Production System
A collection of people, equipment, and procedures
organized to accomplish the manufacturing
operations of a company
Two categories:
• Facilities – the factory and equipment in the facility
and the way the facility is organized (plant layout)
• Manufacturing support systems – the set of
procedures used by a company to manage
production and to solve technical and logistics
problems in ordering materials, moving work
through the factory, and ensuring that products
meet quality standards
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 3
4
Types of Manufacturing Systems
1. Continuous-flow processes. Continuous dedicated production of large
amount of bulk product. Continuous manufacturing is represented by
chemicals, plastics, petroleum, and food industries.
2. Mass production of discrete products. Dedicated production of large
quantities of one product (with perhaps limited model variations).
Examples include automobiles, appliances and engine blocks.
3. Batch production. Production of medium lot sizes of the same product.
The lot may be produced once or repeated periodically. Examples: books,
clothing and certain industrial machinery.
4. Job-shop production. Production of low quantities, often one of a kind, of
specialized products. The products are often customized and
technologically complex. Examples: prototypes, aircraft, machine tools
and other equipment.
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore
Production
quantity
Continuous-
flow production
Mass
production
Batch
production
Job shop
production
Product variety
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 5
Category Automation achievements
Continuous-flow process •Flow process from beginning to end
•Sensors technology available to measure
important process variables
•Use of sophisticated control and optimization
strategies
•Fully computer automated lines
Mass production of discrete products •Automated transfer machines
•Dial indexing machines
•Partially and fully automated assembly lines
•Industrial robots for spot welding, part handling,
machine loading, spray painting, etc.
•Automated material handling systems
•Computer production monitoring
Batch production •Numerical control (NC), direct numerical
control (DNC), computer numerical control
(CNC).
•Adaptive control machining
•Robots for arc welding, parts handling, etc.
•CIM systems.
Job shop production •Numerical control, computer numerical control
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 6
The Production System
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 7
Production System Facilities
Facilities include the factory, production machines
and tooling, material handling equipment,
inspection equipment, and computer systems
that control the manufacturing operations
• Plant layout – the way the equipment is
physically arranged in the factory
• Manufacturing systems – logical groupings of
equipment and workers in the factory
– Production line
– Stand-alone workstation and worker
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 8
Manufacturing Support Systems
Involves a cycle of information-processing
activities that consists of four functions:
1. Business functions - sales and marketing, order
entry, cost accounting, customer billing
2. Product design - research and development,
design engineering, prototype shop
3. Manufacturing planning - process planning,
production planning, MRP, capacity planning
4. Manufacturing control - shop floor control,
inventory control, quality control
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 9
Information Processing Cycle in
Manufacturing Support Systems
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 10
Automation in Production Systems
Two categories of automation in the
production system:
1. Automation of manufacturing systems in the
factory
2. Computerization of the manufacturing
support systems
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 11
Computer Integrated Manufacturing
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 12
Mechanization
• Mechanization is providing human operators
with machinery that assist them with the
muscular requirements of work.
• It can also refer to the use of machines to
replace manual labor or animals.
• A step beyond mechanization is automation.
• The use of hand powered tools is not an
example of mechanization.
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 13
Automation
• What is automation?
• Why automation is required?
• Which are the operations can be automated in
production system?
• Can automation be implemented suddenly?
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 14
Automation
• Automation can be defined as the technology
concerned with the application of complex
mechanical, electronic, and computer-based
systems in the operation and control of
manufacturing systems.
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 15
Automation
Automation is the use of control systems
(such as numerical control, programmable logic
control, and other industrial control systems),
in concert with other applications
of information technology
(such as computer-aided technologies [CAD,
CAM,]),
to control industrial machinery and processes,
reducing the need for human intervention.
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 16
Automation
• In the scope of industrialization, automation
is a step beyond mechanization.
• Where as mechanization provided human
operators with machinery to assist them
with the muscular requirements of work.
• Automation greatly reduces the need for
human and mental requirements as well.
• Processes and systems can also be
automated.
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 17
Automated Manufacturing Systems
Examples:
• Automated machine tools
• Transfer lines
• Automated assembly systems
• Industrial robots that perform processing or
assembly operations
• Automated material handling and storage systems
to integrate manufacturing operations
• Automatic inspection systems for quality control
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 18
Automated Manufacturing Systems
Three basic types:
1. Fixed automation
2. Programmable automation
3. Flexible automation
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 19
Fixed Automation
A manufacturing system in which the sequence of
processing (or assembly) operations is fixed by the
equipment configuration.
Typical features:
• Suited to high production quantities
• High initial investment for custom-engineered
equipment
• High production rates
• Relatively inflexible in accommodating product
variety
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 20
Programmable Automation
A manufacturing system designed with the capability
to change the sequence of operations to
accommodate different product configurations
Typical features:
• High investment in general purpose equipment
• Lower production rates than fixed automation
• Flexibility to deal with variations and changes in
product configuration
• Most suitable for batch production
• Physical setup and part program must be changed
between jobs (batches)
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 21
Flexible Automation
An extension of programmable automation in which
the system is capable of changing over from one
job to the next with no lost time between jobs
Typical features:
• High investment for custom-engineered system
• Continuous production of variable mixes of
products
• Medium production rates
• Flexibility to deal with soft product variety
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 22
Product Variety and Production
Quantity for Three Automation Types
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 23
Reasons for Automating
1. To increase labor productivity
2. To reduce labor cost
3. To mitigate the effects of labor shortages
4. To reduce or remove routine manual and clerical
tasks
5. To improve worker safety
6. To improve product quality
7. To reduce manufacturing lead time
8. To accomplish what cannot be done manually
9. To avoid the high cost of not automating
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 24
Production Concepts and
Mathematical Models
• Production rate Rp
• Production capacity PC
• Utilization U
• Availability A
• Manufacturing lead time MLT
• Work-in-progress WIP
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 25
Production rate Rp
• Hourly production rate
• Work units completed/Hr
• Cycle time: Time that one work unit spends being
processed or assembled. It is the time between
when one work unit begins processing and next
unit begins.
• Not all time is productive.
• Cycle time consists of i) actual machining
operation time ii) workpart handling time
iii) tool handling time per workpiece
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 26
Operation Cycle Time
Typical cycle time for a production operation:
Tc = To + Th + Tth -------------------1
where
Tc = cycle time, min/pc
To = processing time for the operation, min/pc
Th = handling time (e.g., loading and unloading
the production machine), min/pc and
Tth = tool handling time (e.g., time to change
tools), min/pc
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 27
Tool handling time
• Time spent changing tools when worn out
• Time required for changing one tool to the
next.
• Tool indexing time for indexable inserts or for
tools on a turret lathe
• Tool positioning for next pass etc..
– These activities do not occur every cycle
– They must be spread over the number of parts
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 28
Production rate for
batch production
Time to process one batch(Q units) = Setup time +
processing time, i.e., Tb = Tsu + QTc------------------2
where
Tb = Batch processing time in min
Tsu = Setup time required for one batch in min
Q = Batch quantity, pc
Tc = cycle time per workunit in min/cycle
Tp = Tb / Q ,------------------------3
whereTp= Avg prod. Time/workunit , min/pc
Rp = 60 / Tb ,----------------------4
Where Rp = Hourly prod rate, pc/Hr4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 29
Production rate for
job shop production
Time to process one batch(Q units) = Setup time +
processing time, i.e., Tb = Tsu + QTc
For job shop production, Q = 1
So, Tb = Tsu + Tc = Tp
How??
Tp = Tb / Q , whereTp= Avg prod. Time/workunit , min/pc
Rp = 60 / Tb , Where Rp = Hourly prod rate, pc/Hr
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 30
Production rate for
mass production
Production rate = cycle rate of the machine
Tb = Tsu + QTc
For mass production, Q = very large
Tp = Tb/Q = (Tsu + QTc ) / Q = Tsu /Q + QTc/Q
Tp = Tsu/Q +Tc
As Q becomes very large, Tsu/Q  0
So, Tp = Tc
WKT, Production rate is reciprocal of production time
Rp = Rc = 60/Tc
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 31
Production rate for
flow line mass production
• Production rate = cycle rate of the production line
• Workstations are interdependent in the line
• Impossible to divide total work equally among all
workstations on the line.
• So, one station ends up with the longest
operation time ( Bottle neck station).
• Bottle neck station sets the pace to other
workstation.
• Work units should be moved from one
workstation to next (Tr )4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 32
Production rate for
flow line mass production
• Cycle time = transfer time + longest processing time
Tc = Tr + Max To -----------------5
• Where Max To = operation time at the bottle neck
station i.e., The maximum of operation times for all
stations on the line
• Tr = Transfer time
Rc = 60/Tc ----------------6
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 33
Production capacity
• maximum rate of output that a production
facility (or production line, work center, or group
of work centers) is able to produce under a given
set of assumed operating conditions
• Operating conditions refer to the number of
shifts per day, number of days in the week (or
month) that the plant operates, employment
levels, and so forth.
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 34
Production capacity
Let PCw = the production capacity of a given facility under
consideration.
Let the measure of capacity = the number of units produced per
week.
Let n = the number of machines or work centers in the facility.
A work center is a manufacturing system in the plant typically
consisting of one worker and one machine. It might also be one
automated machine with no worker, or multiple workers working
together on a production line.
It is capable of producing at a rate RP unit/hr. Each work center
operates for Hs hr/shift.
Let Sw denote the number of shifts per week.
PCw = n Sw Hs Rp --------------------7
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 35
Production capacity
• If we include the possibility that each work
unit is routed through no operations, with
each operation requiring a new setup on
either the same or a different machine,
• where no = number of operations in the routing
o
psw
n
RHnS
PC  ---------8
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 36
Production Capacity
Plant capacity for facility in which parts are
made in one operation (no = 1):
PCw = n Sw Hs Rp
where PCw = weekly plant capacity, units/wk
Plant capacity for facility in which parts
require multiple operations (no > 1):
where no = number of operations in the routing
o
psw
n
RHnS
PC 
Hareesha N G, Dept of Aero Engg, DSCE, Blore
Production Capacity
Equation indicates the operating parameters that
affect plant capacity.
Changes that can be made to increase or decrease
plant capacity over the short term are:
1. Change the number of shifts per week (S). For
example, Saturday shifts might be authorized
to temporarily increase capacity.
2. Change the number of hours worked per shift
(H). For example, overtime on each regular
shift might be authorized to increase capacity.
o
psw
n
RHnS
PC 
Hareesha N G, Dept of Aero Engg, DSCE, Blore
Over the intermediate or longer term, the following
changes can be made to increase plant capacity:
3. Increase the number of work centers, n, in the shop.
This might be done by using equipment that was
formerly not in use and hiring new workers.
4. Increase the production rate, Rp by making
improvements in methods or process technology.
5. Reduce the number of operations no required per work
unit by using combined operations, simultaneous
operations, or integration of operations.
Production Capacity
Hareesha N G, Dept of Aero Engg, DSCE, Blore
Utilization
• Utilization refers to the amount of output of a
production facility relative to its capacity. Expressing
U=Q/PC------------9
Where U = utilization of the facility,
Q = actual quantity produced by the facility during a given
time period (i.e., pc/wk), and
PC = production capacity for the same period (pc/wk).
It is often defined as the proportion of time that the
facility is operating relative to the time available under
the definition of capacity.
Utilization is usually expressed as a percentage.
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 40
Availability
• Availability is defined using two other reliability
terms, mean time between failure (MTBF) and
mean time to repair (MTTR).
• The MTBF indicates the average length of time
the piece of equipment runs between
breakdowns.
• The MTTR indicates the average time required to
service the equipment and put it back into
operation when a breakdown occurs.
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 41
Availability
Availability is defined as follows:
Availability: A =
where MTBF = mean time between failures, and
MTTR = mean time to repair
Availability is typically expressed as a percentage
MTBF
MTTRMTBF 
-----------10
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 42
Availability -
MTBF and MTTR Defined
Hareesha N G, Dept of Aero Engg, DSCE, Blore
1) A production machine operates at 2 shifts/day and 5 days a week at full
capacity. Its production rate is 20 unit/hr. During a certain week, the machine
produced 1000 parts and was idle in the remaining time, (a) Determine the
production capacity of the machine, (b) What was the utilization of the machine
during the week under consideration?
if the availability of the machine is 90%, and the utilization of the machines
is 80%. Compute the expected plant output.
Solution:
(a) The capacity of the machine can be determined using the assumed
80-hr week as follows:
PC = 80(20) = 1600 unit/wk
(b) Utilization can be determined as the ratio of the number of parts
made by the machine relative to its capacity.
U = 1000/1600 = 0.625 (62.5%)
(c) U=Q/PC or
Q= UxPCxA or UAxnSHRp
Hareesha N G, Dept of Aero Engg, DSCE, Blore
2) The mean time between failures for a certain production machine is 250 hours,
and the mean time to repair is 6 hours. Determine the availability of the
machine.
Availability: A =
3) One million units of a certain product are to be manufactured annually on
dedicated production machines that run 24 hours per day. 5 days per week, 50
weeks per year, (a) If the cycle time of a machine to produce one part is 1.0
minute, how many of the dedicated machines will be required to keep up with
demand? Assume that availability, utilization, and worker efficiency = 100%, and
that no setup time will be lost, (b) Solve part (a) except that availability = 0.90.
Solution: Tc= 1 min
Tb = Tsu+QTc = 0+QTc
Tp= Tb/Q = Tc
Rp=60/Tp = 60 Parts/Hr
n= PC/SHRp
= 1000000/(50x5x24x60)
= 2.77 = 3 machines
MTBF
MTTRMTBF 
Hareesha N G, Dept of Aero Engg, DSCE, Blore
Manufacturing Lead Time
Manufacturing lead time (MLT) is the total time required
to process a given part or product through the plant,
including any lost time due to delays, time spent in
storage, reliability problems, and so on.
 Production consists of a sequence of individual processing and
assembly operations. Between the operations are material
handling, storage, inspections, and other non productive activities.
 Divide these activities as operation and non operation elements.
 Non operation elements are Handling, temporary storage,
inspection and other sources of delay when work unit is not in
machine.
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 46
Let Tc = the operation cycle time at a given machine or workstation,
Tno = the nonoperation time associated with the same machine.
no = the number of separate operations through which the work unit
must be routed
Tsu = Setup time required to prepare each production machine for the
particular product. If we assume batch production, then there are
Q work units in the batch.,
Given these terms, we can define manufacturing lead time as
MLTj =
where
MLTj = manufacturing lead time for part or product j (min).
Tsuji = setup time for operation i (min) for the product j,
Qj = quantity of part or product in the batch (pc),
Tcji = operation cycle time for operation i (min/pc),
Tnoji = nonoperation time associated with operation i (min), and
i indicates the operation sequence in the processing; i = I, 2,... noj


