should i expect from  a marine survey
What should i expect from a marine surveyDonald Mccann
 
Motion stability and control in marine surface vessels
Motion stability and control in marine surface vesselsMotion stability and control in marine surface vessels
Motion stability and control in marine surface vesselsParijat Sinha
 
Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV ) Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV ) Hassan Moursy
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundSigve Hamilton Aspelund
 
Structural members of ship
Structural members of shipStructural members of ship
Structural members of shipVipin Devaraj
 
Port berthing facilities & infrastructure surveyor’s prespective
Port berthing facilities & infrastructure  surveyor’s prespectivePort berthing facilities & infrastructure  surveyor’s prespective
Port berthing facilities & infrastructure surveyor’s prespectiveThiruvali Shrinivaasan
 
Oguk fpso network side shell repairs on-station.
Oguk fpso network   side shell repairs on-station.Oguk fpso network   side shell repairs on-station.
Oguk fpso network side shell repairs on-station.Danny O'Connor
 

Mais procurados (20)

Multi hull vessels
Multi hull vesselsMulti hull vessels
Multi hull vessels
 
Transocean offshore operation 2
Transocean   offshore operation 2Transocean   offshore operation 2
Transocean offshore operation 2
 
Ship Construction (Structure Part)
Ship Construction (Structure Part)Ship Construction (Structure Part)
Ship Construction (Structure Part)
 
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
PD193 FPSO & FLNG DESIGN & tECHNOLOGY -LEVEL 2
 
What should i expect from a marine survey
What should i expect from  a marine surveyWhat should i expect from  a marine survey
What should i expect from a marine survey
 
apl-brochure
apl-brochureapl-brochure
apl-brochure
 
Ship terms
Ship termsShip terms
Ship terms
 
Motion stability and control in marine surface vessels
Motion stability and control in marine surface vesselsMotion stability and control in marine surface vessels
Motion stability and control in marine surface vessels
 
Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV ) Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV )
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton Aspelund
 
Piping layout/ Subsea
Piping layout/ SubseaPiping layout/ Subsea
Piping layout/ Subsea
 
Rig inspection, Sigve Hamilton Aspelund
Rig inspection, Sigve Hamilton AspelundRig inspection, Sigve Hamilton Aspelund
Rig inspection, Sigve Hamilton Aspelund
 
Petroleum drilling fundamentals
Petroleum drilling fundamentalsPetroleum drilling fundamentals
Petroleum drilling fundamentals
 
Structural members of ship
Structural members of shipStructural members of ship
Structural members of ship
 
Port berthing facilities & infrastructure surveyor’s prespective
Port berthing facilities & infrastructure  surveyor’s prespectivePort berthing facilities & infrastructure  surveyor’s prespective
Port berthing facilities & infrastructure surveyor’s prespective
 
212790628 fpso
212790628 fpso212790628 fpso
212790628 fpso
 
cds
 cds cds
cds
 
Oguk fpso network side shell repairs on-station.
Oguk fpso network   side shell repairs on-station.Oguk fpso network   side shell repairs on-station.
Oguk fpso network side shell repairs on-station.
 
Stern Tube and Shafting Arrangements
Stern Tube and Shafting ArrangementsStern Tube and Shafting Arrangements
Stern Tube and Shafting Arrangements
 
Anchor Handling Stability
Anchor Handling StabilityAnchor Handling Stability
Anchor Handling Stability
 

Destaque

Principle Parts of Our Sailboat
Principle Parts of Our SailboatPrinciple Parts of Our Sailboat
Principle Parts of Our SailboatSam Young
 
ACA Level 3 River Safety and Rescue 160903
ACA Level 3 River Safety and Rescue 160903ACA Level 3 River Safety and Rescue 160903
ACA Level 3 River Safety and Rescue 160903Sam Young
 
Catamaran Brochure
Catamaran BrochureCatamaran Brochure
Catamaran Brochurebigdcatslr
 
