Introduction to Lean
Manufacturing

Trainers: Priyank Tewari and Shashank Sharma

2

What is Lean Manufacturing?
• A systematic approach to the identification
and elimination of all forms of waste
from the production process
• Lean concepts were initially developed
and implemented by the Toyota Motor
Corporation

1
08-01-2014

3

What is Lean Manufacturing?
• In simple words, it is a methodology that
reduces your costs by eliminating wastes in
your production processes and increases
the profit margin and the morale of your
enterprise
• Techniques like: 5S, JIT, KANBAN,
KAIZEN, POKA YOKE, SOP, 6-Sigma

4

Overview of Lean Management
• The purpose of lean is to remove all
forms of waste from the value
stream.
▫ Waste includes cycle time, labor,
materials, and energy.

• The chief obstacle is the fact that
waste often hides in plain sight, or is
built into activities.

2
08-01-2014

5

“If LEAN MANAGEMENT principles
are applied to Manufacturing, it is
called LEAN MANUFACTURING”

6

4 basic principles of Lean Management
1. Elimination of Waste: eliminate any activities that do
not add value in an organization. Includes
overproduction, waiting time, processing, inventory, and
motion.
2. Increased Speed and Response: better process
designs allow efficient responses to customers needs
and the competitive environment.
3. Improved Quality: Poor quality creates waste, so
improving quality is essential to the lean environment.
4. Reduced Cost: simplifying processes and improving
efficiency translates to reduced costs.

3
08-01-2014

7

Concept of Friction, Waste, or Muda

“Understanding of friction, waste, or
muda is the foundation of the lean
Manufacturing”

8

7 type of wastes in Manufacturing
1.
2.
3.
4.
5.
6.
7.

Transportation (between workstations, or
between supplier and customer)
Inventory
Motion
Waiting, including time in queue
Over-production
Over-processing: Non-value-adding activities
Defects: Cost of poor quality, scrap, rework,
and inspection

4
08-01-2014

9

TIM WOOD!

10

An 8th waste has also been identified
• Un-utilized or under-utilized talent
• Arises when companies do not involve all of their
employees in continuous improvement

5
08-01-2014

11

Waste Often Hides in Plain View
• We cannot eliminate the waste of
material, labor, or other resources
until we recognize it as waste.
▫ A job can consist of 75 percent waste (or even
more).

• People become used to "living with it"
or "working around it."

12

Demonstration of waste
• The solution is obvious in retrospect, but first,
we have to understand that there is waste (or a
problem).
• Building a wall
• Cleaning dirty parts

6
08-01-2014

13

“Waiting” waste – A golf analogy
• In a four hour golf game, the golf club is in
contact with the ball for less than 2 seconds
▫ The same proportion of value-adding to nonvalue-adding time prevails in many factories.

• Additional analogies:
▫ Waiting for other players = waiting for tools
▫ Walking = transportation
▫ Selecting a club and addressing the ball = setup

14

7
08-01-2014

15

7 type of wastes in Services
1. Delay: Customers waiting for service
2. Duplication: Re-entering data or repeating details
3. Unnecessary Movement: poor ergonomics while delivering
the service
4. Unclear communication: Excessive clarification or
communication over use of the service
5. Incorrect Inventory: Out of stock
6. Opportunity lost: Lost customers which now have to be
retained
7. Errors: Transaction errors, lost/damaged goods

16

What do Manufacturing greats say about waste?
"I believe that the average farmer puts to a really useful
purpose only about 5 per cent. of the energy he expends.
… Not only is everything done by hand, but seldom is a
thought given to a logical arrangement. A farmer doing
his chores will walk up and down a rickety ladder a dozen
times. He will carry water for years instead of putting in a
few lengths of pipe. His whole idea, when there is extra
work to do, is to hire extra men. He thinks of putting
money into improvements as an expense. … It is waste
motion— waste effort— that makes farm prices high and
profits low"

--- (Henry Ford, 1922, My Life and Work).

8
08-01-2014

17

Eliminating waste can lead to reduced
costs and better bottom line or profit
margins
• Exercise <insert case study>

18

Industrial Sector faces problems related to
production and processes
1. Production with defects
2. Wastage in the use of resources
3. Bad product quality
4. De-motivated employees
5. High yields on expense of customer satisfaction

9
08-01-2014

19

Manufacturers are always worrying!
1. Transport
2. Inventory
3. Motion
4. Waiting

Manufacturers
have to
constantly worry
about eliminating
these wastes!

