FORM SSD / PDC / 1

                                      SEWERAGE SERVICES ACT 1993
                                SEWERAGE SYSTEMS AND SEPTIC TANKS


                          APPLICATION FOR SEWERAGE PLANNING APPROVAL

                                                                       Date :

To : The Director General of Sewerage Services

  I / We (the undersigned)

hereby apply for Sewerage Planning Approval to undertake the following sewerage works :




and submit the following particulars (see reverse of form):




Details of Land

Address of site or premises :




Lot No. of land occupied by sewerage works :

Area of land occupied by sewerage works :
        a) Sewage Treatment Plant                                      hectares
        b) Network Pumping Station                                     hectares

Details of Population Equivalent (PE)

             TYPE                                   TOTAL PE                       REMARKS
         RESIDENTIAL
         COMMERCIAL
        INSTITUTIONAL
          INDUSTRIAL
            OTHERS
    TOTAL DEVELOPMENT PE




           BORANG PDC 1
Address and Lot Nos of any affected by the sewerage works :
Signature of Owner

Name of Owner              :
(in block letters)
I.C No                     :

Address                    :




Telephone No               :

Fax No                     :

                                        Declaration by Qualified Person

I hereby certify that the details in the plans and engineering report are in accordance to the 'Guidelines for
Developers' , the MS1228 'Codes of Practice for Design and Installation of Sewerage Systems, and other
regulatory agencies requirements.




                                                                      Signature of Qualified Person


Name of Qualified         :
Person (in block letters)
I.C No.                   :
Address                   :


Telephone No               :
Fax No                     :

Qualifications and Registration particulars:

FOR OFFICE USE ONLY

Date received              :                                   Checked By :

Date replied               :                                      Ref. No. :


            BORANG PDC 1
                     DECLARATION FOR SEWERAGE WORKS PLANNING APPROVAL

SSD Regional Office        :                                                         Date :
File No.                    :

Project Title               :



License Land Surveyor :

Address                     :



Telephone / Fax             :

Lot No. / PT                :

Mukim / Village / Town :

District                    :

State                       :

Land Title No.              :

Area of STPs / NPS          :                           sq meter.

Land Status of STP          :                           State Land / Alienated Land / Reserved Land

Developer                   :

Consultant                  :

Proposed Treatment          :
System

Development Type            :

Population Equivalent       :
(PE)

Catchment                   :



                                         Declaration by Qualified Person

I hereby certify that all written information provided by me in this checklist is full, complete, true and correct
and are in accordance to the 'Guidelines of Developers' and with the MS1228 'Codes of Practice for Design
and Installation of Sewerage Systems.


Date :
                                                                                 (signature)

                                                                      Name :


             BORANG PDC 1

Mais conteúdo relacionado

Mais procurados

Column Analysis and Design
Column Analysis and Design Column Analysis and Design
Column Analysis and Design Waqas Javaid
 
Design of tension members
Design of tension membersDesign of tension members
Design of tension membersSabna Thilakan
 
REPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONREPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONRising Sher
 
Design of columns biaxial bending as per IS 456-2000
Design of columns  biaxial bending as per IS 456-2000Design of columns  biaxial bending as per IS 456-2000
Design of columns biaxial bending as per IS 456-2000PraveenKumar Shanmugam
 
T BEAM (ULTIMATE STRENGTH DESIGN)
T BEAM (ULTIMATE STRENGTH DESIGN)T BEAM (ULTIMATE STRENGTH DESIGN)
T BEAM (ULTIMATE STRENGTH DESIGN)S M Rahat Rahman
 
PERT CPM ON A 2 STOREY RESIDENTIAL BUILDING
PERT CPM ON A 2 STOREY RESIDENTIAL BUILDINGPERT CPM ON A 2 STOREY RESIDENTIAL BUILDING
PERT CPM ON A 2 STOREY RESIDENTIAL BUILDINGIf Acunin
 
Influence lines (structural analysis theories)
Influence lines (structural analysis theories)Influence lines (structural analysis theories)
Influence lines (structural analysis theories)Madujith Sagara
 
Engineering Surveys for Alignment
Engineering Surveys for Alignment Engineering Surveys for Alignment
Engineering Surveys for Alignment RAMPRASAD KUMAWAT
 
