Formulation and Approval of Various
Infrastructure Projects based on Project
Cost

Unit-III
Syllabus
• Formulation and Approval of Various
Infrastructure Projects based on project
cost:
• Institutional Structure, Applicability, Project
Identification,
Inter
ministerial
Consultations, ‘In Principle’ Approval of
PPPAC, Expression of Interest, Formulation of
Project Documents, Appraisal/Approval of
PPPAC,
Invitation
of
Bids,
Time
Frame, Exemption from the above Procedure
Formulation and Approval of Various
Infrastructure Projects based on Project Cost
• The Guidelines for Formulation, Appraisal and
Approval of Public Private Partnership Projects
were notified by Ministry of Finance, Department of
Economic Affairs, vide OM No. 1/5/2005 PPP, dated January 12, 2006.
Formulation and Approval of Various
Infrastructure Projects based on project cost
• The Central Government has notified a
system for appraisal/ approval of projects to
be
undertaken through Public Private
Partnership (PPP).
• Detailed procedure to be followed for this
purpose is specified below.
Formulation and Approval of Various
Infrastructure Projects based on Project Cost
Institutional Structure
Institutional Structure
• The institutional structure for the
appraisal/approval mechanism is specified at
Annex-I.
Institutional Structure
• Public Private Partnership Appraisal
Committee
• Pursuant to the decision of the Cabinet
Committee on Economic Affairs (CCEA) in its
meeting of 27th October, 2005, a Public
Private Partnership Appraisal Committee
(PPPAC) has been set up comprising of the
following
Institutional Structure
Institutional Structure
(a) Secretary, Department of Economic Affairs (in
the Chair);
(b) Secretary, Planning Commission;
(c) Secretary, Department of Expenditure;
(d) Secretary, Department of Legal Affairs; and
(e) Secretary of the Department sponsoring a
project.
• The Committee may co-opt experts as necessary.
Institutional Structure
Institutional Structure
• The Committee would be serviced by the
Department of Economic Affairs, who will
set up a special cell, called the PPPAC
Secretariat for servicing such proposals.
Institutional Structure
• The Ministry of Finance will be the nodal
Ministry
responsible
for
examining
concession agreements from the financial
angle, deciding on guarantees to be
extended, and generally assesses risk
allocation from the investment and banking
perspectives.
• It would also ensure that projects are
scrutinised from the perspective of
government expenditure.
Institutional Structure
Institutional Structure
• The Planning Commission will set up a PPP
Appraisal Unit (PPPAU), similar to the
existing PAMD which appraises public sector
projects. This unit will prepare an appraisal
note for the PPPAC providing specific
suggestions for improving the concession
terms, where this is possible.
PPP Appraisal Unit (PPPAU)
Institutional Structure
• Ministry of Law and Justice, Department of
Legal Affairs, would also be represented on
the PPP Appraisal Committee, as the
concession agreements would require careful
legal scrutiny.
Applicability
• These guidelines will apply to all PPP
projects
sponsored
by
Central
Government Ministries or Central
Public
Sector
Undertakings
(CPSUs), statutory authorities or other
entities under their administrative
control.
Applicability
• The procedure specified herein will apply to
all PPP projects with capital costs exceeding
Rs. 100 crore or where the underlying assets
are valued at a sum greater than Rs. 100
crore. For appraisal/approval of PPP
projects involving a lower capital cost/value,
detailed instructions will be issued by the
Department of Expenditure.
Project Identification
• The sponsoring Ministry will identify the
projects to be taken up through PPPs and
undertake preparation of feasibility studies,
project agreements etc. with the assistance of
legal, financial and technical experts as
necessary.
Project Identification
Inter-Ministerial Consultations
• The Administrative Ministry may, if deemed
necessary, discuss the details of the project
and the terms of concession agreement in an
inter-ministerial consultative committee and
comments, if any, may be incorporated or
annexed to the proposal for consideration of
PPPAC.
Inter-Ministerial Consultations
• There could be projects, which involve more
than one Ministry/Department. While
considering such projects, PPPAC may seek
participation
of
such
Ministries/
Departments.
‘In Principle’ Approval of
PPPAC
• While seeking ‘In Principle’ clearance of