5. Overproduction
6. Over Processing
7. Defects

20

Why should Manufacturers worry?
1. This leads to high cost of production which greatly
impacts the profit margins
2. Big manufacturing enterprises like Railways, Maruti,
Tata Motors, JCB etc. want only high quality, zero defect
products to be sourced from the MSMEs
3. Foreign players coming due to FDI will only purchase
products from companies which have the most sound
production processes
4. Competition is becoming increasingly fierce and there is
no room for errors or wastes in your production
processes

10
08-01-2014

21

What are the benefits of Lean
Manufacturing?
1. Improved profit margins and reduced costs
2. Improved quality and fewer defects
3. Reduced Inventory
4. Space requirement decreases
5. Enhanced overall manufacturing flexibility
6. Makes continuous improvement possible
7. Creates safer working environment
8. Improves employee morale

22

Green Lean Manufacturing
• "…we will not so lightly waste material simply
because we can reclaim it—for salvage involves
labour. The ideal is to have nothing to salvage."
—Henry Ford, Today and Tomorrow

• Pioneered by Henry Ford in the 1900’s

11
08-01-2014

23

Ford's Green Manufacturing
• Recovery and reuse of solvents
• Distillation of waste wood for chemicals yielded
enough money to pay 2000 workers.
▫ Kingsford charcoal

• Design of parts and processes to minimize
machining waste
• Reuse of packaging materials
• Slag
paving materials and cement

24

Identification of Material and Energy
Wastes
• Material and energy waste can easily be built
into a job.
• Elimination of these wastes is central to "green"
manufacturing and the ISO 14001 standard and,
more importantly, very profitable.
• We cannot, however, remove this waste before
we identify it.

12
08-01-2014

25

Discussion
• Do you know of processes in which materials are
thrown away (or recycled)?
▫ If so, can the process or product be redesigned to
reduce the waste?
▫ Could the discarded materials be reused or
recycled in some manner?

• Can energy-intensive processes be made more
efficient?

26

power source
regeneration

13
08-01-2014

27

Lean Manufacturing
Tools & Techniques

28

5S - CANDO
• 5S-CANDO, a systematic approach to cleaning and
organizing the workplace, suppresses friction.
• Seiri (Sort)= Clearing up
▫ "When in doubt, throw it out."

• Seiton (Set in order)= Organizing (Arranging)
▫ "A place for everything and everything in its place."

• Seiso (Shine)= Cleaning (Neatness)
• Seiketsu (Standardize)= Standardization (Ongoing
improvement, holding the gains)
• Shitsuke (Sustain)= Discipline

14
08-01-2014

29

Visual Control
• "Basically, the intent is to make the status of the
operation clearly visible to anyone observing
that operation" (Wayne Smith, 1998).
• "Visual controls identify waste, abnormalities, or
departures from standards" (Caravaggio, in
Levinson, 1998)

30

Examples of Visual Control
• 5S-CANDO (arranging)
• Jidoka or automation
▫ Andon lights and buzzers announce tool status.

• JIT: kanban squares, cards, containers.
▫ Lines on the floor to mark reorder points

• Safety: colored labels for materials
• Statistical process control charts: should be
clearly visible.

15
08-01-2014

31

Visible Management
• A visible production management system
should indicate:
(1) What the operation is trying to make
Measure the takt rate, or desired
production per unit time.
(2)What the operation is achieving
(3)What problems hinder the production goal?

32

Just in Time (JIT) system
• In a pull system, employees at a given operation
(work station) go to the source of the required
parts, such as machining or subassembly, and
withdraw the units as they need them.
• By pulling parts from each preceding workstation,
the entire manufacturing process is synchronized to
the final-assembly schedule.
• Finished goods are made to coincide with the actual
rate of customer demand, resulting in minimal
inventories and maximum responsiveness.

16
08-01-2014

33

Just in Time (JIT) system
• JIT systems are sometimes called a Kanban
system.
• A kanban is a flag or a piece of paper that
contains all relevant information for an order.
• Slips, called kanban cards, are circulated within
the system to initiate withdrawal and production
items through the production process.
• The Kanban cards are simple visual controls.

34

Small Batch and Single-Piece Flow
• Batching is the process of producing large
quantities of items as a group before being
transferred to the next operation.
• Lean operating systems seek to reduce batch
sizes using single-piece flow.
• A transfer batch is part of the original batch
(lot) size that is completed at one workstation
and moved to the next downstream
workstation.

17
08-01-2014

35

Drawbacks of Batch Processing
• Running equipment (e.g. a heat treatment
furnace) at less than full load, wastes capacity.
Waiting for a full load wastes time.
▫ Waste of capacity is not a problem except at a
constraint operation (Goldratt's Theory of
Constraints).

