Risk Management
Jonathon Simon, Senior Manager, Ernst & Young

2nd June 2009
Agenda
                                               1   2   3   4   5   6   7



  1      Introduction
  2      Risk – An EY context
  3      What is risk management?
  4      The risk management lifecycle
  5      Good and bad risk management practice
  6      Critical success factors for managing risk
  7      Communicating risk to stakeholders



Page 2   2nd June 2009       Risk Management
Introduction
                                                           1   2   3   4   5   6   7


Jonathon Simon
►   Senior Manager in the Programme Advisory Services
    team within the IT Advisory practice for Ernst & Young.

►   Project Management Institute (PMI) certified Project
    management Professional (PMP).

►   Over 15 years industry experience in managing large
    projects.

►   Prior to joining Ernst & Young, worked for a global IT service provider as a
    Senior Project Manager fulfilling project and programme assignments for blue
    chip clients in the private sector.

►   Current Chair of the UK PMI London Events Committee.



Page 3   2nd June 2009             Risk Management
Risk – an EY context
                                                                   1   2   3   4   5   6   7


►   Ernst and Young is engaged globally in seeking to identify leading practices in the area
    of risk management.
►   Our work with companies around the world suggests that there is a body of leading risk
    management practice emerging, but many companies are still doing little in this area.
►   Our research has shown that, while strategic risks have become more important,
    companies have been focusing on the easier-to-manage area of operational risk.
►   The implications for different sectors are blurred. Even within each sector, the risks for
    each company may vary.
►   Most programs and projects encounter at least one of the following
         ► Cost and schedule overruns
         ► Schedule delays
         ► Defects
         ► Benefits not realised
         ► Project cancellations
         ► Loss of stakeholder confidence

►   No matter what program or project is undertaken, appropriate control and management
    of risk is essential.




Page 4   2nd June 2009                      Risk Management
Risk – an EY context
                                                                             1       2   3   4    5     6      7

         Keep us out of trouble                                  Make our business better

    Regulatory                                                       Enhanced                  Improved
  non-compliance             Schedule delays
                                                                     capability               visibility and
                                                 Goal                                        transparency

 Unanticipated
business impact               Cost overruns
                                                                                              Enhanced
                                                                      Increase               accountability
                                                                   business value
                                                                    of initiatives
      Loss of                Post completion
    stakeholder                  defects                                                      Increased
    confidence                                                                                confidence

                                                                      Achieve
     Project                   Unrealized                            sustainable              Increased
   cancellations                benefits                              changes                predictability


         All too confusing and overdone…                                  Must do it…
         Except when we get in trouble                             but how do we do it better?




Page 5       2nd June 2009                     Risk Management
What is risk management?
                                                                  1   2   3   4   5      6   7


► Many    types of risk exist in an organisation

► This   presentation will focus on risks within projects

►A  project risk is defined as the probability of an undesirable event occurring or a
  desirable event failing to occur and the consequential impact of and on the project.


► Project risk management is a structured process that allows individual risk events and
  overall project risk to be understood and managed proactively, optimising project success
  by minimising threats and maximising opportunities. Association for project management




Page 6      2nd June 2009                  Risk Management
The risk management lifecycle
                                                                                 1       2    3     4    5     6   7




                            Monitor and Control
                            Monitor and Control                      Risk Planning
                                                                     Risk Planning
                                  Risks
                                   Risks




                                                     Proximity
         Respond to Risks
         Respond to Risks                                                                    Identify Risks
                                                                                              Identify Risks
                                                  The 3 dimensions
                                                        of risk


                                            Impact         Probability



                              Qualitative Risk
                              Qualitative Risk                       Quantitative Risk
                                                                     Quantitative Risk
                                 Analysis
                                 Analysis                               Analysis
                                                                         Analysis




Page 7    2nd June 2009                          Risk Management
Good and bad risk management practice
                                                              1   2   3     4   5   6   7


