SlideShare uma empresa Scribd logo
1 de 71
February 6, 2009 “ We Commission, Army Strong” EAGLE BATTALION STAFF CALL 7 SEPTEMBER 2010
AGENDA ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010
S-1 C/CPT Graf (Personnel) Eagle Battalion 2010
Eagle Battalion Strength Overall Eagle Battalion 2010 G 100-90% A 89-80% R 79-70% B < 69% On Roster Average Personnel Attending Average Personnel Absent  Average Personnel Excused Average Percent Change  Overall Status 224 171 24 20 +10% A
Battalion Strength Status Eagle Battalion 2010 G G B R R G 100-90% A 89-80% R 79-70% B < 69% Unit On Roster Personnel Regularly Attending Average Personnel Absent Average Personnel Excused Average % change in Attendance Status HHC 26 16 0 10 0 G A Co. 58 52 3 3 +10% G B Co. 57 48 7 2 +50% A C Co. 37 33 2 2 +13% G D Co. 46 33 11 2 +13% R
S-1 Report Eagle Battalion 2010 A A - Leadership Matrix - PT / Lab Roster G 100-90% A 89-80% R 79-70% B < 69% Item Last Update Status Notes Telephone Roster 2 SEP 2010 A -Phone roster is being updated as new cadets are joining. Contracted Personnel Tracker 2 SEP 2010 A -Company leadership will have new count of contracted cadets by 9 SEP 2010 Master Roster 2 SEP 2010 A -Company Leadership will be sent a copy and have it verified and gaps/missing info put in
S-2 C/CPT France (Intelligence) Eagle Battalion 2010
Weather Data Eagle Battalion 2010 G 100-90% A 89-80% R 79-70% B < 69% Wednesday 9/8 Thursday 9/9 Friday 9/10 Monday 9/13 Tuesday 9/14 High 90 91 92 85 85 Low 70 69 70 66 66 Weather Part. Cloudy Part. Cloudy Sunny Part. Cloudy Mostly Sunny Rain % 10% 20% 0% 20% 10% Event PT Class/Lab PT PT Class/Staff Call
Weather Data Eagle Battalion 2010 G 100-90% A 89-80% R 79-70% B < 69% Item Last Update Status Notes Security Clearance 2 SEP Allen, S Brinson, W Davis, E Moore, B Ryan, D Turyshin, I See Ms. Jackie immediately to complete/input clearances 104-Rs 2 SEP Badger, A Badger, I Hare Kates Postell, D Green, K  See Ms. Jackie immediately AKO 2 SEP Green, K See Ms. Jackie immediately
[object Object],[object Object],[object Object],[object Object],[object Object],6 September 2010 Eagle Battalion 2010
S-3 C/MAJ Veal (Operations) ‏ Eagle Battalion 2010 Eagle Battalion 2010
September   2010 MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SAT / SUN  1 2 3 4/5 6 7 8 9 10 11/12 PT: RAC pavilion (0630) Lab: MS I- D&C  MS II- Land Nav MS III-  Land Nav (1600) MS I, II, III Tactical Road March  RAC pavillion (0600) 13 14 15 16 17 18/19 PT: RAC pavilion (0630) Staff Call: ROTC Bldg (1530) PT: RAC pavilion (0630) Lab: MS I- D&C MS II- Land Nav  MS III- Land Nav PT: RAC pavilion (0630) MS IV APFT (0530) LDAV Fort Stewart 20 21 22 23 24 25/26 PT: Company RAC pavilion (0630) Staff Call: ROTC Bldg (1530) CA-Russell Union (1900) MS III- Ruck March RAC pavilion  MS I&II- Battle PT (0600) Lab: MS I- Rappelling MS II- Land Nav MS III- Action on OBJ APFT: RAC pavilion (0530) 27 28 29 30 PT: RAC pavilion (0630) Staff Call : ROTC Bldg (1530) CA- Russell Union (1900) PT: RAC pavilion (0630) Lab: MS I- D&C MS II- ? MS III- Squad Attack walk through PT: Company Stakes (0600)
February 6, 2009 06-12SEP10 ,[object Object],[object Object],Monday 6 Tuesday 7 Wednesday 8 Thursday 9 Friday 10 Saturday/Sunday  11/12 PT: RAC pavilion (0630) Lab: MS I- D&C MS II- Land Nav (ROTC Bldg MS III-  Land Nav (Stadium) (1600) MS I, II, III Tactical Road March  RAC pavillion (0600) 22 23 24 25 26 27/28 PT: Ability Group 0630 Rem. PT (0600) Staff Call PT: Ability Group 0630 Rem. PT (0600) Lab: STX(Ambush) PT: Ability Group 0630
Eagle Battalion 2010 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Eagle Battalion 2010 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010
Eagle Battalion 2010
February 6, 2009 13-19SEP10 ,[object Object],[object Object],Monday 13 Tuesday 14 Wednesday 15 Thursday 16 Friday 17 Saturday/Sunday  18/19 PT: RAC pavilion (0630) Staff Call: ROTC Bldg (1530) PT: RAC pavilion (0630) Lab: MS I- D&C (Stadium) MS II-  Land Nav (ROTC Bldg) MS III- Land Nav (Stadium) (1600) PT: RAC pavilion (0630) MS IV APFT (0530) LDAV Fort Stewart 22 23 24 25 26 27/28 PT: Ability Group 0630 Rem. PT (0600) Staff Call PT: Ability Group 0630 Rem. PT (0600) Lab: STX(Ambush) PT: Ability Group 0630
