Preliminary results




                      GCCSI Study
            Liquid logistic Shipping Concept
                Lessons learned to date




                         Rotterdam
                        May 11th, 2011

              Michael Tetteroo & Cees van der Ben
5/13/2011                                           1
Preliminary results


                        CINTRA logistic concept




   •   Bulk making/breaking for off shore CO2 storage
   •   Intermediate Storage
   •   Combine and link pipeline systems and barging/shipping routes: 4 routes
   •   Provide independent custody transfer metering (for ETS)
   •   Network building block (at rivers and coast lines)
5/13/2011                                                                        2
Preliminary results

            Hub service: CO2 transfer barge/ship   pipe




                                BARGE/SHIP

                                                   PIPE




5/13/2011                                                 3
Preliminary results
                       CO2 Transport and Storage systems




                                                   •    Transport from the Emitters via
                                                        pipelines or barges;                     Liquefaction at the Emitter’s site
                                                   •    Collecting CO2 in storage tanks at the   or at the CO2 Hub
                                                        CO2 Hub;
                                                   •    Loading sea vessels for transport to
                                                        depleted offshore gas fields.

         Connecting Hub
         to offshore trunk line




          •      Locking the sea vessel to a floating turret or
                 loading tower linked with the sub-sea system of the
                 depleted gas field;
          •      Injecting the CO2 into the porous rocks (depleted
                 gas or oil field or aquifers, at required temp’s and
                 pressures ;
          •      As an alternative, mooring near a platform for
                 discharging the CO2 into a depleted field via the
                 platform utilities
5/13/2011 •      Ship is designed to carry both CO2 and LPG                                                                    4
Preliminary results

                         Hub Concept Organic Growth Model:
                                 Asset build up follows the volume build-up

              Source 1                                      Source 2             Source 3            Source 4           Source n




                                                                                                         3
                                          1
                                                        2              2
1. Early scheme: single source
   flow too small to justify off shore
                                                                                                3. Final mature scheme:
   pipe
                                                                                                   multiple sources &
2. Intermediate scheme: two                                                                        sinks, both depleted
   combined flows do allow for an                                                                  reservoirs and EOR at
   off shore pipe => ship moves                                                                    production wells
   into alternative CO2 or LPG                                                              3
   service                                              2
                                                                                                                    3
                                    1
                                                                             2
                                                              Potentially
                         Ship now could                        ship that
                          become pipe                         used to sail
                            line for 2                         on sink 1                            Sink 3: EOR
     Sink 1                                   Sink 1                         Sink 2                                      Sink n
  5/13/2011                  sources                                                                 at oil field
                                                                                                                                   5
Preliminary results

                      GCCSI LLSC study:
                    lessons learned to date
General
• Start engineering at the sink
• Minimize CO2 composition requirements
• Combining multiple emitters in one network is technically feasible.
• No metallurgical/corrosion issues found other than water: dry at the
  source
SHE
• No items of concern encountered
• Low vessel collision risk due to high LCO2 density
• On shore pipeline through busy areas: 40 bar
Compression
• Up to 100 bar: bull gear compressor (bull gear), beyond: pump.
• Moderate ambient temperatures: no power consumption difference
  between compression or compression/liquefaction/pumping.
Pipeline
• In dense phase in order to minimize costs.


5/13/2011                                                                6
Preliminary results
                    GCCSI LLSC study:
                  lessons learned to date

   Liquefaction
   • Optimum CO2 liquefaction condition: -50 ˚C, 7 bara.
   • Combining parallel compression and liquefaction in one
     machine feasible.
   Storage
   • Terminal minimum storage volume: 10,000 m3
   • Min. costs/m3: > 2000 m3 shop fabricated spheres
   • Other considerations may call for horizontal bullets.
   Legislation
     Biggest remaining uncertainties:
   • CO2 custody transfer: who, when and to whom
   • Monitoring requirements in the mean time

5/13/2011                                                     7
Preliminary results
                                                GCCSI LLSC study:
                                              lessons learned to date
                                                    ship sizes
                                       Ship transport capacity [mmt/yr]

            3.5                                                                                                                         • Loading & discharge 2000 t/hr
                                                                                                                                        • Sailing speed 15 kts
             3                                                                                                                          • Voyage related spare 1 day


            2.5

             2
                                                                                                    30,000 cbm ship
            1.5

