MAIN ROADS Western Australia

                                                  MRWA

                 ELECTRICAL INFRASTRUCTURE
                  ASSET DRAWING GUIDELINES

                         o Section 1 - General
                         •     Section 2   -   Traffic Control Signals
                         o     Section 3   -   Lighting
                         o     Section 4   -   Emergency Roadside Telephones
                         o     Section 5   -   Closed Circuit Television Monitoring Cameras
                         o     Section 6   -   Variable Message Signs

This manual is owned and controlled by the Traffic Engineering Standards Manager.

The Traffic Engineering Standards Manager is the delegated custodian.

All comments and requests for changes should be submitted to the Custodian.

Main Roads Western Australia
Waterloo Crescent, East Perth
PO Box 6202
EAST PERTH WA 6892

Phone:             9323 4217
Fax:               9323 4600



                                                 Authorisation

     As Manager Road and Traffic Engineering of Main Roads Western Australia, I
     authorise the issue and use of this document.




     SENIOR ENGINEER ROAD AND TRAFFIC DESIGN

     Date:         ____ /____ /____




Controlled Copy No: _____




MAIN ROADS WESTERN AUSTRALIA     ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS   Page 1 of 25
Contents
2.Traffic Control Signals....................................................................................4
     2.1 LM Asset Reference Number............................................................................4
             2.1.1 New Assets........................................................................................................4
             2.1.2 Existing Assets..................................................................................................4
     2.2 Asset Reference Number and Drawing Layout..................................................4
             2.2.1 Title Block and References................................................................................4
             2.2.2 AutoCAD File Name..........................................................................................4
     2.3 LM “A” Electrical Drawing..................................................................................5
             2.3.1 General..............................................................................................................5
             2.3.2 Feature Matrix...................................................................................................5
             2.3.3 Traffic Movement Diagram................................................................................6
             2.3.4 Disconnected Services......................................................................................6
             2.3.5 Underground Post to Pit Connection Table.......................................................7
             2.3.6 Traffic Signal Posts and Numbering..................................................................7
             2.3.7 Lantern Aspect Size and Types.........................................................................7
             2.3.8 Detection Loops.................................................................................................7
             2.3.9 Pedestrian Detection ........................................................................................7
             2.3.10 Illuminated Flashing No Right Turn Signals.....................................................7
             2.3.11 Rail Crossing...................................................................................................7
             2.3.12 Advance Flashing Warning Signals.................................................................8
             2.3.13 Land Boundaries.............................................................................................8
             2.3.14 Typical Drawings.............................................................................................8
     2.4 LM “B” Road Marking and Signs Drawing.........................................................8
             2.4.1 MRWA Traffic Signal Area.................................................................................9
             2.4.2 Dimensions & Sign Reference...........................................................................9
             2.4.3 Typical Drawings...............................................................................................9
     2.5 Site Documentation...........................................................................................9

### 12

INTERGREEN TIMES........................................................................................17

PHASE SPECIAL ALL REDS & SPECIAL MOVEMENT ALL REDS..............17

B,C,D,E,F............................................................................................................18

MASTERLINK....................................................................................................18

Appendices
           A. SAMPLE SITE DOCUMENTATION
           B. EXAMPLE DRAWINGS




MAIN ROADS WESTERN AUSTRALIA         ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS                     Page 2 of 25
Revision Status Record

     Latest           Latest                              Revision                                Approved
    Revision         Revision                       Description/Reference                           By
      No.             Date.
       0            06-09-01                            Original
       1            17/7/2003           Scale for LM A drawing revised to 1:125 in
                                                      section 2.3.2.




Authorised:

TRAFFIC ENGINEERING STANDARDS MANAGER

Date: ____ /____ /____




MAIN ROADS WESTERN AUSTRALIA    ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS    Page 3 of 25
2.      Traffic Control Signals


2.1LM Asset Reference Number


           An “LM” asset reference number identifies each traffic control signal
           installation. This number is shown in the lower right corner of the drawing
           immediately to the right of the drawing number. The LM asset number must
           also be shown on all other documents in a suitable location.

2.1.1New Assets
           New assets will require that new “As Constructed” asset drawings are
           produced. MRWA will organise the new LM asset number and allocate the
           asset drawing numbers.

2.1.2Existing Assets
           An existing asset will already have been assigned an “LM” asset number and
           have existing (“A” electrical and “B” marking) asset drawings. These asset
           drawings numbers must be maintained throughout the life of the asset and
           should not be changed. This will allow changes to the site that occur over time
           to be easily recorded in the amendments column of the drawing. It is therefore
           the asset drawing/s (not the design drawings) that should be updated if an asset
           is modified. However, design/construction drawings may be added as a
           reference drawing within the Asset drawing.
           Asset numbers must not be duplicated.

2.2Asset Reference Number and Drawing Layout

2.2.1Title Block and References
           Traffic control signal asset drawings will have a title block layout that provides
           a discrete (eg LM001) “LM” asset reference number in the lower right corner
           of the drawing and immediately to the right of the MRWA drawing number.
           The drawing set will generally include an “A” and a “B” drawing. The “A”
           drawing will contain the electrical installation details whilst the “B” drawing
           will contain the road marking and signage information.

2.2.2AutoCAD File Name
           The AutoCAD file name format for each drawing will be LM###A.dwg and
           LM###B.dwg where ### is the three digit asset reference number. Should
           more than one drawing be required then the file name would be extended to
           include the sheet number (ie LM###AS1.dwg, LM###AS2.dwg) were S1 and S2
           are sheet 1 and 2 respectively.




MAIN ROADS WESTERN AUSTRALIA   ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS   Page 4 of 25
2.3LM “A” Electrical Drawing

2.3.1General
           The LM “A” drawing contains details relating to all electrical infrastructure,
           the site configuration and the Traffic (phase) Movement Diagram.

2.3.2Feature Matrix
           The following table provides a quick reference to the features that need to be
           shown on the A and B asset drawing. Comments and reference to example
           drawings are provided within the table.

                  Feature                     LM"A" LM"B"                            Comment

Scale                                          1:125      1:500 If updating an old 1:250 “A” or 1:250 “B”
                                                                drawing redraw to 1:125 or 1:500,
                                                                respectively. Choose a standard scale
                                                                of best fit if the site reasonably exceeds
                                                                the page. Use content break-match
                                                                lines where appropriate. If a 1:125 is to
                                                                large for a LM A drawing then use
                                                                1:250.
Kerbing and driveways                             √         √
Traffic islands,                                  √         √
Property boundaries                               √         √
Electrical supply                                 √
Point of Attachment                               √
Pole or underground supply pit/fuse               √
box/pillar
Controller, Earth pit, and                        √
Communication pit
Conduit size and location                         √
Cable pits and Draw pits and numbers              √

Underground pit system details                    √               Including cable size: 19, 29 or 51 core

Detector loops                                    √         √     B drawing only to show dotted loop
                                                                  outlines
Detector loop numbers                             √
Loop pits and pit connections                     √
Loop feeder cable route                           √
Traffic Movement Diagram                          √
Red Light Camera                                  √
Controller type                                   √
Communication type                                √               SCATS, DUST, None
Advanced flashing warning sign                    √         √
Advanced flashing warning signs                   √               Sign number and signal group.
                                                                  Content break-match lines will typically
                                                                  be appropriate to bring the sign
                                                                  locations onto the drawing page.
Traffic signal post                               √         √
Traffic signal post number                        √
Lanterns & signal group number                    √




MAIN ROADS WESTERN AUSTRALIA   ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS   Page 5 of 25
Feature                     LM"A" LM"B"                            Comment

Push buttons and group number                     √
Target boards                                     √
Disconnected services
Visors and Louvres                                                Only on design/construction drawing

Illuminated Flashing No Right Turn                √
Signs
North Arrow                                       √         √
Rail crossing                                     √         √
Temporary signs                                                   Not to be shown
Brick paving, seats, shubs/tree                                   Not to be shown
One call logo
Pedestrian ramps                                  √         √     Not to be shown
Footpaths                                                         Not to be shown
RRPMs                                                       √
MRWA traffic signal area                                          May be deleted when updating an
                                                                  existing asset drawing

Reference to design drawings                      √
Company logo's                                    √         √
CCTV                                              √               Only when connected to the controller

Gore (chevron) marking                                      √     To be shown in outline only
Land boundaries                                   √               To be shown in outline only

2.3.3Traffic Movement Diagram
           A Traffic movement diagram shall be located in the lower left corner of the
           LM ‘A’ drawing, detailing the phases with which the signals operate. Each
           phase shall be labelled as A, B, C, etc., according to the programmed operation
           of the signals. Alternative phases shall be labelled by addition of a number
           behind the phase number (Alt B1 and Alt B2).
           Signal group numbers shall be shown within each phase corresponding to the
           controller outputs. The movement numbers shall be shown against lanterns in
           the main body of the drawing.

2.3.4Disconnected Services
           Over time intersections will undergo modifications. Some equipment may be
           disconnected (eg vehicle detection loops) or become redundant (eg where the
           pits cable routes get moved). To avoid the asset drawing becoming cluttered
           with obsolete information it is desirable not to show disconnected services.
           However, where conduits or equipment are installed for future modifications
           then a suitable note should be added to the body of the drawing. Otherwise
           disconnected services should not be shown.




MAIN ROADS WESTERN AUSTRALIA   ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS   Page 6 of 25
2.3.5Underground Post to Pit Connection Table
           Signal poles will either be wired as a ring main or pit system. If the site has a
           pit system installed then the asset drawing must contain a pit to pole
           connections table similar to the following:

                                 Pit/Controller                   Post
                                   Controller                   1, 2, 12
                                       A                         3, 4, 5
                                       B                         6, 7, 8
                                       C                        9, 10, 11
2.3.6Traffic Signal Posts and Numbering
           Traffic signal posts should be numbered in a clockwise direction starting from
           the controller.

2.3.7Lantern Aspect Size and Types
           Lantern aspect sizes will be 200mm or 300mm. The size and direction of each
           lantern shall be shown on the LM “A” drawing.
           Vehicle filter lanterns, pedestrian lanterns and cycle lanterns shall be shown by
           symbols as shown on drawing 8320-0400.