• Batches introduce waiting time when they arrive
at single-unit tools en masse.
▫ Batch-and-queue forces extra cycle time (waiting) into
the operation.

36

Batch versus Single-Piece Flow
Processing

18
08-01-2014

37

Single-Unit Processing Reduces Cycle
Time
• Wayne Smith (1998) defines manufacturing
cycle efficiency as (Value-adding time)/(Total
cycle time)
▫ This is often less than 1 percent.
▫ Remember the Golf analogy: the club head is in
contact with the ball for less than two seconds in a
typical game.

38

Single-Minute Exchange of Die (SMED)
1. Internal setup requires the tool to stop.
▫

Reduce internal setup time, or convert internal
to external setup.

2. External setup can be performed while the tool
is working on another job.
3. SMED reduces cycle time by facilitating smaller
lot sizes, mixed model production, and/or
single-unit flow

19
08-01-2014

39

Single-Minute Exchange of Die (SMED)
• SMED refers to quick setup or changeover of
tooling and fixtures in processes so that
multiple products in smaller batches can be run
on the same equipment.
• Reducing setup time frees up capacity that can
be producing output, and therefore, generating
revenue.
• Example: An Oil company reduced machine
setup from 9.3 hours to 9 minutes!

40

Error-Proofing (Poka-Yoke)
• Error-proofing makes it difficult or impossible to
do the job the wrong way.
• Slots and keys, for example, prevent parts from
being assembled the wrong way.
• Process recipes and data entry also can be errorproofed.

20
08-01-2014

41

Lean Six - Sigma
• Six Sigma and Lean concepts and methods are
often combined into Lean Six Sigma
• Both are driven by customer requirements
• Both try to eliminate waste, reduce costs, speed
things up, and improve quality
• Both focus on real money savings
• Both rely on a systematic methodology

42

Quality at source
• Quality at the Source
• Quality at the source focuses on doing it right the
first time.

• Continuous Improvement
• Six Sigma compliments lean systems to assure
high-quality output.

21
08-01-2014

43

Total Productive Maintenance
• TPM is focused on ensuring that operating systems
will perform their intended function reliably.
• TPM works to prevent equipment failures and
downtime, maximizing equipment effectiveness and
uptime.
• TPM tries to predict equipment failure rates and
perform maintenance before a problem arises.
• The principles of TPM also include employee
“ownership” of the equipment.

44

KAIZEN
• Japanese word meaning
▫ Kai - gradual and orderly change, Zen for the better

• involves everyone in the organization
in small improvements using
conventional knowledge and tools
• without large capital investments.

22
08-01-2014

45

KAIZEN
• SDCA to PDCA – standardized work [Deming’s
cycle]
• Quality first
▫ If something can be improved, a measure must exist
by which improvement can be quantified – quality
characteristics

• Upstream management
• Speak with data
• Variability control and recurrence prevention

46

Key Steps in Transforming
a Company to the Lean Approach
1. Establish a steering team—conduct strategic
planning session
2. Train the steering team and the model line team in
the disciplines of lean
3. Perform PQR (product-quantity-routing) analysis
4. Identify value streams—select a value stream
5. Calculate model line takt time
6. Value stream map the model line—assemble current
state map
7. Balance the line—assign standard work
8. Establish standard WIP (inventory levels)
9. Test the system (virtual cell)—document results

23
08-01-2014

47

Key Steps in Transforming
a Company to the Lean Approach
10.
11.
12.
13.
14.
15.
16.
17.

Setup reduction event
Conduct 5S event—apply TPM techniques
Establish visual signals—reduce paperwork
Explore alternative flow patterns
Develop block layout
Develop detailed layout
Execute move
Select next value stream and repeat

48

Lean Leadership
• Three Models:
1. “Old” Dictator style: “Do it MY way”
2. The 1980’s “Empowerment” style: “Do it
YOUR way”
3. “Lean” style: “Follow me and let’s figure this
out together”

24
08-01-2014

49

Summary
• Business activities can contain enormous
quantities of built-in waste (muda, friction).
• The greatest obstacle to the waste's removal is
usually failure to recognize it.
• Lean manufacturing includes techniques for
recognition and removal of the waste.
• This delivers an overwhelming competitive
advantage.

