Marine Energy in Australia
 ~15 companies in Australia
 ~10 marine energy plants in various stages of
      development: a further 9 at the proposal stage
 Most are small pilot projects

Clean Energy Council, Marine Energy Sector report (2010).
“The future success of ocean power in Australia is dependent
upon government policies to support the development and
        deployment of these emerging technologies.
 The sector requires a comprehensive policy framework for
emerging technologies to take them from research to full scale
                        demonstration.”

                          Clean Energy Council
Barriers to Development
 Technical
 Financing
 Regulatory and policy barriers
 Bottom line is cost
 Cost of producing a marine energy system is very high, though cost
       will fall as technologies mature – need a helping hand!
 Capital cost ($/kW) of wave and ocean current generation is currently
       $7000 and $5200 respectively: $1498 for coal (without CCS)                                                                                      1




1 CSIRO, ‘Projections of the future costs of electricity generation technologies: An application of CSIRO’s Global and Local Learning Model’ (2011) 64-68.
Regulatory Regime
 No specific legal regime/measures for marine energy projects in
   Australia

 Victoria has been considering policy for some time (note recent
   change of government)

 Existing federal laws applicable to renewable energy projects
   generally, e.g.:
    Environmental Protection and Biodiversity Conservation Act 2009
    Renewable Energy Target legislation
    National Electricity Market
 Federal legislation:
     Australian Maritime Safety Authority Act 1990
     Coastal Waters Acts 1980 (delineating state/federal)
     Sea Installations Act 1987 (permitting for installations)
     Historic Shipwrecks Act 1976 (nearly 8,000 shipwrecks)
 State legal regimes, such as:
     coastal management legislation
     climate change legislation
     planning law
     environmental protection
     regulation of pipelines
     port management legislation
Issues with Existing Regime
 Environmental impact assessment
 Exploration and exploitation licensing
 Transmission network connection
 Split jurisdiction
 Fragmented/Ad-hoc approach
Environmental impact assessment
 EIA is an expensive process: requiring an excessively
   detailed report for low impact technologies and small
   pilot projects adds cost and inefficiency

 Other technologies have homogenised; marine
   technologies are still numerous and diverse – need
   for flexibility

 Wide range of marine energy technologies = diverse
   range of environmental impacts

 Tidal fence and overtopping systems: large-scale
   alteration of the surrounding landscape, impact on
   water flows                                             Maui’s Dolphin

 Freestanding/submerged turbines: minimal impact
Rance Tidal Power Station, Brittany, France
BioWave device
Environmental impact assessment
Portugal

Established a 320 km2 pilot zone for marine energy test projects: less
detailed EIA required

Scotland

Government conducted detailed EIA in high-energy areas to establish
baseline data and likely impacts: takes burden off marine energy companies

Australia

Exploration licensing regime for coal/gas/geothermal applies less stringent
EIA requirements for exploring/assessing resource

                 Exploration Licensing
    Well-established system of exploration/mining licences for coal, gas and oil
    (including offshore), and even geothermal - relatively uniform across jurisdictions

   Exploration for resources on ‘a use it or lose it’ basis

   EL also provides a framework for drilling and testing: differing requirements
    based on activity

   No such system is in place for marine energy: company may spend time and
    money ‘prospecting’, but will not have exclusive rights                               Australia’s wave resource


   Particularly a problem for tidal systems: only a handful of potential locations

   State governments have approached licensing differently, developing the
    licensing process as and when applications arise: lack of uniformity and uncertain
    regulatory landscape

   EL could be used to guarantee rights over a resource and provide a framework          Australia’s tidal resource
    for testing and prototype deployment
Offshore oil & gas exploration licences
Transmission Network Connection
        All large energy generators need to connect to the transmission
         network: building this infrastructure is expensive

        Scotland: “significant constraint to the future development of marine
         renewables”                1




        Coal power stations benefit from existing network: renewable energy
         generators have to bear cost of building new lines

        BUT, can’t operate the transmission lines – gift to operator

        Future generators will want to connect using this infrastructure, but
         will not have to pay the company that built it = unfair distribution of
         costs

        Recent rule-change proposal in Australia to fix this problem was
         drastically toned down: basic structure of the regime left in tact
1 Scottish Marine Renewables SEA (2007).
Transmission Network Connection
UK

Special offshore transmission regime

Transmission network owners bid to build,
own and operate offshore transmission
platform and line