ojn
i
nojicjijsuji TTQT
1
)( -----------11
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 47
To simplify and generalize the model,
let us assume that all setup times, operation cycle times, and non
operation times are equal for the noj machines.
Further, let us suppose that the batch quantities of all parts or
products processed through the plant are equal and that they are
all processed through the same number of machines, so that noj =
no , With these simplifications, Eq. becomes:
MLT = no (Tsu + QTc + Tno)
where
MLT = manufacturing lead time,
no = number of operations,
Tsu = setup time,
Q = batch quantity,
Tc = cycle time per part, and
Tno = non-operation time
-----------12
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 48
• For a job shop in which the batch size is one (Q = 1), Eq.
(1.12) becomes
MLT=no(Tsu+TC+Tno)------------ (1.13)
For mass production, the Q term in Eq. (1.12) is very large
and dominates the other terms.
In the case of quantity type mass production in which a
large number of units are made on a single machine (no
=1). The MLT simply becomes the operation cycle time for
the machine after the setup has been completed and
production begins.
MLT = QxTc ------------1.14
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 49
For flow line mass production, the entire production line is
set up in advance. Also, the non operation time
between processing steps is simply the transfer time Tr
to move the part or product from one workstation to
the next. The station with the longest operation time
sets the pace for all stations:
MLT =no(Tr +Max To) = noTc --------------1.15
Since , (Tr +Max To) = Tc (1.5)
Since the number of stations is equal to the number of
operations (n = no) Eq. (1.15) can also be stated as
MLT =n(Tr +Max To) = nTc --------------1.16
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 50
A certain part is produced in a batch size of 100 units. The batch must be routed
through five operations to complete the processing of the parts. Average
setup time is 3 hr/operation, and average operation time is 6 min . Average
non operation time due to handling, delays, inspections, etc., is 7 hours for
each operation. Determine how many days it will take to complete the batch,
assuming the plant runs one 8-hr shift/day.
Solution:
Given:
Q = 100 units
no = 5
Tsu = 3hr/operation
Tc = 6 min
Tno = 7 hr/operation
The manufacturing lead time is computed from Fq
MLT = no (Tsu + QTc + Tno)
MLT = 5(3 + 100 X 0.1 + 7) = 100 hours
At 8 hr/day. this amounts to L00/8 = 12.5 days.
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 51
A certain part is routed through six machines in a batch production plant. The
setup and operation times for each machine are given in the table below. The
batch size is 100 and the average non operation time per machine is 12 hours.
Determine (a) manufacturing lead time and (b) production rate for operation
3.
Solution:
Given:
Q = 100 units
no = 5
Tsu = 3hr/operation
Tno = 12hr/machine
The manufacturing lead time is computed from Fq
MLT = 