Multihulls Quarterly: Zen's Den
Multihulls Quarterly: Zen's DenMultihulls Quarterly: Zen's Den
Multihulls Quarterly: Zen's DenBurgess Media LLC
 
Best aluminium boat plans and designs
Best aluminium boat plans and designsBest aluminium boat plans and designs
Best aluminium boat plans and designsnansi12
 
Structural Design of 38 m Special Purpose Vessel in Aluminium Alloy
Structural Design of 38 m Special Purpose Vessel in Aluminium AlloyStructural Design of 38 m Special Purpose Vessel in Aluminium Alloy
Structural Design of 38 m Special Purpose Vessel in Aluminium AlloyMurat TOSUN
 
CYA Intermediate Cruising
CYA Intermediate CruisingCYA Intermediate Cruising
CYA Intermediate CruisingJack Dale
 
CYA Advanced Cruising
CYA  Advanced  CruisingCYA  Advanced  Cruising
CYA Advanced CruisingJack Dale
 
Hauling Out and Painting the Sailboat - April 2010
Hauling Out and Painting the Sailboat - April 2010Hauling Out and Painting the Sailboat - April 2010
Hauling Out and Painting the Sailboat - April 2010guest9c1769
 
Teaching Stand up PWC (jet skiing) from a Superyacht
Teaching Stand up PWC (jet skiing) from a SuperyachtTeaching Stand up PWC (jet skiing) from a Superyacht
Teaching Stand up PWC (jet skiing) from a SuperyachtCandi Abbott
 
The time I built a sailboat in high school
The time I built a sailboat in high schoolThe time I built a sailboat in high school
The time I built a sailboat in high schoolTyler Drown
 
Technology sailing effects
Technology sailing effectsTechnology sailing effects
Technology sailing effectsChris Sandström
 

Destaque (18)

Principle Parts of Our Sailboat
Principle Parts of Our SailboatPrinciple Parts of Our Sailboat
Principle Parts of Our Sailboat
 
ACA Level 3 River Safety and Rescue 160903
ACA Level 3 River Safety and Rescue 160903ACA Level 3 River Safety and Rescue 160903
ACA Level 3 River Safety and Rescue 160903
 
Catamaran Brochure
Catamaran BrochureCatamaran Brochure
Catamaran Brochure
 
Boatbuilding Manual - Chapter 2
Boatbuilding Manual - Chapter 2Boatbuilding Manual - Chapter 2
Boatbuilding Manual - Chapter 2
 
Multihulls Quarterly: Zen's Den
Multihulls Quarterly: Zen's DenMultihulls Quarterly: Zen's Den
Multihulls Quarterly: Zen's Den
 
Best aluminium boat plans and designs
Best aluminium boat plans and designsBest aluminium boat plans and designs
Best aluminium boat plans and designs
 
Structural Design of 38 m Special Purpose Vessel in Aluminium Alloy
Structural Design of 38 m Special Purpose Vessel in Aluminium AlloyStructural Design of 38 m Special Purpose Vessel in Aluminium Alloy
Structural Design of 38 m Special Purpose Vessel in Aluminium Alloy
 
Sailing after stroke
Sailing after strokeSailing after stroke
Sailing after stroke
 
If you have been waiting for ideal home on the water in Florida, sailboat acc...
If you have been waiting for ideal home on the water in Florida, sailboat acc...If you have been waiting for ideal home on the water in Florida, sailboat acc...
If you have been waiting for ideal home on the water in Florida, sailboat acc...
 