Texas

Similar system

‘Competitive Renewable Energy Zones’

Transmission companies tender for
infrastructure projects
Split Jurisdiction
 Maritime jurisdiction split between state/federal governments
 3 nautical miles                     1




 Projects within 3 nautical miles of the coast regulated by state legislation and
       the EPBC Act (and other federal legislation)

 Projects beyond this limit regulated by Sea Installations Act 1987 and other
       federal legislation

 Potentially dealing with two separate regulatory regimes, depending upon how
       far from the coast the project is situated
1 Offshore Constitutional Settlement (1979) and Coastal Waters Acts
Ad-hoc Approach
 Lack of a considered regulatory framework means that local
   authorities are often uncertain which legislation to apply for site tenure
   and development approval
 Tendency to ‘invent’ regulation = delay and added cost
 Inappropriate requirements, e.g. excessive EIA requirements ‘just to
   be sure’
 Various relevant bodies for licensing/unclear delineation
 Clear method in commercial legal practice is unlikely to emerge: likely
   that further fragmentation of approach will occur
Ad-hoc Approach
Scotland

Dedicated licensing system for marine energy projects

UK

Established the Marine Management Organisation and a licensing process for marine energy

Portugal

One dedicated management body for its pilot area

Spain

Collated and integrated applicable legislation into a single administrative procedure
New Zealand
   Similar position to Australia: no specific regime
   Marine energy regulated by Resource Management Act
    1991
   Crest Energy: first large-scale tidal project recently
    approved (200 1Mw turbines)
       ~5 years

       Long-winded EIA

       Maori claim issues

   No ELs: very limited tidal locations – likely to be
    competition/dispute
   Limited grid connection options
Policy Measures
 Measures to actively encourage marine energy:
    Feed-in tariffs. e.g.:
       France: €150/MWh for 20 years
       Portugal: €260/MWh for first 4MW installed, down to €76/MWh for
        20-100MW installed
       Ireland: €220/MWH

    Multiplied Renewable Energy Certificates (not relevant until marine energy
      projects are in operation)

    Grants, subsidies and tax breaks, e.g.:
       UK: £22million Marine Renewables Proving Fund
       NZ: NZ$8 million Marine Energy Deployment Fund
Summary
 Ease current regulatory burden:
     Gradated EIA requirements
     ‘One-stop’ system for licensing
     Prototype/RE zones
     New rules for grid connection
 Measures to actively encourage marine energy:
   Feed-in tariff
   Multiplied RECs
   Further grants, subsidies and tax breaks
Thank You
glen.w.wright@gmail.com
   www.GlenWright.net

More Related Content

What's hot

Massachusetts policies for combined heat & power
Massachusetts policies for combined heat & powerMassachusetts policies for combined heat & power
Massachusetts policies for combined heat & power
TNenergy
 
Glen Wright - Legal and Regulatory Aspects of RE
Glen Wright - Legal and Regulatory Aspects of REGlen Wright - Legal and Regulatory Aspects of RE
Glen Wright - Legal and Regulatory Aspects of RE
ANUECI
 
20160615 EI Energy Systems final
20160615 EI Energy Systems final20160615 EI Energy Systems final
20160615 EI Energy Systems final
Matthew Hannon
 
Regulations, Supply Rules and Standards of Electricity
Regulations,  Supply Rules and Standards of ElectricityRegulations,  Supply Rules and Standards of Electricity
Regulations, Supply Rules and Standards of Electricity
Rupesh Bobbili
 

What's hot (16)

Massachusetts policies for combined heat & power
Massachusetts policies for combined heat & powerMassachusetts policies for combined heat & power
Massachusetts policies for combined heat & power
 
Glen Wright - Legal and Regulatory Aspects of RE
Glen Wright - Legal and Regulatory Aspects of REGlen Wright - Legal and Regulatory Aspects of RE
Glen Wright - Legal and Regulatory Aspects of RE
 
Status of North American CO2 Capture and Storage (CCS) Projects - presentatio...
Status of North American CO2 Capture and Storage (CCS) Projects - presentatio...Status of North American CO2 Capture and Storage (CCS) Projects - presentatio...
Status of North American CO2 Capture and Storage (CCS) Projects - presentatio...
 