2.3.8Detection Loops
           All detection loops for vehicles, bicycles and red light cameras shall be shown.
           Starting in an anti-clockwise direction from the northern most loop on the
           Western leg of the intersection, the loops (except Red Camera loops) should be
           allocated a loop number designated by L1 for the first loop, L2 for the second
           loop etc, until all loops are numbered in keeping with the programmed loop
           allocations. A diagram detailing the loop feeder cable route is also required to
           be detailed on the drawing.
           (A layout of the detector loop arrangement and connection to the loop pits is
           indicated on Drawing 9748-1114).

2.3.9Pedestrian Detection
           Pedestrian push buttons shall be shown and marked with a PB number that will
           be paired with one on the opposite kerb side. Symbols for standard (non audio)
           and audio-tactile push buttons should match those shown on the standard
           symbols drawing.

2.3.10Illuminated Flashing No Right Turn Signals
           Illuminated flashing NO RIGHT TURN signals shall be shown. A minimum
           of two signals shall be displayed for each direction of travel and attached to the
           dual primary and the secondary signal posts.

2.3.11Rail Crossing
           Rail crossings shall be shown when the crossing is electrically co-ordinated
           with the traffic signal movements. The equipment to be shown on the “A” asset
           drawing will include boom gates, loops, conduits and controllers. The traffic
           movement diagram shall show phases for operation of the boom gates.




MAIN ROADS WESTERN AUSTRALIA   ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS   Page 7 of 25
Conduit runs to the rail sensors shall be shown on the drawing. Wiring and
           termination schematics shall be provided on a separate sheet similar to the
           example shown in Section 2 – Appendix B.

2.3.12Advance Flashing Warning Signals
           Advance Flashing Warning Signals comprise a standard diamond shaped
           signals ahead warning sign with a standard white on red PREPARE TO STOP
           sign on a rectangular yellow background, with two alternately flashing yellow
           signals located in the upper corners of the sign.
           Starting in a clockwise direction from the controller each sign shall be
           allocated a number designated by S1 for the first sign, S2 for the second sign
           and continuous until all signs are numbered.

2.3.13Land Boundaries
           Land boundaries must be shown.

2.3.14Typical Drawings
           Typical examples of LM “A” drawings are shown in Section 2 – Appendix A

2.4LM “B” Road Marking and Signs Drawing

           Regulatory, warning signs and painted road markings shall be shown on the
           LM “B” drawing. Details shall include:
           •      Stop lines and stop signs
           •      Give Way signs
           •      Lane widths
           •      Lane separation lines (continuous and broken) and centrelines
           •      Pavement arrows
           •      Turning guidelines
           •      Pedestrian walk guidelines
           •      Hazard boards
           •      Guardrails
           •      Site specific marking and signing (yellow hazard gridline across rail
                  crossing, bus bay, guard crossing)
           •      Posts supporting signs
           •      Traffic signal posts (post position only)
           •      Reflectorised Raised Pavement markers (RRPM’s)
           •      Regulatory traffic warning signs
           •      Advanced Flashing warning signals
           •      Street name tags



MAIN ROADS WESTERN AUSTRALIA   ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS   Page 8 of 25
The following signs need not be shown:
           •      Major directional signs
           •      Fencing
           •      Guide signs
           •      Tourist signs
           •      Information signs
           •      Signs not owned by MRWA

2.4.1MRWA Traffic Signal Area
           Historically, the MRWA traffic signals area was defined on the “B” drawing as
           the area between the No Standing signs closest to the signal intersection.
           Whilst some existing “B” drawing may still show this area it is no longer
           required to be detailed on new (or updated) “B” drawings.

2.4.2Dimensions & Sign Reference
           Where there is no distinguishing feature’s that assists location of the sign or
           marking then chainage dimensions to the nearest 0.5m should be shown.

2.4.3Typical Drawings
           Typical examples of LM “B” drawings are shown in Section 2 – Appendix A

2.5Site Documentation

           The provision of the following documentation together with the As
           Constructed drawings is compulsory;
           • Cable Chart – detailing (ring main or pit) cable connections.
           • Conflict Chart – classifying the severity of conflicts for each signal group
                and detailing in a matrix the conflicts between all signal groups.
           • Detector Chart – details the detector triggers (loops, pedestrian
                pushbuttons, rail detectors etc) and assigns demand functions, extension
                functions and other operational characteristics to these.
           • Timing Chart – containing BST (basic sequence timing) details.
           • Phase Sequence Chart – containing details of green display phases and
                signal group overlaps.
           • Intergreen and Pedestrian Times Design Chart – details timings for
                intergreen, all reds and pedestrian phases.
           • Scats Masterlink/Flexilink Chart – details interface parameters for a
                SCATS Masterlink mode and characteristics of Isolated and Flexilink
                operational modes.




MAIN ROADS WESTERN AUSTRALIA   ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS   Page 9 of 25
• Site Inventory Report – containing basic equipment list and quantities and
                commission date.
           The provision of the following documentation together with the As
           Constructed drawings is compulsory when the particular elements have been
           installed;
           • AWFS Design and Timing Record – details design calculations for AWFS
                timing operation.
           • Diamond Filter Notes – details operational set-up of installation.
           • Railway Controller Interface Circuit – schematic circuit of MRWA and
                Railway interface at rail crossings.




MAIN ROADS WESTERN AUSTRALIA   ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS   Page 10 of 25
SECTION 2 - Appendix A


SAMPLE SITE DOCUMENTATION


Compulsory (All Sites)
• Cable Chart
• Conflict Chart
• Detection Chart
• Timing Chart
• Phase Sequence Chart
• Intergreen & Pedestrian Times Design Chart
• SCATS Masterlink/Flexilink Chart
• Site Inventory Report


Compulsory (As and When Element Installed)
• AWFS Design and Timing Records
• Diamond Filter Notes
• Railway Controller Interface Circuit




MAIN ROADS WESTERN AUSTRALIA   ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS   Page 11 of 25
LM:      ###       INTERSECTION:               First St./Second St.                                                        CABLE CHART                          DATE:
Ring Main                             Controller    PIT   CON      CON      CON       CON      A         A        A         B        B        B        B          C        C        C
Core No.       FUNCTION               Terminal     POST    1        2        12       S2       3         4        5         6        7        8        S1         9        10       11
                                                                                      TPS                                                              TPS
   1        V1 RED                      A5                  1                 1                              1        1         1                                                   1
   2        V1 YELLOW                   A4                  2                 2                              2        2         2                                                   2
   3        V1 GREEN                    A3                  3                 3                              3        3         3                                                   3
   4        V2 RED                      A8                  4        1                             1                                              1               1        1
   5        V2 YELLOW                   A7                  5        2                             2                                              2               2        2
   6        V2 GREEN                    A6                  6        3                             3                                              3               3        3
   7        V3 RED                      A11                                   4                                       4                                                             4
   8        V3 YELLOW                   A10                                   5                                       5                                                             5
   9        V3 GREEN                    A9                                    6                                       6                                                             6
  10        V4 RED                      A14                                   7                                       7         4        1                                 4        7
  11        V4 YELLOW                   A13                                   8                                       8         5        2                                 5        8
  12        V4 GREEN                    A12                                   9                                       9         6        3                                 6        9
  13        V5 RED                      B5                           4                             4         4                           4        4               4
  14        V5 YELLOW                   B4                           5                             5         5                           5        5               5
  15        V5 GREEN                    B3                           6                             6         6                           6        6               6
  16
  17
  18        V6 GREEN                     B6                          7                                                                            7               7
            V 7 L/FLASH STHB             B10
            V 7 R/FLASH STHB             B9
  23        V 8 L/FLASH NTHB
  24        V 8 R/FLASH NTHB
  25
  26
  27
  28


                                                                   SAMPLE
  29
  30
  31
  32
  33
  34
  35
  36
  37
  38
  39
  40
  41
  42
  43
  44
  45        P-BUTTON 1                   E5                 16                                     16
  46        P-BUTTON 2                   E6                                                                                              16                       16
  47        P-BUTTON 3                   E7                                   16                                                                                           16
  48        P-BUTTON 4                   E8                                                                16                 16
 GREY       DET COMMON                   E3               Grey     Grey     Grey               Grey      Grey     Grey      Grey     Grey     Grey              Grey     Grey     Grey     Grey     Grey     Grey     Grey
 BLK        NEUTRAL                  A1 B1 C1             Black    Black    Black     Black    Black     Black    Black     Black    Black    Black    Black    Black    Black    Black    Black    Black    Black    Black
 GRN/Y      EARTH                     Earth TB            Green/   Green/   Green/    Green/   Green/    Green/   Green/    Green/   Green/   Green/   Green/   Green/   Green/   Green/   Green/   Green/   Green/   Green/y
                                                          yellow   yellow   yellow    yellow   yellow    yellow   yellow    yellow   yellow   yellow   yellow   yellow   yellow   yellow   yellow   yellow   yellow   ellow




               MAIN ROADS WESTERN AUSTRALIA                                          ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS                                                           Page 12 of 25
CONFLICT CHART
                                                                                                           MAIN ROADS
LM : ###                                                                                                   Western Australia
DATE :                                                                                                      Traffic & Safety

INTERSECTION : First St./Second St.


     SGP          1       2     3    4       5       6        7       8       9      10       11      12   13     14    15     16

       1
                        X X   X X
       2
                 X        X X   X
       3
                 X      X     X X
       4                              4
                        X     X X
       5
                 X        X X
       6

       7
                 X      X X X                               SAMPLE
       8                                                              8


       9

      10

      11

      12                                                                                              12


      13

      14

      15

      16                                                                                                                        16




     SGRP          1      2     3     4       5       6       7       8       9      10       11      12   13    14     15     16

     Major
                 X X                X X
     Minor
                                X                   X
   Adjacent
                                4                   5
     Peds




 MAIN ROADS WESTERN AUSTRALIA       ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS                     Page 13 of 25
DETECTOR CHART
LM : ###                                                                                                    MAIN ROADS
                                                                                                            Western Australia
DATE :                                                                                                       Traffic & Safety
INTERSECTION : First St./Second St.