             1
                                                                                                    10,000 cbm ship

            0.5

             0
                      50
                           100
                                 150
                                        200
                                              250
                                                    300
                                                          350
                                                                400
                                                                      450
                                                                            500
                                                                                  550
                                                                                        600
                                                                                              650
                                                                                                    700
                                                                                                          750
                                                                                                                800
                                                                                                                      850
                                                                                                                            900
                                                                                                                                  950
                  0




                                                           Distance [nm]




5/13/2011                                                                                                                                                                 8
Preliminary results


                                                          LLSC mission statement
            • Depleted gas field NS
            • Stand alone operation
            • Stay above hydrate formation bottom hole temperature: 13 ˚C
            • Challenges:     all solvable
                    Intermittent flow
                    Pressure over sink life time: 150 – 400 bar at well head
                                                450

                                                400
                Ship manifold pressure (bara)




                                                350

                                                300

                                                250

                                                200

                                                150

                                                100

                                                50

                                                 0
                                                      0   2   4     6           8           10   12   14   16
                                                                        Time line (years)


5/13/2011                                                                                                       9
Preliminary results



                                           Shipping




 Source: AnthonyVeder – IP Anthony Veder


    • LPG/CO2 carrier
    • 30,000 m3
    • Stand alone operation
    • Onboard conditioning
    • Key challenge: uptime
         • Conventional
         • X - bow
                                            Source Anthony Veder, X-Bow® IP of Ulstein Sea of Solutions
5/13/2011                                                                                                 10
Preliminary results



                                      Conventional hull




     Source: AnthonyVeder – IP Anthony Veder

                   LOA                  210 m              DP 2
                   B                    33.6 m             Sailing speed 17kts (lpg trade)
5/13/2011          T                    11 m               Gradual power generation build    11
Preliminary results



                                       CO2Conditioning




     Source: AnthonyVeder – IP Anthony Veder


5/13/2011                                                            12
Preliminary results


             Rotterdam distance to sinks

  Dutch sinks are all
  within the 400 km
  range.




5/13/2011                                  13
Preliminary results
                        GCCSI LLSC study:
                      lessons learned to date
   Barging/shipping
   • No CO2 venting/re-liquefaction in transit
   • Barge max. LOA 135 m → 150 m in the future
   • Max barge size Ruhrgebiet → R’dam: 7500 tonnes (Ruhrgebiet →
     Karlsruhe: 6000 tonnes)
   • Required ship sizes: 10,000 - 30,000 m3
   • Ship min. required off loading temperature: 0 ˚C
   • => sea water suffices as heat source for LCO2 “vaporization”
   Ship off loading
   • HP pressure CO2 unmanned off loading: technically feasible at
     acceptable uptimes in deep and shallow water.
   • Depleted reservoir’s existing wells require retubing
   • Ship → sink batch injection technically feasible, multiple wells likely
     to be required flow wise.
   • Tubing: low temperature material of construction.



5/13/2011                                                                      14
Preliminary results

                           GCCSI LLSC study:
                         lessons learned to date
                           Costs: contract duration




            Pipeline system tariffs are hurt the most by short term contracts
5/13/2011                                                                       15
Preliminary results


                  Transportation Costs: insight evolution



                              LNG                       CO2


                                                            Source: IEA GHG, 2004




            CO2                                   CO2




5/13/2011                                                                           16
Preliminary results

                       GCCSI LLSC study:
                     lessons learned to date

   Costs
   • CO2 transportation is to be considered as a regular infra
     structural project: 20+ year contract durations
   • CO2 liquefaction’s energy intensity is relatively low =>
     cost break even distances are
        1. for on shore pipe versus barge: 200 km (and not 1500 km)
        2. for off shore pipe versus ship: 150 km (and not 750 km)
   • Depending on flow and distance the transportation costs
     may vary from 20 to 120 €/ton (20 year contract)
   • Combining multiple emitters in one system is paramount
     to make CCS affordable, especially for industrial
     (smaller) emitters

5/13/2011                                                             17
Preliminary results




            THANK YOU


            QUESTIONS?