Integration of High Levels of Renewables on the Vermont Electric System
Integration of High Levels of Renewables on the Vermont Electric SystemIntegration of High Levels of Renewables on the Vermont Electric System
Integration of High Levels of Renewables on the Vermont Electric System
 
EPA's Clean Power Plan – An Update
EPA's Clean Power Plan – An UpdateEPA's Clean Power Plan – An Update
EPA's Clean Power Plan – An Update
 
64 Mufford Project Status - Dec 15, 2008
64 Mufford Project Status - Dec 15, 200864 Mufford Project Status - Dec 15, 2008
64 Mufford Project Status - Dec 15, 2008
 
20160615 EI Energy Systems final
20160615 EI Energy Systems final20160615 EI Energy Systems final
20160615 EI Energy Systems final
 
City of Santa Monica
City of Santa MonicaCity of Santa Monica
City of Santa Monica
 
Electricity Act 2003 and its proposed amendments
Electricity Act 2003 and its proposed amendmentsElectricity Act 2003 and its proposed amendments
Electricity Act 2003 and its proposed amendments
 
Presentation by MNRE on Solar Parks
Presentation by MNRE on Solar ParksPresentation by MNRE on Solar Parks
Presentation by MNRE on Solar Parks
 
20141216 Connect Iowa Policy Presentation
20141216 Connect Iowa Policy Presentation20141216 Connect Iowa Policy Presentation
20141216 Connect Iowa Policy Presentation
 
The potential for wind energy in lebanon
The potential for wind energy in lebanonThe potential for wind energy in lebanon
The potential for wind energy in lebanon
 
Mark waite-the-role-of-renewable-energy-in-chuuk-state-service-expansion
Mark waite-the-role-of-renewable-energy-in-chuuk-state-service-expansionMark waite-the-role-of-renewable-energy-in-chuuk-state-service-expansion
Mark waite-the-role-of-renewable-energy-in-chuuk-state-service-expansion
 
Regulations, Supply Rules and Standards of Electricity
Regulations,  Supply Rules and Standards of ElectricityRegulations,  Supply Rules and Standards of Electricity
Regulations, Supply Rules and Standards of Electricity
 
El Hierro 100 % res island (EN)
El Hierro 100 % res island (EN)El Hierro 100 % res island (EN)
El Hierro 100 % res island (EN)
 
Abt meter
Abt meterAbt meter
Abt meter
 

Similar to Marine Energy in Australia and New Zealand: Regulatory Barriers and Policy Measures

CCS in Australia – the storage challenge – Dick Wells, Global CCS Institute M...
CCS in Australia – the storage challenge – Dick Wells, Global CCS Institute M...CCS in Australia – the storage challenge – Dick Wells, Global CCS Institute M...
CCS in Australia – the storage challenge – Dick Wells, Global CCS Institute M...
Global CCS Institute
 
Renewable Energy Act of 2008: Hits and Misses for the Philippine Geothermal I...
Renewable Energy Act of 2008: Hits and Misses for the Philippine Geothermal I...Renewable Energy Act of 2008: Hits and Misses for the Philippine Geothermal I...
Renewable Energy Act of 2008: Hits and Misses for the Philippine Geothermal I...
Fernando Penarroyo
 
Marine Renewable Energy: Effectively Balancing the Needs of Developers and Po...
Marine Renewable Energy: Effectively Balancing the Needs of Developers and Po...Marine Renewable Energy: Effectively Balancing the Needs of Developers and Po...
Marine Renewable Energy: Effectively Balancing the Needs of Developers and Po...
Glen Wright
 
SPRU energy seminar Matthew Hannon 1.12.2015 - Lost at Sea? Wave Energy’s Dif...
SPRU energy seminar Matthew Hannon 1.12.2015 - Lost at Sea? Wave Energy’s Dif...SPRU energy seminar Matthew Hannon 1.12.2015 - Lost at Sea? Wave Energy’s Dif...
SPRU energy seminar Matthew Hannon 1.12.2015 - Lost at Sea? Wave Energy’s Dif...
Matthew Hannon
 
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
Economic Research Institute for ASEAN and East Asia
 
OceanEnergyDeliverable-Revised
OceanEnergyDeliverable-RevisedOceanEnergyDeliverable-Revised
OceanEnergyDeliverable-Revised
berndgeels
 

Similar to Marine Energy in Australia and New Zealand: Regulatory Barriers and Policy Measures (20)

Marine Renewable Energy: Legal and Policy Challenges to Integrating an Emergi...
Marine Renewable Energy: Legal and Policy Challenges to Integrating an Emergi...Marine Renewable Energy: Legal and Policy Challenges to Integrating an Emergi...
Marine Renewable Energy: Legal and Policy Challenges to Integrating an Emergi...
 