Eagle Battalion 2010 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010
[object Object],[object Object],February 6, 2009 Monday 20 Tuesday 21 Wednesday 22 Thursday 23 Friday 24 Saturday/Sunday  25/26 PT: Company RAC pavilion (0630) Staff Call: ROTC Bldg (1530) CA-Russell Union (1900) PT: Company- RAC Pavilion (0630) Lab: MS I- Rappelling (Towere) MS II-  Land Nav (ROTC Bldg) MS III- Action on OBJ (Stadium) (1600) APFT: RAC pavilion (0530) 22 23 24 25 26 27/28 PT: Ability Group 0630 Rem. PT (0600) Staff Call PT: Ability Group 0630 Rem. PT (0600) Lab: STX(Ambush) PT: Ability Group 0630
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010
Eagle Battalion 2010 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Eagle Battalion 2010 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010
Events Eagle Battalion 2010 Push-up Sit-up Grid RAC Fields 2 Mile Run Laps- x3 HT/WHT START FINISH Eagle Battalion 2010
October   2010 Eagle Battalion 2010 MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SAT / SUN  1 2/3 FTX PCI (0600) 4 5 6 7 8 9/10 CA- Russell Union (1900) PT: Ruck March FTX PCI (1600) PT: Company Stakes 11 12 13 14 15 16/17 PT: Bat Run Last Day to Withdraw CA- Russell Union (1900) Fall FTX Kiwanis Fair 18 19 20 21 22 23/24 Kiwanis Fair Kiwanis Fair CA- Russell Union (1900) Kiwanis Fair Kiwanis Fair Kiwanis Fair PT: Company Stakes Kiwanis Fair 25 26 27 28 29 30/31 Early Registration (Contracted Cadets) CA- Russell Union (1900)
November   2010 Eagle Battalion 2010 MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SAT / SUN  1 2 3 4 5 6/7 CA- Russell Union (1900) Homecoming Classes cancelled after 2pm 8 9 10 11 12 13/14 CA- Russell Union (1900) 15 16 17 18 19 20/21 CA- Russell Union (1900) 22 23 24 25 26 27/28 Thanksgiving Thanksgiving CA- Russell Union (1900) Thanksgiving Thanksgiving Thanksgiving 29 30 31 CA- Russell Union (1900)
Eagle Battalion 2010 Date Event 23 August 2010 APFT 18 August 2010 LDNAV 24 September 2010 APFT 17-19 September 2010 Kiwanis Fair 14-16 October 2010 RC Competition  15-17 October 2010 Fall FTX 30 October 2010 Military Appreciation Day 5 November 2010 Homecoming Parade  TBD Mid-Terms 11 November 2010 Veterans Day 22-26 November 2010 Thanksgiving  10 December 2010 Commissioning  6-9 December 2010 Finals
S-4 C/CPT Holder  ‏ Supply Eagle Battalion 2010
Eagle Battalion 2010 S4 Trackers In Progress Item Last Update Status Notes HOLDING ROSTER 02 SEP 10 B Ms.Blair and I need to recover items from cadets no longer in the program. MS4 COMPASS TURN IN 02 SEP 10 B As of 02SEP only 8 Compasses have been received from MSIV’s.  LAND NAV 02 SEP 10 B Will be issuing compasses to MS-3 cadets Wednesday at PT G 100-90% A 89-80% R 79-70% B < 69%
Eagle Battalion 2010 S-5 C/CPT   Manning (Public Affairs) Eagle Battalion 2010
Eagle Battalion 2010 Topic/Event Updated Status Notes Newsletter 3 SEPT 10 A In progress Eagle Card 3 SEPT 10 A Working with S-6 to get on website Table at Rotunda 3 SEPT 10 A Waiting for approval Gmail Calendar 3 SEPT 10 G Updated 3 SEPT 10 Bruster’s Fundraiser 3 SEPT 10 A Waiting for approval
Eagle Battalion 2010 S-6 C/CPT   Newton Eagle Battalion 2010
We Commission Army Strong Eagle Battalion 2010 Communication We Commission Army Strong Eagle Battalion  Event Updated Status Notes Website 2 SEPT 10 G Alumni page. -Alumni w/o photo have US Army Logo -Reformatted alumni page into a table -Added 5 new alumni to page Cadet Leadership page now online! MSG Braet information updated. Need SFC Lynn’s Bio for site Spring Photos 2 SEPT 10 A Contacted GSU photographer again IOT acquire photos. Eagle Battalion
Eagle Battalion 2010 Ranger Challenge C/CPT   Williams Eagle Battalion 2010
September   2010 MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SAT / SUN  1 2 3 4/5 6 7 8 9 10 11/12 -Long Run  PT -Morning Time Pool PT - Hunter Zodiac  -5K Race (Pooler) 13 14 15 16 17 18/19 -Upper Body PT (Cross Fit) -Rope Bridge Practice - Interval Run PT -Morning Event (TBA) - Ruck PT (TBA) -L. Nav/ O.Course 20 21 22 23 24 25/26 -Interval Run PT -Rope Bridge Practice  -Upper Body PT (Cross Fit) -Swim PT -Possible O-Course -No PT Test For RC -Same Arrival Time as BTN -Long Run PT:6 Mile ( 27 28 29 30 -Upper Body PT (Cross Fit) -Rope Bridge Practice - Interval Run PT -Morning Event (TBA)
