SlideShare uma empresa Scribd logo
1 de 22
Development Presentation

29th May 2012




Azat Tatygulov
Brian Fong
David Milne
Foivos Skouros
Jean Benard
Liu Yang
Matthew Wood
Miriam Noonan
Rory Thomas

Int. Supervisor: Prof R.Jardine
Ext. Supervisor: Mr Ian Carradice, Arup
Background

Geotechnics
Groundwater
Risks &

              • Multi Billion Dollar
Hazards
Master Plan
Transport       Project
Renewable
Energy

Waste
Management    • Development of Beach
Water
Management
                Front Town                                           Preston Beach
Questions?

              • Population Increase
                from 185 to 25,000



                                       Western Australia (Adapted from Google Maps, 2012)
Background

Geotechnics
              Aims:
Groundwater
Risks &
Hazards
Master Plan
              • Financially Viable
Transport       Project
Renewable
Energy

Waste
Management
              • Developing site with
Water
Management
                complex ground
Questions?      conditions

              • Develop Sustainable
                Community

                                       Clients Land (Arup, 2012)
Background

Geotechnics    Local Demands
Groundwater
Risks &
Hazards
Master Plan
Transport
Renewable
Energy

Waste
Management
              Preserve Local Environment Medical Care      Improve water supply
Water
Management
Questions?




                 Telecom facilities     Retain community       Transportation
                                           atmosphere
Background

Geotechnics
Groundwater
Risks &
Hazards
Master Plan
              • Calcareous Sand and
Transport
Renewable      limestone
Energy

Waste
Management    • Soft, Highly Compressible
Water
Management
Questions?     Material
              • Acid Sulphate Soils



                                      Geological Map (RSP, 2011)
Background

Geotechnics   Groundwork
              • Low Bearing Capacity Soils
Groundwater
Risks &
Hazards
Master Plan
              • Large and Differential Settlements
Transport     • Ground Improvement Required
Renewable
Energy

Waste
Management                Piled Raft           Buoyancy Raft
Water
Management
Questions?




              Piled Rafts (UWE, 1993)    Buoyant Rafts (UWE, 1993)
Background

Geotechnics   Ground Improvement:
Groundwater
Risks &
Hazards
Master Plan
Transport
Renewable
Energy

Waste
Management    CIPS          MICS
Water
Management
Questions?




                                         Compaction
                                         Grouting
              Vibration     Dynamic
              Compaction    Compaction
Background

Geotechnics   • 2 Aquifers
Groundwater
Risks &       • Decreasing Water Levels, Increasing Salinity
Hazards
Master Plan
Transport
Renewable
Energy

Waste
Management
Water
Management
Questions?




                   Groundwater Process (RSP, 2011)
Background

Geotechnics
Groundwater
Risks &
Hazards
Master Plan
Transport     • 8GL/yr Available
Renewable
Energy

Waste
              • 4GL/yr Demand
Management
Water
Management
              • Not Sustainable
Questions?

              • New Resource
               Necessary

                                   Ground Water Contours (RSP, 2011)
Background

Geotechnics
              Coastal Erosion
                                                                            Rock Structures
Groundwater      Maximum 1.3 m coastal
Risks &
Hazards             retreat per year
Master Plan
Transport
Renewable
Energy                                                                         Jute Mats
Waste
Management
Water
Management
Questions?



                                                                             Water Breaks

                      High Risk
                        Zone

              Coastal erosion susceptibility (Geoscience Australia, 2005)
Background

Geotechnics
              Acid Sulphate Soils
Groundwater
Risks &
Hazards           Zone 1 Avoid
Master Plan
Transport
              Zone 2 Lime Treatment
Renewable
Energy

Waste
Management
Water
Management
Questions?




                Zone 3 Avoid


                                      Acid Sulphate Soils Hazards (ARUP, 2011)
Background

Geotechnics
                             Ground
Groundwater
                            Conditions
Risks &
Hazards
Master Plan
Transport
               Business                     Water
                Model                     Resources
Renewable
Energy

Waste
Management
Water
Management
Questions?

               Community
                                           Energy
              Development



                            Environment
Background

Geotechnics
Groundwater
              Residential                                       Central
Risks &
Hazards       District                                          Commercial
Master Plan
                                                                District
Transport
Renewable
Energy

Waste
Management                                                       Lakeside
Water                                                            Pedestrian
Management     School and
                                                                 Route
Questions?
               Leisure            N
               Facilities                ZONE 2

                                                                Exclusive
                                                                Lake Side
                                                                Homes

                            MasterPlan (©PB Consulting, 2012)
Background

Geotechnics   Phase One:
Groundwater
Risks &
Hazards       Zones 1 and
Master Plan
              2 developed
Transport
Renewable     in parallel
Energy

Waste
Management
Water
Management                                                      Phase Two:
Questions?                      N
                                         ZONE 2
                                                                Construction
                                                                of Zone 3



                            MasterPlan (©PB Consulting, 2012)
Background

Geotechnics
Groundwater   Enhance
Risks &
Hazards
              development to
Master Plan   the North
Transport
Renewable
Energy
                                                                     Release
Waste             Central Bus                                        congestion
Management
Water             Station                                            during
Management                                                           construction
Questions?
                                                                     phase
                                               ZONE 2


              Upgrade Dirt
              Tracks to Myalup

                                 MasterPlan (©PB Consulting, 2012)
Background

Geotechnics
Groundwater
Risks &                                                         Advantages:
Hazards
Master Plan
                                                                • Better connections to
Transport
Renewable                                                         neighbouring towns
Energy

Waste
Management
                                                                • Minimum impact on local
Water                                                             environment
Management
Questions?
                                                                • Suitable fire escape
                                                                  routes
                                                                • Cost effective solution

              Transport Plan (Adapted from Google Maps, 2012)
Background

Geotechnics
Groundwater
Risks &
Hazards
Master Plan
Transport
Renewable        Wind                  Solar                 Wave
Energy

Waste
Management
Water
Management
Questions?