Building a Marine Renewables Industry in the United States: The Need for A "...
Building a Marine Renewables Industry in the United States:  The Need for A "...Building a Marine Renewables Industry in the United States:  The Need for A "...
Building a Marine Renewables Industry in the United States: The Need for A "...
 
CCS in Australia – the storage challenge – Dick Wells, Global CCS Institute M...
CCS in Australia – the storage challenge – Dick Wells, Global CCS Institute M...CCS in Australia – the storage challenge – Dick Wells, Global CCS Institute M...
CCS in Australia – the storage challenge – Dick Wells, Global CCS Institute M...
 
Renewable Energy Act of 2008: Hits and Misses for the Philippine Geothermal I...
Renewable Energy Act of 2008: Hits and Misses for the Philippine Geothermal I...Renewable Energy Act of 2008: Hits and Misses for the Philippine Geothermal I...
Renewable Energy Act of 2008: Hits and Misses for the Philippine Geothermal I...
 
Marine Renewable Energy: Effectively Balancing the Needs of Developers and Po...
Marine Renewable Energy: Effectively Balancing the Needs of Developers and Po...Marine Renewable Energy: Effectively Balancing the Needs of Developers and Po...
Marine Renewable Energy: Effectively Balancing the Needs of Developers and Po...
 
SPRU energy seminar Matthew Hannon 1.12.2015 - Lost at Sea? Wave Energy’s Dif...
SPRU energy seminar Matthew Hannon 1.12.2015 - Lost at Sea? Wave Energy’s Dif...SPRU energy seminar Matthew Hannon 1.12.2015 - Lost at Sea? Wave Energy’s Dif...
SPRU energy seminar Matthew Hannon 1.12.2015 - Lost at Sea? Wave Energy’s Dif...
 
Canada’s electricity sector reform
Canada’s electricity sector reform Canada’s electricity sector reform
Canada’s electricity sector reform
 
Philippine Geothermal Industry: Current Status and Perspectives
Philippine Geothermal Industry: Current Status and Perspectives�Philippine Geothermal Industry: Current Status and Perspectives�
Philippine Geothermal Industry: Current Status and Perspectives
 
Penarroyo ARGeo 4 Presentation
Penarroyo ARGeo 4 PresentationPenarroyo ARGeo 4 Presentation
Penarroyo ARGeo 4 Presentation
 
A review of of renewable energy laws lessons for thailand
A review of of renewable energy laws  lessons for thailandA review of of renewable energy laws  lessons for thailand
A review of of renewable energy laws lessons for thailand
 
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
 
marine_action_plan
marine_action_planmarine_action_plan
marine_action_plan
 
Ips connect 2015 francisco gafaro
Ips connect 2015 francisco gafaroIps connect 2015 francisco gafaro
Ips connect 2015 francisco gafaro
 
HAWAII'S ENERGY FUTURE - THE ROAD MAP - WORK IN PROGRESS
HAWAII'S ENERGY FUTURE - THE ROAD MAP - WORK IN PROGRESSHAWAII'S ENERGY FUTURE - THE ROAD MAP - WORK IN PROGRESS
HAWAII'S ENERGY FUTURE - THE ROAD MAP - WORK IN PROGRESS
 
Amc fall gatheringoct2014
Amc fall gatheringoct2014Amc fall gatheringoct2014
Amc fall gatheringoct2014
 
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
Development of Carbon Capture, Utilization, and Storage (CCUS) in the United ...
 
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
 
OceanEnergyDeliverable-Revised
OceanEnergyDeliverable-RevisedOceanEnergyDeliverable-Revised
OceanEnergyDeliverable-Revised
 
Community perspective on multi level governance and energy policy
Community perspective on multi level governance and energy policyCommunity perspective on multi level governance and energy policy
Community perspective on multi level governance and energy policy
 
403
403403
403
 

More from Glen Wright

More from Glen Wright (9)

Bottom Fisheries Closures in Areas Beyond National Jurisdiction
Bottom Fisheries Closures inAreas Beyond National JurisdictionBottom Fisheries Closures inAreas Beyond National Jurisdiction
Bottom Fisheries Closures in Areas Beyond National Jurisdiction
 
La Haute Mer : historique et perspectives
La Haute Mer : historique et perspectivesLa Haute Mer : historique et perspectives
La Haute Mer : historique et perspectives
 
Marine Governance in an Industrialised Ocean: a case study of the UK's emergi...
Marine Governance in an Industrialised Ocean: a case study of the UK's emergi...Marine Governance in an Industrialised Ocean: a case study of the UK's emergi...
Marine Governance in an Industrialised Ocean: a case study of the UK's emergi...
 