Week of Sept. 6-11 Eagle Battalion 2010 ,[object Object],[object Object],[object Object],[object Object],6 7 8 9 10 11/12 -Rope Bridge Practice -Long Run  PT -Morning Time Pool PT - Hunter Zodiac  -5K Race (Pooler)
[object Object],[object Object],[object Object],[object Object],Tuesday, September 7   Eagle Battalion 2010
Wednesday, September 8 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010
Friday, September 10 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010
Saturday, September 11 ,[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010
Week of September 13- 18 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010 13 14 15 16 17 18/19 -Upper Body PT (Cross Fit) -Rope Bridge Practice - Interval Run PT -Morning Event (TBA) - Ruck PT (TBA) -L. Nav/ O.Course
Week   of September 20-24  ,[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010 20 21 22 23 24 25/26 -Interval Run PT -Rope Bridge Practice  -Upper Body PT (Cross Fit) -Swim PT -Possible O-Course? -No PT Test For RC -Same Arrival Time as BTN -Long Run PT:6 Mile
Alpha Co C/CPT Bush Eagle Battalion 2010
Alpha Company A R A A A R B Eagle Battalion 2010 Event Last Update Status Notes Personnel Issues 02 Sept 2010 G None Attendance Trends - PT 02 Sept 2010 G (90%) Attendance-Lab 02 Sept 2010 G (93%) Equipment Issues 02 Sept 2010 A Turned in to Supply Monday, 06Sept2010 TRAINING STATUS 02 Sept 2010 P Fixing Supply Issues Improving PT G 100-90% A 89-80% R 79-70% B < 69%
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010
Bravo Co C/CPT Southerland Eagle Battalion 2010
Bravo Company R Eagle Battalion 2010 R R A A A Event Last Update Status Notes Personnel Issues 7SEP 2010 A Hester, Ebony (8) Attendance Trends - PT 7SEP 2010 G 95% for Contracted  A 84% for Non-contracted  Attendance Trends - Lab 7SEP 2010 G 100% for Contracted G 93 % for Non-contracted  Equipment Issues 7SEP 2010 G How many compasses do we have? Training Goals 7SEP2010 G 260 APFT average, Land Navigation TRAINING STATUS 7SEP 2010 P Working on PT, Fundamentals of Land Navigation G 100-90% A 89-80% R 79-70% B < 69%
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010 Eagle Battalion 2010
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010 Eagle Battalion 2010
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010 Eagle Battalion 2010
Charlie Co C/XO Cambrelen Eagle Battalion 2010
Delta Company A R A A R R B A R A Eagle Battalion 2010 R B A A Event Last Update Status Notes Personnel Issues 2SEP2010 G Garcia, Mike Attendance Trends - PT 2SEP2010 G 100% for Contracted (1/1)  G Non Contracted (33/36) 90% Attendance Trends - Lab 2SEP 2010 G 100% for Contracted (1/1) G Non Contracted (35/36) 97% Equipment Issues 2SEP2010 G None Training Goals 2SEP2010 MS1’s score 200 or better on 2nd PT test and are familiar with cadet creed TRAINING STATUS 2SEP2010 P PT & D&C G 100-90% A 89-80% R 79-70% B < 69%
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010 A
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010
Delta Co C/CPT Holston Eagle Battalion 2010
Eagle Battalion 2010 Event Last Update Status Notes Personnel Issues 2SEP 2010 G 100% Attendance Trends - PT 2 SEP 2010 R 76%Non Contracted White, Googe, Zimmerman,Ericson 1/1Contracted Carrasquillo Attendance Trends - Lab 2 SEP 2010 R 79% No-shows Equipment Issues 2 SEP 2010 G 100% Training Goals 20 SEP 2010 G ,[object Object],[object Object],[object Object],TRAINING STATUS 2SEP 2010 P Need Practice in Self Confidence,  D&C and organization between ROTC and school
We Commission Army Strong ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010 Eagle Battalion
We Commission Army Strong ,[object Object],[object Object],[object Object],[object Object],Eagle Battalion 2010 Eagle Battalion
We Commission Army Strong Delta Co. PT -Mon 13 SEP2010 -Company Formation and Stretching - I minute of Circuit Training Exercises -Sprints in between each Exercise -Cool Down and Stretching Eagle Battalion 2010 Eagle Battalion
CSM C/CSM Thomas Eagle Battalion 2010
XO C/MAJ Lape Eagle Battalion 2010
BN CDR C/LTC Kuss Eagle Battalion 2010