                          Geothermal             Biomass

              Legislation requires 20% of electricity to be provided by
                         renewable energy sources by 2020
                        SEN suggests setting a target of 30%
Background

Geotechnics
Groundwater
Risks &
Hazards
Master Plan
Transport
Renewable
Energy

Waste
Management
Water
Management
Questions?




              Western Power Network Capacity Map (WA, 2012)
Other          Municipal
Background       Total waste produced in                            3%           Solid Waste
                                                                                     23%
Geotechnics      Preston Beach: 87,000 tonnes/year
                                                         Construction
Groundwater                                              & Demolition
                                                             50%                  Commercial &
Risks &                                                                             Industrial
Hazards                                              Perth                             24%

Master Plan
Transport
Renewable
Energy                          20%              Inorganic                                     Organic
Waste
Management                                80%                   Waste Collection
Water
Management
Questions?
                      Recycle                                                                               Biomass


              Glass   Steel     Plastic    E-Waste


                                      Repair                        Landfill                                    Energy
                  New-Product                                                                  Fertiliser
                                      & Resell
                                                                           Waste Management (© PB Consulting, 2012)
Background

Geotechnics   Water efficiency
Groundwater
              Reduce water usage: 71% public water municipal
Risks &
Hazards
Master Plan
Transport
Renewable
Energy

Waste
Management
Water
Management
Questions?
                        Recycle water after use: Only 6% of treated
                        wastewater recycled

                        40% savings possible by 2020
               Water Efficiency, recycling and alternative supplies: (WA, 2009)
Background

Geotechnics   Conclusions:
Groundwater
Risks &               • Identified Issues with Site
Hazards
Master Plan           • Developed Initial Master Plan
Transport
                      • Considered Solutions to Complex Ground
Renewable
Energy                  Conditions
Waste
Management
Summary        Direction:
                      • Refine master plan with topography
Questions?



                      • Develop business plan
                      • Plan for growth of the community


              Water Efficiency, recycling and alternative supplies: (WA, 2009)
Background

Geotechnics
Groundwater
Risks &
Hazards



              Questions Welcome
Master Plan
Transport
Renewable
Energy

Waste
Management
Water
Management
Questions?

Mais conteúdo relacionado

Mais procurados

Keynote: Science in Large Scale River Restoration - Dahm
Keynote: Science in Large Scale River Restoration - DahmKeynote: Science in Large Scale River Restoration - Dahm
Keynote: Science in Large Scale River Restoration - DahmWillamette River Initiative
 
Thesis Presentation
Thesis PresentationThesis Presentation
Thesis Presentationgawump
 
Turning the Tide: Reviving the Estuary: Science, Politics, and Education
Turning the Tide: Reviving the Estuary: Science, Politics, and EducationTurning the Tide: Reviving the Estuary: Science, Politics, and Education
Turning the Tide: Reviving the Estuary: Science, Politics, and EducationCUNY Sustainable Cities
 
Harford Community Stream Restoration 2013
Harford Community Stream Restoration 2013Harford Community Stream Restoration 2013
Harford Community Stream Restoration 2013Fairfax County
 
Strategies for effective stormwater management
Strategies for effective stormwater managementStrategies for effective stormwater management
Strategies for effective stormwater managementBuzzards Bay Coalition
 
9. Process based river restoration design in practice - Hamish Moir, CBEC Ec...
9.  Process based river restoration design in practice - Hamish Moir, CBEC Ec...9.  Process based river restoration design in practice - Hamish Moir, CBEC Ec...
9. Process based river restoration design in practice - Hamish Moir, CBEC Ec...Environmental Protection Agency, Ireland
 
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015Fairfax County
 
AAEE E3Competition-Winners-2002
AAEE E3Competition-Winners-2002AAEE E3Competition-Winners-2002
AAEE E3Competition-Winners-2002Dennis Palalay
 
Options for the environmental future of the River Murray
Options for the environmental future of the River MurrayOptions for the environmental future of the River Murray
Options for the environmental future of the River MurrayUniversity of Adelaide
 
Kansas City's Overflow Control Program, 2012, u.s. water alliance,urban water...
Kansas City's Overflow Control Program, 2012, u.s. water alliance,urban water...Kansas City's Overflow Control Program, 2012, u.s. water alliance,urban water...
Kansas City's Overflow Control Program, 2012, u.s. water alliance,urban water...U.S. Water Alliance
 
Water Conservation and salmon issues for lower Fraser River
Water Conservation and salmon issues for lower Fraser RiverWater Conservation and salmon issues for lower Fraser River
Water Conservation and salmon issues for lower Fraser RiverEric832w
 