50

A journey of continuous improvement

25

Mais conteúdo relacionado

Mais procurados

Gagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmtGagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmtGagan Pareek, PMP
 
Just in Time and Lean Manufacturing
Just in Time and Lean ManufacturingJust in Time and Lean Manufacturing
Just in Time and Lean Manufacturingshahroze11
 
Just in time technology (JIT)
Just in time technology (JIT)Just in time technology (JIT)
Just in time technology (JIT)Akash Dutta
 
Just in time (jit) and lean production
Just in time (jit) and lean productionJust in time (jit) and lean production
Just in time (jit) and lean productionهشام جملة
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in TimeMusfiqur Rahman
 
just in time management
just in time managementjust in time management
just in time managementumesh yadav
 
Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Dr. Mahmoud Al-Naimi
 
Lean production System - TPS
Lean production System - TPSLean production System - TPS
Lean production System - TPSPrakash Prakash
 
JIT and lean operations
JIT and lean operationsJIT and lean operations
JIT and lean operationsRajThakuri
 
Jit principles
Jit principlesJit principles
Jit principlesamarshelke
 
Lean journey from changodar to colombo - case study of pump mfg. company - 3r...
Lean journey from changodar to colombo - case study of pump mfg. company - 3r...Lean journey from changodar to colombo - case study of pump mfg. company - 3r...
Lean journey from changodar to colombo - case study of pump mfg. company - 3r...ADD VALUE CONSULTING Inc
 

Mais procurados (20)

WASTE ELIMINATION
WASTE ELIMINATIONWASTE ELIMINATION
WASTE ELIMINATION
 
Just-In-Time
Just-In-TimeJust-In-Time
Just-In-Time
 
Gagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmtGagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmt
 
Just in Time and Lean Manufacturing
Just in Time and Lean ManufacturingJust in Time and Lean Manufacturing
Just in Time and Lean Manufacturing
 
Just in time technology (JIT)
Just in time technology (JIT)Just in time technology (JIT)
Just in time technology (JIT)
 
3mu
3mu3mu
3mu
 
Lean system
Lean systemLean system
Lean system
 
Just in time (jit) and lean production
Just in time (jit) and lean productionJust in time (jit) and lean production
Just in time (jit) and lean production
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in Time
 
just in time management
just in time managementjust in time management
just in time management
 
Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)
 
Lean production System - TPS
Lean production System - TPSLean production System - TPS
Lean production System - TPS
 
BASICS OF LEAN MANUFACTURING
BASICS OF LEAN MANUFACTURINGBASICS OF LEAN MANUFACTURING
BASICS OF LEAN MANUFACTURING
 
jit
jitjit
jit
 
JIT and lean operations
JIT and lean operationsJIT and lean operations
JIT and lean operations
 
Jit
JitJit
Jit
 
Just in time
Just in timeJust in time
Just in time
 
Lean manufacturing principles
Lean manufacturing principlesLean manufacturing principles
Lean manufacturing principles
 
Jit principles
Jit principlesJit principles
Jit principles
 
Lean journey from changodar to colombo - case study of pump mfg. company - 3r...
Lean journey from changodar to colombo - case study of pump mfg. company - 3r...Lean journey from changodar to colombo - case study of pump mfg. company - 3r...
Lean journey from changodar to colombo - case study of pump mfg. company - 3r...
 

Destaque

Reforming Thailand: Thailand's 81 Years in Masking Deictatorship
Reforming Thailand: Thailand's 81 Years in Masking DeictatorshipReforming Thailand: Thailand's 81 Years in Masking Deictatorship
Reforming Thailand: Thailand's 81 Years in Masking DeictatorshipNarong Chokwatana
 
6 key steps to a successful wellness program
6 key steps to a successful wellness program6 key steps to a successful wellness program
6 key steps to a successful wellness programwellsource10789
 
สงครามแย่งชิงประชาชน
สงครามแย่งชิงประชาชนสงครามแย่งชิงประชาชน
สงครามแย่งชิงประชาชนNarong Chokwatana
 
การเมืองประชาธิปไตย : การต่อสู้และชัยชนะของประชาชน (ตื่นเถิดชาวไทย)
การเมืองประชาธิปไตย : การต่อสู้และชัยชนะของประชาชน (ตื่นเถิดชาวไทย)การเมืองประชาธิปไตย : การต่อสู้และชัยชนะของประชาชน (ตื่นเถิดชาวไทย)
การเมืองประชาธิปไตย : การต่อสู้และชัยชนะของประชาชน (ตื่นเถิดชาวไทย)Narong Chokwatana
 
ปฏิรูปประเทศไทย …เอา…การเมืองชั่วร้ายเผด็จการอำพรางจากการเลือกตั้งและประชาธิป...
ปฏิรูปประเทศไทย …เอา…การเมืองชั่วร้ายเผด็จการอำพรางจากการเลือกตั้งและประชาธิป...ปฏิรูปประเทศไทย …เอา…การเมืองชั่วร้ายเผด็จการอำพรางจากการเลือกตั้งและประชาธิป...
ปฏิรูปประเทศไทย …เอา…การเมืองชั่วร้ายเผด็จการอำพรางจากการเลือกตั้งและประชาธิป...Narong Chokwatana
 