  LOOP           DET                       SPECIFICATIONS                                               REMARKS
    1              1        X(A)                                                                APPROACH A1
    2              2        X(A)                                                                APPROACH A1
    3              3        L(B) X(B)                                                           APPROACH B1
    4              4        L(B) X(B)                                                           APPROACH B1
    5              5        L(B) X(B)                                                           APPROACH B1
    6              6        X(A)                                                                APPROACH A2
    7              7        L(C)IN(B) X(A,C) NX(A) PR7TO                                        APPROACH C1 A3


                                                               SAMPLE
    8              8        L(B) X(B)                                                           APPROACH B2
    9              9        L(B) X(B)                                                           APPROACH B2
   10             10        L(B) X(B)                                                           APPROACH B2
                  11        DP1(A) P(A) CALL AWAY TO BØ                                         PUSHBUTTON NO.1
                  12        DP2(A) P(A,C) CALL AWAY TO BØ                                       PUSHBUTTON NO.2
                  13        DP3(B) P(B)                                                         PUSHBUTTON NO.3
                  14        DP4(B) P(B)                                                         PUSHBUTTON NO.4
                  15        PRES(D) RAILWAY EARLY PRIORITY CALL                                 CLEARANCE
                  16        PRES(E) RAILWAY LATE PRIORITY CALL                                  BOOM GATES DOWN

                                                                NOTES
              “A” PHASE DEMANDED ALWAYS
    1
    2         “A” to “C” PHASE CHANGE PROHIBITED
    3         “B” to “D” Phase change uses Special RED “B” Time.
    4         All demands and extensions are cancelled when "D" and/or “E” phase is called.
    5         The BST is held in ALL RED period when going to "D" if Peds 1, 2, 3 or 4 are in Clearance or SGP4 is
              still timing the Amber / Red closing sequence.
    6         DETECTOR 15: RAILWAY EARLY PRIORITY CALL CLEARANCE.
    7         DETECTOR 16: RAILWAY LATE PRIORITY CALL, BOOM GATES DOWN.
    8         The release of Detectors 15 and/or 16 will cancel the demands for A, B, C phases and cancel all the
              extensions.
    9         If the railway call is registered while Peds1, 2, 3 or 4 are running, the clearance 1 timer will immediately
              be substituted by “A” Phase Late-start time in order to service the clearance phase “D” on time.
   10         “C” to “D” Phase change, after ECO Green, will force “A” Phase demand to service AWFS. with ECO
              time.
   11         “C” to “D” Phase change, before ECO Green, will use “A” Phase ECO Time for AWFS.
   12         “E” to “D” Phase change will force “A” Phase demand to service AWFS. with ECO time.




   MAIN ROADS WESTERN AUSTRALIA           ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS                  Page 14 of 25
TIMING CHART
LM : ###                                                                                                       MAIN ROADS
                                                                                                               Western Australia
DATE :                                                                                                          Traffic & Safety
INTERSECTION : First St/Second St.

CONTROLLER TYPE : PSC
HOUSING TYPE : MK3
CHECKSUM : $69

DIRECTION                A : MANDURAH RD.
                         B : DIXON RD & GILMORE AVE.
                         C : MANDURAH RD R/H TURN.
                         D : RAILWAY CLEARANCE.
                         E : RAILWAY - BOOM GATES DOWN.


LATE START
                                    A
                                    4
                                                   B           SAMPLEC               D                 E            F                   G

MINIMUM GREEN                       4              6               6                 6                 6
MAXIMUM GREEN                      40              30             15
E.C.O. GREEN                       5.8                             0                  6                6
YELLOW                              5              5               5                  5                5
RED                                1.5            1.5             1.5                1.5              1.5
SPECIAL RED                                        4
GAP 1                               3              3                 3
HEADWAY 1                           1              1                 1
WASTE 1                             8              6                 4
GAP 2                               3              3
HEADWAY 2                           1              1
WASTE 2                             8              6
GAP 3                               3
HEADWAY 3                           1
WASTE 3                             4
GAP 4
HEADWAY 4
WASTE 4
                                  PED 1        PED 2          PED 3          PED 4           PED 5          PED 6       PED 7       PED 8
DELAY
WALK                              8               6              6               6
CLEARANCE 1                       6               8              6               6
CLEARANCE 2                       5               5              5               5
PRESENCE TIMES                7: 3s
SPECIAL TIMES                 20: 5s
MAX. TRANSFER
MAX. STEAL
FLEXILINK
N.R.T. TIMES
NOTES                         “A” PHASE IS ALWAYS DEMANDED.




   MAIN ROADS WESTERN AUSTRALIA           ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS               Page 15 of 25
PHASE SEQUENCE CHART
LM : ###                                                                                                   MAIN ROADS
                                                                                                           Western Australia
DATE :                                                                                                      Traffic & Safety
INTERSECTION : First St/Second St.


                 GREEN DISPLAY PHASES                                    SIGNAL GROUP                            RED/OFF
        A    B   C D E                                                     OVERLAPS                           ARROW/SIGNAL
 SGP                                                                PERMITTED   SUBJECT TO                      DURATION
  1     X                  X                                        E-A        RAILWAY
  2          X
  3               X                                                                                           LS P1WLK
  4     X         X        X                                        C-A E-A                RAILWAY
  5          X        X                                             B-D                    RAILWAY


                                                              SAMPLE
  6                   X
 7F     A    M    B   E    R     /   G    R    E     E    N         * SEE NOTES
 8F     A    M    B   E    R     /   G    R    E     E    N         * SEE NOTES




  MAIN ROADS WESTERN AUSTRALIA           ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS          Page 16 of 25
INTERGREEN & PEDESTRIAN TIMES
                                                              DESIGN CHART                                      MAIN ROADS
                                                                                                                Western Australia
    LM : ###                                                                                                     Traffic & Safety
    DATE :
    INTERSECTION : First St./Second St.

     INTERGREEN TIMES
       PHASE                 CLEARANCE DETAILS                 LEGAL
                                                              SPEED            DESIGN SPEED                      INTERGREEN
                      GROUP TRANSITION         DISTANCE
                                                                            YELLOW          RED        YELLOW            RED       TOTAL
            A            1 – 6, 2 - 5            33              80            5              2            5              2             7
            B                3–5                 41              80            5              2            5              2             7
            C                4–6                 41              80            5              2            5              2             7
            D                5–2                 34              70            5              2            5              2             7
            E
            F
            G
                             6-1
                         3 - 2, 4 – 1
                                                 35
                                                 19               SAMPLE
                                                                 70
                                                                 80
                                                                               5
                                                                               5
                                                                                              2
                                                                                              1
                                                                                                           5
                                                                                                           5
                                                                                                                          2
                                                                                                                          2
                                                                                                                                        7
                                                                                                                                        7



     PHASE SPECIAL ALL REDS & SPECIAL MOVEMENT ALL REDS

       FROM             TO                    CLEARANCE DETAILS                         DESIGN                 ALL             PHASE or
       PHASE          PHASE(S)                                                          SPEED                  RED             S.M. NO. *
                                        GROUP TRANSITION              DISTANCE
A               B,F                                                                                 1.0                  SM1
A               C,F                                                                                 1.0                  SM2




     * Specify where timesetting is stored; the phase special all red or the special movement timesetting number.


     PEDESTRIAN TIMES
                                 DISTANCE          DELAY           WALK                CLEARANCE PHASE                           MIN.
       `PE                                         WALK            PHASE                                                        SOLID
        D        PHASE(S)        Between Ped                                       DISTANCE           CLEARANCE
       NO.                                                                                                TIMES                 DON’T
                                   Ramps                  Times in Sec                                                          WALK
                                                                                    CALC.             CL1       CL2
        1         A,B,F1                31                0             6             26              20             6              1
        2         A,C,F2                30                0             6             25              19             6              1
        3           D                   27                0             6             23              17             6              1
        4           E                   31                0             6             26              20             6              1
        5
        6
        7
        8




    MAIN ROADS WESTERN AUSTRALIA             ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS                   Page 17 of 25
SCATS MASTERLINK/FLEXILINK CHART
                                                                                                  MAIN ROADS
                                                                                                  Western Australia
LM : ###                                                                                           Traffic & Safety
DATE :
INTERSECTION : First St./Second St.




 ISOLATED
   1   NUMBER OF PHASES                                 6
   2   ARTERIAL PHASE                                   A
   3   UNUSED MAX TIME TRANSFER                         A-BC


                                                     SAMPLE
   4   MAX TIME STEALING                                B-AC, C-AB
   5   PROHIBITED PHASE SEQUENCES

 FLEXILINK                                                NORMAL SEQ ALT SEQ (Y+)
   1   PHASE SEQUENCE (PIVOT FIRST)                     ABCDEF         ABCDEF
 LOOK AHEAD
   2   LOOK AHEAD FROM A TO -
   3   LOOK AHEAD FROM B TO -
   4   LOOK AHEAD FROM C TO -
   5   LOOK AHEAD FROM D TO -
   6   LOOK AHEAD FROM E TO -
   7   LOOK AHEAD FROM F TO -
   8   LOOK AHEAD FROM G TO -
 RELEASE BY PSEUDO PHASE
   9   AUTO RELEASE BY PSEUDO PHASE(S)                  B,C,D,E,F
  10   R- RELEASE BY PSEUDO PHASE(S)                    A
  11   R+ RELEASE BY PSEUDO PHASE(S)
  12   Q- RELEASE BY PSEUDO PHASE(S)
  13   Q+ RELEASE BY PSEUDO PHASE(S)
 RELEASE BY SIGNAL GROUP GREEN
  14   AUTO RELEASE BY GROUP GREEN(S)
  15   R- RELEASE BY GROUP GREEN(S)
  16   R+ RELEASE BY GROUP GREEN(S)
  17   Q- RELEASE BY GROUP GREEN(S)
  18   Q+ RELEASE BY GROUP GREEN(S)
 SPECIAL FEATURES
  19   Z- SPECIAL FACILITY
  20   Z+ SPECIAL FACILITY

 MASTERLINK
  1     DIS-ALARMED DETECTORS
  2     Y- SPECIAL FACILITY                             AUTO PEDESTRIAN DEMANDS
  3     Z- SPECIAL FACILITY                             CALL “B” PHASE
  4     Z+ SPECIAL FACILITY                             CALL “C” PHASE
 XSF SIGNALS
 XSF FLEXILINK FUNCTION                                 MASTERLINK FUNCTION
  1