  Good Practice                             Bad Practice

   1. Clear risk responsibilities            1. No clear responsibilities
   2. Clarity of risk ownership              2. Lack of risk ownership
      including senior sponsors
                                             3. No process for managing risks
   3. Shared understanding of how
                                             4. No guidelines for managing
      risks will be managed
                                                and escalating risks
   4. Effective methods of assessing
                                             5. No process for monitoring and
      and escalating risks
                                                updating risks
   5. Risks are monitored and good
                                             6. Risks are not reviewed and
      quality information is captured
                                                action is not taken to address
   6. Risks are reviewed as an                  risks
      integral part of performance
      management


Page 8   2nd June 2009               Risk Management
Integrated Risk Management
                                                                          1     2      3      4     5      6      7


     Corporate, Programme and Project Risks

                                                                      Direction, Strategy
                                                                      Focus on a strategic enterprise level governance
Knowing where to go                                                   of the delivery of an organisation’s complete
                                                                      portfolio of transformational programmes and
                                                                      projects to support the organisation’s strategic
                             Corporate                                goals


                                                                      Outcome, Benefit




                                               Inf
                      rs




                               2.                                     Focus on the delivery of a strategic change to
                   ive




                                                  orm
Doing the right            Programme                                  the organisational state comprising a linked set of
                Dr




                                                                      projects and / or activities that are coordinated
things




                                                     s
                           Management                                 and managed as a unit such that they achieve
                                                                      outcomes and realise benefits
                                                                      Eg, delivery of games and legacy


                                                                      Output, Product
                                                                      Focus on the delivery of a unique set of
Doing things                3. Project                                coordinated activities, with clearly articulated
                                                                      start and end points, which is undertaken by an
right                      Management                                 individual or team to meet specific objectives
                                                                      within defined time, cost and performance
                                                                      parameters as specified in the business case
                                                                      Eg, Construction of a new building
   There must be alignment and escalation from one level to another

Page 9    2nd June 2009                    Risk Management
EY Case Study – Government Health Project
                                                                                          1   2   3   4   5   6   7


Situation…
► A government department running a programme supporting a significant government health initiative
► Risk management was performed at an operational and strategic level
► No defined process for risk escalation
► Lack of risk ownership at the executive board level


Consequence
► Risks were not addressed on a timely basis
► Lack of visibility of risks at a senior level
► Potential for the project to fail to deliver its scope of work within time and budget


Actions taken…
► Implemented a robust risk escalation process
► Developed a risk dashboard that communicated a high level summary of risks to executive board members
► Conducted analysis and developed mitigating actions to reduce risks to an acceptable level
► Embedded risks review within the project management processes
► Implemented a communications process for mitigating actions, timelines and ownership


Result
► Clear roles and responsibilities for risk management
► Project wide understanding of the process for managing risks
► Visibility of risks at a senior level and actioning of risks within acceptable timeframe




Page 10      2nd June 2009                            Risk Management
Critical success factors for managing risk
                                                               1   2   3   4   5   6     7



►   Be proactive - to be successful the organisation should be committed to addressing
    risk management proactively and consistently throughout the project.

►   Conduct a regular risk assessment - that defines key risks and weights the impact
    on business drivers.

►   Conduct scenario planning - for major risks identify and develop a number of
    operational responses.

►   Evaluate your project’s ability to manage risks - ensure that the risk management
    process is linked to the actual risks that the business faces.

►   Undertake effective monitoring and control processes - to give both early warning
    and improved ability to respond.

►   Keep an open mind - about where the risks can come from.