ojn
i
nojicjijsuji TTQT
1
)(
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 52
A certain part is routed through six machines in a production plant. The
operation times for each machine are given in the table below. Suppose the
part is made in very large quantities on a production line in which an
automated work handling system is used to transfer parts between machines.
Transfer time between stations = 15 s. The total time required to set up the
entire line is 150 hours. Assume that the operation times at the individual
machines remain the same. Determine (a) manufacturing lead time for a part
coming off the line.(b) production rate for operation 3. and (c) theoretical
production rate for the entire production line.
Solution:
Given:
a) MLT = no(Tr+MaxTo)
b) Rp3 = 60/Tp ; But Tp = Tc = To
c) Rp = 60/Tp; But Tp = Tc ; But Tc = Tr+Max To
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 53
Work-In-Process
Work-in-process (WIP) is the quantity of parts or
products currently located in the factory that
either are being processed or are between
processing operations.
WIP is inventory that is in the state of being
transformed from raw material to finished
product.
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 54
Work-In-Process
An approximate measure of work-in-process can be
obtained from the following, using terms previously
defined:
WIP=
where WIP = work-in-process, pc;
A = availability, U = utilization,
PC = plant capacity, pc/wk;
MLT = manufacturing lead time, hr;
Sw = shifts per week,
Hsh = hours per shift, hr/shift
  
w sh
AU PC MLT
S H
Hareesha N G, Dept of Aero Engg, DSCE, Blore
TIP Ratio
The TIP ratio measures the time that the product
spends in the plant relative to its actual
processing time.
It is computed as the total MLT for a part divided by
the sum of individual operation time for the
plant.


oT
MLT
TIP
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 56
The average part produced in a certain batch manufacturing plant must be processed
sequentially through six machines on average. Twenty (20) new batches of parts are
launched each week. Average operation time = 6 minutes, average setup time = 5
hours, average batch size= 25 parts, and average non operation time per batch = 10
hr/machine. There are 18 machines in the plant working in parallel. Each of the
machines can be set up for any type of job processed in the plant. The plant operates an
average of 70 production hours per week. Scrap rate is negligible. Determine (a)
manufacturing lead time for an average part, (b) plant capacity, and (c) plant utilization,
(d) Determine the average level of work-in-process in the plant.
a) MLT = no( Tsu + QxTc + Tno )
b) PC = A.U. n.SwHs.Rp/no
c) U = Q/PC
d) WIP = A.U.PC.MLT/SwHs
4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 57

Mais conteúdo relacionado

Mais procurados

Group technology
Group technologyGroup technology
Group technologyjntuhcej
 
Group Technology
Group TechnologyGroup Technology
Group Technologysgrsoni45
 
Manual part programming
Manual part programmingManual part programming
Manual part programmingjntuhcej
 
Adaptive control System
Adaptive control SystemAdaptive control System
Adaptive control SystemSUMIT ATTRI
 
CIM Computer Integrated Manufacturing
CIM Computer Integrated ManufacturingCIM Computer Integrated Manufacturing
CIM Computer Integrated ManufacturingTanuVerma39
 
COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)Victor Al
 
Automation in manufacturing five unit vtu, mechanical engineering notes pdf d...
Automation in manufacturing five unit vtu, mechanical engineering notes pdf d...Automation in manufacturing five unit vtu, mechanical engineering notes pdf d...
Automation in manufacturing five unit vtu, mechanical engineering notes pdf d...kiran555555
 
Computer Aided Quality
Computer Aided QualityComputer Aided Quality
Computer Aided QualityAliRaza1767
 
Introduction to manufacturing system and cnc machines
Introduction to manufacturing system and cnc machinesIntroduction to manufacturing system and cnc machines
Introduction to manufacturing system and cnc machinesThulasikanth Vaddi
 