Mais conteúdo relacionado

Mais procurados

15FEB2011 Staff Call Slides
15FEB2011 Staff Call Slides15FEB2011 Staff Call Slides
15FEB2011 Staff Call SlidesGSU Army ROTC
 
Staff Call Slides 21 Feb 2012
Staff Call Slides 21 Feb 2012Staff Call Slides 21 Feb 2012
Staff Call Slides 21 Feb 2012GSU Army ROTC
 
26APR2011 Staff Call Slides
26APR2011 Staff Call Slides26APR2011 Staff Call Slides
26APR2011 Staff Call SlidesGSU Army ROTC
 
8MAR2011 Staff Call Slides
8MAR2011 Staff Call Slides8MAR2011 Staff Call Slides
8MAR2011 Staff Call SlidesGSU Army ROTC
 
Staff Call 25JAN2011
Staff Call 25JAN2011Staff Call 25JAN2011
Staff Call 25JAN2011GSU Army ROTC
 
Ref 2 1-160 in air assault assessment (a3) concept brief, august 2013
Ref 2   1-160 in air assault assessment (a3) concept brief, august 2013Ref 2   1-160 in air assault assessment (a3) concept brief, august 2013
Ref 2 1-160 in air assault assessment (a3) concept brief, august 2013chuckcastle
 
Cansat 2008: University of Michigan Victor V Final Presentation
Cansat 2008: University of Michigan Victor V Final PresentationCansat 2008: University of Michigan Victor V Final Presentation
Cansat 2008: University of Michigan Victor V Final PresentationAmerican Astronautical Society
 
26October2010 Staff Call
26October2010 Staff Call26October2010 Staff Call
26October2010 Staff CallGSU Army ROTC
 
Goddard Space Flight Ctr. Presentation by Chris Scolese
Goddard Space Flight Ctr. Presentation by Chris ScoleseGoddard Space Flight Ctr. Presentation by Chris Scolese
Goddard Space Flight Ctr. Presentation by Chris ScoleseWallopsIslandRegionalAlliance
 
ResumeSupReg9.16.16
ResumeSupReg9.16.16ResumeSupReg9.16.16
ResumeSupReg9.16.16Jude Jean
 

Mais procurados (13)

15FEB2011 Staff Call Slides
15FEB2011 Staff Call Slides15FEB2011 Staff Call Slides
15FEB2011 Staff Call Slides
 
retirement.pkg
retirement.pkgretirement.pkg
retirement.pkg
 
Staff Call Slides 21 Feb 2012
Staff Call Slides 21 Feb 2012Staff Call Slides 21 Feb 2012
Staff Call Slides 21 Feb 2012
 
26APR2011 Staff Call Slides
26APR2011 Staff Call Slides26APR2011 Staff Call Slides
26APR2011 Staff Call Slides
 
8MAR2011 Staff Call Slides
8MAR2011 Staff Call Slides8MAR2011 Staff Call Slides
8MAR2011 Staff Call Slides
 
VMET_Document
VMET_DocumentVMET_Document
VMET_Document
 
Staff Call 25JAN2011
Staff Call 25JAN2011Staff Call 25JAN2011
Staff Call 25JAN2011
 
Ref 2 1-160 in air assault assessment (a3) concept brief, august 2013
Ref 2   1-160 in air assault assessment (a3) concept brief, august 2013Ref 2   1-160 in air assault assessment (a3) concept brief, august 2013
Ref 2 1-160 in air assault assessment (a3) concept brief, august 2013
 
Cansat 2008: University of Michigan Victor V Final Presentation
Cansat 2008: University of Michigan Victor V Final PresentationCansat 2008: University of Michigan Victor V Final Presentation
Cansat 2008: University of Michigan Victor V Final Presentation
 
26October2010 Staff Call
26October2010 Staff Call26October2010 Staff Call
26October2010 Staff Call
 
Goddard Space Flight Ctr. Presentation by Chris Scolese
Goddard Space Flight Ctr. Presentation by Chris ScoleseGoddard Space Flight Ctr. Presentation by Chris Scolese
Goddard Space Flight Ctr. Presentation by Chris Scolese
 
ResumeSupReg9.16.16
ResumeSupReg9.16.16ResumeSupReg9.16.16
ResumeSupReg9.16.16
 
MS4 Matrix
MS4 Matrix MS4 Matrix
MS4 Matrix
 

Semelhante a 07Sept 2010 Staff Call

Staff Call Slides 30 Mar10
Staff Call Slides 30 Mar10Staff Call Slides 30 Mar10
Staff Call Slides 30 Mar10GSU Army ROTC
 
1FEB2011 Staff Call Slides
1FEB2011 Staff Call Slides1FEB2011 Staff Call Slides
1FEB2011 Staff Call SlidesGSU Army ROTC
 
05 October Staff Call
05 October Staff Call 05 October Staff Call
05 October Staff Call GSU Army ROTC
 
C:\documents and settings\student\desktop\bn staff call_slides_25_apr_10
C:\documents and settings\student\desktop\bn staff call_slides_25_apr_10C:\documents and settings\student\desktop\bn staff call_slides_25_apr_10
C:\documents and settings\student\desktop\bn staff call_slides_25_apr_10GSU Army ROTC
 
Staff call slides 31 jan final
Staff call slides 31 jan finalStaff call slides 31 jan final
Staff call slides 31 jan finalJustin Jay
 
19APR 2011 Staff Call Slides
19APR 2011 Staff Call Slides19APR 2011 Staff Call Slides
19APR 2011 Staff Call SlidesGSU Army ROTC
 