Page 11   2nd June 2009               Risk Management
Communicating risk to stakeholders
                                                                                                                              1      2        3      4       5       6         7

                                                                                       1 - Cannot operate without (no ability to trade)
                                                                                       2 - Workarounds available (limited ability to trade)
                                                                                       3 - Does not impact on ability to operate / trade

KEY
                                                                   Criticality 3

Position on grid: priority and criticality of project

Priority - Proximity of time requirement for completion
Criticality - Ability of business to function without capability                               Focus management attention, project resource and reporting on:
                                                                                               • Projects which are time critical and impact ability to trade (top right
                                                                                                 hand corner)
Size of circle: degree of risk associated to project
                                                                              2                • Projects impacting on overall programme (large circles)

                            H
                                                                                               • Projects which are not on track (red circles)
   L          M                                                                                Aim to push projects away from proximity to axis

L – Risk impact within project
M – Risk impact within IS
H – Risk impact to programme

                                                                              1
Color of circle: current project status



R – Project late against plan (delay to critical path)                                                                    1 - Completion required for first wave of movement
A – Project at risk of slipping                                                                                           2 - Workarounds available (inhibits movement)
                                                                                                                          3 - Completion not mandatory for movement
G – Project on track against plan

                                                                                   1                                  2                              3                Priority


Page 12           2nd June 2009                                       Risk Management
Questions?

2nd June 2009

Mais conteúdo relacionado

Mais procurados

Andrew.george
Andrew.georgeAndrew.george
Andrew.georgeNASAPMC
 
Social Enterprise Learning Toolkit (Risk Management Module)
Social Enterprise Learning Toolkit (Risk Management Module)Social Enterprise Learning Toolkit (Risk Management Module)
Social Enterprise Learning Toolkit (Risk Management Module)Enterprising Non-Profits
 
Risk leadership perspectives Risk Manager of the Year
Risk leadership perspectives Risk Manager of the YearRisk leadership perspectives Risk Manager of the Year
Risk leadership perspectives Risk Manager of the YearKarl Davey
 
Risk Management in Five Easy Pieces
Risk Management in Five Easy PiecesRisk Management in Five Easy Pieces
Risk Management in Five Easy PiecesGlen Alleman
 
Delivering Business Value By Applying Agile Principles To Business Continuity...
Delivering Business Value By Applying Agile Principles To Business Continuity...Delivering Business Value By Applying Agile Principles To Business Continuity...
Delivering Business Value By Applying Agile Principles To Business Continuity...Ken Collins
 
Canga.m.wood.j
Canga.m.wood.jCanga.m.wood.j
Canga.m.wood.jNASAPMC
 
Risk Management Basics for Globalization Projects
Risk Management Basics for Globalization ProjectsRisk Management Basics for Globalization Projects
Risk Management Basics for Globalization Projectsvanessa_wilburn
 
Why Traditional Risk Management fails in the Oil+Gas Sector
Why Traditional Risk Management fails in the Oil+Gas SectorWhy Traditional Risk Management fails in the Oil+Gas Sector
Why Traditional Risk Management fails in the Oil+Gas Sectorjanknopfler
 
Enterprise Risk Management - Deddy Jacobus
Enterprise Risk Management - Deddy JacobusEnterprise Risk Management - Deddy Jacobus
Enterprise Risk Management - Deddy JacobusDeddy Jacobus
 
12.0 risk management agile+evm (v10.2)
12.0 risk management agile+evm (v10.2)12.0 risk management agile+evm (v10.2)
12.0 risk management agile+evm (v10.2)Glen Alleman
 
Software Engineering Risk Management Software Application
Software Engineering Risk Management   Software ApplicationSoftware Engineering Risk Management   Software Application
Software Engineering Risk Management Software Applicationguestfea9c55
 
Applying risk radar (v2)
Applying risk radar (v2)Applying risk radar (v2)
Applying risk radar (v2)Glen Alleman
 
Workshop project risk management (29 june 2012)
Workshop   project risk management (29 june 2012)Workshop   project risk management (29 june 2012)
Workshop project risk management (29 june 2012)bfriday
 

Mais procurados (18)

Risk ppt1672
Risk ppt1672Risk ppt1672
Risk ppt1672
 
Andrew.george
Andrew.georgeAndrew.george
Andrew.george
 
Social Enterprise Learning Toolkit (Risk Management Module)
Social Enterprise Learning Toolkit (Risk Management Module)Social Enterprise Learning Toolkit (Risk Management Module)
Social Enterprise Learning Toolkit (Risk Management Module)
 