Engineering & Construction 4.0 – A Digital pathway to a more profitable future
Engineering & Construction 4.0 – A Digital pathway to a more profitable futureEngineering & Construction 4.0 – A Digital pathway to a more profitable future
Engineering & Construction 4.0 – A Digital pathway to a more profitable futureLaurianneSchillesDur
 
15-Bending Coefficient (Steel Structural Design & Prof. Shehab Mourad)
15-Bending Coefficient (Steel Structural Design & Prof. Shehab Mourad)15-Bending Coefficient (Steel Structural Design & Prof. Shehab Mourad)
15-Bending Coefficient (Steel Structural Design & Prof. Shehab Mourad)Hossam Shafiq II
 
IMPORTANCE & PURPOSES OF SPECIFICATION
IMPORTANCE & PURPOSES OF SPECIFICATIONIMPORTANCE & PURPOSES OF SPECIFICATION
IMPORTANCE & PURPOSES OF SPECIFICATIONSagar Kaptan
 
Geotechnical Engineering-I [Lec #16: Soil Compaction - Practice Problems]
Geotechnical Engineering-I [Lec #16: Soil Compaction - Practice Problems]Geotechnical Engineering-I [Lec #16: Soil Compaction - Practice Problems]
Geotechnical Engineering-I [Lec #16: Soil Compaction - Practice Problems]Muhammad Irfan
 
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...Hossam Shafiq II
 
Complete design of r.c.c over head tank & boq estimate
Complete design of r.c.c over head tank & boq estimateComplete design of r.c.c over head tank & boq estimate
Complete design of r.c.c over head tank & boq estimateHarish Mahavar
 
Width of formation or Roadway , Right of way and land width, Typical cross se...
Width of formation or Roadway , Right of way and land width, Typical cross se...Width of formation or Roadway , Right of way and land width, Typical cross se...
Width of formation or Roadway , Right of way and land width, Typical cross se...RAMPRASAD KUMAWAT
 
Uni and bi axial column and design
Uni and bi axial column and design Uni and bi axial column and design
Uni and bi axial column and design Vikas Mehta
 
Table of Fixed End Moments Formulas
Table of Fixed End Moments FormulasTable of Fixed End Moments Formulas
Table of Fixed End Moments FormulasAnas Share
 

Mais procurados (20)

Column Analysis and Design
Column Analysis and Design Column Analysis and Design
Column Analysis and Design
 
Design of tension members
Design of tension membersDesign of tension members
Design of tension members
 
REPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONREPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTION
 
Betti
BettiBetti
Betti
 
Design of steel beams
Design of steel beamsDesign of steel beams
Design of steel beams
 
Design of columns biaxial bending as per IS 456-2000
Design of columns  biaxial bending as per IS 456-2000Design of columns  biaxial bending as per IS 456-2000
Design of columns biaxial bending as per IS 456-2000
 
T BEAM (ULTIMATE STRENGTH DESIGN)
T BEAM (ULTIMATE STRENGTH DESIGN)T BEAM (ULTIMATE STRENGTH DESIGN)
T BEAM (ULTIMATE STRENGTH DESIGN)
 
PERT CPM ON A 2 STOREY RESIDENTIAL BUILDING
PERT CPM ON A 2 STOREY RESIDENTIAL BUILDINGPERT CPM ON A 2 STOREY RESIDENTIAL BUILDING
PERT CPM ON A 2 STOREY RESIDENTIAL BUILDING
 
Influence lines (structural analysis theories)
Influence lines (structural analysis theories)Influence lines (structural analysis theories)
Influence lines (structural analysis theories)
 
Engineering Surveys for Alignment
Engineering Surveys for Alignment Engineering Surveys for Alignment
Engineering Surveys for Alignment
 
Engineering & Construction 4.0 – A Digital pathway to a more profitable future
Engineering & Construction 4.0 – A Digital pathway to a more profitable futureEngineering & Construction 4.0 – A Digital pathway to a more profitable future
Engineering & Construction 4.0 – A Digital pathway to a more profitable future
 
15-Bending Coefficient (Steel Structural Design & Prof. Shehab Mourad)
15-Bending Coefficient (Steel Structural Design & Prof. Shehab Mourad)15-Bending Coefficient (Steel Structural Design & Prof. Shehab Mourad)
15-Bending Coefficient (Steel Structural Design & Prof. Shehab Mourad)
 
IMPORTANCE & PURPOSES OF SPECIFICATION
IMPORTANCE & PURPOSES OF SPECIFICATIONIMPORTANCE & PURPOSES OF SPECIFICATION
IMPORTANCE & PURPOSES OF SPECIFICATION
 