 MAIN ROADS WESTERN AUSTRALIA   ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS              Page 18 of 25
2
 3
 4
 5




                                                    SAMPLE




MAIN ROADS WESTERN AUSTRALIA   ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS   Page 19 of 25
SIT E INVENT ORY REPORT
Intersection:                                                                                                 L M No:                        Version:
                                                                                                              Report carried out by:
Date:                      Job Number:                                                                       SignalsDrawing No: __________________________________
Special Functions (if applicable):                                                                           Signs & Lines Drawing No:
   1) Controller                 DATE FIRST INSTALLED (if known) ____/____/_______                        4) Power Supply
  1.1 Documentation is accurate and relevant to the site                           Yes                       Indicate Supply Authority if not Western Power:
                                                                                                                                                         _______________
        Timing Chart                                                                                         Sw/board, Meter Number: ______________________________
                                                                                                                                          _
        Conflict Chart                                                                                       If Aerial Pole installed, indicate "y"
        Detector Chart                                                                                       If pole Top Isolator fitted, indicate "y"
        Cable wiring charts                                                                                  If pavement Fuse Link fitted, indicate "y"
        Phase sequence chart                                                                              5) Lanterns                               QTY          QTY
        As constructed drawings                                                                              Number of Lamps           20 Watt           67 Watt
        Processor Plus Card (HRS Version)(C.12)                                                                                        30 Watt          100 Watt
        Housing Serial Number / Type / Mark                                                                   If installed, number of illuminated NRT's
        Module Serial Number                                                                                  If installed, number of Red Light Camera's
        Software Checksum (C.9)                                                                               If installed, number of Advanced Warning Signals



  1.2
        Number of LCB's (if PSC)

                                                        SAMPLE                QTY
        Number of Det Cards and Channels: Card 1_______Channels. Card 2_______Channels.
        Vehicle Detectors operate according to the site documentation
                                                                                                              Quantity of each
                                                                                                             AE 200 (ELV)
                                                                                                             Siemens 200 (ELV)
                                                                                                                                        3Asp      2asp    1asp      W/DW



  1.3   Pedestrian Push Buttons operate according to the site documentations                                 Siemens 300 (ELV)
  1.4   Controller and cable pit are clean and free from surplus materials                                   Target boards as per drawing, indicate if "y".
  1.5   Communication type.       (Cross out N/A)     SCATS ----DUST----NOT CONNECTED                     6) Pedestrian Push Buttons                        TYPE     QTY
   2)   Signs and Roadmarking                                                    Yes                         NON AUDIBLE PPB
  2.1 Signs have been installed according to the site documentation.                                         AUDIBLE PPB
  2.2 Roadmarking has been installed according to the site documentation.                                    AUDIBLE PPB DRIVER
   3) Field Hardware                                                                                      7) Paint Condition                                        Good
        Number of Push Button Poles                                                                          Poles
        Number of Plain Poles                                                                                Controller
        Number of Stubby Push Button Poles                                                                8) Loops                                                   QTY
        Number of Stubby Protection Poles                                                                     SYMETRIPOLE LOOPS
        Type of Ring Main Cable                                                                               QUADRUPOLE LOOPS
        Number of Finial Caps                   METAL         PLASTIC                                         11 METER LOOPS
        Number of Termination Pits if Installed                                                               BICYCLE LOOPS
        Laminated Charts in Pits if Applicable                                                                POLICE CAMERA LOOPS

        MAIN ROADS WESTERN AUSTRALIA                       ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS                                         Page 20 of 25
SAMPLE




MAIN ROADS WESTERN AUSTRALIA   ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS   Page 21 of 25
FIRST ST/SECOND ST ADVANCED WARNING FLASHERS

LM : ###
DATE :
INTERSECTION : First St./Second St.


 FLASHERS

 SGP7 and SGP8 flashing AMBER/GREEN is at a rate of 1Hz (ie 0.5 sec ON/OFF) during
 EARLY CUT OFF GREEN of :
   "A” PHASE (ie SGP7 for SOUTH BOUND on Mandurah Rd) while SGP1 is RED or
   "A & C” PHASES (ie SGP8 for NORTH BOUND on Mandurah Rd). while SGP1 and/or
   SGP4
   are RED.

 The "PREPARE TO STOP" SIGNS are located on the SOUTH BOUND and NORTH BOUND
 approaches of MANDURAH RD.
 The distance from the TRAFFIC SIGNALS STOP LINE and the EARLY CUT OFF TIME are
 shown below:

 Calculation of ECO AMBER for FLASHERS.

 SOUTH BOUND and NORTH BOUND SGP7/SGP8
 EARLY CUT OFF TIME = (D(m) + 21.3)/V(m/s)

 D = DISTANCE from STOP LINE to SIGN, with NEGLIGIBLE GRADIENT and a posted
 speed limit of 80 Km/h, giving a DISTANCE of 106 metres.

 ECOG time (Early Cut Off Green).

 V = VELOCITY = Speed limit/time. Posted Speed Limit is 80 Km/h.
 V = 80x1000(m)/60x60(s)
 V = 22.2 m/s

 ECO = (106(m) + 21.3)/22.2(m/s)
 ECO = 5.73(s) - Therefore ECO time rounded off to 5.8s.




 MAIN ROADS WESTERN AUSTRALIA   ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS   Page 22 of 25
DIAMOND FILTER NOTES

                                    FIRST ST./SECOND ST.                     LM: ###


                               Additional notes for Single Diamond FILTER
This site operates to Single Diamond standard with the following exceptions:

•        Filtering is always permitted on the A-B approach (signal group 3) during "A".

         - The SGP3 Red arrow will be held red during:
                 . "A" phase late start interval following B, E, E1 and E2.
                 . The pedestrian 1 Walk period .

         - The controller prevents local demands for "C" phase to inhibit the movement from "A" to "C", as the SGP2 is
         not permitted to overlap from "A" to "C".

         - Loop 3 places a demand for "E1" during "A" phase subject to the presence time on DET 3, to avoid a funny
         shut down situation ("A" to "E1") the controller will go from "A" to "E" phase.

          - Loop 3 extends "A" phase ( approach A3 ) until the presence timer has timed off.

•        Filtering is always permitted on the A-C approach (signal group 4) during "A".

         - The SGP4 Red arrow will be held red during:
                 . "A" phase late start interval following C, E, E1 and E2.
                 . The pedestrian 1 Walk period.

         - The controller prevents local demands for "B" phase to inhibit the movement from "A" to "B", as the SGP1 is
         not permitted to overlap from "A" to "B".

         - Loop 9 places a demand for "E2" during "A" phase subject to the presence time on DET 9, to avoid a funny
         shut down situation ("A" to "E2") the controller will go from "A" to "E" phase.

         - Loop 9 extends "A" phase ( approach A4 ) until the presence timer has timed off.

Notes on SGP7 Left Turn:

Signal Group 7 is green during B,D,E & E1 Phases but overlap only permitted
from E - E1 phases. SGP7 closes down between phases B,D & E and remains Red at the start of those phases to permit
right turn filter traffic from the opposing lane (loop11).
Delayed start of SGP7 is subject to Special Timer 10.




MAIN ROADS WESTERN AUSTRALIA        ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS       Page 23 of 25
RAILWAY CONTROLLER INTERFACE CIRCUIT
                  LM###                                                                   Date :   / /
                                            First St / Second St




                                                                        E5                           10


                                                                        E6                           11




             EARLY CALL
                                        2                    RDA 1
                                                core 2


             LATE CALL                  3                    RDB 1
                                                core 3




                                        1
                                                                    BBL RDA
                                                core 1



                                  WESTRAIL
                                  CONNECTION BLOCK


                                        1
                                                                       BL MCP
                                                core 1

                                        2
                                                core 2
                                        3
                                                cable 2
                                                core 3




MAIN ROADS WESTERN AUSTRALIA   ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS       Page 24 of 25
SECTION 2 - Appendix B


EXAMPLE DRAWINGS




MAIN ROADS WESTERN AUSTRALIA   ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS   Page 25 of 25

Mais conteúdo relacionado

Semelhante a E27029 20080901082423522

Tma inst service_manual
Tma inst service_manualTma inst service_manual
Tma inst service_manualMuhammad Saqib
 
Seminar report main page 2
Seminar report main page 2Seminar report main page 2
Seminar report main page 2Ranjan kumar
 
DigSILENT PF - 06 irena additional exercises
DigSILENT PF - 06 irena  additional exercisesDigSILENT PF - 06 irena  additional exercises
DigSILENT PF - 06 irena additional exercisesHimmelstern
 
Icom 2200 h service manual
Icom 2200 h service manualIcom 2200 h service manual
Icom 2200 h service manualjoffco
 
A Comparative Analysis on Parameters of Different Adder Topologies
A Comparative Analysis on Parameters of Different Adder TopologiesA Comparative Analysis on Parameters of Different Adder Topologies
A Comparative Analysis on Parameters of Different Adder TopologiesIRJET Journal
 
Lcd samsung gnb23 mla gnb26mla_gnb32mla_gnb40mla_=_ln263r71bax__ln263r71wax__...
Lcd samsung gnb23 mla gnb26mla_gnb32mla_gnb40mla_=_ln263r71bax__ln263r71wax__...Lcd samsung gnb23 mla gnb26mla_gnb32mla_gnb40mla_=_ln263r71bax__ln263r71wax__...
Lcd samsung gnb23 mla gnb26mla_gnb32mla_gnb40mla_=_ln263r71bax__ln263r71wax__...BatistaBR
 
01 networkparameter-110906050044-phpapp02
01 networkparameter-110906050044-phpapp0201 networkparameter-110906050044-phpapp02
01 networkparameter-110906050044-phpapp02syafri djalilan
 
Cd00004444 understanding-and-minimising-adc-conversion-errors-stmicroelectronics
Cd00004444 understanding-and-minimising-adc-conversion-errors-stmicroelectronicsCd00004444 understanding-and-minimising-adc-conversion-errors-stmicroelectronics
Cd00004444 understanding-and-minimising-adc-conversion-errors-stmicroelectronicsvu CAO
 