PPPAC, the Administrative Ministry shall
submit its proposal (in six copies, both in
hard and soft form) to the PPPAC Secretariat
in the format specified at Annex-II and
accompanied by the prefeasibility/ feasibility
report and a term-sheet containing the
salient features of the proposed project
agreements.
‘In Principle’ Approval of
PPPAC
• PPPAC Secretariat will circulate the copies
of PPPAC memo and associated documents
to all concerned. A meeting of the PPPAC
will be convened within three weeks to
consider the proposal for ‘In Principle’
approval.
‘In Principle’ Approval of
PPPAC
• In cases where the PPP project is based on a
duly
approved
Model
Concession
Agreement (MCA), ‘In Principle’ clearance
by the PPPAC would not be necessary. In
such cases, approval of the PPPAC may be
obtained before inviting the financial bids as
detailed below.
Expression of Interest
Following the ‘In Principle’ clearance of
• PPPAC, the Administrative Ministry may
invite expressions of interest in the form of
Request for Qualification (RFQ) to be
followed by short-listing of pre-qualified
bidders.
Expression of Interest
(Sample Doc)
Formulation of Project Documents
• The documents that would need to be
prepared would, inter alia, include the various
agreements to be entered into with the
concessionaire detailing the terms of the
concession and the rights and obligations of
the various parties.
• These project documents would vary
depending on the sector and type of project.
Formulation of Project Documents
• Typically, a PPP will involve the concession
agreement that will specify the terms of the
concession granted to the private party and
will include the rights and obligations of all
parties. There could be associated
agreements based on specific requirements.
Appraisal/Approval of PPPAC
• RFP (Request for Proposals), i.e. invitation to
submit financial bids, should normally
include a copy of all the agreements that are
proposed to be entered into with the
successful bidder. After formulating the draft
RFP, the Administrative Ministry would
seek clearance of the PPPAC before inviting
the financial bids.
Appraisal/Approval of PPPAC
Appraisal/Approval of PPPAC
• The proposal for seeking clearance of
PPPAC shall be sent (in six copies) to the
PPPAC Secretariat in the format specified
at Annex-III along with copies of all draft
project agreements and the Project Report.
• The proposal will be circulated by PPPAC
Secretariat to all members of the PPPAC.
Appraisal/Approval of PPPAC
• Planning Commission will appraise the
project proposal and forward its Appraisal
Note to the PPPAC Secretariat. Ministry of
Law and any other Ministry/ Department
involved will also forward written
comments to the PPPAC Secretariat within
the stipulated time period. The PPPAC
Secretariat will forward all the comments to
the Administrative Ministry for submitting a
written response to each of the comments.
Appraisal/Approval of PPPAC
• The concession agreement and any supporting
agreements/ documents thereof, along with
the PPPAC Memo, will be submitted for
consideration of PPPAC. The PPPAC will
take a view on the Appraisal Note and on
the comments of different Ministries, along
with the response from the Administrative
Ministry.
Appraisal/Approval of PPPAC
• PPPAC will either recommend the proposal
for approval of the competent authority
(with or without modifications) or request the
Administrative Ministry to make necessary
changes for further consideration of
PPPAC.
Appraisal/Approval of PPPAC
• Once cleared by the PPPAC, the project
would be put up to the competent authority
for final approval. The competent authority
for each project will be the same as
applicable for projects approval by PIB.
Invitation of Bids
• Financial bids may be invited after final
approval of the competent authority has
been obtained. However, pending approval of
the competent authority, financial bids could
be invited after clearance of PPPAC has
been conveyed.
Invitation of Bids
(Sample Doc)
Time Frame
• The time frame for the appraisal of projects
under the above procedure is at Annex-IV.
Time Frame
Exemption from the Above
Procedure
• Ministry of Defence, Department of Atomic
Energy and Department of Space will not be
covered under the purview of these guidelines.
References
Guidelines
 Formulation, Appraisal and Approval of Public
Private Partnership Projects
• By: The Secretariat for the Committee on
Infrastructure
• Planning Commission, Government of India