5/13/2011                         18
Preliminary results




            BACKUP SLIDES




5/13/2011                           19
Preliminary results


            Which transport solution to choose cost wise




5/13/2011                                                  20
Preliminary results

                        Transportation tariffs




5/13/2011   From capture flange to storage well head; 20 year take or pay   21
Preliminary results

                        Transportation tariffs




5/13/2011   From capture flange to storage well head; 20 year take or pay   22
Preliminary results

                        Transportation tariffs




5/13/2011   From capture flange to storage well head; 20 year take or pay   23
Preliminary results

                        Transportation tariffs




5/13/2011   From capture flange to storage well head; 20 year take or pay   24
Preliminary results

            CO2 Hub Process Flow Diagram




5/13/2011                                  25

More Related Content

What's hot

Hydrogen Mission 2021& Green Hydrogen Policy 2022.pptx
Hydrogen Mission 2021& Green Hydrogen  Policy 2022.pptxHydrogen Mission 2021& Green Hydrogen  Policy 2022.pptx
Hydrogen Mission 2021& Green Hydrogen Policy 2022.pptx
YuvrajSaigal
 
Dust explosion sizing comparison
Dust explosion sizing comparisonDust explosion sizing comparison
Dust explosion sizing comparison
Christopher Bell
 
Perdagangan Bursa Karbon memfasilitasi Pembangkit Tenaga Listrik.pdf
Perdagangan Bursa Karbon memfasilitasi Pembangkit Tenaga Listrik.pdfPerdagangan Bursa Karbon memfasilitasi Pembangkit Tenaga Listrik.pdf
Perdagangan Bursa Karbon memfasilitasi Pembangkit Tenaga Listrik.pdf
AswarSani1
 

What's hot (20)

Hydrogen Mission 2021& Green Hydrogen Policy 2022.pptx
Hydrogen Mission 2021& Green Hydrogen  Policy 2022.pptxHydrogen Mission 2021& Green Hydrogen  Policy 2022.pptx
Hydrogen Mission 2021& Green Hydrogen Policy 2022.pptx
 
Methanation Catalyst Start Up Procedures
Methanation Catalyst Start Up Procedures Methanation Catalyst Start Up Procedures
Methanation Catalyst Start Up Procedures
 
Hydrogen policy regulations and standards
Hydrogen policy regulations and standardsHydrogen policy regulations and standards
Hydrogen policy regulations and standards
 
Carbon Capture & Storage
Carbon Capture & StorageCarbon Capture & Storage
Carbon Capture & Storage
 
Dust explosion sizing comparison
Dust explosion sizing comparisonDust explosion sizing comparison
Dust explosion sizing comparison
 
OECD presentation - Financing the energy transition in emerging and developin...
OECD presentation - Financing the energy transition in emerging and developin...OECD presentation - Financing the energy transition in emerging and developin...
OECD presentation - Financing the energy transition in emerging and developin...
 
Carbon capture and storage
Carbon capture and storageCarbon capture and storage
Carbon capture and storage
 
Green hydrogen Basics - Overview_Jan 2022
Green hydrogen Basics - Overview_Jan 2022Green hydrogen Basics - Overview_Jan 2022
Green hydrogen Basics - Overview_Jan 2022
 
Carbon Capture & Storage
Carbon Capture & StorageCarbon Capture & Storage
Carbon Capture & Storage
 
2020-2024 strategic plan: Towards Net Zero
2020-2024 strategic plan: Towards Net Zero2020-2024 strategic plan: Towards Net Zero
2020-2024 strategic plan: Towards Net Zero
 
Presentation on ONGC
Presentation on ONGCPresentation on ONGC
Presentation on ONGC
 
Indonesia-Energy-Transition-Outlook_2023.pdf
Indonesia-Energy-Transition-Outlook_2023.pdfIndonesia-Energy-Transition-Outlook_2023.pdf
Indonesia-Energy-Transition-Outlook_2023.pdf
 
The opportunities for reducing CO2 emissions in the iron and steel industry -...
The opportunities for reducing CO2 emissions in the iron and steel industry -...The opportunities for reducing CO2 emissions in the iron and steel industry -...
The opportunities for reducing CO2 emissions in the iron and steel industry -...
 