River Restoration in Asia and Connection Between IWRM and River Restoration
River Restoration in Asia and Connection Between IWRM and River RestorationRiver Restoration in Asia and Connection Between IWRM and River Restoration
River Restoration in Asia and Connection Between IWRM and River RestorationWildan Maulana
 
Sustainable Water Security at a time of Climate Change: India's 12th Five Yea...
Sustainable Water Security at a time of Climate Change: India's 12th Five Yea...Sustainable Water Security at a time of Climate Change: India's 12th Five Yea...
Sustainable Water Security at a time of Climate Change: India's 12th Five Yea...Global Water Partnership
 
Bill armstrong upper quinault river restoration - tribal habitat conference n...
Bill armstrong upper quinault river restoration - tribal habitat conference n...Bill armstrong upper quinault river restoration - tribal habitat conference n...
Bill armstrong upper quinault river restoration - tribal habitat conference n...Northwest Indian Fisheries Commission
 

Mais procurados (19)

Keynote: Science in Large Scale River Restoration - Dahm
Keynote: Science in Large Scale River Restoration - DahmKeynote: Science in Large Scale River Restoration - Dahm
Keynote: Science in Large Scale River Restoration - Dahm
 
Thesis Presentation
Thesis PresentationThesis Presentation
Thesis Presentation
 
Turning the Tide: Reviving the Estuary: Science, Politics, and Education
Turning the Tide: Reviving the Estuary: Science, Politics, and EducationTurning the Tide: Reviving the Estuary: Science, Politics, and Education
Turning the Tide: Reviving the Estuary: Science, Politics, and Education
 
Harford Community Stream Restoration 2013
Harford Community Stream Restoration 2013Harford Community Stream Restoration 2013
Harford Community Stream Restoration 2013
 
Strategies for effective stormwater management
Strategies for effective stormwater managementStrategies for effective stormwater management
Strategies for effective stormwater management
 
9. Process based river restoration design in practice - Hamish Moir, CBEC Ec...
9.  Process based river restoration design in practice - Hamish Moir, CBEC Ec...9.  Process based river restoration design in practice - Hamish Moir, CBEC Ec...
9. Process based river restoration design in practice - Hamish Moir, CBEC Ec...
 
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
Dead Run Stream Restoration Project Meeting: Feb. 18, 2015
 
26. Floods Directive & Hydromorpholgy Measures
26. Floods Directive & Hydromorpholgy Measures26. Floods Directive & Hydromorpholgy Measures
26. Floods Directive & Hydromorpholgy Measures
 
AAEE E3Competition-Winners-2002
AAEE E3Competition-Winners-2002AAEE E3Competition-Winners-2002
AAEE E3Competition-Winners-2002
 
Greening the Gray - NYWEA 2012
Greening the Gray - NYWEA 2012Greening the Gray - NYWEA 2012
Greening the Gray - NYWEA 2012
 
Options for the environmental future of the River Murray
Options for the environmental future of the River MurrayOptions for the environmental future of the River Murray
Options for the environmental future of the River Murray
 
ENV 101 Ch15 lecture ppt_a
ENV 101 Ch15 lecture ppt_aENV 101 Ch15 lecture ppt_a
ENV 101 Ch15 lecture ppt_a
 
Kansas City's Overflow Control Program, 2012, u.s. water alliance,urban water...
Kansas City's Overflow Control Program, 2012, u.s. water alliance,urban water...Kansas City's Overflow Control Program, 2012, u.s. water alliance,urban water...
Kansas City's Overflow Control Program, 2012, u.s. water alliance,urban water...
 
Water Conservation and salmon issues for lower Fraser River
Water Conservation and salmon issues for lower Fraser RiverWater Conservation and salmon issues for lower Fraser River
Water Conservation and salmon issues for lower Fraser River
 
River Restoration in Asia and Connection Between IWRM and River Restoration
River Restoration in Asia and Connection Between IWRM and River RestorationRiver Restoration in Asia and Connection Between IWRM and River Restoration
River Restoration in Asia and Connection Between IWRM and River Restoration
 
Sustainable Water Security at a time of Climate Change: India's 12th Five Yea...
Sustainable Water Security at a time of Climate Change: India's 12th Five Yea...Sustainable Water Security at a time of Climate Change: India's 12th Five Yea...
Sustainable Water Security at a time of Climate Change: India's 12th Five Yea...
 
Bill armstrong upper quinault river restoration - tribal habitat conference n...
Bill armstrong upper quinault river restoration - tribal habitat conference n...Bill armstrong upper quinault river restoration - tribal habitat conference n...
Bill armstrong upper quinault river restoration - tribal habitat conference n...
 