• Urbanization Urban Development & Metropolitan
Cities in India
•

Dr V. Nath Concept Publications
Thanks…

More Related Content

What's hot

Public infra financing in india
Public infra financing in indiaPublic infra financing in india
Public infra financing in indiaSumeet Sharma PMP
 
Union Budget 2017 - A Pitchfork Partners Analysis
Union Budget 2017 - A Pitchfork Partners AnalysisUnion Budget 2017 - A Pitchfork Partners Analysis
Union Budget 2017 - A Pitchfork Partners AnalysisAshraf Engineer
 
RV 2014: Show Me the Money- Federal Funding in a Non-Earmark World (Federal F...
RV 2014: Show Me the Money- Federal Funding in a Non-Earmark World (Federal F...RV 2014: Show Me the Money- Federal Funding in a Non-Earmark World (Federal F...
RV 2014: Show Me the Money- Federal Funding in a Non-Earmark World (Federal F...Rail~Volution
 
The National Treasury, PPP Unit Health Infrastructure Development and Servi...
The National Treasury, PPP Unit   Health Infrastructure Development and Servi...The National Treasury, PPP Unit   Health Infrastructure Development and Servi...
The National Treasury, PPP Unit Health Infrastructure Development and Servi...Emmanuel Mosoti Machani
 
Research Assignment
Research AssignmentResearch Assignment
Research Assignmentsaharsaqib
 
Rakesh verma public audit english
Rakesh verma public audit englishRakesh verma public audit english
Rakesh verma public audit englishicgfmconference
 
Unit 4 c) changes in policy perspectives role of institutional framework afte...
Unit 4 c) changes in policy perspectives role of institutional framework afte...Unit 4 c) changes in policy perspectives role of institutional framework afte...
Unit 4 c) changes in policy perspectives role of institutional framework afte...Mahendra Kumar Ghadoliya
 
Possible Financing Options for Projects in India
Possible Financing Options for Projects in IndiaPossible Financing Options for Projects in India
Possible Financing Options for Projects in IndiaSagar Srivastava
 
Will the new ECB frameworks change the borrowing strategies for Indian Corpor...
Will the new ECB frameworks change the borrowing strategies for Indian Corpor...Will the new ECB frameworks change the borrowing strategies for Indian Corpor...
Will the new ECB frameworks change the borrowing strategies for Indian Corpor...SAS Partners
 
LAWYER IN VIETNAM DR. OLIVER MASSMANN KEY COMMENTS ON DRAFT PUBLIC PRIVATE PA...
LAWYER IN VIETNAM DR. OLIVER MASSMANN KEY COMMENTS ON DRAFT PUBLIC PRIVATE PA...LAWYER IN VIETNAM DR. OLIVER MASSMANN KEY COMMENTS ON DRAFT PUBLIC PRIVATE PA...
LAWYER IN VIETNAM DR. OLIVER MASSMANN KEY COMMENTS ON DRAFT PUBLIC PRIVATE PA...Dr. Oliver Massmann
 
Lawyer in Vietnam Dr Oliver Massmann VIETNAM—FOREIGN DIRECT INVESTMENT AND U...
Lawyer in Vietnam Dr Oliver Massmann VIETNAM—FOREIGN DIRECT INVESTMENT AND  U...Lawyer in Vietnam Dr Oliver Massmann VIETNAM—FOREIGN DIRECT INVESTMENT AND  U...
Lawyer in Vietnam Dr Oliver Massmann VIETNAM—FOREIGN DIRECT INVESTMENT AND U...Dr. Oliver Massmann
 
Foreign Direct Investment in India
Foreign Direct Investment in IndiaForeign Direct Investment in India
Foreign Direct Investment in IndiaPratyush Kumar
 
FOREIGN DIRECT INVESTMENT IN INFRASTRUCTURE
FOREIGN DIRECT INVESTMENT IN INFRASTRUCTUREFOREIGN DIRECT INVESTMENT IN INFRASTRUCTURE
FOREIGN DIRECT INVESTMENT IN INFRASTRUCTUREVivek Mahajan
 