Layout of FMS
Layout of FMSLayout of FMS
Layout of FMSsgrsoni45
 
Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).Nitin Patil
 
Introduction of computer aided manufacturing.pptx
Introduction of computer aided manufacturing.pptxIntroduction of computer aided manufacturing.pptx
Introduction of computer aided manufacturing.pptxChirag Patel
 
Group technology, Production flow Analysis
Group technology, Production flow AnalysisGroup technology, Production flow Analysis
Group technology, Production flow AnalysisKEERTHIVASAN RAVI
 
Numerical control machines tool
Numerical control machines toolNumerical control machines tool
Numerical control machines tooljntuhcej
 
Computer Integrated Manufacturing
Computer Integrated Manufacturing  Computer Integrated Manufacturing
Computer Integrated Manufacturing suraj_21
 
Ch9 computer integrated manufacturing
Ch9 computer integrated manufacturingCh9 computer integrated manufacturing
Ch9 computer integrated manufacturingviswa375
 
Module 1 Lecture 1 Introduction To Automation In Production Systems.ppt
Module 1 Lecture 1 Introduction To Automation In Production Systems.pptModule 1 Lecture 1 Introduction To Automation In Production Systems.ppt
Module 1 Lecture 1 Introduction To Automation In Production Systems.pptKhalil Alhatab
 
Computer Integrated Manufacturing System
Computer Integrated Manufacturing SystemComputer Integrated Manufacturing System
Computer Integrated Manufacturing SystemSaif Eye
 

Mais procurados (20)

Unit 2.1 cim
Unit 2.1 cimUnit 2.1 cim
Unit 2.1 cim
 
Group technology
Group technologyGroup technology
Group technology
 
Group Technology
Group TechnologyGroup Technology
Group Technology
 
Manual part programming
Manual part programmingManual part programming
Manual part programming
 
Adaptive control System
Adaptive control SystemAdaptive control System
Adaptive control System
 
CIM Computer Integrated Manufacturing
CIM Computer Integrated ManufacturingCIM Computer Integrated Manufacturing
CIM Computer Integrated Manufacturing
 
Nc part programming
Nc part programmingNc part programming
Nc part programming
 
COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)
 
Automation in manufacturing five unit vtu, mechanical engineering notes pdf d...
Automation in manufacturing five unit vtu, mechanical engineering notes pdf d...Automation in manufacturing five unit vtu, mechanical engineering notes pdf d...
Automation in manufacturing five unit vtu, mechanical engineering notes pdf d...
 
Computer Aided Quality
Computer Aided QualityComputer Aided Quality
Computer Aided Quality
 
Introduction to manufacturing system and cnc machines
Introduction to manufacturing system and cnc machinesIntroduction to manufacturing system and cnc machines
Introduction to manufacturing system and cnc machines
 
Layout of FMS
Layout of FMSLayout of FMS
Layout of FMS
 
Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).
 
Introduction of computer aided manufacturing.pptx
Introduction of computer aided manufacturing.pptxIntroduction of computer aided manufacturing.pptx
Introduction of computer aided manufacturing.pptx
 
Group technology, Production flow Analysis
Group technology, Production flow AnalysisGroup technology, Production flow Analysis
Group technology, Production flow Analysis
 
Numerical control machines tool
Numerical control machines toolNumerical control machines tool
Numerical control machines tool
 
Computer Integrated Manufacturing
Computer Integrated Manufacturing  Computer Integrated Manufacturing
Computer Integrated Manufacturing
 
Ch9 computer integrated manufacturing
Ch9 computer integrated manufacturingCh9 computer integrated manufacturing
Ch9 computer integrated manufacturing
 
Module 1 Lecture 1 Introduction To Automation In Production Systems.ppt
Module 1 Lecture 1 Introduction To Automation In Production Systems.pptModule 1 Lecture 1 Introduction To Automation In Production Systems.ppt
Module 1 Lecture 1 Introduction To Automation In Production Systems.ppt
 
Computer Integrated Manufacturing System
Computer Integrated Manufacturing SystemComputer Integrated Manufacturing System
Computer Integrated Manufacturing System
 

Destaque (20)

COMPONENTS OF CIM
COMPONENTS OF CIM COMPONENTS OF CIM
COMPONENTS OF CIM
 
CIM - Computer-integrated manufacturing
CIM - Computer-integrated manufacturing CIM - Computer-integrated manufacturing
CIM - Computer-integrated manufacturing
 
High volume production systems
High volume production systemsHigh volume production systems
High volume production systems
 
Computer integrated manufacturing
Computer integrated manufacturingComputer integrated manufacturing
Computer integrated manufacturing
 
CNC Machining Centres
CNC Machining CentresCNC Machining Centres
CNC Machining Centres
 
CIM
CIMCIM
CIM
 
Intro to CAD/CAM/CIM
Intro to CAD/CAM/CIMIntro to CAD/CAM/CIM
Intro to CAD/CAM/CIM
 
Flexible manufacturing systems
Flexible manufacturing systems Flexible manufacturing systems
Flexible manufacturing systems
 
Cim ppt
Cim pptCim ppt
Cim ppt
 
Computer Integrated Manufacturing
Computer Integrated ManufacturingComputer Integrated Manufacturing
Computer Integrated Manufacturing
 
CIM
CIMCIM
CIM
 
Flexible Manufacturing System
Flexible Manufacturing SystemFlexible Manufacturing System
Flexible Manufacturing System
 
FLEXIBLE MANUFACTURING SYSTEM
FLEXIBLE MANUFACTURING SYSTEMFLEXIBLE MANUFACTURING SYSTEM
FLEXIBLE MANUFACTURING SYSTEM
 
Be project report template
Be project report templateBe project report template
Be project report template
 
Introduction to cad cam
Introduction to cad camIntroduction to cad cam
Introduction to cad cam
 
C.I.M ( By ABHI PANWALA )
C.I.M ( By ABHI PANWALA ) C.I.M ( By ABHI PANWALA )
C.I.M ( By ABHI PANWALA )
 
Cim presentation
Cim presentationCim presentation
Cim presentation
 
Manufacturing systems powerpoint
Manufacturing systems powerpointManufacturing systems powerpoint
Manufacturing systems powerpoint
 
Cellular Manufacturing (Flexible Operations)
Cellular Manufacturing (Flexible Operations)Cellular Manufacturing (Flexible Operations)
Cellular Manufacturing (Flexible Operations)
 
Magnetic Particle Inspection
Magnetic Particle InspectionMagnetic Particle Inspection
Magnetic Particle Inspection
 

Semelhante a Introduction to computer Integrated Manufacturing (CIM)

Automation in Manufacturing (Unit-4) by Varun Pratap Singh.pdf
Automation in Manufacturing (Unit-4) by Varun Pratap Singh.pdfAutomation in Manufacturing (Unit-4) by Varun Pratap Singh.pdf
Automation in Manufacturing (Unit-4) by Varun Pratap Singh.pdfVarun Pratap Singh
 
Routing.pptx scheduling and production plan
Routing.pptx scheduling and production planRouting.pptx scheduling and production plan
Routing.pptx scheduling and production planNehaSharma673767
 
Unit 1-automation of assembly lines
Unit 1-automation of assembly linesUnit 1-automation of assembly lines
Unit 1-automation of assembly linesjoemaxagu
 