Geotechnical Engineering-I [Lec #16: Soil Compaction - Practice Problems]
Geotechnical Engineering-I [Lec #16: Soil Compaction - Practice Problems]Geotechnical Engineering-I [Lec #16: Soil Compaction - Practice Problems]
Geotechnical Engineering-I [Lec #16: Soil Compaction - Practice Problems]
 
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
 
Complete design of r.c.c over head tank & boq estimate
Complete design of r.c.c over head tank & boq estimateComplete design of r.c.c over head tank & boq estimate
Complete design of r.c.c over head tank & boq estimate
 
Width of formation or Roadway , Right of way and land width, Typical cross se...
Width of formation or Roadway , Right of way and land width, Typical cross se...Width of formation or Roadway , Right of way and land width, Typical cross se...
Width of formation or Roadway , Right of way and land width, Typical cross se...
 
contract procedure
contract procedurecontract procedure
contract procedure
 
Uni and bi axial column and design
Uni and bi axial column and design Uni and bi axial column and design
Uni and bi axial column and design
 
Table of Fixed End Moments Formulas
Table of Fixed End Moments FormulasTable of Fixed End Moments Formulas
Table of Fixed End Moments Formulas
 

Mais de hadypower

Form G1 G21(Bm)
Form G1 G21(Bm)Form G1 G21(Bm)
Form G1 G21(Bm)hadypower
 
Form G1 G21(Bm)
Form G1 G21(Bm)Form G1 G21(Bm)
Form G1 G21(Bm)hadypower
 
Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006hadypower
 
Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006hadypower
 
Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006hadypower
 
Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006hadypower
 
Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006hadypower
 

Mais de hadypower (8)

Pdc 2
Pdc 2Pdc 2
Pdc 2
 
Form G1 G21(Bm)
Form G1 G21(Bm)Form G1 G21(Bm)
Form G1 G21(Bm)
 
Form G1 G21(Bm)
Form G1 G21(Bm)Form G1 G21(Bm)
Form G1 G21(Bm)
 
Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006
 
Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006
 
Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006
 
Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006
 
Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006
 

Pdc 1

  • 1. FORM SSD / PDC / 1 SEWERAGE SERVICES ACT 1993 SEWERAGE SYSTEMS AND SEPTIC TANKS APPLICATION FOR SEWERAGE PLANNING APPROVAL Date : To : The Director General of Sewerage Services I / We (the undersigned) hereby apply for Sewerage Planning Approval to undertake the following sewerage works : and submit the following particulars (see reverse of form): Details of Land Address of site or premises : Lot No. of land occupied by sewerage works : Area of land occupied by sewerage works : a) Sewage Treatment Plant hectares b) Network Pumping Station hectares Details of Population Equivalent (PE) TYPE TOTAL PE REMARKS RESIDENTIAL COMMERCIAL INSTITUTIONAL INDUSTRIAL OTHERS TOTAL DEVELOPMENT PE BORANG PDC 1 Address and Lot Nos of any affected by the sewerage works :
  • 2. Signature of Owner Name of Owner : (in block letters) I.C No : Address : Telephone No : Fax No : Declaration by Qualified Person I hereby certify that the details in the plans and engineering report are in accordance to the 'Guidelines for Developers' , the MS1228 'Codes of Practice for Design and Installation of Sewerage Systems, and other regulatory agencies requirements. Signature of Qualified Person Name of Qualified : Person (in block letters) I.C No. : Address : Telephone No : Fax No : Qualifications and Registration particulars: FOR OFFICE USE ONLY Date received : Checked By : Date replied : Ref. No. : BORANG PDC 1 DECLARATION FOR SEWERAGE WORKS PLANNING APPROVAL SSD Regional Office : Date :
  • 3. File No. : Project Title : License Land Surveyor : Address : Telephone / Fax : Lot No. / PT : Mukim / Village / Town : District : State : Land Title No. : Area of STPs / NPS : sq meter. Land Status of STP : State Land / Alienated Land / Reserved Land Developer : Consultant : Proposed Treatment : System Development Type : Population Equivalent : (PE) Catchment : Declaration by Qualified Person I hereby certify that all written information provided by me in this checklist is full, complete, true and correct and are in accordance to the 'Guidelines of Developers' and with the MS1228 'Codes of Practice for Design and Installation of Sewerage Systems. Date : (signature) Name : BORANG PDC 1