MERCURY MERCRUISER 496 MAG DIAGNOSTICS Service Repair Manual SN:0M000000 and ...
MERCURY MERCRUISER 496 MAG DIAGNOSTICS Service Repair Manual SN:0M000000 and ...MERCURY MERCRUISER 496 MAG DIAGNOSTICS Service Repair Manual SN:0M000000 and ...
MERCURY MERCRUISER 496 MAG DIAGNOSTICS Service Repair Manual SN:0M000000 and ...jkmsemmdmew
 
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...hjnsemm
 
MERCURY MERCRUISER 8.1S HO DIAGNOSTICS Service Repair Manual SN:0M000000 and ...
MERCURY MERCRUISER 8.1S HO DIAGNOSTICS Service Repair Manual SN:0M000000 and ...MERCURY MERCRUISER 8.1S HO DIAGNOSTICS Service Repair Manual SN:0M000000 and ...
MERCURY MERCRUISER 8.1S HO DIAGNOSTICS Service Repair Manual SN:0M000000 and ...jknsekmdmd
 
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...yjsekmdm dhjsekdm
 
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...kjsmemm
 
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...hjmkmd jskemmd
 
1991 yamaha vmx1200 b v max service repair manual
1991 yamaha vmx1200 b v max service repair manual1991 yamaha vmx1200 b v max service repair manual
1991 yamaha vmx1200 b v max service repair manualjksnmdm
 
1990 yamaha vmx1200 a v max service repair manual
1990 yamaha vmx1200 a v max service repair manual1990 yamaha vmx1200 a v max service repair manual
1990 yamaha vmx1200 a v max service repair manualjknsmmem
 
1988 yamaha vmx1200 u c vmax service repair manual
1988 yamaha vmx1200 u c vmax service repair manual1988 yamaha vmx1200 u c vmax service repair manual
1988 yamaha vmx1200 u c vmax service repair manualjkmsedopl
 
1997 Yamaha VMX1200J V-MAX Service Repair Manual
1997 Yamaha VMX1200J V-MAX Service Repair Manual1997 Yamaha VMX1200J V-MAX Service Repair Manual
1997 Yamaha VMX1200J V-MAX Service Repair Manualjskemmdn eukdms
 
1989 yamaha vmx1200 w vmax service repair manual
1989 yamaha vmx1200 w vmax service repair manual1989 yamaha vmx1200 w vmax service repair manual
1989 yamaha vmx1200 w vmax service repair manualjksnmdms
 

Semelhante a E27029 20080901082423522 (20)

Tma inst service_manual
Tma inst service_manualTma inst service_manual
Tma inst service_manual
 
Seminar report main page 2
Seminar report main page 2Seminar report main page 2
Seminar report main page 2
 
DigSILENT PF - 06 irena additional exercises
DigSILENT PF - 06 irena  additional exercisesDigSILENT PF - 06 irena  additional exercises
DigSILENT PF - 06 irena additional exercises
 
Icom 2200 h service manual
Icom 2200 h service manualIcom 2200 h service manual
Icom 2200 h service manual
 
A Comparative Analysis on Parameters of Different Adder Topologies
A Comparative Analysis on Parameters of Different Adder TopologiesA Comparative Analysis on Parameters of Different Adder Topologies
A Comparative Analysis on Parameters of Different Adder Topologies
 
Lcd samsung gnb23 mla gnb26mla_gnb32mla_gnb40mla_=_ln263r71bax__ln263r71wax__...
Lcd samsung gnb23 mla gnb26mla_gnb32mla_gnb40mla_=_ln263r71bax__ln263r71wax__...Lcd samsung gnb23 mla gnb26mla_gnb32mla_gnb40mla_=_ln263r71bax__ln263r71wax__...
Lcd samsung gnb23 mla gnb26mla_gnb32mla_gnb40mla_=_ln263r71bax__ln263r71wax__...
 
01 networkparameter-110906050044-phpapp02
01 networkparameter-110906050044-phpapp0201 networkparameter-110906050044-phpapp02
01 networkparameter-110906050044-phpapp02
 
Cd00004444 understanding-and-minimising-adc-conversion-errors-stmicroelectronics
Cd00004444 understanding-and-minimising-adc-conversion-errors-stmicroelectronicsCd00004444 understanding-and-minimising-adc-conversion-errors-stmicroelectronics
Cd00004444 understanding-and-minimising-adc-conversion-errors-stmicroelectronics
 
Norma cmaa 70
Norma cmaa 70Norma cmaa 70
Norma cmaa 70
 
MERCURY MERCRUISER 496 MAG DIAGNOSTICS Service Repair Manual SN:0M000000 and ...
MERCURY MERCRUISER 496 MAG DIAGNOSTICS Service Repair Manual SN:0M000000 and ...MERCURY MERCRUISER 496 MAG DIAGNOSTICS Service Repair Manual SN:0M000000 and ...
MERCURY MERCRUISER 496 MAG DIAGNOSTICS Service Repair Manual SN:0M000000 and ...
 
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...
 
MERCURY MERCRUISER 8.1S HO DIAGNOSTICS Service Repair Manual SN:0M000000 and ...
MERCURY MERCRUISER 8.1S HO DIAGNOSTICS Service Repair Manual SN:0M000000 and ...MERCURY MERCRUISER 8.1S HO DIAGNOSTICS Service Repair Manual SN:0M000000 and ...
MERCURY MERCRUISER 8.1S HO DIAGNOSTICS Service Repair Manual SN:0M000000 and ...
 
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...
 
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...
 
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...
MERCURY MERCRUISER 496 MAG HO DIAGNOSTICS Service Repair Manual SN:0M000000 a...
 
1991 yamaha vmx1200 b v max service repair manual
1991 yamaha vmx1200 b v max service repair manual1991 yamaha vmx1200 b v max service repair manual
1991 yamaha vmx1200 b v max service repair manual
 
1990 yamaha vmx1200 a v max service repair manual
1990 yamaha vmx1200 a v max service repair manual1990 yamaha vmx1200 a v max service repair manual
1990 yamaha vmx1200 a v max service repair manual
 
1988 yamaha vmx1200 u c vmax service repair manual
1988 yamaha vmx1200 u c vmax service repair manual1988 yamaha vmx1200 u c vmax service repair manual
1988 yamaha vmx1200 u c vmax service repair manual
 
1997 Yamaha VMX1200J V-MAX Service Repair Manual
1997 Yamaha VMX1200J V-MAX Service Repair Manual1997 Yamaha VMX1200J V-MAX Service Repair Manual
1997 Yamaha VMX1200J V-MAX Service Repair Manual
 
1989 yamaha vmx1200 w vmax service repair manual
1989 yamaha vmx1200 w vmax service repair manual1989 yamaha vmx1200 w vmax service repair manual
1989 yamaha vmx1200 w vmax service repair manual
 

Último

Implementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptxImplementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptxRich Reba
 
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...PRnews2
 
71368-80-4.pdf Fast delivery good quality
71368-80-4.pdf Fast delivery  good quality71368-80-4.pdf Fast delivery  good quality
71368-80-4.pdf Fast delivery good qualitycathy664059
 
Simplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansSimplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansNugget Global
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Jiastral oracle
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
Darshan Hiranandani (Son of Niranjan Hiranandani).pdf
Darshan Hiranandani (Son of Niranjan Hiranandani).pdfDarshan Hiranandani (Son of Niranjan Hiranandani).pdf
Darshan Hiranandani (Son of Niranjan Hiranandani).pdfShashank Mehta
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
Customizable Contents Restoration Training
Customizable Contents Restoration TrainingCustomizable Contents Restoration Training
Customizable Contents Restoration TrainingCalvinarnold843
 
Rakhi sets symbolizing the bond of love.pptx
Rakhi sets symbolizing the bond of love.pptxRakhi sets symbolizing the bond of love.pptx
Rakhi sets symbolizing the bond of love.pptxRakhi Bazaar
 
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdfSherl Simon
 
Paul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate ProfessionalPaul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate ProfessionalPaul Turovsky
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdfMintel Group
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
How to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHow to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHelp Desk Migration
 

Último (20)

Implementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptxImplementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptx
 
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
 
71368-80-4.pdf Fast delivery good quality
71368-80-4.pdf Fast delivery  good quality71368-80-4.pdf Fast delivery  good quality
71368-80-4.pdf Fast delivery good quality
 
Simplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansSimplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business Loans
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
Darshan Hiranandani (Son of Niranjan Hiranandani).pdf
Darshan Hiranandani (Son of Niranjan Hiranandani).pdfDarshan Hiranandani (Son of Niranjan Hiranandani).pdf
Darshan Hiranandani (Son of Niranjan Hiranandani).pdf
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
Customizable Contents Restoration Training
Customizable Contents Restoration TrainingCustomizable Contents Restoration Training
Customizable Contents Restoration Training
 
Toyota and Seven Parts Storage Techniques
Toyota and Seven Parts Storage TechniquesToyota and Seven Parts Storage Techniques
Toyota and Seven Parts Storage Techniques
 
Rakhi sets symbolizing the bond of love.pptx
Rakhi sets symbolizing the bond of love.pptxRakhi sets symbolizing the bond of love.pptx
Rakhi sets symbolizing the bond of love.pptx
 
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
 
Paul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate ProfessionalPaul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate Professional
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
How to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHow to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your Business
 