Foreign capital policy
Foreign capital policyForeign capital policy
Foreign capital policySunita Sukhija
 
OSAA @OECD Side Event #FFD3 Concept Note
OSAA @OECD Side Event #FFD3 Concept NoteOSAA @OECD Side Event #FFD3 Concept Note
OSAA @OECD Side Event #FFD3 Concept NoteDr Lendy Spires
 

What's hot (20)

C0362021025
C0362021025C0362021025
C0362021025
 
Public infra financing in india
Public infra financing in indiaPublic infra financing in india
Public infra financing in india
 
FDI in Nepal "Background Material"
FDI in Nepal "Background Material"FDI in Nepal "Background Material"
FDI in Nepal "Background Material"
 
Union Budget 2017 - A Pitchfork Partners Analysis
Union Budget 2017 - A Pitchfork Partners AnalysisUnion Budget 2017 - A Pitchfork Partners Analysis
Union Budget 2017 - A Pitchfork Partners Analysis
 
RV 2014: Show Me the Money- Federal Funding in a Non-Earmark World (Federal F...
RV 2014: Show Me the Money- Federal Funding in a Non-Earmark World (Federal F...RV 2014: Show Me the Money- Federal Funding in a Non-Earmark World (Federal F...
RV 2014: Show Me the Money- Federal Funding in a Non-Earmark World (Federal F...
 
The National Treasury, PPP Unit Health Infrastructure Development and Servi...
The National Treasury, PPP Unit   Health Infrastructure Development and Servi...The National Treasury, PPP Unit   Health Infrastructure Development and Servi...
The National Treasury, PPP Unit Health Infrastructure Development and Servi...
 
Special economic zone
Special economic zoneSpecial economic zone
Special economic zone
 
Research Assignment
Research AssignmentResearch Assignment
Research Assignment
 
Rakesh verma public audit english
Rakesh verma public audit englishRakesh verma public audit english
Rakesh verma public audit english
 
Unit 4 c) changes in policy perspectives role of institutional framework afte...
Unit 4 c) changes in policy perspectives role of institutional framework afte...Unit 4 c) changes in policy perspectives role of institutional framework afte...
Unit 4 c) changes in policy perspectives role of institutional framework afte...
 
Role and purpose of FDI
Role and purpose of FDIRole and purpose of FDI
Role and purpose of FDI
 
Possible Financing Options for Projects in India
Possible Financing Options for Projects in IndiaPossible Financing Options for Projects in India
Possible Financing Options for Projects in India
 
Intoduction
IntoductionIntoduction
Intoduction
 
Will the new ECB frameworks change the borrowing strategies for Indian Corpor...
Will the new ECB frameworks change the borrowing strategies for Indian Corpor...Will the new ECB frameworks change the borrowing strategies for Indian Corpor...
Will the new ECB frameworks change the borrowing strategies for Indian Corpor...
 
LAWYER IN VIETNAM DR. OLIVER MASSMANN KEY COMMENTS ON DRAFT PUBLIC PRIVATE PA...
LAWYER IN VIETNAM DR. OLIVER MASSMANN KEY COMMENTS ON DRAFT PUBLIC PRIVATE PA...LAWYER IN VIETNAM DR. OLIVER MASSMANN KEY COMMENTS ON DRAFT PUBLIC PRIVATE PA...
LAWYER IN VIETNAM DR. OLIVER MASSMANN KEY COMMENTS ON DRAFT PUBLIC PRIVATE PA...
 
Lawyer in Vietnam Dr Oliver Massmann VIETNAM—FOREIGN DIRECT INVESTMENT AND U...
Lawyer in Vietnam Dr Oliver Massmann VIETNAM—FOREIGN DIRECT INVESTMENT AND  U...Lawyer in Vietnam Dr Oliver Massmann VIETNAM—FOREIGN DIRECT INVESTMENT AND  U...
Lawyer in Vietnam Dr Oliver Massmann VIETNAM—FOREIGN DIRECT INVESTMENT AND U...
 