Towards a New International Agreement on High Seas Biodiversity
Towards a New International Agreement on High Seas BiodiversityTowards a New International Agreement on High Seas Biodiversity
Towards a New International Agreement on High Seas Biodiversity
 
Towards a new international instrument on the conservation and sustainable us...
Towards a new international instrument on the conservation and sustainable us...Towards a new international instrument on the conservation and sustainable us...
Towards a new international instrument on the conservation and sustainable us...
 
Towards a new international instrument on the conservation and sustainable us...
Towards a new international instrument on the conservation and sustainable us...Towards a new international instrument on the conservation and sustainable us...
Towards a new international instrument on the conservation and sustainable us...
 
Sustainably advancing the Blue Economy: EIA of Marine Renewable Energy projec...
Sustainably advancing the Blue Economy: EIA of Marine Renewable Energy projec...Sustainably advancing the Blue Economy: EIA of Marine Renewable Energy projec...
Sustainably advancing the Blue Economy: EIA of Marine Renewable Energy projec...
 
Wild Law (pecha kucha)
Wild Law (pecha kucha)Wild Law (pecha kucha)
Wild Law (pecha kucha)
 
Systemic Biases in the National Electricity Market
Systemic Biases in the National Electricity MarketSystemic Biases in the National Electricity Market
Systemic Biases in the National Electricity Market
 

Recently uploaded

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Recently uploaded (20)

Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 

Marine Energy in Australia and New Zealand: Regulatory Barriers and Policy Measures