CYA Intermediate Cruising
CYA Intermediate CruisingCYA Intermediate Cruising
CYA Intermediate Cruising
 
CYA Advanced Cruising
CYA  Advanced  CruisingCYA  Advanced  Cruising
CYA Advanced Cruising
 
Hauling Out and Painting the Sailboat - April 2010
Hauling Out and Painting the Sailboat - April 2010Hauling Out and Painting the Sailboat - April 2010
Hauling Out and Painting the Sailboat - April 2010
 
Sailing Through the Storms
Sailing Through the StormsSailing Through the Storms
Sailing Through the Storms
 
Teaching Stand up PWC (jet skiing) from a Superyacht
Teaching Stand up PWC (jet skiing) from a SuperyachtTeaching Stand up PWC (jet skiing) from a Superyacht
Teaching Stand up PWC (jet skiing) from a Superyacht
 
Sailing
SailingSailing
Sailing
 
Sailing
SailingSailing
Sailing
 
The time I built a sailboat in high school
The time I built a sailboat in high schoolThe time I built a sailboat in high school
The time I built a sailboat in high school
 
Technology sailing effects
Technology sailing effectsTechnology sailing effects
Technology sailing effects
 

Semelhante a Frp catamaran (8m)

C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004David Seow
 
SEAM-5-GRP2-REPORT.pptx
SEAM-5-GRP2-REPORT.pptxSEAM-5-GRP2-REPORT.pptx
SEAM-5-GRP2-REPORT.pptxAllenDizon3
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)coderweb
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso designChieu Nguyen
 
Current meter, propeller type
Current meter, propeller typeCurrent meter, propeller type
Current meter, propeller typehydrologyproject0
 
BOURBON's Fleet
BOURBON's FleetBOURBON's Fleet
BOURBON's FleetBOURBON
 
Marpol waste collection vessel catalogue
Marpol waste collection vessel catalogueMarpol waste collection vessel catalogue
Marpol waste collection vessel catalogueOnat Emre Altuntop
 
FINAL PRESENTATION Final
FINAL PRESENTATION FinalFINAL PRESENTATION Final
FINAL PRESENTATION FinalRyan Slimmon
 
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New ConstructionRobert Denison
 
Nautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptxNautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptxdevmarineacademy
 
sea trial.docx
sea trial.docxsea trial.docx
sea trial.docxmaneesh10
 

Semelhante a Frp catamaran (8m) (20)

Lifeboatppt
LifeboatpptLifeboatppt
Lifeboatppt
 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004
 
Outboard engine
Outboard engineOutboard engine
Outboard engine
 
Boat outfit
Boat outfitBoat outfit
Boat outfit
 
Boat trailer
Boat trailerBoat trailer
Boat trailer
 
SEAM-5-GRP2-REPORT.pptx
SEAM-5-GRP2-REPORT.pptxSEAM-5-GRP2-REPORT.pptx
SEAM-5-GRP2-REPORT.pptx
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso design
 
Coastal Research Vessel
Coastal Research VesselCoastal Research Vessel
Coastal Research Vessel
 
Ship Construction by Jayan Pillai
Ship Construction by Jayan PillaiShip Construction by Jayan Pillai
Ship Construction by Jayan Pillai
 
Current meter, propeller type
Current meter, propeller typeCurrent meter, propeller type
Current meter, propeller type
 
BOURBON's Fleet
BOURBON's FleetBOURBON's Fleet
BOURBON's Fleet
 
ROV Presentation
ROV PresentationROV Presentation
ROV Presentation
 
Marpol waste collection vessel catalogue
Marpol waste collection vessel catalogueMarpol waste collection vessel catalogue
Marpol waste collection vessel catalogue
 
FINAL PRESENTATION Final
FINAL PRESENTATION FinalFINAL PRESENTATION Final
FINAL PRESENTATION Final
 
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
270' Orucoglu Yacht & Marine Construction Miss Tor 270 - New Construction
 
Nautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptxNautical and engineering terms and concepts .pptx
Nautical and engineering terms and concepts .pptx
 
Schedule 3
Schedule 3Schedule 3
Schedule 3
 
sea trial.docx
sea trial.docxsea trial.docx
sea trial.docx
 
Dry docking operations
Dry docking operationsDry docking operations
Dry docking operations
 

Mais de hydrologyproject0 (20)

Specification purewater
Specification purewaterSpecification purewater
Specification purewater
 