PPT ON DIRECT AIR CARBON CAPTURE.pdf
PPT ON DIRECT AIR CARBON CAPTURE.pdfPPT ON DIRECT AIR CARBON CAPTURE.pdf
PPT ON DIRECT AIR CARBON CAPTURE.pdf
 
Carbon capture and storage
Carbon capture and storageCarbon capture and storage
Carbon capture and storage
 
Perdagangan Bursa Karbon memfasilitasi Pembangkit Tenaga Listrik.pdf
Perdagangan Bursa Karbon memfasilitasi Pembangkit Tenaga Listrik.pdfPerdagangan Bursa Karbon memfasilitasi Pembangkit Tenaga Listrik.pdf
Perdagangan Bursa Karbon memfasilitasi Pembangkit Tenaga Listrik.pdf
 
Carbon Capture and Storage: what is it, why is it relevant, and does it work?
Carbon Capture and Storage: what is it, why is it relevant, and does it work?Carbon Capture and Storage: what is it, why is it relevant, and does it work?
Carbon Capture and Storage: what is it, why is it relevant, and does it work?
 
The Role of Carbon Capture Storage (CCS) and Carbon Capture Utilization (CCU)...
The Role of Carbon Capture Storage (CCS) and Carbon Capture Utilization (CCU)...The Role of Carbon Capture Storage (CCS) and Carbon Capture Utilization (CCU)...
The Role of Carbon Capture Storage (CCS) and Carbon Capture Utilization (CCU)...
 
Bahan KLHK.PDF
Bahan KLHK.PDFBahan KLHK.PDF
Bahan KLHK.PDF
 
Hydrogen as an energy carrier
Hydrogen as an energy carrierHydrogen as an energy carrier
Hydrogen as an energy carrier
 

Viewers also liked

Halderman ch066 lecture
Halderman ch066 lectureHalderman ch066 lecture
Halderman ch066 lecture
mcfalltj
 
Aromatics & gasoline components overview (EPCA 2012 presentation)
Aromatics & gasoline components overview (EPCA 2012 presentation)Aromatics & gasoline components overview (EPCA 2012 presentation)
Aromatics & gasoline components overview (EPCA 2012 presentation)
emeamarketing
 
Global ports strategy_update_presentation_2014
Global ports strategy_update_presentation_2014Global ports strategy_update_presentation_2014
Global ports strategy_update_presentation_2014
Company Spotlight
 
fujairah_oil_terminal
fujairah_oil_terminalfujairah_oil_terminal
fujairah_oil_terminal
Irfan ahamed
 

Viewers also liked (20)

Halderman ch066 lecture
Halderman ch066 lectureHalderman ch066 lecture
Halderman ch066 lecture
 
IH Metrics
IH MetricsIH Metrics
IH Metrics
 
Demystifying Gasoline Components Exposure Assessment
Demystifying Gasoline Components Exposure AssessmentDemystifying Gasoline Components Exposure Assessment
Demystifying Gasoline Components Exposure Assessment
 
Aromatics & gasoline components overview (EPCA 2012 presentation)
Aromatics & gasoline components overview (EPCA 2012 presentation)Aromatics & gasoline components overview (EPCA 2012 presentation)
Aromatics & gasoline components overview (EPCA 2012 presentation)
 
Gasoline blending
Gasoline blendingGasoline blending
Gasoline blending
 
SWISS TRADING COMPANIES, AFRICAN OIL AND THE RISKS OF OPACITY
SWISS TRADING COMPANIES, AFRICAN OIL AND THE RISKS OF OPACITY SWISS TRADING COMPANIES, AFRICAN OIL AND THE RISKS OF OPACITY
SWISS TRADING COMPANIES, AFRICAN OIL AND THE RISKS OF OPACITY
 
Port of Corpus Christ Powerpoint Presentation
Port of Corpus Christ Powerpoint PresentationPort of Corpus Christ Powerpoint Presentation
Port of Corpus Christ Powerpoint Presentation
 
Global ports strategy_update_presentation_2014
Global ports strategy_update_presentation_2014Global ports strategy_update_presentation_2014
Global ports strategy_update_presentation_2014
 
Drewry marine terminal finance investment summit 2015
Drewry   marine terminal finance investment summit 2015Drewry   marine terminal finance investment summit 2015
Drewry marine terminal finance investment summit 2015
 
Opportunities for Shipping LNG to the Caribbean
Opportunities for Shipping LNG to the CaribbeanOpportunities for Shipping LNG to the Caribbean
Opportunities for Shipping LNG to the Caribbean
 