Foreign Direct Investment in India
Foreign Direct Investment in IndiaForeign Direct Investment in India
Foreign Direct Investment in India
 
FOREIGN DIRECT INVESTMENT IN INFRASTRUCTURE
FOREIGN DIRECT INVESTMENT IN INFRASTRUCTUREFOREIGN DIRECT INVESTMENT IN INFRASTRUCTURE
FOREIGN DIRECT INVESTMENT IN INFRASTRUCTURE
 
Foreign capital policy
Foreign capital policyForeign capital policy
Foreign capital policy
 
OSAA @OECD Side Event #FFD3 Concept Note
OSAA @OECD Side Event #FFD3 Concept NoteOSAA @OECD Side Event #FFD3 Concept Note
OSAA @OECD Side Event #FFD3 Concept Note
 

Viewers also liked

Viewers also liked (18)

Dispex® Ultra PX 4575 -- BASF Formulation Additives
Dispex® Ultra PX 4575 -- BASF Formulation AdditivesDispex® Ultra PX 4575 -- BASF Formulation Additives
Dispex® Ultra PX 4575 -- BASF Formulation Additives
 
Windows server 2012(guide)
Windows server 2012(guide)Windows server 2012(guide)
Windows server 2012(guide)
 
Ra04 cause and effect
Ra04 cause and effectRa04 cause and effect
Ra04 cause and effect
 
Computer awareness With Answers
Computer awareness With AnswersComputer awareness With Answers
Computer awareness With Answers
 
One words substitutions with answers
One words substitutions with answersOne words substitutions with answers
One words substitutions with answers
 
Wireless notes
Wireless notesWireless notes
Wireless notes
 
Matching definitions
Matching definitionsMatching definitions
Matching definitions
 
Science and technology (IAS)
Science and technology (IAS)Science and technology (IAS)
Science and technology (IAS)
 
Tcs 2014 saved in 97-2003 format
Tcs 2014 saved in 97-2003 formatTcs 2014 saved in 97-2003 format
Tcs 2014 saved in 97-2003 format
 
Ra01 data sufficiency
Ra01 data sufficiencyRa01 data sufficiency
Ra01 data sufficiency
 
Niti 08.02.2015
Niti 08.02.2015Niti 08.02.2015
Niti 08.02.2015
 
Niti 08.02.2015
Niti 08.02.2015Niti 08.02.2015
Niti 08.02.2015
 
Railway RRB Model Paper
Railway RRB Model PaperRailway RRB Model Paper
Railway RRB Model Paper
 
Current affairs-magazine-november-2012-13
Current affairs-magazine-november-2012-13Current affairs-magazine-november-2012-13
Current affairs-magazine-november-2012-13
 
Important places in india
Important places in indiaImportant places in india
Important places in india
 
Gk in india2012
Gk in india2012Gk in india2012
Gk in india2012
 
Ra04 course of action
Ra04 course of actionRa04 course of action
Ra04 course of action
 
Percentage standard level
Percentage standard levelPercentage standard level
Percentage standard level
 

Similar to Formulation and Approval of Various Infrastructure Projects

IFAD Procurement Guidelines revised 2008
IFAD Procurement Guidelines revised 2008IFAD Procurement Guidelines revised 2008
IFAD Procurement Guidelines revised 2008IFAD Vietnam
 
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission ProjectsTariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission ProjectsAmitava Nag
 
Bolt(build own lease transfer) model
Bolt(build own lease transfer) modelBolt(build own lease transfer) model
Bolt(build own lease transfer) modelAxay Sharma
 
Frequently-asked-questions-about-ra-9184
Frequently-asked-questions-about-ra-9184Frequently-asked-questions-about-ra-9184
Frequently-asked-questions-about-ra-9184june alapa
 
Webinar ITI Brazil - Investment Partnerships Program (PPI)
Webinar ITI Brazil - Investment Partnerships Program (PPI)Webinar ITI Brazil - Investment Partnerships Program (PPI)
Webinar ITI Brazil - Investment Partnerships Program (PPI)UKinBrazilNetwork
 
Salient Features_RA 9184.pptx
Salient Features_RA 9184.pptxSalient Features_RA 9184.pptx
Salient Features_RA 9184.pptxDanteRevamonte
 