10. Restoring the River Camac - Mary-Liz Walshe, DCC
10. Restoring the River Camac - Mary-Liz Walshe, DCC10. Restoring the River Camac - Mary-Liz Walshe, DCC
10. Restoring the River Camac - Mary-Liz Walshe, DCC
 
Pinti_2014
Pinti_2014Pinti_2014
Pinti_2014
 

Destaque

Rana Haris Masood's Résumé
Rana Haris Masood's RésuméRana Haris Masood's Résumé
Rana Haris Masood's RésuméRana Haris
 
Add graphics with type
Add graphics with typeAdd graphics with type
Add graphics with typeRaymond Manley
 
конспект к уроку по проекту
конспект к уроку по проектуконспект к уроку по проекту
конспект к уроку по проектуОльга Сокирка
 
LA NOTIZIA DI 5° A IN ITALIANO
LA NOTIZIA DI 5° A IN ITALIANOLA NOTIZIA DI 5° A IN ITALIANO
LA NOTIZIA DI 5° A IN ITALIANOamichemie
 
Alaska Living Life USA
Alaska Living Life USAAlaska Living Life USA
Alaska Living Life USAbrinkleykristy
 
CV-Europass-20160902-Nadrljanski-EN
CV-Europass-20160902-Nadrljanski-ENCV-Europass-20160902-Nadrljanski-EN
CV-Europass-20160902-Nadrljanski-ENMila Nadrljanski
 
регіональний розвиток в програмах кандидатів по 206 виборчому округу
регіональний розвиток в програмах кандидатів по 206 виборчому округурегіональний розвиток в програмах кандидатів по 206 виборчому округу
регіональний розвиток в програмах кандидатів по 206 виборчому округуSveta Bilous
 
Continuación cuento histórico Grandi Opere, La Cloaca Maxima
Continuación cuento histórico Grandi Opere, La Cloaca MaximaContinuación cuento histórico Grandi Opere, La Cloaca Maxima
Continuación cuento histórico Grandi Opere, La Cloaca Maximachamaca23
 
馬太福音20章0706 風佳
馬太福音20章0706 風佳馬太福音20章0706 風佳
馬太福音20章0706 風佳Fong Jean
 

Destaque (15)

Storyboard - Merak
Storyboard - MerakStoryboard - Merak
Storyboard - Merak
 
Famous Dave's
Famous Dave'sFamous Dave's
Famous Dave's
 
Rana Haris Masood's Résumé
Rana Haris Masood's RésuméRana Haris Masood's Résumé
Rana Haris Masood's Résumé
 
Add graphics with type
Add graphics with typeAdd graphics with type
Add graphics with type
 
конспект к уроку по проекту
конспект к уроку по проектуконспект к уроку по проекту
конспект к уроку по проекту
 
LA NOTIZIA DI 5° A IN ITALIANO
LA NOTIZIA DI 5° A IN ITALIANOLA NOTIZIA DI 5° A IN ITALIANO
LA NOTIZIA DI 5° A IN ITALIANO
 
Alaska Living Life USA
Alaska Living Life USAAlaska Living Life USA
Alaska Living Life USA
 
CV-Europass-20160902-Nadrljanski-EN
CV-Europass-20160902-Nadrljanski-ENCV-Europass-20160902-Nadrljanski-EN
CV-Europass-20160902-Nadrljanski-EN
 
ACCA0001
ACCA0001ACCA0001
ACCA0001
 
Always be reading
Always be readingAlways be reading
Always be reading
 
регіональний розвиток в програмах кандидатів по 206 виборчому округу
регіональний розвиток в програмах кандидатів по 206 виборчому округурегіональний розвиток в програмах кандидатів по 206 виборчому округу
регіональний розвиток в програмах кандидатів по 206 виборчому округу
 
Continuación cuento histórico Grandi Opere, La Cloaca Maxima
Continuación cuento histórico Grandi Opere, La Cloaca MaximaContinuación cuento histórico Grandi Opere, La Cloaca Maxima
Continuación cuento histórico Grandi Opere, La Cloaca Maxima
 
馬太福音20章0706 風佳
馬太福音20章0706 風佳馬太福音20章0706 風佳
馬太福音20章0706 風佳
 
DOC 8400
DOC 8400DOC 8400
DOC 8400
 
Tesina_Cristian_de_Santos
Tesina_Cristian_de_SantosTesina_Cristian_de_Santos
Tesina_Cristian_de_Santos
 

Semelhante a Group 03 Development Presentation

Session 2A - Richard Middleton
Session 2A - Richard MiddletonSession 2A - Richard Middleton
Session 2A - Richard MiddletonReenergize
 
Environmental Performance of Cities - Elements for a Framework-Mainguy
Environmental Performance of Cities - Elements for a Framework-MainguyEnvironmental Performance of Cities - Elements for a Framework-Mainguy
Environmental Performance of Cities - Elements for a Framework-MainguyICLEI
 
ADB, Climate Change and Water Security in South Asia, by Arnaud Cauchois
ADB, Climate Change and Water Security in South Asia, by Arnaud CauchoisADB, Climate Change and Water Security in South Asia, by Arnaud Cauchois
ADB, Climate Change and Water Security in South Asia, by Arnaud CauchoisGlobal Water Partnership
 
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Ivica Trumbic
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Ivica TrumbicInt. Roundtable on Transboundary Waters Management, 15-16.12.2011, Ivica Trumbic
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Ivica TrumbicGWP-Mediterranean (GWP-Med)
 
ADB’s Adaptation Program: Poverty Implications and Emerging Responses
ADB’s Adaptation Program: Poverty Implications and Emerging ResponsesADB’s Adaptation Program: Poverty Implications and Emerging Responses
ADB’s Adaptation Program: Poverty Implications and Emerging ResponsesPoverty Environment Net
 
Using GIS for Water Resources Management – Selected U.S. and International Ap...
Using GIS for Water Resources Management – Selected U.S. and International Ap...Using GIS for Water Resources Management – Selected U.S. and International Ap...
Using GIS for Water Resources Management – Selected U.S. and International Ap...Michael Baker Jr., Inc.
 