Risk leadership perspectives Risk Manager of the Year
Risk leadership perspectives Risk Manager of the YearRisk leadership perspectives Risk Manager of the Year
Risk leadership perspectives Risk Manager of the Year
 
Risk Management in Five Easy Pieces
Risk Management in Five Easy PiecesRisk Management in Five Easy Pieces
Risk Management in Five Easy Pieces
 
Risk analysis
Risk analysisRisk analysis
Risk analysis
 
Delivering Business Value By Applying Agile Principles To Business Continuity...
Delivering Business Value By Applying Agile Principles To Business Continuity...Delivering Business Value By Applying Agile Principles To Business Continuity...
Delivering Business Value By Applying Agile Principles To Business Continuity...
 
Srm
SrmSrm
Srm
 
Erm
ErmErm
Erm
 
Canga.m.wood.j
Canga.m.wood.jCanga.m.wood.j
Canga.m.wood.j
 
Chap5
Chap5Chap5
Chap5
 
Risk Management Basics for Globalization Projects
Risk Management Basics for Globalization ProjectsRisk Management Basics for Globalization Projects
Risk Management Basics for Globalization Projects
 
Why Traditional Risk Management fails in the Oil+Gas Sector
Why Traditional Risk Management fails in the Oil+Gas SectorWhy Traditional Risk Management fails in the Oil+Gas Sector
Why Traditional Risk Management fails in the Oil+Gas Sector
 
Enterprise Risk Management - Deddy Jacobus
Enterprise Risk Management - Deddy JacobusEnterprise Risk Management - Deddy Jacobus
Enterprise Risk Management - Deddy Jacobus
 
12.0 risk management agile+evm (v10.2)
12.0 risk management agile+evm (v10.2)12.0 risk management agile+evm (v10.2)
12.0 risk management agile+evm (v10.2)
 
Software Engineering Risk Management Software Application
Software Engineering Risk Management   Software ApplicationSoftware Engineering Risk Management   Software Application
Software Engineering Risk Management Software Application
 
Applying risk radar (v2)
Applying risk radar (v2)Applying risk radar (v2)
Applying risk radar (v2)
 
Workshop project risk management (29 june 2012)
Workshop   project risk management (29 june 2012)Workshop   project risk management (29 june 2012)
Workshop project risk management (29 june 2012)
 

Semelhante a EY Risk Management Guide

CONF. 404- Effective risk management and avoiding project disasters. A pragma...
CONF. 404- Effective risk management and avoiding project disasters. A pragma...CONF. 404- Effective risk management and avoiding project disasters. A pragma...
CONF. 404- Effective risk management and avoiding project disasters. A pragma...PMI-Montréal
 
Microsoft power point risk governance-schreckenberg_swissre_idrc_2012
Microsoft power point   risk governance-schreckenberg_swissre_idrc_2012Microsoft power point   risk governance-schreckenberg_swissre_idrc_2012
Microsoft power point risk governance-schreckenberg_swissre_idrc_2012Global Risk Forum GRFDavos
 
Enterprise Risk Management - Deddy Jacobus
Enterprise Risk Management - Deddy JacobusEnterprise Risk Management - Deddy Jacobus
Enterprise Risk Management - Deddy JacobusDeddy Jacobus
 
Project Management Risks Review
Project Management Risks ReviewProject Management Risks Review
Project Management Risks ReviewDavid Tennant
 
Enabling Embedded Business Continuity
Enabling Embedded Business ContinuityEnabling Embedded Business Continuity
Enabling Embedded Business ContinuityMustafa KILIC
 

Semelhante a EY Risk Management Guide (20)

CONF. 404- Effective risk management and avoiding project disasters. A pragma...
CONF. 404- Effective risk management and avoiding project disasters. A pragma...CONF. 404- Effective risk management and avoiding project disasters. A pragma...
CONF. 404- Effective risk management and avoiding project disasters. A pragma...
 