E27029 20080901082423522

  • 1. MAIN ROADS Western Australia MRWA ELECTRICAL INFRASTRUCTURE ASSET DRAWING GUIDELINES o Section 1 - General • Section 2 - Traffic Control Signals o Section 3 - Lighting o Section 4 - Emergency Roadside Telephones o Section 5 - Closed Circuit Television Monitoring Cameras o Section 6 - Variable Message Signs This manual is owned and controlled by the Traffic Engineering Standards Manager. The Traffic Engineering Standards Manager is the delegated custodian. All comments and requests for changes should be submitted to the Custodian. Main Roads Western Australia Waterloo Crescent, East Perth PO Box 6202 EAST PERTH WA 6892 Phone: 9323 4217 Fax: 9323 4600 Authorisation As Manager Road and Traffic Engineering of Main Roads Western Australia, I authorise the issue and use of this document. SENIOR ENGINEER ROAD AND TRAFFIC DESIGN Date: ____ /____ /____ Controlled Copy No: _____ MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 1 of 25
  • 2. Contents 2.Traffic Control Signals....................................................................................4 2.1 LM Asset Reference Number............................................................................4 2.1.1 New Assets........................................................................................................4 2.1.2 Existing Assets..................................................................................................4 2.2 Asset Reference Number and Drawing Layout..................................................4 2.2.1 Title Block and References................................................................................4 2.2.2 AutoCAD File Name..........................................................................................4 2.3 LM “A” Electrical Drawing..................................................................................5 2.3.1 General..............................................................................................................5 2.3.2 Feature Matrix...................................................................................................5 2.3.3 Traffic Movement Diagram................................................................................6 2.3.4 Disconnected Services......................................................................................6 2.3.5 Underground Post to Pit Connection Table.......................................................7 2.3.6 Traffic Signal Posts and Numbering..................................................................7 2.3.7 Lantern Aspect Size and Types.........................................................................7 2.3.8 Detection Loops.................................................................................................7 2.3.9 Pedestrian Detection ........................................................................................7 2.3.10 Illuminated Flashing No Right Turn Signals.....................................................7 2.3.11 Rail Crossing...................................................................................................7 2.3.12 Advance Flashing Warning Signals.................................................................8 2.3.13 Land Boundaries.............................................................................................8 2.3.14 Typical Drawings.............................................................................................8 2.4 LM “B” Road Marking and Signs Drawing.........................................................8 2.4.1 MRWA Traffic Signal Area.................................................................................9 2.4.2 Dimensions & Sign Reference...........................................................................9 2.4.3 Typical Drawings...............................................................................................9 2.5 Site Documentation...........................................................................................9 ### 12 INTERGREEN TIMES........................................................................................17 PHASE SPECIAL ALL REDS & SPECIAL MOVEMENT ALL REDS..............17 B,C,D,E,F............................................................................................................18 MASTERLINK....................................................................................................18 Appendices A. SAMPLE SITE DOCUMENTATION B. EXAMPLE DRAWINGS MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 2 of 25
  • 3. Revision Status Record Latest Latest Revision Approved Revision Revision Description/Reference By No. Date. 0 06-09-01 Original 1 17/7/2003 Scale for LM A drawing revised to 1:125 in section 2.3.2. Authorised: TRAFFIC ENGINEERING STANDARDS MANAGER Date: ____ /____ /____ MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 3 of 25
  • 4. 2. Traffic Control Signals 2.1LM Asset Reference Number An “LM” asset reference number identifies each traffic control signal installation. This number is shown in the lower right corner of the drawing immediately to the right of the drawing number. The LM asset number must also be shown on all other documents in a suitable location. 2.1.1New Assets New assets will require that new “As Constructed” asset drawings are produced. MRWA will organise the new LM asset number and allocate the asset drawing numbers. 2.1.2Existing Assets An existing asset will already have been assigned an “LM” asset number and have existing (“A” electrical and “B” marking) asset drawings. These asset drawings numbers must be maintained throughout the life of the asset and should not be changed. This will allow changes to the site that occur over time to be easily recorded in the amendments column of the drawing. It is therefore the asset drawing/s (not the design drawings) that should be updated if an asset is modified. However, design/construction drawings may be added as a reference drawing within the Asset drawing. Asset numbers must not be duplicated. 2.2Asset Reference Number and Drawing Layout 2.2.1Title Block and References Traffic control signal asset drawings will have a title block layout that provides a discrete (eg LM001) “LM” asset reference number in the lower right corner of the drawing and immediately to the right of the MRWA drawing number. The drawing set will generally include an “A” and a “B” drawing. The “A” drawing will contain the electrical installation details whilst the “B” drawing will contain the road marking and signage information. 2.2.2AutoCAD File Name The AutoCAD file name format for each drawing will be LM###A.dwg and LM###B.dwg where ### is the three digit asset reference number. Should more than one drawing be required then the file name would be extended to include the sheet number (ie LM###AS1.dwg, LM###AS2.dwg) were S1 and S2 are sheet 1 and 2 respectively. MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 4 of 25
  • 5. 2.3LM “A” Electrical Drawing 2.3.1General The LM “A” drawing contains details relating to all electrical infrastructure, the site configuration and the Traffic (phase) Movement Diagram. 2.3.2Feature Matrix The following table provides a quick reference to the features that need to be shown on the A and B asset drawing. Comments and reference to example drawings are provided within the table. Feature LM"A" LM"B" Comment Scale 1:125 1:500 If updating an old 1:250 “A” or 1:250 “B” drawing redraw to 1:125 or 1:500, respectively. Choose a standard scale of best fit if the site reasonably exceeds the page. Use content break-match lines where appropriate. If a 1:125 is to large for a LM A drawing then use 1:250. Kerbing and driveways √ √ Traffic islands, √ √ Property boundaries √ √ Electrical supply √ Point of Attachment √ Pole or underground supply pit/fuse √ box/pillar Controller, Earth pit, and √ Communication pit Conduit size and location √ Cable pits and Draw pits and numbers √ Underground pit system details √ Including cable size: 19, 29 or 51 core Detector loops √ √ B drawing only to show dotted loop outlines Detector loop numbers √ Loop pits and pit connections √ Loop feeder cable route √ Traffic Movement Diagram √ Red Light Camera √ Controller type √ Communication type √ SCATS, DUST, None Advanced flashing warning sign √ √ Advanced flashing warning signs √ Sign number and signal group. Content break-match lines will typically be appropriate to bring the sign locations onto the drawing page. Traffic signal post √ √ Traffic signal post number √ Lanterns & signal group number √ MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 5 of 25
  • 6. Feature LM"A" LM"B" Comment Push buttons and group number √ Target boards √ Disconnected services Visors and Louvres Only on design/construction drawing Illuminated Flashing No Right Turn √ Signs North Arrow √ √ Rail crossing √ √ Temporary signs Not to be shown Brick paving, seats, shubs/tree Not to be shown One call logo Pedestrian ramps √ √ Not to be shown Footpaths Not to be shown RRPMs √ MRWA traffic signal area May be deleted when updating an existing asset drawing Reference to design drawings √ Company logo's √ √ CCTV √ Only when connected to the controller Gore (chevron) marking √ To be shown in outline only Land boundaries √ To be shown in outline only 2.3.3Traffic Movement Diagram A Traffic movement diagram shall be located in the lower left corner of the LM ‘A’ drawing, detailing the phases with which the signals operate. Each phase shall be labelled as A, B, C, etc., according to the programmed operation of the signals. Alternative phases shall be labelled by addition of a number behind the phase number (Alt B1 and Alt B2). Signal group numbers shall be shown within each phase corresponding to the controller outputs. The movement numbers shall be shown against lanterns in the main body of the drawing. 2.3.4Disconnected Services Over time intersections will undergo modifications. Some equipment may be disconnected (eg vehicle detection loops) or become redundant (eg where the pits cable routes get moved). To avoid the asset drawing becoming cluttered with obsolete information it is desirable not to show disconnected services. However, where conduits or equipment are installed for future modifications then a suitable note should be added to the body of the drawing. Otherwise disconnected services should not be shown. MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 6 of 25