Decision Support for Urban Environmental Planning
Decision Support for Urban Environmental PlanningDecision Support for Urban Environmental Planning
Decision Support for Urban Environmental Planningurbanmetabolism
 
R.sres final
R.sres finalR.sres final
R.sres finalrpsresov
 
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Fairfax County
 
DSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - Caillibotte
DSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - CaillibotteDSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - Caillibotte
DSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - CaillibotteDeltares
 
ICLR Friday Forum: Tantramar Marshes Flooding (March 19, 2021)
ICLR Friday Forum: Tantramar Marshes Flooding (March 19, 2021)ICLR Friday Forum: Tantramar Marshes Flooding (March 19, 2021)
ICLR Friday Forum: Tantramar Marshes Flooding (March 19, 2021)glennmcgillivray
 
Maya LEROY "Delivering on environmental commitments? Guidelines and evaluatio...
Maya LEROY "Delivering on environmental commitments? Guidelines and evaluatio...Maya LEROY "Delivering on environmental commitments? Guidelines and evaluatio...
Maya LEROY "Delivering on environmental commitments? Guidelines and evaluatio...Global Risk Forum GRFDavos
 
Interdisciplinary approach
Interdisciplinary approachInterdisciplinary approach
Interdisciplinary approachOmkar Parishwad
 
WATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIA
WATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIAWATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIA
WATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIAIRJET Journal
 
DSD-INT 2017 The omnipotent river manager - automated intervention planning a...
DSD-INT 2017 The omnipotent river manager - automated intervention planning a...DSD-INT 2017 The omnipotent river manager - automated intervention planning a...
DSD-INT 2017 The omnipotent river manager - automated intervention planning a...Deltares
 

Semelhante a Group 03 Development Presentation (20)

Session 2A - Richard Middleton
Session 2A - Richard MiddletonSession 2A - Richard Middleton
Session 2A - Richard Middleton
 
Environmental Performance of Cities - Elements for a Framework-Mainguy
Environmental Performance of Cities - Elements for a Framework-MainguyEnvironmental Performance of Cities - Elements for a Framework-Mainguy
Environmental Performance of Cities - Elements for a Framework-Mainguy
 
ADB, Climate Change and Water Security in South Asia, by Arnaud Cauchois
ADB, Climate Change and Water Security in South Asia, by Arnaud CauchoisADB, Climate Change and Water Security in South Asia, by Arnaud Cauchois
ADB, Climate Change and Water Security in South Asia, by Arnaud Cauchois
 
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Ivica Trumbic
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Ivica TrumbicInt. Roundtable on Transboundary Waters Management, 15-16.12.2011, Ivica Trumbic
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Ivica Trumbic
 
Trans-boundary Issues
Trans-boundary IssuesTrans-boundary Issues
Trans-boundary Issues
 
ADB’s Adaptation Program: Poverty Implications and Emerging Responses
ADB’s Adaptation Program: Poverty Implications and Emerging ResponsesADB’s Adaptation Program: Poverty Implications and Emerging Responses
ADB’s Adaptation Program: Poverty Implications and Emerging Responses
 
Using GIS for Water Resources Management – Selected U.S. and International Ap...
Using GIS for Water Resources Management – Selected U.S. and International Ap...Using GIS for Water Resources Management – Selected U.S. and International Ap...
Using GIS for Water Resources Management – Selected U.S. and International Ap...
 
Final presentation
Final presentationFinal presentation
Final presentation
 
Decision Support for Urban Environmental Planning
Decision Support for Urban Environmental PlanningDecision Support for Urban Environmental Planning
Decision Support for Urban Environmental Planning
 
R.sres final
R.sres finalR.sres final
R.sres final
 
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
Lake Accotink Dredge Public Meeting Combined Presentation July 29 & aug 5...
 
110228 acedp water sensitive cities
110228 acedp water sensitive cities110228 acedp water sensitive cities
110228 acedp water sensitive cities
 
DSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - Caillibotte
DSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - CaillibotteDSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - Caillibotte
DSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - Caillibotte
 
ICLR Friday Forum: Tantramar Marshes Flooding (March 19, 2021)
ICLR Friday Forum: Tantramar Marshes Flooding (March 19, 2021)ICLR Friday Forum: Tantramar Marshes Flooding (March 19, 2021)
ICLR Friday Forum: Tantramar Marshes Flooding (March 19, 2021)
 
Maya LEROY "Delivering on environmental commitments? Guidelines and evaluatio...
Maya LEROY "Delivering on environmental commitments? Guidelines and evaluatio...Maya LEROY "Delivering on environmental commitments? Guidelines and evaluatio...
Maya LEROY "Delivering on environmental commitments? Guidelines and evaluatio...
 