Perubahan Fisiologi dan Psikologi pada Masa Nifas
Perubahan Fisiologi dan Psikologi pada Masa NifasPerubahan Fisiologi dan Psikologi pada Masa Nifas
Perubahan Fisiologi dan Psikologi pada Masa NifasNurul Amalia
 

Destaque (17)

Reforming Thailand: Thailand's 81 Years in Masking Deictatorship
Reforming Thailand: Thailand's 81 Years in Masking DeictatorshipReforming Thailand: Thailand's 81 Years in Masking Deictatorship
Reforming Thailand: Thailand's 81 Years in Masking Deictatorship
 
6 key steps to a successful wellness program
6 key steps to a successful wellness program6 key steps to a successful wellness program
6 key steps to a successful wellness program
 
Session 3
Session 3Session 3
Session 3
 
สงครามแย่งชิงประชาชน
สงครามแย่งชิงประชาชนสงครามแย่งชิงประชาชน
สงครามแย่งชิงประชาชน
 
Session 4
Session 4Session 4
Session 4
 
การเมืองประชาธิปไตย : การต่อสู้และชัยชนะของประชาชน (ตื่นเถิดชาวไทย)
การเมืองประชาธิปไตย : การต่อสู้และชัยชนะของประชาชน (ตื่นเถิดชาวไทย)การเมืองประชาธิปไตย : การต่อสู้และชัยชนะของประชาชน (ตื่นเถิดชาวไทย)
การเมืองประชาธิปไตย : การต่อสู้และชัยชนะของประชาชน (ตื่นเถิดชาวไทย)
 
ปฏิรูปประเทศไทย …เอา…การเมืองชั่วร้ายเผด็จการอำพรางจากการเลือกตั้งและประชาธิป...
ปฏิรูปประเทศไทย …เอา…การเมืองชั่วร้ายเผด็จการอำพรางจากการเลือกตั้งและประชาธิป...ปฏิรูปประเทศไทย …เอา…การเมืองชั่วร้ายเผด็จการอำพรางจากการเลือกตั้งและประชาธิป...
ปฏิรูปประเทศไทย …เอา…การเมืองชั่วร้ายเผด็จการอำพรางจากการเลือกตั้งและประชาธิป...
 
Session 5
Session 5Session 5
Session 5
 
Chapters 21 23 ecology
Chapters 21 23 ecology Chapters 21 23 ecology
Chapters 21 23 ecology
 
Chapter 6 7 ecology
Chapter 6 7 ecologyChapter 6 7 ecology
Chapter 6 7 ecology
 
Chapters 17 20 ecology
Chapters 17 20 ecologyChapters 17 20 ecology
Chapters 17 20 ecology
 
Chapters 8 11 ecology
Chapters 8 11 ecologyChapters 8 11 ecology
Chapters 8 11 ecology
 
Inorganic nutrients
Inorganic nutrientsInorganic nutrients
Inorganic nutrients
 
Applications of biotechnology in cancer
Applications of biotechnology in cancerApplications of biotechnology in cancer
Applications of biotechnology in cancer
 
Perubahan Fisiologi dan Psikologi pada Masa Nifas
Perubahan Fisiologi dan Psikologi pada Masa NifasPerubahan Fisiologi dan Psikologi pada Masa Nifas
Perubahan Fisiologi dan Psikologi pada Masa Nifas
 
Dissolved oxygen
Dissolved oxygenDissolved oxygen
Dissolved oxygen
 
Dictatorship gets out
Dictatorship gets outDictatorship gets out
Dictatorship gets out
 

Semelhante a Session 1 2 (20)

Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
Identifying Waste
Identifying WasteIdentifying Waste
Identifying Waste
 
Lean-TAREQ.pptx
Lean-TAREQ.pptxLean-TAREQ.pptx
Lean-TAREQ.pptx
 
Identifying Lean Waste
Identifying Lean WasteIdentifying Lean Waste
Identifying Lean Waste
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
 
3 lean thinking & jit
3 lean thinking & jit3 lean thinking & jit
3 lean thinking & jit
 
Lean management and six sigma
Lean management and six sigmaLean management and six sigma
Lean management and six sigma
 
Lean six sigma 3d
Lean six sigma 3dLean six sigma 3d
Lean six sigma 3d
 
LEAN
LEANLEAN
LEAN
 
Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)Lean - PPT (Lean manufacturing and six sigma)
Lean - PPT (Lean manufacturing and six sigma)
 
