5. This Edinburgh house, built in 1840, featured a passive vent system Air was heated in a boiler in the basement, and routed up through the house, via cornices, ducts and floorboards.
61. Should you have any enquiries about this lecture, please do not hesitate to contact us by: Email – [email_address] Phone – 0131 668 8668 Website – www.historic-scotland.gov.uk