Interdisciplinary approach
Interdisciplinary approachInterdisciplinary approach
Interdisciplinary approach
 
ceesupware
ceesupwareceesupware
ceesupware
 
Stormwater Compliance
Stormwater ComplianceStormwater Compliance
Stormwater Compliance
 
WATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIA
WATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIAWATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIA
WATERSHED MANAGEMENT AT BHARANANGANAM PANCHAYATH OF KOTTAYAM DISTRICT,INDIA
 
DSD-INT 2017 The omnipotent river manager - automated intervention planning a...
DSD-INT 2017 The omnipotent river manager - automated intervention planning a...DSD-INT 2017 The omnipotent river manager - automated intervention planning a...
DSD-INT 2017 The omnipotent river manager - automated intervention planning a...
 

Mais de GP Design PS

[Group Design Projects] Sustainability in Engineering
[Group Design Projects] Sustainability in Engineering[Group Design Projects] Sustainability in Engineering
[Group Design Projects] Sustainability in EngineeringGP Design PS
 
[Group Design Projects] Enterprise Risk Management
[Group Design Projects] Enterprise Risk Management[Group Design Projects] Enterprise Risk Management
[Group Design Projects] Enterprise Risk ManagementGP Design PS
 
[Group 04] Offshore Platform
[Group 04] Offshore Platform[Group 04] Offshore Platform
[Group 04] Offshore PlatformGP Design PS
 
[Group 02] Safer Crossings
[Group 02] Safer Crossings[Group 02] Safer Crossings
[Group 02] Safer CrossingsGP Design PS
 
[Group 08] Project W
[Group 08] Project W[Group 08] Project W
[Group 08] Project WGP Design PS
 
[Group 07] New General Hospital for the Capital
[Group 07] New General Hospital for the Capital[Group 07] New General Hospital for the Capital
[Group 07] New General Hospital for the CapitalGP Design PS
 
[Group 06] Imperial War Museum
[Group 06] Imperial War Museum[Group 06] Imperial War Museum
[Group 06] Imperial War MuseumGP Design PS
 
[Group 05] Multi-storey Timber Office
[Group 05] Multi-storey Timber Office[Group 05] Multi-storey Timber Office
[Group 05] Multi-storey Timber OfficeGP Design PS
 
[Group 03] Smart Water / Smart Power
[Group 03] Smart Water / Smart Power[Group 03] Smart Water / Smart Power
[Group 03] Smart Water / Smart PowerGP Design PS
 
Group 12 Development Presentation
Group 12 Development PresentationGroup 12 Development Presentation
Group 12 Development PresentationGP Design PS
 
Group 11 Development Presentation
Group 11 Development PresentationGroup 11 Development Presentation
Group 11 Development PresentationGP Design PS
 
Group 10 Development Presentation
Group 10 Development PresentationGroup 10 Development Presentation
Group 10 Development PresentationGP Design PS
 
Group 09 Development Presentation
Group 09 Development PresentationGroup 09 Development Presentation
Group 09 Development PresentationGP Design PS
 
Group 08 Development Presentation
Group 08 Development PresentationGroup 08 Development Presentation
Group 08 Development PresentationGP Design PS
 
Group 05 Development Presentation
Group 05 Development PresentationGroup 05 Development Presentation
Group 05 Development PresentationGP Design PS
 
Group 04 Development Presentation
Group 04 Development PresentationGroup 04 Development Presentation
Group 04 Development PresentationGP Design PS
 
Group 01 Development Presentation
Group 01 Development PresentationGroup 01 Development Presentation
Group 01 Development PresentationGP Design PS
 
Group 07 Development Presentation
Group 07 Development PresentationGroup 07 Development Presentation
Group 07 Development PresentationGP Design PS
 
Group 06 Development Presentation
Group 06 Development PresentationGroup 06 Development Presentation
Group 06 Development PresentationGP Design PS
 
Group 02 Development Presentation
Group 02 Development Presentation Group 02 Development Presentation
Group 02 Development Presentation GP Design PS
 

Mais de GP Design PS (20)

[Group Design Projects] Sustainability in Engineering
[Group Design Projects] Sustainability in Engineering[Group Design Projects] Sustainability in Engineering
[Group Design Projects] Sustainability in Engineering
 
[Group Design Projects] Enterprise Risk Management
[Group Design Projects] Enterprise Risk Management[Group Design Projects] Enterprise Risk Management
[Group Design Projects] Enterprise Risk Management
 
[Group 04] Offshore Platform
[Group 04] Offshore Platform[Group 04] Offshore Platform
[Group 04] Offshore Platform
 
[Group 02] Safer Crossings
[Group 02] Safer Crossings[Group 02] Safer Crossings
[Group 02] Safer Crossings
 
[Group 08] Project W
[Group 08] Project W[Group 08] Project W
[Group 08] Project W
 
[Group 07] New General Hospital for the Capital
[Group 07] New General Hospital for the Capital[Group 07] New General Hospital for the Capital
[Group 07] New General Hospital for the Capital
 
[Group 06] Imperial War Museum
[Group 06] Imperial War Museum[Group 06] Imperial War Museum
[Group 06] Imperial War Museum
 
[Group 05] Multi-storey Timber Office
[Group 05] Multi-storey Timber Office[Group 05] Multi-storey Timber Office
[Group 05] Multi-storey Timber Office
 
