1. Movement for
Underground Metro
A Citizen’s Initiative
9/11/2010
2. Our Basis
• The IIT Report – Comparative
Evaluation between Elevated &
Underground Metro
• Our practical experience of living with
the VAG Elevated Metro
9/11/2010
3. Question asked to Suburban Respondents
in IIT’s Social Perception Survey
Does Mumbai need a
Metrorail ?
Yes, yes, yes (90%)
– but ……..
9/11/2010
15. MMRDA has scrapped
9 flyovers en route
No scope for
future traffic decongestion
9/11/2010
16. Elevated Metro flouts legal
norms:
• Built under Tramways Act
1886
• Fire Brigade refuses NOC
for stations
• CRZ violations
• No AAI approval
9/11/2010
32. MMRDA Argument 1:
All over the world
densely populated city areas
have underground metro and
suburbs have elevated metro
9/11/2010
33. Andheri-Bandra is one of the most
congested land masseshttp://www.citymayors.com/statistics*
in the world !!
9/11/2010
34. MMRDA Argument 2:
Underground (`531 cr/km) costs more than
Elevated (`260 cr/km)
1.Why underground in city, when suburbs
is more densely populated?
2.What about costs of land
acquisition, re-laying utilities, increased
length, project delay, environmental
costs, social costs etc?
3.Cost of relocation of Andheri Pumping
Station, Santacruz Police Station and
rehabilitating project affected persons?
9/11/2010
35. IIT Mumbai Report
Govt. must invest in underground
Reasons:
• Existing urban fabric not disturbed
• Arterial roads not choked
• No violation of civil laws
• Vast saving in marginal cost
• Scope for future expansion
underground
• Scope for integration with buses, taxi
etc
• Creation of additional urban space
• Total Decongestion of city
• Minimal environmental impact
9/11/2010
37. Hyderabad Metro (71 km) Cost Mumbai Metro (32.5 km) Cost
`12,132 Cr = `171 Cr/km `11,500 Cr = `354 Cr/km
Our BIG Question
Where has `5950 Cr Gone ?!!!
9/11/2010
38. Metro Rail Cost Comparison
City Stations Kms Cost Elevated Cost Total Cost Diff with
per km Underground Mumbai
per km
Chennai 32 45.1 `100 cr* `300 cr** `14600 cr `7440 cr
Bangalore 32 42.3 `80 cr* `250 cr** `8100 cr `8090 cr
Hyderabad 39 71 `171 cr*** - `12132 cr `5950 cr
* Estimated cost of construction of elevated station `30 cr.
** Estimated cost of construction of underground station `100 cr.
*** Includes construction cost of stations
9/11/2010
39. Kolkata Mumbai’s
& Delhi’s Shame !
Pride !