Production and operation management
Production and operation managementProduction and operation management
Production and operation managementHarsha Mathad
 
Introduction to Automation.ppt
Introduction to Automation.pptIntroduction to Automation.ppt
Introduction to Automation.pptPrateek573064
 
01-K-I-Ahmad-AIP.ppt
01-K-I-Ahmad-AIP.ppt01-K-I-Ahmad-AIP.ppt
01-K-I-Ahmad-AIP.pptHarinathC5
 
Automation Notes on Manufacturing in Industries.ppt
Automation Notes on Manufacturing in Industries.pptAutomation Notes on Manufacturing in Industries.ppt
Automation Notes on Manufacturing in Industries.pptPrabhuSwamy24
 
Cam 1 unit palanivendhan manufacturin systems
Cam 1 unit palanivendhan manufacturin systemsCam 1 unit palanivendhan manufacturin systems
Cam 1 unit palanivendhan manufacturin systemspalanivendhan
 
Study material for machenicql engenering student
Study material for machenicql engenering studentStudy material for machenicql engenering student
Study material for machenicql engenering studentWasifAli366658
 
MANUFACT SYSTEMS AND AUTOMATION.pptx
MANUFACT SYSTEMS AND AUTOMATION.pptxMANUFACT SYSTEMS AND AUTOMATION.pptx
MANUFACT SYSTEMS AND AUTOMATION.pptxAbhishekChavan77
 
Production planning and control - PPC
Production planning and control - PPCProduction planning and control - PPC
Production planning and control - PPCThe Learning Hub
 
Om lect 03_a(r0-aug08)_process selection_process design_mms_sies
Om lect 03_a(r0-aug08)_process selection_process design_mms_siesOm lect 03_a(r0-aug08)_process selection_process design_mms_sies
Om lect 03_a(r0-aug08)_process selection_process design_mms_siesvideoaakash15
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineeringSyed Jafri
 
Process Design and Development of Engine Block
Process Design and Development of Engine BlockProcess Design and Development of Engine Block
Process Design and Development of Engine Blockpaperpublications3
 
Lecture on Production management- Plant layout
Lecture on Production management- Plant layoutLecture on Production management- Plant layout
Lecture on Production management- Plant layoutSujeet TAMBE
 

Semelhante a Introduction to computer Integrated Manufacturing (CIM) (20)

plant layout
plant layoutplant layout
plant layout
 
Automation in Manufacturing (Unit-4) by Varun Pratap Singh.pdf
Automation in Manufacturing (Unit-4) by Varun Pratap Singh.pdfAutomation in Manufacturing (Unit-4) by Varun Pratap Singh.pdf
Automation in Manufacturing (Unit-4) by Varun Pratap Singh.pdf
 
Routing.pptx scheduling and production plan
Routing.pptx scheduling and production planRouting.pptx scheduling and production plan
Routing.pptx scheduling and production plan
 
Unit 1-automation of assembly lines
Unit 1-automation of assembly linesUnit 1-automation of assembly lines
Unit 1-automation of assembly lines
 
Production and operation management
Production and operation managementProduction and operation management
Production and operation management
 
Introduction to Automation.ppt
Introduction to Automation.pptIntroduction to Automation.ppt
Introduction to Automation.ppt
 
01-K-I-Ahmad-AIP.ppt
01-K-I-Ahmad-AIP.ppt01-K-I-Ahmad-AIP.ppt
01-K-I-Ahmad-AIP.ppt
 
Automation Notes on Manufacturing in Industries.ppt
Automation Notes on Manufacturing in Industries.pptAutomation Notes on Manufacturing in Industries.ppt
Automation Notes on Manufacturing in Industries.ppt
 
Unit 4 ppc
Unit 4 ppcUnit 4 ppc
Unit 4 ppc
 
Cam 1 unit palanivendhan manufacturin systems
Cam 1 unit palanivendhan manufacturin systemsCam 1 unit palanivendhan manufacturin systems
Cam 1 unit palanivendhan manufacturin systems
 
Study material for machenicql engenering student
Study material for machenicql engenering studentStudy material for machenicql engenering student
Study material for machenicql engenering student
 
MANUFACT SYSTEMS AND AUTOMATION.pptx
MANUFACT SYSTEMS AND AUTOMATION.pptxMANUFACT SYSTEMS AND AUTOMATION.pptx
MANUFACT SYSTEMS AND AUTOMATION.pptx
 
Production planning and control - PPC
Production planning and control - PPCProduction planning and control - PPC
Production planning and control - PPC
 
Om lect 03_a(r0-aug08)_process selection_process design_mms_sies
Om lect 03_a(r0-aug08)_process selection_process design_mms_siesOm lect 03_a(r0-aug08)_process selection_process design_mms_sies
Om lect 03_a(r0-aug08)_process selection_process design_mms_sies
 
Manufacturing systems
Manufacturing systems Manufacturing systems
Manufacturing systems
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineering
 
Digital manufacturing
Digital manufacturingDigital manufacturing
Digital manufacturing
 
Process Design and Development of Engine Block
Process Design and Development of Engine BlockProcess Design and Development of Engine Block
Process Design and Development of Engine Block
 
Pmm
PmmPmm
Pmm
 
Lecture on Production management- Plant layout
Lecture on Production management- Plant layoutLecture on Production management- Plant layout
Lecture on Production management- Plant layout
 

Mais de Hareesha N Gowda, Dayananda Sagar College of Engg, Bangalore

Mais de Hareesha N Gowda, Dayananda Sagar College of Engg, Bangalore (20)

Alumni Meet Invitation.pdf
Alumni Meet Invitation.pdfAlumni Meet Invitation.pdf
Alumni Meet Invitation.pdf
 
Brammadevarahalli GP Panchapayana
Brammadevarahalli GP PanchapayanaBrammadevarahalli GP Panchapayana
Brammadevarahalli GP Panchapayana
 
Introduction to control systems
Introduction to control systemsIntroduction to control systems
Introduction to control systems
 
Computer aided machine drawing manual
Computer aided machine drawing manualComputer aided machine drawing manual
Computer aided machine drawing manual
 
Unit 1- simple stress and strain
Unit 1- simple stress and strainUnit 1- simple stress and strain
Unit 1- simple stress and strain
 
Unit 8: Torsion of circular shafts and elastic stability of columns
Unit 8: Torsion of circular shafts and elastic stability of columnsUnit 8: Torsion of circular shafts and elastic stability of columns
Unit 8: Torsion of circular shafts and elastic stability of columns
 
Unit 6: Bending and shear Stresses in beams
Unit 6: Bending and shear Stresses in beamsUnit 6: Bending and shear Stresses in beams
Unit 6: Bending and shear Stresses in beams
 
Unit 5 shear force and bending moment in beams
Unit 5  shear force and bending moment in beamsUnit 5  shear force and bending moment in beams
Unit 5 shear force and bending moment in beams
 
Unit 3 Compound stresses
Unit 3  Compound stressesUnit 3  Compound stresses
Unit 3 Compound stresses
 
Unit 2 stresses in composite sections
Unit 2  stresses in composite sectionsUnit 2  stresses in composite sections
Unit 2 stresses in composite sections
 