Water purifier ion exchange resin column
Water purifier ion exchange resin columnWater purifier ion exchange resin column
Water purifier ion exchange resin column
 
Water purifier, double distillation unit
Water purifier, double distillation unitWater purifier, double distillation unit
Water purifier, double distillation unit
 
Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)
 
Water geyser (heater)
Water geyser (heater)Water geyser (heater)
Water geyser (heater)
 
Water bath, general purpose
Water bath, general purposeWater bath, general purpose
Water bath, general purpose
 
Water bath, bacteriological
Water bath, bacteriologicalWater bath, bacteriological
Water bath, bacteriological
 
Wash bottle
Wash bottleWash bottle
Wash bottle
 
Volumetric flask
Volumetric flaskVolumetric flask
Volumetric flask
 
Visual accumulation tube
Visual accumulation tubeVisual accumulation tube
Visual accumulation tube
 
Vacuum pump
Vacuum pumpVacuum pump
Vacuum pump
 
Turbidity meter (nephelometer)
Turbidity meter (nephelometer)Turbidity meter (nephelometer)
Turbidity meter (nephelometer)
 
Tool kit
Tool kitTool kit
Tool kit
 
Toc analyser, microprocessor controlled
Toc analyser, microprocessor controlledToc analyser, microprocessor controlled
Toc analyser, microprocessor controlled
 
Tissue grinder
Tissue grinderTissue grinder
Tissue grinder
 
Thermometers, set of
Thermometers, set ofThermometers, set of
Thermometers, set of
 
Test tubes
Test tubesTest tubes
Test tubes
 
Test sieves with shaker
Test sieves with shakerTest sieves with shaker
Test sieves with shaker
 
Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)
 
Sterliser, autoclave
Sterliser, autoclaveSterliser, autoclave
Sterliser, autoclave
 

Último

HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 

Último (20)

HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 

Frp catamaran (8m)