Staff call slides 28 FEB 2012
Staff call slides 28 FEB 2012Staff call slides 28 FEB 2012
Staff call slides 28 FEB 2012GSU Army ROTC
 
BOLC FTX OPORD Brief
BOLC FTX OPORD BriefBOLC FTX OPORD Brief
BOLC FTX OPORD Briefwethe1ma
 
Danger Close Live Fire Brief
Danger Close Live Fire BriefDanger Close Live Fire Brief
Danger Close Live Fire BriefDavid Fritz
 
PYLKIN ,Oleksiy AHTS MASTER - SDPO
PYLKIN ,Oleksiy AHTS MASTER - SDPOPYLKIN ,Oleksiy AHTS MASTER - SDPO
PYLKIN ,Oleksiy AHTS MASTER - SDPOOleksiy Pylkin
 
30 aug traing slides
30 aug traing slides30 aug traing slides
30 aug traing slidesJohn Aaron
 

Semelhante a 07Sept 2010 Staff Call (17)

Staff Call Slides 30 Mar10
Staff Call Slides 30 Mar10Staff Call Slides 30 Mar10
Staff Call Slides 30 Mar10
 
28 Sept Staff Call
28 Sept Staff Call28 Sept Staff Call
28 Sept Staff Call
 
1FEB2011 Staff Call Slides
1FEB2011 Staff Call Slides1FEB2011 Staff Call Slides
1FEB2011 Staff Call Slides
 
05 October Staff Call
05 October Staff Call 05 October Staff Call
05 October Staff Call
 
C:\documents and settings\student\desktop\bn staff call_slides_25_apr_10
C:\documents and settings\student\desktop\bn staff call_slides_25_apr_10C:\documents and settings\student\desktop\bn staff call_slides_25_apr_10
C:\documents and settings\student\desktop\bn staff call_slides_25_apr_10
 
Staff call slides 31 jan final
Staff call slides 31 jan finalStaff call slides 31 jan final
Staff call slides 31 jan final
 
19APR 2011 Staff Call Slides
19APR 2011 Staff Call Slides19APR 2011 Staff Call Slides
19APR 2011 Staff Call Slides
 
Staff call slides 28 FEB 2012
Staff call slides 28 FEB 2012Staff call slides 28 FEB 2012
Staff call slides 28 FEB 2012
 
Camp horne ftx
Camp horne ftxCamp horne ftx
Camp horne ftx
 
Camp horne ftx
Camp horne ftxCamp horne ftx
Camp horne ftx
 
BOLC FTX OPORD Brief
BOLC FTX OPORD BriefBOLC FTX OPORD Brief
BOLC FTX OPORD Brief
 
CV
CVCV
CV
 
Danger Close Live Fire Brief
Danger Close Live Fire BriefDanger Close Live Fire Brief
Danger Close Live Fire Brief
 
23rd annual nca pdt agenda (09 june2011)
23rd annual nca pdt agenda (09 june2011)23rd annual nca pdt agenda (09 june2011)
23rd annual nca pdt agenda (09 june2011)
 
Eduardo Lim
Eduardo LimEduardo Lim
Eduardo Lim
 
PYLKIN ,Oleksiy AHTS MASTER - SDPO
PYLKIN ,Oleksiy AHTS MASTER - SDPOPYLKIN ,Oleksiy AHTS MASTER - SDPO
PYLKIN ,Oleksiy AHTS MASTER - SDPO
 
30 aug traing slides
30 aug traing slides30 aug traing slides
30 aug traing slides
 

Mais de GSU Army ROTC

August 28th Staff Call
August 28th Staff CallAugust 28th Staff Call
August 28th Staff CallGSU Army ROTC
 
21st Aug. 2012 Staff call
21st Aug. 2012 Staff call 21st Aug. 2012 Staff call
21st Aug. 2012 Staff call GSU Army ROTC
 
1 may staff call slide
1 may staff call slide1 may staff call slide
1 may staff call slideGSU Army ROTC
 
Apr24 staffcall slides
Apr24 staffcall slidesApr24 staffcall slides
Apr24 staffcall slidesGSU Army ROTC
 
Dining out spring 2012
Dining out spring 2012Dining out spring 2012
Dining out spring 2012GSU Army ROTC
 
Dining out ettiquette
Dining out ettiquetteDining out ettiquette
Dining out ettiquetteGSU Army ROTC
 
Apr17 staffcall slides
Apr17 staffcall slidesApr17 staffcall slides
Apr17 staffcall slidesGSU Army ROTC
 
Staff call slides 10 APR
Staff call slides 10 APRStaff call slides 10 APR
Staff call slides 10 APRGSU Army ROTC
 
Staff call slides 03 April 2012
Staff call slides 03 April 2012Staff call slides 03 April 2012
Staff call slides 03 April 2012GSU Army ROTC
 
Staff call slides 27 MAR
Staff call slides 27 MARStaff call slides 27 MAR
Staff call slides 27 MARGSU Army ROTC
 
Staff call slides 20 mar
Staff call slides 20 marStaff call slides 20 mar
Staff call slides 20 marGSU Army ROTC
 
Staff call slides 06 mar2012
Staff call slides 06 mar2012Staff call slides 06 mar2012
Staff call slides 06 mar2012GSU Army ROTC
 