Project Finance Chapter-10, 28.pdf
Project Finance Chapter-10, 28.pdfProject Finance Chapter-10, 28.pdf
Project Finance Chapter-10, 28.pdfSapnaSingh834014
 
Government procurement Act RA 9184
Government procurement Act  RA 9184Government procurement Act  RA 9184
Government procurement Act RA 9184SQSY
 
governmentprocurementactww-180625195256.pdf
governmentprocurementactww-180625195256.pdfgovernmentprocurementactww-180625195256.pdf
governmentprocurementactww-180625195256.pdfRalph Vasquez, CIE
 
National Treasury, PPP Unit. PPPs in Kenya. Context, Legal and Institutional ...
National Treasury, PPP Unit. PPPs in Kenya. Context, Legal and Institutional ...National Treasury, PPP Unit. PPPs in Kenya. Context, Legal and Institutional ...
National Treasury, PPP Unit. PPPs in Kenya. Context, Legal and Institutional ...Emmanuel Mosoti Machani
 
Powerpoint Presentation on Public Procurement.pdf
Powerpoint Presentation on Public Procurement.pdfPowerpoint Presentation on Public Procurement.pdf
Powerpoint Presentation on Public Procurement.pdfkayerencaole1
 
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...Juan Paolo Somorostro - Aranas, MPA, BSOSM
 
governmentprocurementactww-180625195256.pptx
governmentprocurementactww-180625195256.pptxgovernmentprocurementactww-180625195256.pptx
governmentprocurementactww-180625195256.pptxJeesseJadulco
 
Project Bank Accounts in Scotland - 15 Key Questions
Project Bank Accounts in Scotland - 15 Key QuestionsProject Bank Accounts in Scotland - 15 Key Questions
Project Bank Accounts in Scotland - 15 Key QuestionsCraig Bradshaw
 
Ppp swiss-challenge-route
Ppp swiss-challenge-routePpp swiss-challenge-route
Ppp swiss-challenge-routeNaman Kumar
 

Similar to Formulation and Approval of Various Infrastructure Projects (20)

IFAD Procurement Guidelines revised 2008
IFAD Procurement Guidelines revised 2008IFAD Procurement Guidelines revised 2008
IFAD Procurement Guidelines revised 2008
 
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission ProjectsTariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
 
Works programme
Works programmeWorks programme
Works programme
 
Bolt(build own lease transfer) model
Bolt(build own lease transfer) modelBolt(build own lease transfer) model
Bolt(build own lease transfer) model
 
Frequently-asked-questions-about-ra-9184
Frequently-asked-questions-about-ra-9184Frequently-asked-questions-about-ra-9184
Frequently-asked-questions-about-ra-9184
 
PPP for Dummies
PPP for DummiesPPP for Dummies
PPP for Dummies
 
Webinar ITI Brazil - Investment Partnerships Program (PPI)
Webinar ITI Brazil - Investment Partnerships Program (PPI)Webinar ITI Brazil - Investment Partnerships Program (PPI)
Webinar ITI Brazil - Investment Partnerships Program (PPI)
 
Salient Features_RA 9184.pptx
Salient Features_RA 9184.pptxSalient Features_RA 9184.pptx
Salient Features_RA 9184.pptx
 
Project Finance Chapter-10, 28.pdf
Project Finance Chapter-10, 28.pdfProject Finance Chapter-10, 28.pdf
Project Finance Chapter-10, 28.pdf
 
PPP models.pptx
 PPP models.pptx PPP models.pptx
PPP models.pptx
 
Government procurement Act RA 9184
Government procurement Act  RA 9184Government procurement Act  RA 9184
Government procurement Act RA 9184
 
Bihar rfp
Bihar rfpBihar rfp
Bihar rfp
 
governmentprocurementactww-180625195256.pdf
governmentprocurementactww-180625195256.pdfgovernmentprocurementactww-180625195256.pdf
governmentprocurementactww-180625195256.pdf
 
National Treasury, PPP Unit. PPPs in Kenya. Context, Legal and Institutional ...
National Treasury, PPP Unit. PPPs in Kenya. Context, Legal and Institutional ...National Treasury, PPP Unit. PPPs in Kenya. Context, Legal and Institutional ...
National Treasury, PPP Unit. PPPs in Kenya. Context, Legal and Institutional ...
 