Riskpro Insurance Services Ver5
Riskpro Insurance Services Ver5Riskpro Insurance Services Ver5
Riskpro Insurance Services Ver5
 
Riskpro Insurance Services Ver5
Riskpro Insurance Services Ver5Riskpro Insurance Services Ver5
Riskpro Insurance Services Ver5
 
Microsoft power point risk governance-schreckenberg_swissre_idrc_2012
Microsoft power point   risk governance-schreckenberg_swissre_idrc_2012Microsoft power point   risk governance-schreckenberg_swissre_idrc_2012
Microsoft power point risk governance-schreckenberg_swissre_idrc_2012
 
Risk management benchmarking 2013
Risk management benchmarking 2013Risk management benchmarking 2013
Risk management benchmarking 2013
 
Risk Management Benchmarking
Risk Management BenchmarkingRisk Management Benchmarking
Risk Management Benchmarking
 
Risk management benchmarking 2013
Risk management benchmarking 2013Risk management benchmarking 2013
Risk management benchmarking 2013
 
Risk management benchmarking 2013
Risk management benchmarking 2013Risk management benchmarking 2013
Risk management benchmarking 2013
 
Riskpro Insurance Advisory Services
Riskpro Insurance Advisory ServicesRiskpro Insurance Advisory Services
Riskpro Insurance Advisory Services
 
Riskpro Insurance Advisory Services
Riskpro Insurance Advisory ServicesRiskpro Insurance Advisory Services
Riskpro Insurance Advisory Services
 
Riskpro insurance advisory services 2013
Riskpro insurance advisory services 2013Riskpro insurance advisory services 2013
Riskpro insurance advisory services 2013
 
Enterprise Risk Management - Deddy Jacobus
Enterprise Risk Management - Deddy JacobusEnterprise Risk Management - Deddy Jacobus
Enterprise Risk Management - Deddy Jacobus
 
Erm public workshop
Erm public workshopErm public workshop
Erm public workshop
 
People Risk Collateral
People Risk CollateralPeople Risk Collateral
People Risk Collateral
 
People Risk Collateral
People Risk CollateralPeople Risk Collateral
People Risk Collateral
 
Project Management Risks Review
Project Management Risks ReviewProject Management Risks Review
Project Management Risks Review
 
Enabling Embedded Business Continuity
Enabling Embedded Business ContinuityEnabling Embedded Business Continuity
Enabling Embedded Business Continuity
 
People risk collateral 2013
People risk collateral 2013People risk collateral 2013
People risk collateral 2013
 
People risk collateral 2013
People risk collateral 2013People risk collateral 2013
People risk collateral 2013
 
People risk collateral 2013
People risk collateral 2013People risk collateral 2013
People risk collateral 2013
 

Mais de guesta09d518

W2 Proc Si It A Bus Nerozumi
W2 Proc Si It A Bus NerozumiW2 Proc Si It A Bus Nerozumi
W2 Proc Si It A Bus Nerozumiguesta09d518
 
W1 Hausmann Jarabko
W1 Hausmann JarabkoW1 Hausmann Jarabko
W1 Hausmann Jarabkoguesta09d518
 
Rybnicek Icz Final
Rybnicek Icz FinalRybnicek Icz Final
Rybnicek Icz Finalguesta09d518
 
Knop Ceska Sporitelna
Knop Ceska SporitelnaKnop Ceska Sporitelna
Knop Ceska Sporitelnaguesta09d518
 
Bpm2009 Vyhlaseni Vysledku Na Web
Bpm2009 Vyhlaseni Vysledku Na WebBpm2009 Vyhlaseni Vysledku Na Web
Bpm2009 Vyhlaseni Vysledku Na Webguesta09d518
 

Mais de guesta09d518 (7)

W2 Proc Si It A Bus Nerozumi
W2 Proc Si It A Bus NerozumiW2 Proc Si It A Bus Nerozumi
W2 Proc Si It A Bus Nerozumi
 