  • 7. 2.3.5Underground Post to Pit Connection Table Signal poles will either be wired as a ring main or pit system. If the site has a pit system installed then the asset drawing must contain a pit to pole connections table similar to the following: Pit/Controller Post Controller 1, 2, 12 A 3, 4, 5 B 6, 7, 8 C 9, 10, 11 2.3.6Traffic Signal Posts and Numbering Traffic signal posts should be numbered in a clockwise direction starting from the controller. 2.3.7Lantern Aspect Size and Types Lantern aspect sizes will be 200mm or 300mm. The size and direction of each lantern shall be shown on the LM “A” drawing. Vehicle filter lanterns, pedestrian lanterns and cycle lanterns shall be shown by symbols as shown on drawing 8320-0400. 2.3.8Detection Loops All detection loops for vehicles, bicycles and red light cameras shall be shown. Starting in an anti-clockwise direction from the northern most loop on the Western leg of the intersection, the loops (except Red Camera loops) should be allocated a loop number designated by L1 for the first loop, L2 for the second loop etc, until all loops are numbered in keeping with the programmed loop allocations. A diagram detailing the loop feeder cable route is also required to be detailed on the drawing. (A layout of the detector loop arrangement and connection to the loop pits is indicated on Drawing 9748-1114). 2.3.9Pedestrian Detection Pedestrian push buttons shall be shown and marked with a PB number that will be paired with one on the opposite kerb side. Symbols for standard (non audio) and audio-tactile push buttons should match those shown on the standard symbols drawing. 2.3.10Illuminated Flashing No Right Turn Signals Illuminated flashing NO RIGHT TURN signals shall be shown. A minimum of two signals shall be displayed for each direction of travel and attached to the dual primary and the secondary signal posts. 2.3.11Rail Crossing Rail crossings shall be shown when the crossing is electrically co-ordinated with the traffic signal movements. The equipment to be shown on the “A” asset drawing will include boom gates, loops, conduits and controllers. The traffic movement diagram shall show phases for operation of the boom gates. MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 7 of 25
  • 8. Conduit runs to the rail sensors shall be shown on the drawing. Wiring and termination schematics shall be provided on a separate sheet similar to the example shown in Section 2 – Appendix B. 2.3.12Advance Flashing Warning Signals Advance Flashing Warning Signals comprise a standard diamond shaped signals ahead warning sign with a standard white on red PREPARE TO STOP sign on a rectangular yellow background, with two alternately flashing yellow signals located in the upper corners of the sign. Starting in a clockwise direction from the controller each sign shall be allocated a number designated by S1 for the first sign, S2 for the second sign and continuous until all signs are numbered. 2.3.13Land Boundaries Land boundaries must be shown. 2.3.14Typical Drawings Typical examples of LM “A” drawings are shown in Section 2 – Appendix A 2.4LM “B” Road Marking and Signs Drawing Regulatory, warning signs and painted road markings shall be shown on the LM “B” drawing. Details shall include: • Stop lines and stop signs • Give Way signs • Lane widths • Lane separation lines (continuous and broken) and centrelines • Pavement arrows • Turning guidelines • Pedestrian walk guidelines • Hazard boards • Guardrails • Site specific marking and signing (yellow hazard gridline across rail crossing, bus bay, guard crossing) • Posts supporting signs • Traffic signal posts (post position only) • Reflectorised Raised Pavement markers (RRPM’s) • Regulatory traffic warning signs • Advanced Flashing warning signals • Street name tags MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 8 of 25
  • 9. The following signs need not be shown: • Major directional signs • Fencing • Guide signs • Tourist signs • Information signs • Signs not owned by MRWA 2.4.1MRWA Traffic Signal Area Historically, the MRWA traffic signals area was defined on the “B” drawing as the area between the No Standing signs closest to the signal intersection. Whilst some existing “B” drawing may still show this area it is no longer required to be detailed on new (or updated) “B” drawings. 2.4.2Dimensions & Sign Reference Where there is no distinguishing feature’s that assists location of the sign or marking then chainage dimensions to the nearest 0.5m should be shown. 2.4.3Typical Drawings Typical examples of LM “B” drawings are shown in Section 2 – Appendix A 2.5Site Documentation The provision of the following documentation together with the As Constructed drawings is compulsory; • Cable Chart – detailing (ring main or pit) cable connections. • Conflict Chart – classifying the severity of conflicts for each signal group and detailing in a matrix the conflicts between all signal groups. • Detector Chart – details the detector triggers (loops, pedestrian pushbuttons, rail detectors etc) and assigns demand functions, extension functions and other operational characteristics to these. • Timing Chart – containing BST (basic sequence timing) details. • Phase Sequence Chart – containing details of green display phases and signal group overlaps. • Intergreen and Pedestrian Times Design Chart – details timings for intergreen, all reds and pedestrian phases. • Scats Masterlink/Flexilink Chart – details interface parameters for a SCATS Masterlink mode and characteristics of Isolated and Flexilink operational modes. MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 9 of 25
  • 10. • Site Inventory Report – containing basic equipment list and quantities and commission date. The provision of the following documentation together with the As Constructed drawings is compulsory when the particular elements have been installed; • AWFS Design and Timing Record – details design calculations for AWFS timing operation. • Diamond Filter Notes – details operational set-up of installation. • Railway Controller Interface Circuit – schematic circuit of MRWA and Railway interface at rail crossings. MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 10 of 25
  • 11. SECTION 2 - Appendix A SAMPLE SITE DOCUMENTATION Compulsory (All Sites) • Cable Chart • Conflict Chart • Detection Chart • Timing Chart • Phase Sequence Chart • Intergreen & Pedestrian Times Design Chart • SCATS Masterlink/Flexilink Chart • Site Inventory Report Compulsory (As and When Element Installed) • AWFS Design and Timing Records • Diamond Filter Notes • Railway Controller Interface Circuit MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 11 of 25
  • 12. LM: ### INTERSECTION: First St./Second St. CABLE CHART DATE: Ring Main Controller PIT CON CON CON CON A A A B B B B C C C Core No. FUNCTION Terminal POST 1 2 12 S2 3 4 5 6 7 8 S1 9 10 11 TPS TPS 1 V1 RED A5 1 1 1 1 1 1 2 V1 YELLOW A4 2 2 2 2 2 2 3 V1 GREEN A3 3 3 3 3 3 3 4 V2 RED A8 4 1 1 1 1 1 5 V2 YELLOW A7 5 2 2 2 2 2 6 V2 GREEN A6 6 3 3 3 3 3 7 V3 RED A11 4 4 4 8 V3 YELLOW A10 5 5 5 9 V3 GREEN A9 6 6 6 10 V4 RED A14 7 7 4 1 4 7 11 V4 YELLOW A13 8 8 5 2 5 8 12 V4 GREEN A12 9 9 6 3 6 9 13 V5 RED B5 4 4 4 4 4 4 14 V5 YELLOW B4 5 5 5 5 5 5 15 V5 GREEN B3 6 6 6 6 6 6 16 17 18 V6 GREEN B6 7 7 7 V 7 L/FLASH STHB B10 V 7 R/FLASH STHB B9 23 V 8 L/FLASH NTHB 24 V 8 R/FLASH NTHB 25 26 27 28 SAMPLE 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 P-BUTTON 1 E5 16 16 46 P-BUTTON 2 E6 16 16 47 P-BUTTON 3 E7 16 16 48 P-BUTTON 4 E8 16 16 GREY DET COMMON E3 Grey Grey Grey Grey Grey Grey Grey Grey Grey Grey Grey Grey Grey Grey Grey Grey BLK NEUTRAL A1 B1 C1 Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black Black GRN/Y EARTH Earth TB Green/ Green/ Green/ Green/ Green/ Green/ Green/ Green/ Green/ Green/ Green/ Green/ Green/ Green/ Green/ Green/ Green/ Green/y yellow yellow yellow yellow yellow yellow yellow yellow yellow yellow yellow yellow yellow yellow yellow yellow yellow ellow MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 12 of 25
  • 13. CONFLICT CHART MAIN ROADS LM : ### Western Australia DATE : Traffic & Safety INTERSECTION : First St./Second St. SGP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 X X X X 2 X X X X 3 X X X X 4 4 X X X 5 X X X 6 7 X X X X SAMPLE 8 8 9 10 11 12 12 13 14 15 16 16 SGRP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Major X X X X Minor X X Adjacent 4 5 Peds MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 13 of 25
  • 14. DETECTOR CHART LM : ### MAIN ROADS Western Australia DATE : Traffic & Safety INTERSECTION : First St./Second St. LOOP DET SPECIFICATIONS REMARKS 1 1 X(A) APPROACH A1 2 2 X(A) APPROACH A1 3 3 L(B) X(B) APPROACH B1 4 4 L(B) X(B) APPROACH B1 5 5 L(B) X(B) APPROACH B1 6 6 X(A) APPROACH A2 7 7 L(C)IN(B) X(A,C) NX(A) PR7TO APPROACH C1 A3 SAMPLE 8 8 L(B) X(B) APPROACH B2 9 9 L(B) X(B) APPROACH B2 10 10 L(B) X(B) APPROACH B2 11 DP1(A) P(A) CALL AWAY TO BØ PUSHBUTTON NO.1 12 DP2(A) P(A,C) CALL AWAY TO BØ PUSHBUTTON NO.2 13 DP3(B) P(B) PUSHBUTTON NO.3 14 DP4(B) P(B) PUSHBUTTON NO.4 15 PRES(D) RAILWAY EARLY PRIORITY CALL CLEARANCE 16 PRES(E) RAILWAY LATE PRIORITY CALL BOOM GATES DOWN NOTES “A” PHASE DEMANDED ALWAYS 1 2 “A” to “C” PHASE CHANGE PROHIBITED 3 “B” to “D” Phase change uses Special RED “B” Time. 4 All demands and extensions are cancelled when "D" and/or “E” phase is called. 5 The BST is held in ALL RED period when going to "D" if Peds 1, 2, 3 or 4 are in Clearance or SGP4 is still timing the Amber / Red closing sequence. 6 DETECTOR 15: RAILWAY EARLY PRIORITY CALL CLEARANCE. 7 DETECTOR 16: RAILWAY LATE PRIORITY CALL, BOOM GATES DOWN. 8 The release of Detectors 15 and/or 16 will cancel the demands for A, B, C phases and cancel all the extensions. 9 If the railway call is registered while Peds1, 2, 3 or 4 are running, the clearance 1 timer will immediately be substituted by “A” Phase Late-start time in order to service the clearance phase “D” on time. 10 “C” to “D” Phase change, after ECO Green, will force “A” Phase demand to service AWFS. with ECO time. 11 “C” to “D” Phase change, before ECO Green, will use “A” Phase ECO Time for AWFS. 12 “E” to “D” Phase change will force “A” Phase demand to service AWFS. with ECO time. MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 14 of 25