Powerpoint Presentation on Public Procurement.pdf
Powerpoint Presentation on Public Procurement.pdfPowerpoint Presentation on Public Procurement.pdf
Powerpoint Presentation on Public Procurement.pdf
 
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
Property and Supply Management w/ introduction to R.A. 9184 Government Procur...
 
governmentprocurementactww-180625195256.pptx
governmentprocurementactww-180625195256.pptxgovernmentprocurementactww-180625195256.pptx
governmentprocurementactww-180625195256.pptx
 
Project Bank Accounts in Scotland - 15 Key Questions
Project Bank Accounts in Scotland - 15 Key QuestionsProject Bank Accounts in Scotland - 15 Key Questions
Project Bank Accounts in Scotland - 15 Key Questions
 
Ra 9184
Ra 9184Ra 9184
Ra 9184
 
Ppp swiss-challenge-route
Ppp swiss-challenge-routePpp swiss-challenge-route
Ppp swiss-challenge-route
 

More from GAURAV. H .TANDON

Suicide Prevention through Architecture (Building) and City Planning
Suicide Prevention through  Architecture (Building) and City PlanningSuicide Prevention through  Architecture (Building) and City Planning
Suicide Prevention through Architecture (Building) and City PlanningGAURAV. H .TANDON
 
Suicide Prevention through Architecture (Building) and City Planning
Suicide Prevention through  Architecture (Building) and City PlanningSuicide Prevention through  Architecture (Building) and City Planning
Suicide Prevention through Architecture (Building) and City PlanningGAURAV. H .TANDON
 
Digital Detoxing in Smart Cities
Digital Detoxing in Smart CitiesDigital Detoxing in Smart Cities
Digital Detoxing in Smart CitiesGAURAV. H .TANDON
 
Digital Detoxing in Smart Cities
Digital Detoxing in Smart CitiesDigital Detoxing in Smart Cities
Digital Detoxing in Smart CitiesGAURAV. H .TANDON
 
Crash for Cash-Organized Crime (COC).pptx
Crash for Cash-Organized Crime (COC).pptxCrash for Cash-Organized Crime (COC).pptx
Crash for Cash-Organized Crime (COC).pptxGAURAV. H .TANDON
 
Ecological Footprint (1).pptx
Ecological Footprint (1).pptxEcological Footprint (1).pptx
Ecological Footprint (1).pptxGAURAV. H .TANDON
 
The unethical practice of gift giving to doctors by pharma companies
The unethical practice of gift giving to doctors by pharma companiesThe unethical practice of gift giving to doctors by pharma companies
The unethical practice of gift giving to doctors by pharma companiesGAURAV. H .TANDON
 
Gamification of Smart Cities
Gamification of Smart Cities Gamification of Smart Cities
Gamification of Smart Cities GAURAV. H .TANDON
 
Collusion and Fraud Detection on Electronic Energy Meters
Collusion and Fraud Detection on Electronic Energy Meters Collusion and Fraud Detection on Electronic Energy Meters
Collusion and Fraud Detection on Electronic Energy Meters GAURAV. H .TANDON
 
Cyber Security in Smart Buildings
Cyber Security in Smart Buildings Cyber Security in Smart Buildings
Cyber Security in Smart Buildings GAURAV. H .TANDON
 

More from GAURAV. H .TANDON (20)

Suicide Prevention through Architecture (Building) and City Planning
Suicide Prevention through  Architecture (Building) and City PlanningSuicide Prevention through  Architecture (Building) and City Planning
Suicide Prevention through Architecture (Building) and City Planning
 
Suicide Prevention through Architecture (Building) and City Planning
Suicide Prevention through  Architecture (Building) and City PlanningSuicide Prevention through  Architecture (Building) and City Planning
Suicide Prevention through Architecture (Building) and City Planning
 
Digital Detoxing in Smart Cities
Digital Detoxing in Smart CitiesDigital Detoxing in Smart Cities
Digital Detoxing in Smart Cities
 