[Group 03] Smart Water / Smart Power
[Group 03] Smart Water / Smart Power[Group 03] Smart Water / Smart Power
[Group 03] Smart Water / Smart Power
 
Group 12 Development Presentation
Group 12 Development PresentationGroup 12 Development Presentation
Group 12 Development Presentation
 
Group 11 Development Presentation
Group 11 Development PresentationGroup 11 Development Presentation
Group 11 Development Presentation
 
Group 10 Development Presentation
Group 10 Development PresentationGroup 10 Development Presentation
Group 10 Development Presentation
 
Group 09 Development Presentation
Group 09 Development PresentationGroup 09 Development Presentation
Group 09 Development Presentation
 
Group 08 Development Presentation
Group 08 Development PresentationGroup 08 Development Presentation
Group 08 Development Presentation
 
Group 05 Development Presentation
Group 05 Development PresentationGroup 05 Development Presentation
Group 05 Development Presentation
 
Group 04 Development Presentation
Group 04 Development PresentationGroup 04 Development Presentation
Group 04 Development Presentation
 
Group 01 Development Presentation
Group 01 Development PresentationGroup 01 Development Presentation
Group 01 Development Presentation
 
Group 07 Development Presentation
Group 07 Development PresentationGroup 07 Development Presentation
Group 07 Development Presentation
 
Group 06 Development Presentation
Group 06 Development PresentationGroup 06 Development Presentation
Group 06 Development Presentation
 
Group 02 Development Presentation
Group 02 Development Presentation Group 02 Development Presentation
Group 02 Development Presentation
 

Último

Babel Compiler - Transforming JavaScript for All Browsers.pptx
Babel Compiler - Transforming JavaScript for All Browsers.pptxBabel Compiler - Transforming JavaScript for All Browsers.pptx
Babel Compiler - Transforming JavaScript for All Browsers.pptxYounusS2
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesThousandEyes
 
OpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureOpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureEric D. Schabell
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfinfogdgmi
 
Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.YounusS2
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7DianaGray10
 
Digital magic. A small project for controlling smart light bulbs.
Digital magic. A small project for controlling smart light bulbs.Digital magic. A small project for controlling smart light bulbs.
Digital magic. A small project for controlling smart light bulbs.francesco barbera
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024SkyPlanner
 
COMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a WebsiteCOMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a Websitedgelyza
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdfPedro Manuel
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfAijun Zhang
 
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...Aggregage
 
NIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopNIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopBachir Benyammi
 
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Will Schroeder
 
RAG Patterns and Vector Search in Generative AI
RAG Patterns and Vector Search in Generative AIRAG Patterns and Vector Search in Generative AI
RAG Patterns and Vector Search in Generative AIUdaiappa Ramachandran
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostMatt Ray
 
9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding TeamAdam Moalla
 
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online CollaborationCOMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online Collaborationbruanjhuli
 
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UbiTrack UK
 
Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintMahmoud Rabie
 

Último (20)

Babel Compiler - Transforming JavaScript for All Browsers.pptx
Babel Compiler - Transforming JavaScript for All Browsers.pptxBabel Compiler - Transforming JavaScript for All Browsers.pptx
Babel Compiler - Transforming JavaScript for All Browsers.pptx
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
 
OpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureOpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability Adventure
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdf
 
Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7
 
Digital magic. A small project for controlling smart light bulbs.
Digital magic. A small project for controlling smart light bulbs.Digital magic. A small project for controlling smart light bulbs.
Digital magic. A small project for controlling smart light bulbs.
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024
 
COMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a WebsiteCOMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a Website
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdf
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdf
 
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
 
NIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopNIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 Workshop
 
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
 
RAG Patterns and Vector Search in Generative AI
RAG Patterns and Vector Search in Generative AIRAG Patterns and Vector Search in Generative AI
RAG Patterns and Vector Search in Generative AI
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
 
9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team
 
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online CollaborationCOMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
 