Jordan Godwin: Ethanol vs. Gasoline: Implications of the New Normal
Jordan Godwin:  Ethanol vs. Gasoline: Implications of the New NormalJordan Godwin:  Ethanol vs. Gasoline: Implications of the New Normal
Jordan Godwin: Ethanol vs. Gasoline: Implications of the New Normal
 
fujairah_oil_terminal
fujairah_oil_terminalfujairah_oil_terminal
fujairah_oil_terminal
 
Blending of ethanol in gasoline for petrol engines
Blending of ethanol in gasoline for petrol enginesBlending of ethanol in gasoline for petrol engines
Blending of ethanol in gasoline for petrol engines
 
The Oil Gas Tipping Point & Business Case Economics
The Oil Gas Tipping Point & Business Case EconomicsThe Oil Gas Tipping Point & Business Case Economics
The Oil Gas Tipping Point & Business Case Economics
 
Gasoline blending
Gasoline blendingGasoline blending
Gasoline blending
 
Riverkeeper Crude Oil Presentation to Putnam County Legislature Committee 2.1...
Riverkeeper Crude Oil Presentation to Putnam County Legislature Committee 2.1...Riverkeeper Crude Oil Presentation to Putnam County Legislature Committee 2.1...
Riverkeeper Crude Oil Presentation to Putnam County Legislature Committee 2.1...
 
Gas Recovery Systems Vopak VCM Sphere Project
Gas Recovery Systems Vopak VCM Sphere ProjectGas Recovery Systems Vopak VCM Sphere Project
Gas Recovery Systems Vopak VCM Sphere Project
 
Business plan 2000-2009
Business plan 2000-2009Business plan 2000-2009
Business plan 2000-2009
 
Commodities demystified - a guide to trading and the global supply chain
Commodities demystified - a guide to trading and the global supply chainCommodities demystified - a guide to trading and the global supply chain
Commodities demystified - a guide to trading and the global supply chain
 
Come by chance
Come by chanceCome by chance
Come by chance
 

Similar to CCS - liquid logistics shipping concept - Anthony Veder Vopak

Michael Tetteroo and Cees van der Ben - CCS Projects – Presentation at the Gl...
Michael Tetteroo and Cees van der Ben - CCS Projects – Presentation at the Gl...Michael Tetteroo and Cees van der Ben - CCS Projects – Presentation at the Gl...
Michael Tetteroo and Cees van der Ben - CCS Projects – Presentation at the Gl...
Global CCS Institute
 
Modeling the CO2 hub terminal concept
Modeling the CO2 hub terminal conceptModeling the CO2 hub terminal concept
Modeling the CO2 hub terminal concept
jhjsmits
 
overview of materials and processes for CCS technologies 2
overview of materials and processes for CCS technologies 2overview of materials and processes for CCS technologies 2
overview of materials and processes for CCS technologies 2
chenntntnuno
 
2013 iea - potential for CO2 storage in oil gas shale reservoirs
2013 iea - potential for CO2 storage in oil gas shale reservoirs2013 iea - potential for CO2 storage in oil gas shale reservoirs
2013 iea - potential for CO2 storage in oil gas shale reservoirs
Steve Wittrig
 
DFS Section 2 Executive Summary
DFS Section 2 Executive SummaryDFS Section 2 Executive Summary
DFS Section 2 Executive Summary
Frank Henry
 
Tim Bertels - The Quest CCS project Canada - Presentation at the Global CCS I...
Tim Bertels - The Quest CCS project Canada - Presentation at the Global CCS I...Tim Bertels - The Quest CCS project Canada - Presentation at the Global CCS I...
Tim Bertels - The Quest CCS project Canada - Presentation at the Global CCS I...
Global CCS Institute
 
Carbon Dioxide Capture and Storage (CSS)
Carbon Dioxide Capture and Storage (CSS)Carbon Dioxide Capture and Storage (CSS)
Carbon Dioxide Capture and Storage (CSS)
Tamer Koksalan, PhD
 
European CCS Demonstration Project Network
European CCS Demonstration Project NetworkEuropean CCS Demonstration Project Network
European CCS Demonstration Project Network
Global CCS Institute
 
CBM Reservoir Simulation
CBM Reservoir SimulationCBM Reservoir Simulation
CBM Reservoir Simulation
Jameel Akbar
 

Similar to CCS - liquid logistics shipping concept - Anthony Veder Vopak (20)

Michael Tetteroo and Cees van der Ben - CCS Projects – Presentation at the Gl...
Michael Tetteroo and Cees van der Ben - CCS Projects – Presentation at the Gl...Michael Tetteroo and Cees van der Ben - CCS Projects – Presentation at the Gl...
Michael Tetteroo and Cees van der Ben - CCS Projects – Presentation at the Gl...
 