  • 15. TIMING CHART LM : ### MAIN ROADS Western Australia DATE : Traffic & Safety INTERSECTION : First St/Second St. CONTROLLER TYPE : PSC HOUSING TYPE : MK3 CHECKSUM : $69 DIRECTION A : MANDURAH RD. B : DIXON RD & GILMORE AVE. C : MANDURAH RD R/H TURN. D : RAILWAY CLEARANCE. E : RAILWAY - BOOM GATES DOWN. LATE START A 4 B SAMPLEC D E F G MINIMUM GREEN 4 6 6 6 6 MAXIMUM GREEN 40 30 15 E.C.O. GREEN 5.8 0 6 6 YELLOW 5 5 5 5 5 RED 1.5 1.5 1.5 1.5 1.5 SPECIAL RED 4 GAP 1 3 3 3 HEADWAY 1 1 1 1 WASTE 1 8 6 4 GAP 2 3 3 HEADWAY 2 1 1 WASTE 2 8 6 GAP 3 3 HEADWAY 3 1 WASTE 3 4 GAP 4 HEADWAY 4 WASTE 4 PED 1 PED 2 PED 3 PED 4 PED 5 PED 6 PED 7 PED 8 DELAY WALK 8 6 6 6 CLEARANCE 1 6 8 6 6 CLEARANCE 2 5 5 5 5 PRESENCE TIMES 7: 3s SPECIAL TIMES 20: 5s MAX. TRANSFER MAX. STEAL FLEXILINK N.R.T. TIMES NOTES “A” PHASE IS ALWAYS DEMANDED. MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 15 of 25
  • 16. PHASE SEQUENCE CHART LM : ### MAIN ROADS Western Australia DATE : Traffic & Safety INTERSECTION : First St/Second St. GREEN DISPLAY PHASES SIGNAL GROUP RED/OFF A B C D E OVERLAPS ARROW/SIGNAL SGP PERMITTED SUBJECT TO DURATION 1 X X E-A RAILWAY 2 X 3 X LS P1WLK 4 X X X C-A E-A RAILWAY 5 X X B-D RAILWAY SAMPLE 6 X 7F A M B E R / G R E E N * SEE NOTES 8F A M B E R / G R E E N * SEE NOTES MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 16 of 25
  • 17. INTERGREEN & PEDESTRIAN TIMES DESIGN CHART MAIN ROADS Western Australia LM : ### Traffic & Safety DATE : INTERSECTION : First St./Second St. INTERGREEN TIMES PHASE CLEARANCE DETAILS LEGAL SPEED DESIGN SPEED INTERGREEN GROUP TRANSITION DISTANCE YELLOW RED YELLOW RED TOTAL A 1 – 6, 2 - 5 33 80 5 2 5 2 7 B 3–5 41 80 5 2 5 2 7 C 4–6 41 80 5 2 5 2 7 D 5–2 34 70 5 2 5 2 7 E F G 6-1 3 - 2, 4 – 1 35 19 SAMPLE 70 80 5 5 2 1 5 5 2 2 7 7 PHASE SPECIAL ALL REDS & SPECIAL MOVEMENT ALL REDS FROM TO CLEARANCE DETAILS DESIGN ALL PHASE or PHASE PHASE(S) SPEED RED S.M. NO. * GROUP TRANSITION DISTANCE A B,F 1.0 SM1 A C,F 1.0 SM2 * Specify where timesetting is stored; the phase special all red or the special movement timesetting number. PEDESTRIAN TIMES DISTANCE DELAY WALK CLEARANCE PHASE MIN. `PE WALK PHASE SOLID D PHASE(S) Between Ped DISTANCE CLEARANCE NO. TIMES DON’T Ramps Times in Sec WALK CALC. CL1 CL2 1 A,B,F1 31 0 6 26 20 6 1 2 A,C,F2 30 0 6 25 19 6 1 3 D 27 0 6 23 17 6 1 4 E 31 0 6 26 20 6 1 5 6 7 8 MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 17 of 25
  • 18. SCATS MASTERLINK/FLEXILINK CHART MAIN ROADS Western Australia LM : ### Traffic & Safety DATE : INTERSECTION : First St./Second St. ISOLATED 1 NUMBER OF PHASES 6 2 ARTERIAL PHASE A 3 UNUSED MAX TIME TRANSFER A-BC SAMPLE 4 MAX TIME STEALING B-AC, C-AB 5 PROHIBITED PHASE SEQUENCES FLEXILINK NORMAL SEQ ALT SEQ (Y+) 1 PHASE SEQUENCE (PIVOT FIRST) ABCDEF ABCDEF LOOK AHEAD 2 LOOK AHEAD FROM A TO - 3 LOOK AHEAD FROM B TO - 4 LOOK AHEAD FROM C TO - 5 LOOK AHEAD FROM D TO - 6 LOOK AHEAD FROM E TO - 7 LOOK AHEAD FROM F TO - 8 LOOK AHEAD FROM G TO - RELEASE BY PSEUDO PHASE 9 AUTO RELEASE BY PSEUDO PHASE(S) B,C,D,E,F 10 R- RELEASE BY PSEUDO PHASE(S) A 11 R+ RELEASE BY PSEUDO PHASE(S) 12 Q- RELEASE BY PSEUDO PHASE(S) 13 Q+ RELEASE BY PSEUDO PHASE(S) RELEASE BY SIGNAL GROUP GREEN 14 AUTO RELEASE BY GROUP GREEN(S) 15 R- RELEASE BY GROUP GREEN(S) 16 R+ RELEASE BY GROUP GREEN(S) 17 Q- RELEASE BY GROUP GREEN(S) 18 Q+ RELEASE BY GROUP GREEN(S) SPECIAL FEATURES 19 Z- SPECIAL FACILITY 20 Z+ SPECIAL FACILITY MASTERLINK 1 DIS-ALARMED DETECTORS 2 Y- SPECIAL FACILITY AUTO PEDESTRIAN DEMANDS 3 Z- SPECIAL FACILITY CALL “B” PHASE 4 Z+ SPECIAL FACILITY CALL “C” PHASE XSF SIGNALS XSF FLEXILINK FUNCTION MASTERLINK FUNCTION 1 MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 18 of 25
  • 19. 2 3 4 5 SAMPLE MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 19 of 25
  • 20. SIT E INVENT ORY REPORT Intersection: L M No: Version: Report carried out by: Date: Job Number: SignalsDrawing No: __________________________________ Special Functions (if applicable): Signs & Lines Drawing No: 1) Controller DATE FIRST INSTALLED (if known) ____/____/_______ 4) Power Supply 1.1 Documentation is accurate and relevant to the site Yes Indicate Supply Authority if not Western Power: _______________ Timing Chart Sw/board, Meter Number: ______________________________ _ Conflict Chart If Aerial Pole installed, indicate "y" Detector Chart If pole Top Isolator fitted, indicate "y" Cable wiring charts If pavement Fuse Link fitted, indicate "y" Phase sequence chart 5) Lanterns QTY QTY As constructed drawings Number of Lamps 20 Watt 67 Watt Processor Plus Card (HRS Version)(C.12) 30 Watt 100 Watt Housing Serial Number / Type / Mark If installed, number of illuminated NRT's Module Serial Number If installed, number of Red Light Camera's Software Checksum (C.9) If installed, number of Advanced Warning Signals 1.2 Number of LCB's (if PSC) SAMPLE QTY Number of Det Cards and Channels: Card 1_______Channels. Card 2_______Channels. Vehicle Detectors operate according to the site documentation Quantity of each AE 200 (ELV) Siemens 200 (ELV) 3Asp 2asp 1asp W/DW 1.3 Pedestrian Push Buttons operate according to the site documentations Siemens 300 (ELV) 1.4 Controller and cable pit are clean and free from surplus materials Target boards as per drawing, indicate if "y". 1.5 Communication type. (Cross out N/A) SCATS ----DUST----NOT CONNECTED 6) Pedestrian Push Buttons TYPE QTY 2) Signs and Roadmarking Yes NON AUDIBLE PPB 2.1 Signs have been installed according to the site documentation. AUDIBLE PPB 2.2 Roadmarking has been installed according to the site documentation. AUDIBLE PPB DRIVER 3) Field Hardware 7) Paint Condition Good Number of Push Button Poles Poles Number of Plain Poles Controller Number of Stubby Push Button Poles 8) Loops QTY Number of Stubby Protection Poles SYMETRIPOLE LOOPS Type of Ring Main Cable QUADRUPOLE LOOPS Number of Finial Caps METAL PLASTIC 11 METER LOOPS Number of Termination Pits if Installed BICYCLE LOOPS Laminated Charts in Pits if Applicable POLICE CAMERA LOOPS MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 20 of 25
  • 21. SAMPLE MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 21 of 25
  • 22. FIRST ST/SECOND ST ADVANCED WARNING FLASHERS LM : ### DATE : INTERSECTION : First St./Second St. FLASHERS SGP7 and SGP8 flashing AMBER/GREEN is at a rate of 1Hz (ie 0.5 sec ON/OFF) during EARLY CUT OFF GREEN of : "A” PHASE (ie SGP7 for SOUTH BOUND on Mandurah Rd) while SGP1 is RED or "A & C” PHASES (ie SGP8 for NORTH BOUND on Mandurah Rd). while SGP1 and/or SGP4 are RED. The "PREPARE TO STOP" SIGNS are located on the SOUTH BOUND and NORTH BOUND approaches of MANDURAH RD. The distance from the TRAFFIC SIGNALS STOP LINE and the EARLY CUT OFF TIME are shown below: Calculation of ECO AMBER for FLASHERS. SOUTH BOUND and NORTH BOUND SGP7/SGP8 EARLY CUT OFF TIME = (D(m) + 21.3)/V(m/s) D = DISTANCE from STOP LINE to SIGN, with NEGLIGIBLE GRADIENT and a posted speed limit of 80 Km/h, giving a DISTANCE of 106 metres. ECOG time (Early Cut Off Green). V = VELOCITY = Speed limit/time. Posted Speed Limit is 80 Km/h. V = 80x1000(m)/60x60(s) V = 22.2 m/s ECO = (106(m) + 21.3)/22.2(m/s) ECO = 5.73(s) - Therefore ECO time rounded off to 5.8s. MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 22 of 25
  • 23. DIAMOND FILTER NOTES FIRST ST./SECOND ST. LM: ### Additional notes for Single Diamond FILTER This site operates to Single Diamond standard with the following exceptions: • Filtering is always permitted on the A-B approach (signal group 3) during "A". - The SGP3 Red arrow will be held red during: . "A" phase late start interval following B, E, E1 and E2. . The pedestrian 1 Walk period . - The controller prevents local demands for "C" phase to inhibit the movement from "A" to "C", as the SGP2 is not permitted to overlap from "A" to "C". - Loop 3 places a demand for "E1" during "A" phase subject to the presence time on DET 3, to avoid a funny shut down situation ("A" to "E1") the controller will go from "A" to "E" phase. - Loop 3 extends "A" phase ( approach A3 ) until the presence timer has timed off. • Filtering is always permitted on the A-C approach (signal group 4) during "A". - The SGP4 Red arrow will be held red during: . "A" phase late start interval following C, E, E1 and E2. . The pedestrian 1 Walk period. - The controller prevents local demands for "B" phase to inhibit the movement from "A" to "B", as the SGP1 is not permitted to overlap from "A" to "B". - Loop 9 places a demand for "E2" during "A" phase subject to the presence time on DET 9, to avoid a funny shut down situation ("A" to "E2") the controller will go from "A" to "E" phase. - Loop 9 extends "A" phase ( approach A4 ) until the presence timer has timed off. Notes on SGP7 Left Turn: Signal Group 7 is green during B,D,E & E1 Phases but overlap only permitted from E - E1 phases. SGP7 closes down between phases B,D & E and remains Red at the start of those phases to permit right turn filter traffic from the opposing lane (loop11). Delayed start of SGP7 is subject to Special Timer 10. MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 23 of 25
  • 24. RAILWAY CONTROLLER INTERFACE CIRCUIT LM### Date : / / First St / Second St E5 10 E6 11 EARLY CALL 2 RDA 1 core 2 LATE CALL 3 RDB 1 core 3 1 BBL RDA core 1 WESTRAIL CONNECTION BLOCK 1 BL MCP core 1 2 core 2 3 cable 2 core 3 MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 24 of 25
  • 25. SECTION 2 - Appendix B EXAMPLE DRAWINGS MAIN ROADS WESTERN AUSTRALIA ASSET DRAWINGS GUIDELINES – SECTION 2 – TRAFFIC CONTROL SIGNALS Page 25 of 25