  • 1. 10.034 FRP CATAMARAN Approval Date: 20 May 1998 Reviewed on : 23 October 2007 Version: 1 Equipment Specification: FRP CATAMARAN Version 1 10.034-1/6 Purpose The FRP (Fibre Reinforced Plastic) catamaran will be used to execute hydrological measurements in rivers, canals and reservoirs. Many of the measurements will be made in very shallow water. Conditions & Requirements • The FRP catamaran shall be of such a design that it operates reliably and safely under the prevailing environmental and hydraulic conditions. • The boat shall be capable to operate in shallow water where repeatedly the hull may impact with rock or sediment. • All materials on the boat exterior and on wet spots inside the boat shall be non- corrosive. • The boat shall be very sturdy, unsinkable and shall have an adequate stability. • The boat shall be easy to operate and maintain. • The boat shall have an expected technical lifetime of not less than 10 years. • The boat and the outboard engines shall be capable to operate for at least 6 months without any major servicing. • The boat shall have floatation chambers filled with closed cell foam. • The boat shall be provided with appropriate fenders. • The boat shall have a cabin to accommodate equipment and staff. • At port and starboard site the cabin shall have sitting benches with an in-built store cum board provided underneath. • The cabin shall have windows and a lockable door. • An opening of at least 3 x 3 m2 should be provided on deck to carry out hydrological measurements. • Access openings are to be provided in each compartment by flush manholes. • The rear deck shall be provided with an awning. • The boat shall be supplied with the accessories as needed for effective deployment. • The boat shall be fitted with two outboard engines (see 10.036). • The outboard engines shall be operated by a remote control system, located at the stern side bulkhead of the cabin. • The control system shall have a starting switch, gear switch and a throttle system for each engine and a steering wheel and emergency stop switch for simultaneous operation of the engines. • The control system shall match the outboard engines. • Guard-rail and stanchions with detachable chain will be rigged out around the deck- opening. Suitable guard-rails shall also be provided around the deck. • Bollards and fairleads are to be provided on the deck for mooring purpose. • An overhead beam and a winch will be suitably positioned to lower and hoist the measuring equipment. • A maintenance manual, related to the type and model of the FRP catamaran, shall be part of the delivery.
  • 2. Equipment Specification: FRP CATAMARAN Version 1 10.034-2/6 Specifications 1. Boat length approx. 8 m width approx. 3.75 m draft approx. 0.5 m free board approx. 0.7 m bottom shape catamaran propulsion 2 Nos. of 30 kW (40 HP) outboard engines carrying capacity 2000 kg required speed 5 m/s 2. Cabin length approx. 3 m height ample sitting height door lockable door width >0.8 m windows glass, possibility to open, closed water tight 3. Boat outfit anchor matching boat, fitted with 5 chain and rope for water depth of 20 m and current velocity of 5 m/s echo-sounder indicator type, fitted in the boat compass magnetic type, fitted in the boat fenders 4 of Coir type paddles 4 for rowing life-jacket for each person on board, also for guests life-buoy 8 pieces with at least 50 m line, readily available on board fire extinguisher >5 kg The fire extinguisher shall be readily accessible in the motor compartment (if any) and in the cabin Remarks For the installation of winches, fitting of survey echo-sounder transducers etc. some local reinforcements and/or supports may be required. Arrangements shall exist for mounting the boat outfit (Bracket) and for dropping of the anchor to keep the boat stationary, during flow measurements. These can only be specified after selection of the survey instruments and other relevant equipment. Arrangements shall be made for safe working on the boat. For Indian bidders, the Registrar of Shipping, Mumbai, shall approve the design and drawing. For international bidders the design and drawing shall be approved by a national agency in their country authorised for the purpose and acceptable to the purchaser. Option Optionally, the boat may be fitted with an instrument-well for acoustical and other transducers. Basically, there are two ways to install acoustical transducers, such as echo-sounder and ADCP, on a boat, viz.: 1. Transducers attached to a bracket at the boat exterior This method can be used virtually on any available boat. However, the bracket and transducer are relatively vulnerable and may generate considerable drag. Further, being at a distance from the boat’s centre, external transducers experience all the pitch and roll
  • 3. Equipment Specification: FRP CATAMARAN Version 1 10.034-3/6 movements. 2. Transducers in a well inside the boat Transducers in the well are in direct contact with the water and can execute the acoustic measurements but are not exposed to the flow of water, hence much more protected. In particular in case the well is constructed in or close to the boat’s centre, then the transducer will experience little effect of pitch and roll movements. This increases accuracy and data quality. The well has to be tailor made and adds to the boat cost. Being inside the boat and for safety reasons it should be of a sound construction. To construct a well, a FRP pipe with ID of about 0.4 m could be installed in the centre of the boat. The well top should be at about board level. The well bottom should be soundly fixed to the boat bottom. It shall be possible to close the top of the well. The location and exact size of the well will be specified after selection of the measuring equipment. The purchaser may execute his judicious discretion in the choice of configuration and options.