W1 Hausmann Jarabko
W1 Hausmann JarabkoW1 Hausmann Jarabko
W1 Hausmann Jarabko
 
Rybnicek Icz Final
Rybnicek Icz FinalRybnicek Icz Final
Rybnicek Icz Final
 
Krelina Ge
Krelina GeKrelina Ge
Krelina Ge
 
Knop Ceska Sporitelna
Knop Ceska SporitelnaKnop Ceska Sporitelna
Knop Ceska Sporitelna
 
15 Trhon Sestak
15 Trhon Sestak15 Trhon Sestak
15 Trhon Sestak
 
Bpm2009 Vyhlaseni Vysledku Na Web
Bpm2009 Vyhlaseni Vysledku Na WebBpm2009 Vyhlaseni Vysledku Na Web
Bpm2009 Vyhlaseni Vysledku Na Web
 

Último

Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 

Último (20)

Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 

EY Risk Management Guide

  • 1. Risk Management Jonathon Simon, Senior Manager, Ernst & Young 2nd June 2009
  • 2. Agenda 1 2 3 4 5 6 7 1 Introduction 2 Risk – An EY context 3 What is risk management? 4 The risk management lifecycle 5 Good and bad risk management practice 6 Critical success factors for managing risk 7 Communicating risk to stakeholders Page 2 2nd June 2009 Risk Management
  • 3. Introduction 1 2 3 4 5 6 7 Jonathon Simon ► Senior Manager in the Programme Advisory Services team within the IT Advisory practice for Ernst & Young. ► Project Management Institute (PMI) certified Project management Professional (PMP). ► Over 15 years industry experience in managing large projects. ► Prior to joining Ernst & Young, worked for a global IT service provider as a Senior Project Manager fulfilling project and programme assignments for blue chip clients in the private sector. ► Current Chair of the UK PMI London Events Committee. Page 3 2nd June 2009 Risk Management
  • 4. Risk – an EY context 1 2 3 4 5 6 7 ► Ernst and Young is engaged globally in seeking to identify leading practices in the area of risk management. ► Our work with companies around the world suggests that there is a body of leading risk management practice emerging, but many companies are still doing little in this area. ► Our research has shown that, while strategic risks have become more important, companies have been focusing on the easier-to-manage area of operational risk. ► The implications for different sectors are blurred. Even within each sector, the risks for each company may vary. ► Most programs and projects encounter at least one of the following ► Cost and schedule overruns ► Schedule delays ► Defects ► Benefits not realised ► Project cancellations ► Loss of stakeholder confidence ► No matter what program or project is undertaken, appropriate control and management of risk is essential. Page 4 2nd June 2009 Risk Management
  • 5. Risk – an EY context 1 2 3 4 5 6 7 Keep us out of trouble Make our business better Regulatory Enhanced Improved non-compliance Schedule delays capability visibility and Goal transparency Unanticipated business impact Cost overruns Enhanced Increase accountability business value of initiatives Loss of Post completion stakeholder defects Increased confidence confidence Achieve Project Unrealized sustainable Increased cancellations benefits changes predictability All too confusing and overdone… Must do it… Except when we get in trouble but how do we do it better? Page 5 2nd June 2009 Risk Management
  • 6. What is risk management? 1 2 3 4 5 6 7 ► Many types of risk exist in an organisation ► This presentation will focus on risks within projects ►A project risk is defined as the probability of an undesirable event occurring or a desirable event failing to occur and the consequential impact of and on the project. ► Project risk management is a structured process that allows individual risk events and overall project risk to be understood and managed proactively, optimising project success by minimising threats and maximising opportunities. Association for project management Page 6 2nd June 2009 Risk Management
  • 7. The risk management lifecycle 1 2 3 4 5 6 7 Monitor and Control Monitor and Control Risk Planning Risk Planning Risks Risks Proximity Respond to Risks Respond to Risks Identify Risks Identify Risks The 3 dimensions of risk Impact Probability Qualitative Risk Qualitative Risk Quantitative Risk Quantitative Risk Analysis Analysis Analysis Analysis Page 7 2nd June 2009 Risk Management
  • 8. Good and bad risk management practice 1 2 3 4 5 6 7 Good Practice Bad Practice 1. Clear risk responsibilities 1. No clear responsibilities 2. Clarity of risk ownership 2. Lack of risk ownership including senior sponsors 3. No process for managing risks 3. Shared understanding of how 4. No guidelines for managing risks will be managed and escalating risks 4. Effective methods of assessing 5. No process for monitoring and and escalating risks updating risks 5. Risks are monitored and good 6. Risks are not reviewed and quality information is captured action is not taken to address 6. Risks are reviewed as an risks integral part of performance management Page 8 2nd June 2009 Risk Management