Dynamics of Machines: Question bank unitwise from vtu old question papers
Dynamics of Machines: Question bank unitwise from vtu old question papersDynamics of Machines: Question bank unitwise from vtu old question papers
Dynamics of Machines: Question bank unitwise from vtu old question papers
 
Mechanics of Materials: Question Bank from old VTU Question papers
Mechanics of Materials: Question Bank from old VTU Question papersMechanics of Materials: Question Bank from old VTU Question papers
Mechanics of Materials: Question Bank from old VTU Question papers
 
Robots: state of-the-art and future trends
Robots: state of-the-art and future trendsRobots: state of-the-art and future trends
Robots: state of-the-art and future trends
 
Screw thread measurements and Gear measurement
Screw thread measurements and Gear measurementScrew thread measurements and Gear measurement
Screw thread measurements and Gear measurement
 
Force, Pressure and Torque measurements
Force, Pressure and Torque measurementsForce, Pressure and Torque measurements
Force, Pressure and Torque measurements
 
Mechanical measurements and Measurement systems
Mechanical measurements and Measurement systemsMechanical measurements and Measurement systems
Mechanical measurements and Measurement systems
 
CIM and automation laboratory manual
CIM and automation laboratory manualCIM and automation laboratory manual
CIM and automation laboratory manual
 
Introduction to Non-Traditional Machining
Introduction to Non-Traditional MachiningIntroduction to Non-Traditional Machining
Introduction to Non-Traditional Machining
 
Chemical machining
Chemical machiningChemical machining
Chemical machining
 
Ultrasonic machining
Ultrasonic machiningUltrasonic machining
Ultrasonic machining
 

Último

Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesShubhangi Sonawane
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 

Último (20)

Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 

Introduction to computer Integrated Manufacturing (CIM)