  • 1. Marine Energy in Australia and New Zealand Regulatory Barriers and Policy Measures Glen Wright All-Energy Australia Melbourne 2011
  • 2. Marine Energy in Australia  ~15 companies in Australia  ~10 marine energy plants in various stages of development: a further 9 at the proposal stage  Most are small pilot projects Clean Energy Council, Marine Energy Sector report (2010).
  • 3. “The future success of ocean power in Australia is dependent upon government policies to support the development and deployment of these emerging technologies. The sector requires a comprehensive policy framework for emerging technologies to take them from research to full scale demonstration.” Clean Energy Council
  • 4. Barriers to Development  Technical  Financing  Regulatory and policy barriers  Bottom line is cost  Cost of producing a marine energy system is very high, though cost will fall as technologies mature – need a helping hand!  Capital cost ($/kW) of wave and ocean current generation is currently $7000 and $5200 respectively: $1498 for coal (without CCS) 1 1 CSIRO, ‘Projections of the future costs of electricity generation technologies: An application of CSIRO’s Global and Local Learning Model’ (2011) 64-68.
  • 5. Regulatory Regime  No specific legal regime/measures for marine energy projects in Australia  Victoria has been considering policy for some time (note recent change of government)  Existing federal laws applicable to renewable energy projects generally, e.g.:  Environmental Protection and Biodiversity Conservation Act 2009  Renewable Energy Target legislation  National Electricity Market
  • 6.  Federal legislation:  Australian Maritime Safety Authority Act 1990  Coastal Waters Acts 1980 (delineating state/federal)  Sea Installations Act 1987 (permitting for installations)  Historic Shipwrecks Act 1976 (nearly 8,000 shipwrecks)  State legal regimes, such as:  coastal management legislation  climate change legislation  planning law  environmental protection  regulation of pipelines  port management legislation
  • 7. Issues with Existing Regime  Environmental impact assessment  Exploration and exploitation licensing  Transmission network connection  Split jurisdiction  Fragmented/Ad-hoc approach
  • 8. Environmental impact assessment  EIA is an expensive process: requiring an excessively detailed report for low impact technologies and small pilot projects adds cost and inefficiency  Other technologies have homogenised; marine technologies are still numerous and diverse – need for flexibility  Wide range of marine energy technologies = diverse range of environmental impacts  Tidal fence and overtopping systems: large-scale alteration of the surrounding landscape, impact on water flows Maui’s Dolphin  Freestanding/submerged turbines: minimal impact
  • 9. Rance Tidal Power Station, Brittany, France
  • 11. Environmental impact assessment Portugal Established a 320 km2 pilot zone for marine energy test projects: less detailed EIA required Scotland Government conducted detailed EIA in high-energy areas to establish baseline data and likely impacts: takes burden off marine energy companies Australia Exploration licensing regime for coal/gas/geothermal applies less stringent EIA requirements for exploring/assessing resource
  • 12. Exploration Licensing Well-established system of exploration/mining licences for coal, gas and oil (including offshore), and even geothermal - relatively uniform across jurisdictions  Exploration for resources on ‘a use it or lose it’ basis  EL also provides a framework for drilling and testing: differing requirements based on activity  No such system is in place for marine energy: company may spend time and money ‘prospecting’, but will not have exclusive rights Australia’s wave resource  Particularly a problem for tidal systems: only a handful of potential locations  State governments have approached licensing differently, developing the licensing process as and when applications arise: lack of uniformity and uncertain regulatory landscape  EL could be used to guarantee rights over a resource and provide a framework Australia’s tidal resource for testing and prototype deployment
  • 13. Offshore oil & gas exploration licences
  • 14. Transmission Network Connection  All large energy generators need to connect to the transmission network: building this infrastructure is expensive  Scotland: “significant constraint to the future development of marine renewables” 1  Coal power stations benefit from existing network: renewable energy generators have to bear cost of building new lines  BUT, can’t operate the transmission lines – gift to operator  Future generators will want to connect using this infrastructure, but will not have to pay the company that built it = unfair distribution of costs  Recent rule-change proposal in Australia to fix this problem was drastically toned down: basic structure of the regime left in tact 1 Scottish Marine Renewables SEA (2007).
  • 15. Transmission Network Connection UK Special offshore transmission regime Transmission network owners bid to build, own and operate offshore transmission platform and line Texas Similar system ‘Competitive Renewable Energy Zones’ Transmission companies tender for infrastructure projects
  • 16. Split Jurisdiction  Maritime jurisdiction split between state/federal governments  3 nautical miles 1  Projects within 3 nautical miles of the coast regulated by state legislation and the EPBC Act (and other federal legislation)  Projects beyond this limit regulated by Sea Installations Act 1987 and other federal legislation  Potentially dealing with two separate regulatory regimes, depending upon how far from the coast the project is situated 1 Offshore Constitutional Settlement (1979) and Coastal Waters Acts
  • 17. Ad-hoc Approach  Lack of a considered regulatory framework means that local authorities are often uncertain which legislation to apply for site tenure and development approval  Tendency to ‘invent’ regulation = delay and added cost  Inappropriate requirements, e.g. excessive EIA requirements ‘just to be sure’  Various relevant bodies for licensing/unclear delineation  Clear method in commercial legal practice is unlikely to emerge: likely that further fragmentation of approach will occur
  • 18. Ad-hoc Approach Scotland Dedicated licensing system for marine energy projects UK Established the Marine Management Organisation and a licensing process for marine energy Portugal One dedicated management body for its pilot area Spain Collated and integrated applicable legislation into a single administrative procedure
  • 19. New Zealand  Similar position to Australia: no specific regime  Marine energy regulated by Resource Management Act 1991  Crest Energy: first large-scale tidal project recently approved (200 1Mw turbines)  ~5 years  Long-winded EIA  Maori claim issues  No ELs: very limited tidal locations – likely to be competition/dispute  Limited grid connection options
  • 20. Policy Measures  Measures to actively encourage marine energy:  Feed-in tariffs. e.g.:  France: €150/MWh for 20 years  Portugal: €260/MWh for first 4MW installed, down to €76/MWh for 20-100MW installed  Ireland: €220/MWH  Multiplied Renewable Energy Certificates (not relevant until marine energy projects are in operation)  Grants, subsidies and tax breaks, e.g.:  UK: £22million Marine Renewables Proving Fund  NZ: NZ$8 million Marine Energy Deployment Fund
  • 21. Summary  Ease current regulatory burden:  Gradated EIA requirements  ‘One-stop’ system for licensing  Prototype/RE zones  New rules for grid connection  Measures to actively encourage marine energy:  Feed-in tariff  Multiplied RECs  Further grants, subsidies and tax breaks