  • 9. Integrated Risk Management 1 2 3 4 5 6 7 Corporate, Programme and Project Risks Direction, Strategy Focus on a strategic enterprise level governance Knowing where to go of the delivery of an organisation’s complete portfolio of transformational programmes and projects to support the organisation’s strategic Corporate goals Outcome, Benefit Inf rs 2. Focus on the delivery of a strategic change to ive orm Doing the right Programme the organisational state comprising a linked set of Dr projects and / or activities that are coordinated things s Management and managed as a unit such that they achieve outcomes and realise benefits Eg, delivery of games and legacy Output, Product Focus on the delivery of a unique set of Doing things 3. Project coordinated activities, with clearly articulated start and end points, which is undertaken by an right Management individual or team to meet specific objectives within defined time, cost and performance parameters as specified in the business case Eg, Construction of a new building There must be alignment and escalation from one level to another Page 9 2nd June 2009 Risk Management
  • 10. EY Case Study – Government Health Project 1 2 3 4 5 6 7 Situation… ► A government department running a programme supporting a significant government health initiative ► Risk management was performed at an operational and strategic level ► No defined process for risk escalation ► Lack of risk ownership at the executive board level Consequence ► Risks were not addressed on a timely basis ► Lack of visibility of risks at a senior level ► Potential for the project to fail to deliver its scope of work within time and budget Actions taken… ► Implemented a robust risk escalation process ► Developed a risk dashboard that communicated a high level summary of risks to executive board members ► Conducted analysis and developed mitigating actions to reduce risks to an acceptable level ► Embedded risks review within the project management processes ► Implemented a communications process for mitigating actions, timelines and ownership Result ► Clear roles and responsibilities for risk management ► Project wide understanding of the process for managing risks ► Visibility of risks at a senior level and actioning of risks within acceptable timeframe Page 10 2nd June 2009 Risk Management
  • 11. Critical success factors for managing risk 1 2 3 4 5 6 7 ► Be proactive - to be successful the organisation should be committed to addressing risk management proactively and consistently throughout the project. ► Conduct a regular risk assessment - that defines key risks and weights the impact on business drivers. ► Conduct scenario planning - for major risks identify and develop a number of operational responses. ► Evaluate your project’s ability to manage risks - ensure that the risk management process is linked to the actual risks that the business faces. ► Undertake effective monitoring and control processes - to give both early warning and improved ability to respond. ► Keep an open mind - about where the risks can come from. Page 11 2nd June 2009 Risk Management
  • 12. Communicating risk to stakeholders 1 2 3 4 5 6 7 1 - Cannot operate without (no ability to trade) 2 - Workarounds available (limited ability to trade) 3 - Does not impact on ability to operate / trade KEY Criticality 3 Position on grid: priority and criticality of project Priority - Proximity of time requirement for completion Criticality - Ability of business to function without capability Focus management attention, project resource and reporting on: • Projects which are time critical and impact ability to trade (top right hand corner) Size of circle: degree of risk associated to project 2 • Projects impacting on overall programme (large circles) H • Projects which are not on track (red circles) L M Aim to push projects away from proximity to axis L – Risk impact within project M – Risk impact within IS H – Risk impact to programme 1 Color of circle: current project status R – Project late against plan (delay to critical path) 1 - Completion required for first wave of movement A – Project at risk of slipping 2 - Workarounds available (inhibits movement) 3 - Completion not mandatory for movement G – Project on track against plan 1 2 3 Priority Page 12 2nd June 2009 Risk Management