Lean Office by Operational Excellence Consulting
Lean Office by Operational Excellence ConsultingLean Office by Operational Excellence Consulting
Lean Office by Operational Excellence Consulting
 
materials info
materials infomaterials info
materials info
 
Waste
WasteWaste
Waste
 
Lean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.pptLean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.ppt
 
Lean manufanturing
Lean manufanturingLean manufanturing
Lean manufanturing
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Kaizen
KaizenKaizen
Kaizen
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systems
 

Último

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterMateoGardella
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 

Último (20)

Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 

Session 1 2

  • 1. 08-01-2014 1 Introduction to Lean Manufacturing Trainers: Priyank Tewari and Shashank Sharma 2 What is Lean Manufacturing? • A systematic approach to the identification and elimination of all forms of waste from the production process • Lean concepts were initially developed and implemented by the Toyota Motor Corporation 1
  • 2. 08-01-2014 3 What is Lean Manufacturing? • In simple words, it is a methodology that reduces your costs by eliminating wastes in your production processes and increases the profit margin and the morale of your enterprise • Techniques like: 5S, JIT, KANBAN, KAIZEN, POKA YOKE, SOP, 6-Sigma 4 Overview of Lean Management • The purpose of lean is to remove all forms of waste from the value stream. ▫ Waste includes cycle time, labor, materials, and energy. • The chief obstacle is the fact that waste often hides in plain sight, or is built into activities. 2
  • 3. 08-01-2014 5 “If LEAN MANAGEMENT principles are applied to Manufacturing, it is called LEAN MANUFACTURING” 6 4 basic principles of Lean Management 1. Elimination of Waste: eliminate any activities that do not add value in an organization. Includes overproduction, waiting time, processing, inventory, and motion. 2. Increased Speed and Response: better process designs allow efficient responses to customers needs and the competitive environment. 3. Improved Quality: Poor quality creates waste, so improving quality is essential to the lean environment. 4. Reduced Cost: simplifying processes and improving efficiency translates to reduced costs. 3
  • 4. 08-01-2014 7 Concept of Friction, Waste, or Muda “Understanding of friction, waste, or muda is the foundation of the lean Manufacturing” 8 7 type of wastes in Manufacturing 1. 2. 3. 4. 5. 6. 7. Transportation (between workstations, or between supplier and customer) Inventory Motion Waiting, including time in queue Over-production Over-processing: Non-value-adding activities Defects: Cost of poor quality, scrap, rework, and inspection 4
  • 5. 08-01-2014 9 TIM WOOD! 10 An 8th waste has also been identified • Un-utilized or under-utilized talent • Arises when companies do not involve all of their employees in continuous improvement 5
  • 6. 08-01-2014 11 Waste Often Hides in Plain View • We cannot eliminate the waste of material, labor, or other resources until we recognize it as waste. ▫ A job can consist of 75 percent waste (or even more). • People become used to "living with it" or "working around it." 12 Demonstration of waste • The solution is obvious in retrospect, but first, we have to understand that there is waste (or a problem). • Building a wall • Cleaning dirty parts 6
  • 7. 08-01-2014 13 “Waiting” waste – A golf analogy • In a four hour golf game, the golf club is in contact with the ball for less than 2 seconds ▫ The same proportion of value-adding to nonvalue-adding time prevails in many factories. • Additional analogies: ▫ Waiting for other players = waiting for tools ▫ Walking = transportation ▫ Selecting a club and addressing the ball = setup 14 7
  • 8. 08-01-2014 15 7 type of wastes in Services 1. Delay: Customers waiting for service 2. Duplication: Re-entering data or repeating details 3. Unnecessary Movement: poor ergonomics while delivering the service 4. Unclear communication: Excessive clarification or communication over use of the service 5. Incorrect Inventory: Out of stock 6. Opportunity lost: Lost customers which now have to be retained 7. Errors: Transaction errors, lost/damaged goods 16 What do Manufacturing greats say about waste? "I believe that the average farmer puts to a really useful purpose only about 5 per cent. of the energy he expends. … Not only is everything done by hand, but seldom is a thought given to a logical arrangement. A farmer doing his chores will walk up and down a rickety ladder a dozen times. He will carry water for years instead of putting in a few lengths of pipe. His whole idea, when there is extra work to do, is to hire extra men. He thinks of putting money into improvements as an expense. … It is waste motion— waste effort— that makes farm prices high and profits low" --- (Henry Ford, 1922, My Life and Work). 8