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
 
Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership Blueprint
 

Group 03 Development Presentation

  • 1. Development Presentation 29th May 2012 Azat Tatygulov Brian Fong David Milne Foivos Skouros Jean Benard Liu Yang Matthew Wood Miriam Noonan Rory Thomas Int. Supervisor: Prof R.Jardine Ext. Supervisor: Mr Ian Carradice, Arup
  • 2. Background Geotechnics Groundwater Risks & • Multi Billion Dollar Hazards Master Plan Transport Project Renewable Energy Waste Management • Development of Beach Water Management Front Town Preston Beach Questions? • Population Increase from 185 to 25,000 Western Australia (Adapted from Google Maps, 2012)
  • 3. Background Geotechnics Aims: Groundwater Risks & Hazards Master Plan • Financially Viable Transport Project Renewable Energy Waste Management • Developing site with Water Management complex ground Questions? conditions • Develop Sustainable Community Clients Land (Arup, 2012)
  • 4. Background Geotechnics Local Demands Groundwater Risks & Hazards Master Plan Transport Renewable Energy Waste Management Preserve Local Environment Medical Care Improve water supply Water Management Questions? Telecom facilities Retain community Transportation atmosphere
  • 5. Background Geotechnics Groundwater Risks & Hazards Master Plan • Calcareous Sand and Transport Renewable limestone Energy Waste Management • Soft, Highly Compressible Water Management Questions? Material • Acid Sulphate Soils Geological Map (RSP, 2011)
  • 6. Background Geotechnics Groundwork • Low Bearing Capacity Soils Groundwater Risks & Hazards Master Plan • Large and Differential Settlements Transport • Ground Improvement Required Renewable Energy Waste Management Piled Raft Buoyancy Raft Water Management Questions? Piled Rafts (UWE, 1993) Buoyant Rafts (UWE, 1993)
  • 7. Background Geotechnics Ground Improvement: Groundwater Risks & Hazards Master Plan Transport Renewable Energy Waste Management CIPS MICS Water Management Questions? Compaction Grouting Vibration Dynamic Compaction Compaction
  • 8. Background Geotechnics • 2 Aquifers Groundwater Risks & • Decreasing Water Levels, Increasing Salinity Hazards Master Plan Transport Renewable Energy Waste Management Water Management Questions? Groundwater Process (RSP, 2011)
  • 9. Background Geotechnics Groundwater Risks & Hazards Master Plan Transport • 8GL/yr Available Renewable Energy Waste • 4GL/yr Demand Management Water Management • Not Sustainable Questions? • New Resource Necessary Ground Water Contours (RSP, 2011)
  • 10. Background Geotechnics Coastal Erosion Rock Structures Groundwater Maximum 1.3 m coastal Risks & Hazards retreat per year Master Plan Transport Renewable Energy Jute Mats Waste Management Water Management Questions? Water Breaks High Risk Zone Coastal erosion susceptibility (Geoscience Australia, 2005)
  • 11. Background Geotechnics Acid Sulphate Soils Groundwater Risks & Hazards Zone 1 Avoid Master Plan Transport Zone 2 Lime Treatment Renewable Energy Waste Management Water Management Questions? Zone 3 Avoid Acid Sulphate Soils Hazards (ARUP, 2011)
  • 12. Background Geotechnics Ground Groundwater Conditions Risks & Hazards Master Plan Transport Business Water Model Resources Renewable Energy Waste Management Water Management Questions? Community Energy Development Environment
  • 13. Background Geotechnics Groundwater Residential Central Risks & Hazards District Commercial Master Plan District Transport Renewable Energy Waste Management Lakeside Water Pedestrian Management School and Route Questions? Leisure N Facilities ZONE 2 Exclusive Lake Side Homes MasterPlan (©PB Consulting, 2012)
  • 14. Background Geotechnics Phase One: Groundwater Risks & Hazards Zones 1 and Master Plan 2 developed Transport Renewable in parallel Energy Waste Management Water Management Phase Two: Questions? N ZONE 2 Construction of Zone 3 MasterPlan (©PB Consulting, 2012)
  • 15. Background Geotechnics Groundwater Enhance Risks & Hazards development to Master Plan the North Transport Renewable Energy Release Waste Central Bus congestion Management Water Station during Management construction Questions? phase ZONE 2 Upgrade Dirt Tracks to Myalup MasterPlan (©PB Consulting, 2012)
  • 16. Background Geotechnics Groundwater Risks & Advantages: Hazards Master Plan • Better connections to Transport Renewable neighbouring towns Energy Waste Management • Minimum impact on local Water environment Management Questions? • Suitable fire escape routes • Cost effective solution Transport Plan (Adapted from Google Maps, 2012)
  • 17. Background Geotechnics Groundwater Risks & Hazards Master Plan Transport Renewable Wind Solar Wave Energy Waste Management Water Management Questions? Geothermal Biomass Legislation requires 20% of electricity to be provided by renewable energy sources by 2020 SEN suggests setting a target of 30%
  • 19. Other Municipal Background Total waste produced in 3% Solid Waste 23% Geotechnics Preston Beach: 87,000 tonnes/year Construction Groundwater & Demolition 50% Commercial & Risks & Industrial Hazards Perth 24% Master Plan Transport Renewable Energy 20% Inorganic Organic Waste Management 80% Waste Collection Water Management Questions? Recycle Biomass Glass Steel Plastic E-Waste Repair Landfill Energy New-Product Fertiliser & Resell Waste Management (© PB Consulting, 2012)
  • 20. Background Geotechnics Water efficiency Groundwater Reduce water usage: 71% public water municipal Risks & Hazards Master Plan Transport Renewable Energy Waste Management Water Management Questions? Recycle water after use: Only 6% of treated wastewater recycled 40% savings possible by 2020 Water Efficiency, recycling and alternative supplies: (WA, 2009)
  • 21. Background Geotechnics Conclusions: Groundwater Risks & • Identified Issues with Site Hazards Master Plan • Developed Initial Master Plan Transport • Considered Solutions to Complex Ground Renewable Energy Conditions Waste Management Summary Direction: • Refine master plan with topography Questions? • Develop business plan • Plan for growth of the community Water Efficiency, recycling and alternative supplies: (WA, 2009)
  • 22. Background Geotechnics Groundwater Risks & Hazards Questions Welcome Master Plan Transport Renewable Energy Waste Management Water Management Questions?

Notas do Editor

  1. Matt (Back Ground & Geotechnics – 5)Dave (Water – 2)Brian (Risks and Hazards – 4)Miriam (MasterPlan / Tranpsort - 4)Rory (Energy, Water, Waste - 6)