Modeling the CO2 hub terminal concept
Modeling the CO2 hub terminal conceptModeling the CO2 hub terminal concept
Modeling the CO2 hub terminal concept
 
Key aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirsKey aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirs
 
EOR CCS webinar slides - Ernie Perkins - August 2011
EOR CCS webinar slides - Ernie Perkins - August 2011EOR CCS webinar slides - Ernie Perkins - August 2011
EOR CCS webinar slides - Ernie Perkins - August 2011
 
Carbon capture and storage
Carbon capture and storage Carbon capture and storage
Carbon capture and storage
 
overview of materials and processes for CCS technologies 2
overview of materials and processes for CCS technologies 2overview of materials and processes for CCS technologies 2
overview of materials and processes for CCS technologies 2
 
1st poster example of core analysis program
1st poster example of core analysis program1st poster example of core analysis program
1st poster example of core analysis program
 
2013 iea - potential for CO2 storage in oil gas shale reservoirs
2013 iea - potential for CO2 storage in oil gas shale reservoirs2013 iea - potential for CO2 storage in oil gas shale reservoirs
2013 iea - potential for CO2 storage in oil gas shale reservoirs
 
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
Grangemouth CCS project, Stephen Kerr, Summit Power - UKCCSRC Strathclyde Bia...
 
DFS Section 2 Executive Summary
DFS Section 2 Executive SummaryDFS Section 2 Executive Summary
DFS Section 2 Executive Summary
 
Flow assurance using AspenHYSYS Hydraulics
Flow assurance using AspenHYSYS HydraulicsFlow assurance using AspenHYSYS Hydraulics
Flow assurance using AspenHYSYS Hydraulics
 
Membrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationMembrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) Presentation
 
Tim Bertels - The Quest CCS project Canada - Presentation at the Global CCS I...
Tim Bertels - The Quest CCS project Canada - Presentation at the Global CCS I...Tim Bertels - The Quest CCS project Canada - Presentation at the Global CCS I...
Tim Bertels - The Quest CCS project Canada - Presentation at the Global CCS I...
 
Cfdstr
CfdstrCfdstr
Cfdstr
 
Carbon Dioxide Capture and Storage (CSS)
Carbon Dioxide Capture and Storage (CSS)Carbon Dioxide Capture and Storage (CSS)
Carbon Dioxide Capture and Storage (CSS)
 
LW BEER 1.6.10
LW BEER 1.6.10LW BEER 1.6.10
LW BEER 1.6.10
 
Qatar Carbonates and Carbon Storage Centre
Qatar Carbonates and Carbon Storage CentreQatar Carbonates and Carbon Storage Centre
Qatar Carbonates and Carbon Storage Centre
 
European CCS Demonstration Project Network
European CCS Demonstration Project NetworkEuropean CCS Demonstration Project Network
European CCS Demonstration Project Network
 
CBM Reservoir Simulation
CBM Reservoir SimulationCBM Reservoir Simulation
CBM Reservoir Simulation
 
EOR vs. Storage, Ed Steadman, EERC
EOR vs. Storage, Ed Steadman, EERCEOR vs. Storage, Ed Steadman, EERC
EOR vs. Storage, Ed Steadman, EERC
 

More from Global CCS Institute

Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Global CCS Institute
 
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCSDecarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Global CCS Institute
 
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Global CCS Institute
 
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Global CCS Institute
 
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Global CCS Institute
 
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Global CCS Institute
 
Managing carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basinsManaging carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basins
Global CCS Institute
 
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Global CCS Institute
 
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Global CCS Institute
 
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Global CCS Institute
 
Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...
Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...
Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...
Global CCS Institute
 
CarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection processCarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection process
Global CCS Institute
 

More from Global CCS Institute (20)

Webinar: Policy priorities to incentivise large scale deployment of CCS
Webinar: Policy priorities to incentivise large scale deployment of CCSWebinar: Policy priorities to incentivise large scale deployment of CCS
Webinar: Policy priorities to incentivise large scale deployment of CCS
 
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
 
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
 
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCSDecarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
 
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
 
Global CCS Institute Presentation
Global CCS Institute PresentationGlobal CCS Institute Presentation
Global CCS Institute Presentation
 
ION Engineering Presentation
ION Engineering PresentationION Engineering Presentation
ION Engineering Presentation
 
Mission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation ChallengeMission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation Challenge
 
Can the United States Achieve a Low Carbon Economy by 2050?
Can the United States Achieve a Low Carbon Economy by 2050?Can the United States Achieve a Low Carbon Economy by 2050?
Can the United States Achieve a Low Carbon Economy by 2050?
 