  • 9. 08-01-2014 17 Eliminating waste can lead to reduced costs and better bottom line or profit margins • Exercise <insert case study> 18 Industrial Sector faces problems related to production and processes 1. Production with defects 2. Wastage in the use of resources 3. Bad product quality 4. De-motivated employees 5. High yields on expense of customer satisfaction 9
  • 10. 08-01-2014 19 Manufacturers are always worrying! 1. Transport 2. Inventory 3. Motion 4. Waiting Manufacturers have to constantly worry about eliminating these wastes! 5. Overproduction 6. Over Processing 7. Defects 20 Why should Manufacturers worry? 1. This leads to high cost of production which greatly impacts the profit margins 2. Big manufacturing enterprises like Railways, Maruti, Tata Motors, JCB etc. want only high quality, zero defect products to be sourced from the MSMEs 3. Foreign players coming due to FDI will only purchase products from companies which have the most sound production processes 4. Competition is becoming increasingly fierce and there is no room for errors or wastes in your production processes 10
  • 11. 08-01-2014 21 What are the benefits of Lean Manufacturing? 1. Improved profit margins and reduced costs 2. Improved quality and fewer defects 3. Reduced Inventory 4. Space requirement decreases 5. Enhanced overall manufacturing flexibility 6. Makes continuous improvement possible 7. Creates safer working environment 8. Improves employee morale 22 Green Lean Manufacturing • "…we will not so lightly waste material simply because we can reclaim it—for salvage involves labour. The ideal is to have nothing to salvage." —Henry Ford, Today and Tomorrow • Pioneered by Henry Ford in the 1900’s 11
  • 12. 08-01-2014 23 Ford's Green Manufacturing • Recovery and reuse of solvents • Distillation of waste wood for chemicals yielded enough money to pay 2000 workers. ▫ Kingsford charcoal • Design of parts and processes to minimize machining waste • Reuse of packaging materials • Slag paving materials and cement 24 Identification of Material and Energy Wastes • Material and energy waste can easily be built into a job. • Elimination of these wastes is central to "green" manufacturing and the ISO 14001 standard and, more importantly, very profitable. • We cannot, however, remove this waste before we identify it. 12
  • 13. 08-01-2014 25 Discussion • Do you know of processes in which materials are thrown away (or recycled)? ▫ If so, can the process or product be redesigned to reduce the waste? ▫ Could the discarded materials be reused or recycled in some manner? • Can energy-intensive processes be made more efficient? 26 power source regeneration 13
  • 14. 08-01-2014 27 Lean Manufacturing Tools & Techniques 28 5S - CANDO • 5S-CANDO, a systematic approach to cleaning and organizing the workplace, suppresses friction. • Seiri (Sort)= Clearing up ▫ "When in doubt, throw it out." • Seiton (Set in order)= Organizing (Arranging) ▫ "A place for everything and everything in its place." • Seiso (Shine)= Cleaning (Neatness) • Seiketsu (Standardize)= Standardization (Ongoing improvement, holding the gains) • Shitsuke (Sustain)= Discipline 14
  • 15. 08-01-2014 29 Visual Control • "Basically, the intent is to make the status of the operation clearly visible to anyone observing that operation" (Wayne Smith, 1998). • "Visual controls identify waste, abnormalities, or departures from standards" (Caravaggio, in Levinson, 1998) 30 Examples of Visual Control • 5S-CANDO (arranging) • Jidoka or automation ▫ Andon lights and buzzers announce tool status. • JIT: kanban squares, cards, containers. ▫ Lines on the floor to mark reorder points • Safety: colored labels for materials • Statistical process control charts: should be clearly visible. 15
  • 16. 08-01-2014 31 Visible Management • A visible production management system should indicate: (1) What the operation is trying to make Measure the takt rate, or desired production per unit time. (2)What the operation is achieving (3)What problems hinder the production goal? 32 Just in Time (JIT) system • In a pull system, employees at a given operation (work station) go to the source of the required parts, such as machining or subassembly, and withdraw the units as they need them. • By pulling parts from each preceding workstation, the entire manufacturing process is synchronized to the final-assembly schedule. • Finished goods are made to coincide with the actual rate of customer demand, resulting in minimal inventories and maximum responsiveness. 16
  • 17. 08-01-2014 33 Just in Time (JIT) system • JIT systems are sometimes called a Kanban system. • A kanban is a flag or a piece of paper that contains all relevant information for an order. • Slips, called kanban cards, are circulated within the system to initiate withdrawal and production items through the production process. • The Kanban cards are simple visual controls. 34 Small Batch and Single-Piece Flow • Batching is the process of producing large quantities of items as a group before being transferred to the next operation. • Lean operating systems seek to reduce batch sizes using single-piece flow. • A transfer batch is part of the original batch (lot) size that is completed at one workstation and moved to the next downstream workstation. 17