  • 1. 4/3/2014 1Hareesha N G, Dept of Aero Engg, DSCE, Blore
  • 2. 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 2
  • 3. Production System A collection of people, equipment, and procedures organized to accomplish the manufacturing operations of a company Two categories: • Facilities – the factory and equipment in the facility and the way the facility is organized (plant layout) • Manufacturing support systems – the set of procedures used by a company to manage production and to solve technical and logistics problems in ordering materials, moving work through the factory, and ensuring that products meet quality standards 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 3
  • 4. 4 Types of Manufacturing Systems 1. Continuous-flow processes. Continuous dedicated production of large amount of bulk product. Continuous manufacturing is represented by chemicals, plastics, petroleum, and food industries. 2. Mass production of discrete products. Dedicated production of large quantities of one product (with perhaps limited model variations). Examples include automobiles, appliances and engine blocks. 3. Batch production. Production of medium lot sizes of the same product. The lot may be produced once or repeated periodically. Examples: books, clothing and certain industrial machinery. 4. Job-shop production. Production of low quantities, often one of a kind, of specialized products. The products are often customized and technologically complex. Examples: prototypes, aircraft, machine tools and other equipment. 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore
  • 6. Category Automation achievements Continuous-flow process •Flow process from beginning to end •Sensors technology available to measure important process variables •Use of sophisticated control and optimization strategies •Fully computer automated lines Mass production of discrete products •Automated transfer machines •Dial indexing machines •Partially and fully automated assembly lines •Industrial robots for spot welding, part handling, machine loading, spray painting, etc. •Automated material handling systems •Computer production monitoring Batch production •Numerical control (NC), direct numerical control (DNC), computer numerical control (CNC). •Adaptive control machining •Robots for arc welding, parts handling, etc. •CIM systems. Job shop production •Numerical control, computer numerical control 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 6
  • 7. The Production System 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 7
  • 8. Production System Facilities Facilities include the factory, production machines and tooling, material handling equipment, inspection equipment, and computer systems that control the manufacturing operations • Plant layout – the way the equipment is physically arranged in the factory • Manufacturing systems – logical groupings of equipment and workers in the factory – Production line – Stand-alone workstation and worker 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 8
  • 9. Manufacturing Support Systems Involves a cycle of information-processing activities that consists of four functions: 1. Business functions - sales and marketing, order entry, cost accounting, customer billing 2. Product design - research and development, design engineering, prototype shop 3. Manufacturing planning - process planning, production planning, MRP, capacity planning 4. Manufacturing control - shop floor control, inventory control, quality control 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 9
  • 10. Information Processing Cycle in Manufacturing Support Systems 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 10
  • 11. Automation in Production Systems Two categories of automation in the production system: 1. Automation of manufacturing systems in the factory 2. Computerization of the manufacturing support systems 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 11
  • 12. Computer Integrated Manufacturing 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 12
  • 13. Mechanization • Mechanization is providing human operators with machinery that assist them with the muscular requirements of work. • It can also refer to the use of machines to replace manual labor or animals. • A step beyond mechanization is automation. • The use of hand powered tools is not an example of mechanization. 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 13
  • 14. Automation • What is automation? • Why automation is required? • Which are the operations can be automated in production system? • Can automation be implemented suddenly? 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 14
  • 15. Automation • Automation can be defined as the technology concerned with the application of complex mechanical, electronic, and computer-based systems in the operation and control of manufacturing systems. 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 15
  • 16. Automation Automation is the use of control systems (such as numerical control, programmable logic control, and other industrial control systems), in concert with other applications of information technology (such as computer-aided technologies [CAD, CAM,]), to control industrial machinery and processes, reducing the need for human intervention. 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 16
  • 17. Automation • In the scope of industrialization, automation is a step beyond mechanization. • Where as mechanization provided human operators with machinery to assist them with the muscular requirements of work. • Automation greatly reduces the need for human and mental requirements as well. • Processes and systems can also be automated. 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 17
  • 18. Automated Manufacturing Systems Examples: • Automated machine tools • Transfer lines • Automated assembly systems • Industrial robots that perform processing or assembly operations • Automated material handling and storage systems to integrate manufacturing operations • Automatic inspection systems for quality control 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 18
  • 19. Automated Manufacturing Systems Three basic types: 1. Fixed automation 2. Programmable automation 3. Flexible automation 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 19
  • 20. Fixed Automation A manufacturing system in which the sequence of processing (or assembly) operations is fixed by the equipment configuration. Typical features: • Suited to high production quantities • High initial investment for custom-engineered equipment • High production rates • Relatively inflexible in accommodating product variety 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 20
  • 21. Programmable Automation A manufacturing system designed with the capability to change the sequence of operations to accommodate different product configurations Typical features: • High investment in general purpose equipment • Lower production rates than fixed automation • Flexibility to deal with variations and changes in product configuration • Most suitable for batch production • Physical setup and part program must be changed between jobs (batches) 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 21
  • 22. Flexible Automation An extension of programmable automation in which the system is capable of changing over from one job to the next with no lost time between jobs Typical features: • High investment for custom-engineered system • Continuous production of variable mixes of products • Medium production rates • Flexibility to deal with soft product variety 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 22
  • 23. Product Variety and Production Quantity for Three Automation Types 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 23
  • 24. Reasons for Automating 1. To increase labor productivity 2. To reduce labor cost 3. To mitigate the effects of labor shortages 4. To reduce or remove routine manual and clerical tasks 5. To improve worker safety 6. To improve product quality 7. To reduce manufacturing lead time 8. To accomplish what cannot be done manually 9. To avoid the high cost of not automating 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 24
  • 25. Production Concepts and Mathematical Models • Production rate Rp • Production capacity PC • Utilization U • Availability A • Manufacturing lead time MLT • Work-in-progress WIP 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 25
  • 26. Production rate Rp • Hourly production rate • Work units completed/Hr • Cycle time: Time that one work unit spends being processed or assembled. It is the time between when one work unit begins processing and next unit begins. • Not all time is productive. • Cycle time consists of i) actual machining operation time ii) workpart handling time iii) tool handling time per workpiece 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 26
  • 27. Operation Cycle Time Typical cycle time for a production operation: Tc = To + Th + Tth -------------------1 where Tc = cycle time, min/pc To = processing time for the operation, min/pc Th = handling time (e.g., loading and unloading the production machine), min/pc and Tth = tool handling time (e.g., time to change tools), min/pc 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 27
  • 28. Tool handling time • Time spent changing tools when worn out • Time required for changing one tool to the next. • Tool indexing time for indexable inserts or for tools on a turret lathe • Tool positioning for next pass etc.. – These activities do not occur every cycle – They must be spread over the number of parts 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 28
  • 29. Production rate for batch production Time to process one batch(Q units) = Setup time + processing time, i.e., Tb = Tsu + QTc------------------2 where Tb = Batch processing time in min Tsu = Setup time required for one batch in min Q = Batch quantity, pc Tc = cycle time per workunit in min/cycle Tp = Tb / Q ,------------------------3 whereTp= Avg prod. Time/workunit , min/pc Rp = 60 / Tb ,----------------------4 Where Rp = Hourly prod rate, pc/Hr4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 29
  • 30. Production rate for job shop production Time to process one batch(Q units) = Setup time + processing time, i.e., Tb = Tsu + QTc For job shop production, Q = 1 So, Tb = Tsu + Tc = Tp How?? Tp = Tb / Q , whereTp= Avg prod. Time/workunit , min/pc Rp = 60 / Tb , Where Rp = Hourly prod rate, pc/Hr 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 30
  • 31. Production rate for mass production Production rate = cycle rate of the machine Tb = Tsu + QTc For mass production, Q = very large Tp = Tb/Q = (Tsu + QTc ) / Q = Tsu /Q + QTc/Q Tp = Tsu/Q +Tc As Q becomes very large, Tsu/Q  0 So, Tp = Tc WKT, Production rate is reciprocal of production time Rp = Rc = 60/Tc 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 31
  • 32. Production rate for flow line mass production • Production rate = cycle rate of the production line • Workstations are interdependent in the line • Impossible to divide total work equally among all workstations on the line. • So, one station ends up with the longest operation time ( Bottle neck station). • Bottle neck station sets the pace to other workstation. • Work units should be moved from one workstation to next (Tr )4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 32
  • 33. Production rate for flow line mass production • Cycle time = transfer time + longest processing time Tc = Tr + Max To -----------------5 • Where Max To = operation time at the bottle neck station i.e., The maximum of operation times for all stations on the line • Tr = Transfer time Rc = 60/Tc ----------------6 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 33
  • 34. Production capacity • maximum rate of output that a production facility (or production line, work center, or group of work centers) is able to produce under a given set of assumed operating conditions • Operating conditions refer to the number of shifts per day, number of days in the week (or month) that the plant operates, employment levels, and so forth. 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 34
  • 35. Production capacity Let PCw = the production capacity of a given facility under consideration. Let the measure of capacity = the number of units produced per week. Let n = the number of machines or work centers in the facility. A work center is a manufacturing system in the plant typically consisting of one worker and one machine. It might also be one automated machine with no worker, or multiple workers working together on a production line. It is capable of producing at a rate RP unit/hr. Each work center operates for Hs hr/shift. Let Sw denote the number of shifts per week. PCw = n Sw Hs Rp --------------------7 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 35