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
 
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
 
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
 
Managing carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basinsManaging carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basins
 
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
 
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
 
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
 
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
 
Water use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systemsWater use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systems
 
Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...
Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...
Global Status of CCS: 2016. Saline Aquifer Storage Performance at the Quest C...
 
CarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection processCarbonNet storage site characterisation and selection process
CarbonNet storage site characterisation and selection process
 

Recently uploaded

Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
laloo_007
 

Recently uploaded (20)

Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdf
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Rice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsRice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna Exports
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 

CCS - liquid logistics shipping concept - Anthony Veder Vopak

  • 1. Preliminary results GCCSI Study Liquid logistic Shipping Concept Lessons learned to date Rotterdam May 11th, 2011 Michael Tetteroo & Cees van der Ben 5/13/2011 1
  • 2. Preliminary results CINTRA logistic concept • Bulk making/breaking for off shore CO2 storage • Intermediate Storage • Combine and link pipeline systems and barging/shipping routes: 4 routes • Provide independent custody transfer metering (for ETS) • Network building block (at rivers and coast lines) 5/13/2011 2
  • 3. Preliminary results Hub service: CO2 transfer barge/ship pipe BARGE/SHIP PIPE 5/13/2011 3
  • 4. Preliminary results CO2 Transport and Storage systems • Transport from the Emitters via pipelines or barges; Liquefaction at the Emitter’s site • Collecting CO2 in storage tanks at the or at the CO2 Hub CO2 Hub; • Loading sea vessels for transport to depleted offshore gas fields. Connecting Hub to offshore trunk line • Locking the sea vessel to a floating turret or loading tower linked with the sub-sea system of the depleted gas field; • Injecting the CO2 into the porous rocks (depleted gas or oil field or aquifers, at required temp’s and pressures ; • As an alternative, mooring near a platform for discharging the CO2 into a depleted field via the platform utilities 5/13/2011 • Ship is designed to carry both CO2 and LPG 4
  • 5. Preliminary results Hub Concept Organic Growth Model: Asset build up follows the volume build-up Source 1 Source 2 Source 3 Source 4 Source n 3 1 2 2 1. Early scheme: single source flow too small to justify off shore 3. Final mature scheme: pipe multiple sources & 2. Intermediate scheme: two sinks, both depleted combined flows do allow for an reservoirs and EOR at off shore pipe => ship moves production wells into alternative CO2 or LPG 3 service 2 3 1 2 Potentially Ship now could ship that become pipe used to sail line for 2 on sink 1 Sink 3: EOR Sink 1 Sink 1 Sink 2 Sink n 5/13/2011 sources at oil field 5
  • 6. Preliminary results GCCSI LLSC study: lessons learned to date General • Start engineering at the sink • Minimize CO2 composition requirements • Combining multiple emitters in one network is technically feasible. • No metallurgical/corrosion issues found other than water: dry at the source SHE • No items of concern encountered • Low vessel collision risk due to high LCO2 density • On shore pipeline through busy areas: 40 bar Compression • Up to 100 bar: bull gear compressor (bull gear), beyond: pump. • Moderate ambient temperatures: no power consumption difference between compression or compression/liquefaction/pumping. Pipeline • In dense phase in order to minimize costs. 5/13/2011 6