  • 18. 08-01-2014 35 Drawbacks of Batch Processing • Running equipment (e.g. a heat treatment furnace) at less than full load, wastes capacity. Waiting for a full load wastes time. ▫ Waste of capacity is not a problem except at a constraint operation (Goldratt's Theory of Constraints). • Batches introduce waiting time when they arrive at single-unit tools en masse. ▫ Batch-and-queue forces extra cycle time (waiting) into the operation. 36 Batch versus Single-Piece Flow Processing 18
  • 19. 08-01-2014 37 Single-Unit Processing Reduces Cycle Time • Wayne Smith (1998) defines manufacturing cycle efficiency as (Value-adding time)/(Total cycle time) ▫ This is often less than 1 percent. ▫ Remember the Golf analogy: the club head is in contact with the ball for less than two seconds in a typical game. 38 Single-Minute Exchange of Die (SMED) 1. Internal setup requires the tool to stop. ▫ Reduce internal setup time, or convert internal to external setup. 2. External setup can be performed while the tool is working on another job. 3. SMED reduces cycle time by facilitating smaller lot sizes, mixed model production, and/or single-unit flow 19
  • 20. 08-01-2014 39 Single-Minute Exchange of Die (SMED) • SMED refers to quick setup or changeover of tooling and fixtures in processes so that multiple products in smaller batches can be run on the same equipment. • Reducing setup time frees up capacity that can be producing output, and therefore, generating revenue. • Example: An Oil company reduced machine setup from 9.3 hours to 9 minutes! 40 Error-Proofing (Poka-Yoke) • Error-proofing makes it difficult or impossible to do the job the wrong way. • Slots and keys, for example, prevent parts from being assembled the wrong way. • Process recipes and data entry also can be errorproofed. 20
  • 21. 08-01-2014 41 Lean Six - Sigma • Six Sigma and Lean concepts and methods are often combined into Lean Six Sigma • Both are driven by customer requirements • Both try to eliminate waste, reduce costs, speed things up, and improve quality • Both focus on real money savings • Both rely on a systematic methodology 42 Quality at source • Quality at the Source • Quality at the source focuses on doing it right the first time. • Continuous Improvement • Six Sigma compliments lean systems to assure high-quality output. 21
  • 22. 08-01-2014 43 Total Productive Maintenance • TPM is focused on ensuring that operating systems will perform their intended function reliably. • TPM works to prevent equipment failures and downtime, maximizing equipment effectiveness and uptime. • TPM tries to predict equipment failure rates and perform maintenance before a problem arises. • The principles of TPM also include employee “ownership” of the equipment. 44 KAIZEN • Japanese word meaning ▫ Kai - gradual and orderly change, Zen for the better • involves everyone in the organization in small improvements using conventional knowledge and tools • without large capital investments. 22
  • 23. 08-01-2014 45 KAIZEN • SDCA to PDCA – standardized work [Deming’s cycle] • Quality first ▫ If something can be improved, a measure must exist by which improvement can be quantified – quality characteristics • Upstream management • Speak with data • Variability control and recurrence prevention 46 Key Steps in Transforming a Company to the Lean Approach 1. Establish a steering team—conduct strategic planning session 2. Train the steering team and the model line team in the disciplines of lean 3. Perform PQR (product-quantity-routing) analysis 4. Identify value streams—select a value stream 5. Calculate model line takt time 6. Value stream map the model line—assemble current state map 7. Balance the line—assign standard work 8. Establish standard WIP (inventory levels) 9. Test the system (virtual cell)—document results 23
  • 24. 08-01-2014 47 Key Steps in Transforming a Company to the Lean Approach 10. 11. 12. 13. 14. 15. 16. 17. Setup reduction event Conduct 5S event—apply TPM techniques Establish visual signals—reduce paperwork Explore alternative flow patterns Develop block layout Develop detailed layout Execute move Select next value stream and repeat 48 Lean Leadership • Three Models: 1. “Old” Dictator style: “Do it MY way” 2. The 1980’s “Empowerment” style: “Do it YOUR way” 3. “Lean” style: “Follow me and let’s figure this out together” 24
  • 25. 08-01-2014 49 Summary • Business activities can contain enormous quantities of built-in waste (muda, friction). • The greatest obstacle to the waste's removal is usually failure to recognize it. • Lean manufacturing includes techniques for recognition and removal of the waste. • This delivers an overwhelming competitive advantage. 50 A journey of continuous improvement 25