  • 36. Production capacity • If we include the possibility that each work unit is routed through no operations, with each operation requiring a new setup on either the same or a different machine, • where no = number of operations in the routing o psw n RHnS PC  ---------8 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 36
  • 37. Production Capacity Plant capacity for facility in which parts are made in one operation (no = 1): PCw = n Sw Hs Rp where PCw = weekly plant capacity, units/wk Plant capacity for facility in which parts require multiple operations (no > 1): where no = number of operations in the routing o psw n RHnS PC  Hareesha N G, Dept of Aero Engg, DSCE, Blore
  • 38. Production Capacity Equation indicates the operating parameters that affect plant capacity. Changes that can be made to increase or decrease plant capacity over the short term are: 1. Change the number of shifts per week (S). For example, Saturday shifts might be authorized to temporarily increase capacity. 2. Change the number of hours worked per shift (H). For example, overtime on each regular shift might be authorized to increase capacity. o psw n RHnS PC  Hareesha N G, Dept of Aero Engg, DSCE, Blore
  • 39. Over the intermediate or longer term, the following changes can be made to increase plant capacity: 3. Increase the number of work centers, n, in the shop. This might be done by using equipment that was formerly not in use and hiring new workers. 4. Increase the production rate, Rp by making improvements in methods or process technology. 5. Reduce the number of operations no required per work unit by using combined operations, simultaneous operations, or integration of operations. Production Capacity Hareesha N G, Dept of Aero Engg, DSCE, Blore
  • 40. Utilization • Utilization refers to the amount of output of a production facility relative to its capacity. Expressing U=Q/PC------------9 Where U = utilization of the facility, Q = actual quantity produced by the facility during a given time period (i.e., pc/wk), and PC = production capacity for the same period (pc/wk). It is often defined as the proportion of time that the facility is operating relative to the time available under the definition of capacity. Utilization is usually expressed as a percentage. 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 40
  • 41. Availability • Availability is defined using two other reliability terms, mean time between failure (MTBF) and mean time to repair (MTTR). • The MTBF indicates the average length of time the piece of equipment runs between breakdowns. • The MTTR indicates the average time required to service the equipment and put it back into operation when a breakdown occurs. 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 41
  • 42. Availability Availability is defined as follows: Availability: A = where MTBF = mean time between failures, and MTTR = mean time to repair Availability is typically expressed as a percentage MTBF MTTRMTBF  -----------10 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 42
  • 43. Availability - MTBF and MTTR Defined Hareesha N G, Dept of Aero Engg, DSCE, Blore
  • 44. 1) A production machine operates at 2 shifts/day and 5 days a week at full capacity. Its production rate is 20 unit/hr. During a certain week, the machine produced 1000 parts and was idle in the remaining time, (a) Determine the production capacity of the machine, (b) What was the utilization of the machine during the week under consideration? if the availability of the machine is 90%, and the utilization of the machines is 80%. Compute the expected plant output. Solution: (a) The capacity of the machine can be determined using the assumed 80-hr week as follows: PC = 80(20) = 1600 unit/wk (b) Utilization can be determined as the ratio of the number of parts made by the machine relative to its capacity. U = 1000/1600 = 0.625 (62.5%) (c) U=Q/PC or Q= UxPCxA or UAxnSHRp Hareesha N G, Dept of Aero Engg, DSCE, Blore
  • 45. 2) The mean time between failures for a certain production machine is 250 hours, and the mean time to repair is 6 hours. Determine the availability of the machine. Availability: A = 3) One million units of a certain product are to be manufactured annually on dedicated production machines that run 24 hours per day. 5 days per week, 50 weeks per year, (a) If the cycle time of a machine to produce one part is 1.0 minute, how many of the dedicated machines will be required to keep up with demand? Assume that availability, utilization, and worker efficiency = 100%, and that no setup time will be lost, (b) Solve part (a) except that availability = 0.90. Solution: Tc= 1 min Tb = Tsu+QTc = 0+QTc Tp= Tb/Q = Tc Rp=60/Tp = 60 Parts/Hr n= PC/SHRp = 1000000/(50x5x24x60) = 2.77 = 3 machines MTBF MTTRMTBF  Hareesha N G, Dept of Aero Engg, DSCE, Blore
  • 46. Manufacturing Lead Time Manufacturing lead time (MLT) is the total time required to process a given part or product through the plant, including any lost time due to delays, time spent in storage, reliability problems, and so on.  Production consists of a sequence of individual processing and assembly operations. Between the operations are material handling, storage, inspections, and other non productive activities.  Divide these activities as operation and non operation elements.  Non operation elements are Handling, temporary storage, inspection and other sources of delay when work unit is not in machine. 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 46
  • 47. Let Tc = the operation cycle time at a given machine or workstation, Tno = the nonoperation time associated with the same machine. no = the number of separate operations through which the work unit must be routed Tsu = Setup time required to prepare each production machine for the particular product. If we assume batch production, then there are Q work units in the batch., Given these terms, we can define manufacturing lead time as MLTj = where MLTj = manufacturing lead time for part or product j (min). Tsuji = setup time for operation i (min) for the product j, Qj = quantity of part or product in the batch (pc), Tcji = operation cycle time for operation i (min/pc), Tnoji = nonoperation time associated with operation i (min), and i indicates the operation sequence in the processing; i = I, 2,... noj   ojn i nojicjijsuji TTQT 1 )( -----------11 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 47
  • 48. To simplify and generalize the model, let us assume that all setup times, operation cycle times, and non operation times are equal for the noj machines. Further, let us suppose that the batch quantities of all parts or products processed through the plant are equal and that they are all processed through the same number of machines, so that noj = no , With these simplifications, Eq. becomes: MLT = no (Tsu + QTc + Tno) where MLT = manufacturing lead time, no = number of operations, Tsu = setup time, Q = batch quantity, Tc = cycle time per part, and Tno = non-operation time -----------12 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 48
  • 49. • For a job shop in which the batch size is one (Q = 1), Eq. (1.12) becomes MLT=no(Tsu+TC+Tno)------------ (1.13) For mass production, the Q term in Eq. (1.12) is very large and dominates the other terms. In the case of quantity type mass production in which a large number of units are made on a single machine (no =1). The MLT simply becomes the operation cycle time for the machine after the setup has been completed and production begins. MLT = QxTc ------------1.14 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 49
  • 50. For flow line mass production, the entire production line is set up in advance. Also, the non operation time between processing steps is simply the transfer time Tr to move the part or product from one workstation to the next. The station with the longest operation time sets the pace for all stations: MLT =no(Tr +Max To) = noTc --------------1.15 Since , (Tr +Max To) = Tc (1.5) Since the number of stations is equal to the number of operations (n = no) Eq. (1.15) can also be stated as MLT =n(Tr +Max To) = nTc --------------1.16 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 50
  • 51. A certain part is produced in a batch size of 100 units. The batch must be routed through five operations to complete the processing of the parts. Average setup time is 3 hr/operation, and average operation time is 6 min . Average non operation time due to handling, delays, inspections, etc., is 7 hours for each operation. Determine how many days it will take to complete the batch, assuming the plant runs one 8-hr shift/day. Solution: Given: Q = 100 units no = 5 Tsu = 3hr/operation Tc = 6 min Tno = 7 hr/operation The manufacturing lead time is computed from Fq MLT = no (Tsu + QTc + Tno) MLT = 5(3 + 100 X 0.1 + 7) = 100 hours At 8 hr/day. this amounts to L00/8 = 12.5 days. 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 51
  • 52. A certain part is routed through six machines in a batch production plant. The setup and operation times for each machine are given in the table below. The batch size is 100 and the average non operation time per machine is 12 hours. Determine (a) manufacturing lead time and (b) production rate for operation 3. Solution: Given: Q = 100 units no = 5 Tsu = 3hr/operation Tno = 12hr/machine The manufacturing lead time is computed from Fq MLT =   ojn i nojicjijsuji TTQT 1 )( 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 52
  • 53. A certain part is routed through six machines in a production plant. The operation times for each machine are given in the table below. Suppose the part is made in very large quantities on a production line in which an automated work handling system is used to transfer parts between machines. Transfer time between stations = 15 s. The total time required to set up the entire line is 150 hours. Assume that the operation times at the individual machines remain the same. Determine (a) manufacturing lead time for a part coming off the line.(b) production rate for operation 3. and (c) theoretical production rate for the entire production line. Solution: Given: a) MLT = no(Tr+MaxTo) b) Rp3 = 60/Tp ; But Tp = Tc = To c) Rp = 60/Tp; But Tp = Tc ; But Tc = Tr+Max To 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 53
  • 54. Work-In-Process Work-in-process (WIP) is the quantity of parts or products currently located in the factory that either are being processed or are between processing operations. WIP is inventory that is in the state of being transformed from raw material to finished product. 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 54
  • 55. Work-In-Process An approximate measure of work-in-process can be obtained from the following, using terms previously defined: WIP= where WIP = work-in-process, pc; A = availability, U = utilization, PC = plant capacity, pc/wk; MLT = manufacturing lead time, hr; Sw = shifts per week, Hsh = hours per shift, hr/shift    w sh AU PC MLT S H Hareesha N G, Dept of Aero Engg, DSCE, Blore
  • 56. TIP Ratio The TIP ratio measures the time that the product spends in the plant relative to its actual processing time. It is computed as the total MLT for a part divided by the sum of individual operation time for the plant.   oT MLT TIP 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 56
  • 57. The average part produced in a certain batch manufacturing plant must be processed sequentially through six machines on average. Twenty (20) new batches of parts are launched each week. Average operation time = 6 minutes, average setup time = 5 hours, average batch size= 25 parts, and average non operation time per batch = 10 hr/machine. There are 18 machines in the plant working in parallel. Each of the machines can be set up for any type of job processed in the plant. The plant operates an average of 70 production hours per week. Scrap rate is negligible. Determine (a) manufacturing lead time for an average part, (b) plant capacity, and (c) plant utilization, (d) Determine the average level of work-in-process in the plant. a) MLT = no( Tsu + QxTc + Tno ) b) PC = A.U. n.SwHs.Rp/no c) U = Q/PC d) WIP = A.U.PC.MLT/SwHs 4/3/2014 Hareesha N G, Dept of Aero Engg, DSCE, Blore 57