  • 4. 10.034 FRP CATAMARAN As per HP-I Approval Date: 20 May 1998 Version: 1 Equipment Specification: FRP CATAMARAN Version 1 10.034-4/6 Purpose The FRP (Fibre Reinforced Plastic) catamaran will be used to execute hydrological measurements in rivers, canals and reservoirs. Many of the measurements will be made in very shallow water. Conditions & Requirements • The FRP catamaran shall be of such a design that it operates reliably and safely under the prevailing environmental and hydraulic conditions. • The boat shall be capable to operate in shallow water where repeatedly the hull may impact with rock or sediment. • All materials on the boat exterior and on wet spots inside the boat shall be non- corrosive. • The boat shall be very sturdy, unsinkable and shall have an adequate stability. • The boat shall be easy to operate and maintain. • The boat shall have an expected technical lifetime of not less than 10 years. • The boat and the outboard engines shall be capable to operate for at least 6 months without any major servicing. • The boat shall have floatation chambers filled with closed cell foam. • The boat shall be provided with appropriate fenders. • The boat shall have a cabin to accommodate equipment and staff. • At port and starboard site the cabin shall have sitting benches with an in-built store cum board provided underneath. • The cabin shall have windows and a lockable door. • An opening of at least 3 x 3 m2 should be provided on deck to carry out hydrological measurements. • Access openings are to be provided in each compartment by flush manholes. • The rear deck shall be provided with an awning. • The boat shall be supplied with the accessories as needed for effective deployment. • The boat shall be fitted with two outboard engines (see 10.036). • The outboard engines shall be operated by a remote control system, located at the stern side bulkhead of the cabin. • The control system shall have a starting switch, gear switch and a throttle system for each engine and a steering wheel and emergency stop switch for simultaneous operation of the engines. • The control system shall match the outboard engines. • Guard-rail and stanchions with detachable chain will be rigged out around the deck- opening. Suitable guard-rails shall also be provided around the deck. • Bollards and fairleads are to be provided on the deck for mooring purpose. • An overhead beam and a winch will be suitably positioned to lower and hoist the measuring equipment. • A maintenance manual, related to the type and model of the FRP catamaran, shall be part of the delivery.
  • 5. Equipment Specification: FRP CATAMARAN Version 1 10.034-5/6 Specifications 4. Boat length approx. 8 m width approx. 3.75 m draft approx. 0.5 m free board approx. 0.7 m bottom shape catamaran propulsion 2 Nos. of 30 kW (40 HP) outboard engines carrying capacity 2000 kg required speed 5 m/s 5. Cabin length approx. 3 m height ample sitting height door lockable door width >0.8 m windows glass, possibility to open, closed water tight 6. Boat outfit anchor matching boat, fitted with 5 chain and rope for water depth of 20 m and current velocity of 5 m/s echo-sounder indicator type, fitted in the boat compass magnetic type, fitted in the boat fenders 4 of Coir type paddles 4 for rowing life-jacket for each person on board, also for guests life-buoy 8 pieces with at least 50 m line, readily available on board fire extinguisher >5 kg The fire extinguisher shall be readily accessible in the motor compartment (if any) and in the cabin Remarks For the installation of winches, fitting of survey echo-sounder transducers etc. some local reinforcements and/or supports may be required. Arrangements shall exist for mounting the boat outfit (Bracket) and for dropping of the anchor to keep the boat stationary, during flow measurements. These can only be specified after selection of the survey instruments and other relevant equipment. Arrangements shall be made for safe working on the boat. For Indian bidders, the Registrar of Shipping, Mumbai, shall approve the design and drawing. For international bidders the design and drawing shall be approved by a national agency in their country authorised for the purpose and acceptable to the purchaser. Option Optionally, the boat may be fitted with an instrument-well for acoustical and other transducers. Basically, there are two ways to install acoustical transducers, such as echo-sounder and ADCP, on a boat, viz.: 3. Transducers attached to a bracket at the boat exterior This method can be used virtually on any available boat. However, the bracket and transducer are relatively vulnerable and may generate considerable drag. Further, being at a distance from the boat’s centre, external transducers experience all the pitch and roll
  • 6. Equipment Specification: FRP CATAMARAN Version 1 10.034-6/6 movements. 4. Transducers in a well inside the boat Transducers in the well are in direct contact with the water and can execute the acoustic measurements but are not exposed to the flow of water, hence much more protected. In particular in case the well is constructed in or close to the boat’s centre, then the transducer will experience little effect of pitch and roll movements. This increases accuracy and data quality. The well has to be tailor made and adds to the boat cost. Being inside the boat and for safety reasons it should be of a sound construction. To construct a well, a FRP pipe with ID of about 0.4 m could be installed in the centre of the boat. The well top should be at about board level. The well bottom should be soundly fixed to the boat bottom. It shall be possible to close the top of the well. The location and exact size of the well will be specified after selection of the measuring equipment. The purchaser may execute his judicious discretion in the choice of configuration and options.