Staff call slides 14 Feb
Staff call slides 14 FebStaff call slides 14 Feb
Staff call slides 14 FebGSU Army ROTC
 
Staff call slides 07 feb 2012
Staff call slides 07 feb 2012Staff call slides 07 feb 2012
Staff call slides 07 feb 2012GSU Army ROTC
 
Squad attack_approved
Squad attack_approvedSquad attack_approved
Squad attack_approvedGSU Army ROTC
 
Georgia Southern ROTC's 2nd Annual 1 Mile Crawl, Walk or Run 5K
Georgia Southern ROTC's 2nd Annual 1 Mile Crawl, Walk or Run 5KGeorgia Southern ROTC's 2nd Annual 1 Mile Crawl, Walk or Run 5K
Georgia Southern ROTC's 2nd Annual 1 Mile Crawl, Walk or Run 5KGSU Army ROTC
 
Georgia Southern ROTC's 2nd Annual 5K Crawl, Walk, Run
Georgia Southern ROTC's 2nd Annual 5K Crawl, Walk, RunGeorgia Southern ROTC's 2nd Annual 5K Crawl, Walk, Run
Georgia Southern ROTC's 2nd Annual 5K Crawl, Walk, RunGSU Army ROTC
 

Mais de GSU Army ROTC (20)

September 04 2012
September 04 2012 September 04 2012
September 04 2012
 
August 28th Staff Call
August 28th Staff CallAugust 28th Staff Call
August 28th Staff Call
 
21st Aug. 2012 Staff call
21st Aug. 2012 Staff call 21st Aug. 2012 Staff call
21st Aug. 2012 Staff call
 
1 may staff call slide
1 may staff call slide1 may staff call slide
1 may staff call slide
 
Apr24 staffcall slides
Apr24 staffcall slidesApr24 staffcall slides
Apr24 staffcall slides
 
ASU MS1-3 example
ASU MS1-3 exampleASU MS1-3 example
ASU MS1-3 example
 
Dining out spring 2012
Dining out spring 2012Dining out spring 2012
Dining out spring 2012
 
Dining Out 2012
Dining Out 2012Dining Out 2012
Dining Out 2012
 
Dining out ettiquette
Dining out ettiquetteDining out ettiquette
Dining out ettiquette
 
Apr17 staffcall slides
Apr17 staffcall slidesApr17 staffcall slides
Apr17 staffcall slides
 
Staff call slides 10 APR
Staff call slides 10 APRStaff call slides 10 APR
Staff call slides 10 APR
 
Staff call slides 03 April 2012
Staff call slides 03 April 2012Staff call slides 03 April 2012
Staff call slides 03 April 2012
 
Staff call slides 27 MAR
Staff call slides 27 MARStaff call slides 27 MAR
Staff call slides 27 MAR
 
Staff call slides 20 mar
Staff call slides 20 marStaff call slides 20 mar
Staff call slides 20 mar
 
Staff call slides 06 mar2012
Staff call slides 06 mar2012Staff call slides 06 mar2012
Staff call slides 06 mar2012
 
Staff call slides 14 Feb
Staff call slides 14 FebStaff call slides 14 Feb
Staff call slides 14 Feb
 
Staff call slides 07 feb 2012
Staff call slides 07 feb 2012Staff call slides 07 feb 2012
Staff call slides 07 feb 2012
 
Squad attack_approved
Squad attack_approvedSquad attack_approved
Squad attack_approved
 
Georgia Southern ROTC's 2nd Annual 1 Mile Crawl, Walk or Run 5K
Georgia Southern ROTC's 2nd Annual 1 Mile Crawl, Walk or Run 5KGeorgia Southern ROTC's 2nd Annual 1 Mile Crawl, Walk or Run 5K
Georgia Southern ROTC's 2nd Annual 1 Mile Crawl, Walk or Run 5K
 
Georgia Southern ROTC's 2nd Annual 5K Crawl, Walk, Run
Georgia Southern ROTC's 2nd Annual 5K Crawl, Walk, RunGeorgia Southern ROTC's 2nd Annual 5K Crawl, Walk, Run
Georgia Southern ROTC's 2nd Annual 5K Crawl, Walk, Run
 