  • 7. Preliminary results GCCSI LLSC study: lessons learned to date Liquefaction • Optimum CO2 liquefaction condition: -50 ˚C, 7 bara. • Combining parallel compression and liquefaction in one machine feasible. Storage • Terminal minimum storage volume: 10,000 m3 • Min. costs/m3: > 2000 m3 shop fabricated spheres • Other considerations may call for horizontal bullets. Legislation Biggest remaining uncertainties: • CO2 custody transfer: who, when and to whom • Monitoring requirements in the mean time 5/13/2011 7
  • 8. Preliminary results GCCSI LLSC study: lessons learned to date ship sizes Ship transport capacity [mmt/yr] 3.5 • Loading & discharge 2000 t/hr • Sailing speed 15 kts 3 • Voyage related spare 1 day 2.5 2 30,000 cbm ship 1.5 1 10,000 cbm ship 0.5 0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 0 Distance [nm] 5/13/2011 8
  • 9. Preliminary results LLSC mission statement • Depleted gas field NS • Stand alone operation • Stay above hydrate formation bottom hole temperature: 13 ˚C • Challenges: all solvable Intermittent flow Pressure over sink life time: 150 – 400 bar at well head 450 400 Ship manifold pressure (bara) 350 300 250 200 150 100 50 0 0 2 4 6 8 10 12 14 16 Time line (years) 5/13/2011 9
  • 10. Preliminary results Shipping Source: AnthonyVeder – IP Anthony Veder • LPG/CO2 carrier • 30,000 m3 • Stand alone operation • Onboard conditioning • Key challenge: uptime • Conventional • X - bow Source Anthony Veder, X-Bow® IP of Ulstein Sea of Solutions 5/13/2011 10
  • 11. Preliminary results Conventional hull Source: AnthonyVeder – IP Anthony Veder LOA 210 m DP 2 B 33.6 m Sailing speed 17kts (lpg trade) 5/13/2011 T 11 m Gradual power generation build 11
  • 12. Preliminary results CO2Conditioning Source: AnthonyVeder – IP Anthony Veder 5/13/2011 12
  • 13. Preliminary results Rotterdam distance to sinks Dutch sinks are all within the 400 km range. 5/13/2011 13
  • 14. Preliminary results GCCSI LLSC study: lessons learned to date Barging/shipping • No CO2 venting/re-liquefaction in transit • Barge max. LOA 135 m → 150 m in the future • Max barge size Ruhrgebiet → R’dam: 7500 tonnes (Ruhrgebiet → Karlsruhe: 6000 tonnes) • Required ship sizes: 10,000 - 30,000 m3 • Ship min. required off loading temperature: 0 ˚C • => sea water suffices as heat source for LCO2 “vaporization” Ship off loading • HP pressure CO2 unmanned off loading: technically feasible at acceptable uptimes in deep and shallow water. • Depleted reservoir’s existing wells require retubing • Ship → sink batch injection technically feasible, multiple wells likely to be required flow wise. • Tubing: low temperature material of construction. 5/13/2011 14
  • 15. Preliminary results GCCSI LLSC study: lessons learned to date Costs: contract duration Pipeline system tariffs are hurt the most by short term contracts 5/13/2011 15
  • 16. Preliminary results Transportation Costs: insight evolution LNG CO2 Source: IEA GHG, 2004 CO2 CO2 5/13/2011 16
  • 17. Preliminary results GCCSI LLSC study: lessons learned to date Costs • CO2 transportation is to be considered as a regular infra structural project: 20+ year contract durations • CO2 liquefaction’s energy intensity is relatively low => cost break even distances are 1. for on shore pipe versus barge: 200 km (and not 1500 km) 2. for off shore pipe versus ship: 150 km (and not 750 km) • Depending on flow and distance the transportation costs may vary from 20 to 120 €/ton (20 year contract) • Combining multiple emitters in one system is paramount to make CCS affordable, especially for industrial (smaller) emitters 5/13/2011 17
  • 18. Preliminary results THANK YOU QUESTIONS? 5/13/2011 18
  • 19. Preliminary results BACKUP SLIDES 5/13/2011 19
  • 20. Preliminary results Which transport solution to choose cost wise 5/13/2011 20
  • 21. Preliminary results Transportation tariffs 5/13/2011 From capture flange to storage well head; 20 year take or pay 21
  • 22. Preliminary results Transportation tariffs 5/13/2011 From capture flange to storage well head; 20 year take or pay 22
  • 23. Preliminary results Transportation tariffs 5/13/2011 From capture flange to storage well head; 20 year take or pay 23
  • 24. Preliminary results Transportation tariffs 5/13/2011 From capture flange to storage well head; 20 year take or pay 24
  • 25. Preliminary results CO2 Hub Process Flow Diagram 5/13/2011 25