07Sept 2010 Staff Call

  • 1. February 6, 2009 “ We Commission, Army Strong” EAGLE BATTALION STAFF CALL 7 SEPTEMBER 2010
  • 2.
  • 3. S-1 C/CPT Graf (Personnel) Eagle Battalion 2010
  • 4. Eagle Battalion Strength Overall Eagle Battalion 2010 G 100-90% A 89-80% R 79-70% B < 69% On Roster Average Personnel Attending Average Personnel Absent Average Personnel Excused Average Percent Change Overall Status 224 171 24 20 +10% A
  • 5. Battalion Strength Status Eagle Battalion 2010 G G B R R G 100-90% A 89-80% R 79-70% B < 69% Unit On Roster Personnel Regularly Attending Average Personnel Absent Average Personnel Excused Average % change in Attendance Status HHC 26 16 0 10 0 G A Co. 58 52 3 3 +10% G B Co. 57 48 7 2 +50% A C Co. 37 33 2 2 +13% G D Co. 46 33 11 2 +13% R
  • 6. S-1 Report Eagle Battalion 2010 A A - Leadership Matrix - PT / Lab Roster G 100-90% A 89-80% R 79-70% B < 69% Item Last Update Status Notes Telephone Roster 2 SEP 2010 A -Phone roster is being updated as new cadets are joining. Contracted Personnel Tracker 2 SEP 2010 A -Company leadership will have new count of contracted cadets by 9 SEP 2010 Master Roster 2 SEP 2010 A -Company Leadership will be sent a copy and have it verified and gaps/missing info put in
  • 7. S-2 C/CPT France (Intelligence) Eagle Battalion 2010
  • 8. Weather Data Eagle Battalion 2010 G 100-90% A 89-80% R 79-70% B < 69% Wednesday 9/8 Thursday 9/9 Friday 9/10 Monday 9/13 Tuesday 9/14 High 90 91 92 85 85 Low 70 69 70 66 66 Weather Part. Cloudy Part. Cloudy Sunny Part. Cloudy Mostly Sunny Rain % 10% 20% 0% 20% 10% Event PT Class/Lab PT PT Class/Staff Call
  • 9. Weather Data Eagle Battalion 2010 G 100-90% A 89-80% R 79-70% B < 69% Item Last Update Status Notes Security Clearance 2 SEP Allen, S Brinson, W Davis, E Moore, B Ryan, D Turyshin, I See Ms. Jackie immediately to complete/input clearances 104-Rs 2 SEP Badger, A Badger, I Hare Kates Postell, D Green, K See Ms. Jackie immediately AKO 2 SEP Green, K See Ms. Jackie immediately
  • 10.
  • 11. S-3 C/MAJ Veal (Operations) ‏ Eagle Battalion 2010 Eagle Battalion 2010
  • 12. September 2010 MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SAT / SUN 1 2 3 4/5 6 7 8 9 10 11/12 PT: RAC pavilion (0630) Lab: MS I- D&C MS II- Land Nav MS III- Land Nav (1600) MS I, II, III Tactical Road March RAC pavillion (0600) 13 14 15 16 17 18/19 PT: RAC pavilion (0630) Staff Call: ROTC Bldg (1530) PT: RAC pavilion (0630) Lab: MS I- D&C MS II- Land Nav MS III- Land Nav PT: RAC pavilion (0630) MS IV APFT (0530) LDAV Fort Stewart 20 21 22 23 24 25/26 PT: Company RAC pavilion (0630) Staff Call: ROTC Bldg (1530) CA-Russell Union (1900) MS III- Ruck March RAC pavilion MS I&II- Battle PT (0600) Lab: MS I- Rappelling MS II- Land Nav MS III- Action on OBJ APFT: RAC pavilion (0530) 27 28 29 30 PT: RAC pavilion (0630) Staff Call : ROTC Bldg (1530) CA- Russell Union (1900) PT: RAC pavilion (0630) Lab: MS I- D&C MS II- ? MS III- Squad Attack walk through PT: Company Stakes (0600)
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32. Events Eagle Battalion 2010 Push-up Sit-up Grid RAC Fields 2 Mile Run Laps- x3 HT/WHT START FINISH Eagle Battalion 2010
  • 33. October 2010 Eagle Battalion 2010 MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SAT / SUN 1 2/3 FTX PCI (0600) 4 5 6 7 8 9/10 CA- Russell Union (1900) PT: Ruck March FTX PCI (1600) PT: Company Stakes 11 12 13 14 15 16/17 PT: Bat Run Last Day to Withdraw CA- Russell Union (1900) Fall FTX Kiwanis Fair 18 19 20 21 22 23/24 Kiwanis Fair Kiwanis Fair CA- Russell Union (1900) Kiwanis Fair Kiwanis Fair Kiwanis Fair PT: Company Stakes Kiwanis Fair 25 26 27 28 29 30/31 Early Registration (Contracted Cadets) CA- Russell Union (1900)
  • 34. November 2010 Eagle Battalion 2010 MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SAT / SUN 1 2 3 4 5 6/7 CA- Russell Union (1900) Homecoming Classes cancelled after 2pm 8 9 10 11 12 13/14 CA- Russell Union (1900) 15 16 17 18 19 20/21 CA- Russell Union (1900) 22 23 24 25 26 27/28 Thanksgiving Thanksgiving CA- Russell Union (1900) Thanksgiving Thanksgiving Thanksgiving 29 30 31 CA- Russell Union (1900)
  • 35. Eagle Battalion 2010 Date Event 23 August 2010 APFT 18 August 2010 LDNAV 24 September 2010 APFT 17-19 September 2010 Kiwanis Fair 14-16 October 2010 RC Competition 15-17 October 2010 Fall FTX 30 October 2010 Military Appreciation Day 5 November 2010 Homecoming Parade TBD Mid-Terms 11 November 2010 Veterans Day 22-26 November 2010 Thanksgiving 10 December 2010 Commissioning 6-9 December 2010 Finals
  • 36. S-4 C/CPT Holder ‏ Supply Eagle Battalion 2010
  • 37. Eagle Battalion 2010 S4 Trackers In Progress Item Last Update Status Notes HOLDING ROSTER 02 SEP 10 B Ms.Blair and I need to recover items from cadets no longer in the program. MS4 COMPASS TURN IN 02 SEP 10 B As of 02SEP only 8 Compasses have been received from MSIV’s. LAND NAV 02 SEP 10 B Will be issuing compasses to MS-3 cadets Wednesday at PT G 100-90% A 89-80% R 79-70% B < 69%
  • 38. Eagle Battalion 2010 S-5 C/CPT Manning (Public Affairs) Eagle Battalion 2010
  • 39. Eagle Battalion 2010 Topic/Event Updated Status Notes Newsletter 3 SEPT 10 A In progress Eagle Card 3 SEPT 10 A Working with S-6 to get on website Table at Rotunda 3 SEPT 10 A Waiting for approval Gmail Calendar 3 SEPT 10 G Updated 3 SEPT 10 Bruster’s Fundraiser 3 SEPT 10 A Waiting for approval
  • 40. Eagle Battalion 2010 S-6 C/CPT Newton Eagle Battalion 2010
  • 41. We Commission Army Strong Eagle Battalion 2010 Communication We Commission Army Strong Eagle Battalion Event Updated Status Notes Website 2 SEPT 10 G Alumni page. -Alumni w/o photo have US Army Logo -Reformatted alumni page into a table -Added 5 new alumni to page Cadet Leadership page now online! MSG Braet information updated. Need SFC Lynn’s Bio for site Spring Photos 2 SEPT 10 A Contacted GSU photographer again IOT acquire photos. Eagle Battalion
  • 42. Eagle Battalion 2010 Ranger Challenge C/CPT Williams Eagle Battalion 2010
  • 43. September 2010 MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SAT / SUN 1 2 3 4/5 6 7 8 9 10 11/12 -Long Run PT -Morning Time Pool PT - Hunter Zodiac -5K Race (Pooler) 13 14 15 16 17 18/19 -Upper Body PT (Cross Fit) -Rope Bridge Practice - Interval Run PT -Morning Event (TBA) - Ruck PT (TBA) -L. Nav/ O.Course 20 21 22 23 24 25/26 -Interval Run PT -Rope Bridge Practice -Upper Body PT (Cross Fit) -Swim PT -Possible O-Course -No PT Test For RC -Same Arrival Time as BTN -Long Run PT:6 Mile ( 27 28 29 30 -Upper Body PT (Cross Fit) -Rope Bridge Practice - Interval Run PT -Morning Event (TBA)
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51. Alpha Co C/CPT Bush Eagle Battalion 2010
  • 52. Alpha Company A R A A A R B Eagle Battalion 2010 Event Last Update Status Notes Personnel Issues 02 Sept 2010 G None Attendance Trends - PT 02 Sept 2010 G (90%) Attendance-Lab 02 Sept 2010 G (93%) Equipment Issues 02 Sept 2010 A Turned in to Supply Monday, 06Sept2010 TRAINING STATUS 02 Sept 2010 P Fixing Supply Issues Improving PT G 100-90% A 89-80% R 79-70% B < 69%
  • 53.
  • 54. Bravo Co C/CPT Southerland Eagle Battalion 2010
  • 55. Bravo Company R Eagle Battalion 2010 R R A A A Event Last Update Status Notes Personnel Issues 7SEP 2010 A Hester, Ebony (8) Attendance Trends - PT 7SEP 2010 G 95% for Contracted A 84% for Non-contracted Attendance Trends - Lab 7SEP 2010 G 100% for Contracted G 93 % for Non-contracted Equipment Issues 7SEP 2010 G How many compasses do we have? Training Goals 7SEP2010 G 260 APFT average, Land Navigation TRAINING STATUS 7SEP 2010 P Working on PT, Fundamentals of Land Navigation G 100-90% A 89-80% R 79-70% B < 69%
  • 56.
  • 57.
  • 58.
  • 59. Charlie Co C/XO Cambrelen Eagle Battalion 2010
  • 60. Delta Company A R A A R R B A R A Eagle Battalion 2010 R B A A Event Last Update Status Notes Personnel Issues 2SEP2010 G Garcia, Mike Attendance Trends - PT 2SEP2010 G 100% for Contracted (1/1) G Non Contracted (33/36) 90% Attendance Trends - Lab 2SEP 2010 G 100% for Contracted (1/1) G Non Contracted (35/36) 97% Equipment Issues 2SEP2010 G None Training Goals 2SEP2010 MS1’s score 200 or better on 2nd PT test and are familiar with cadet creed TRAINING STATUS 2SEP2010 P PT & D&C G 100-90% A 89-80% R 79-70% B < 69%
  • 61.
  • 62.
  • 63.
  • 64. Delta Co C/CPT Holston Eagle Battalion 2010
  • 65.
  • 66.
  • 67.
  • 68. We Commission Army Strong Delta Co. PT -Mon 13 SEP2010 -Company Formation and Stretching - I minute of Circuit Training Exercises -Sprints in between each Exercise -Cool Down and Stretching Eagle Battalion 2010 Eagle Battalion
  • 69. CSM C/CSM Thomas Eagle Battalion 2010
  • 70. XO C/MAJ Lape Eagle Battalion 2010
  • 71. BN CDR C/LTC Kuss Eagle Battalion 2010