Digital Detoxing in Smart Cities
Digital Detoxing in Smart CitiesDigital Detoxing in Smart Cities
Digital Detoxing in Smart Cities
 
Premerital Sceening .pptx
Premerital Sceening .pptxPremerital Sceening .pptx
Premerital Sceening .pptx
 
Polymath(Renaissance man)
Polymath(Renaissance man)Polymath(Renaissance man)
Polymath(Renaissance man)
 
Crash for Cash-Organized Crime (COC).pptx
Crash for Cash-Organized Crime (COC).pptxCrash for Cash-Organized Crime (COC).pptx
Crash for Cash-Organized Crime (COC).pptx
 
Voting Age .pptx
Voting Age .pptxVoting Age .pptx
Voting Age .pptx
 
Ecological Footprint (1).pptx
Ecological Footprint (1).pptxEcological Footprint (1).pptx
Ecological Footprint (1).pptx
 
Urban Heat Island Effect
Urban Heat Island EffectUrban Heat Island Effect
Urban Heat Island Effect
 
Communication Skills
Communication SkillsCommunication Skills
Communication Skills
 
The unethical practice of gift giving to doctors by pharma companies
The unethical practice of gift giving to doctors by pharma companiesThe unethical practice of gift giving to doctors by pharma companies
The unethical practice of gift giving to doctors by pharma companies
 
Compassionate Cities
Compassionate CitiesCompassionate Cities
Compassionate Cities
 
Gamification of Smart Cities
Gamification of Smart Cities Gamification of Smart Cities
Gamification of Smart Cities
 
Anti-Microbial Copper
Anti-Microbial Copper Anti-Microbial Copper
Anti-Microbial Copper
 
Smart Forest City
Smart Forest City Smart Forest City
Smart Forest City
 
Smart forest cities
Smart forest cities Smart forest cities
Smart forest cities
 
Automotive Hacking
Automotive Hacking Automotive Hacking
Automotive Hacking
 
Collusion and Fraud Detection on Electronic Energy Meters
Collusion and Fraud Detection on Electronic Energy Meters Collusion and Fraud Detection on Electronic Energy Meters
Collusion and Fraud Detection on Electronic Energy Meters
 
Cyber Security in Smart Buildings
Cyber Security in Smart Buildings Cyber Security in Smart Buildings
Cyber Security in Smart Buildings
 

Recently uploaded

Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 

Recently uploaded (20)

Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 

Formulation and Approval of Various Infrastructure Projects

  • 1. Formulation and Approval of Various Infrastructure Projects based on Project Cost Unit-III
  • 2. Syllabus • Formulation and Approval of Various Infrastructure Projects based on project cost: • Institutional Structure, Applicability, Project Identification, Inter ministerial Consultations, ‘In Principle’ Approval of PPPAC, Expression of Interest, Formulation of Project Documents, Appraisal/Approval of PPPAC, Invitation of Bids, Time Frame, Exemption from the above Procedure
  • 3. Formulation and Approval of Various Infrastructure Projects based on Project Cost • The Guidelines for Formulation, Appraisal and Approval of Public Private Partnership Projects were notified by Ministry of Finance, Department of Economic Affairs, vide OM No. 1/5/2005 PPP, dated January 12, 2006.
  • 4. Formulation and Approval of Various Infrastructure Projects based on project cost • The Central Government has notified a system for appraisal/ approval of projects to be undertaken through Public Private Partnership (PPP). • Detailed procedure to be followed for this purpose is specified below.
  • 5. Formulation and Approval of Various Infrastructure Projects based on Project Cost
  • 6. Institutional Structure Institutional Structure • The institutional structure for the appraisal/approval mechanism is specified at Annex-I.
  • 7. Institutional Structure • Public Private Partnership Appraisal Committee • Pursuant to the decision of the Cabinet Committee on Economic Affairs (CCEA) in its meeting of 27th October, 2005, a Public Private Partnership Appraisal Committee (PPPAC) has been set up comprising of the following
  • 9. Institutional Structure (a) Secretary, Department of Economic Affairs (in the Chair); (b) Secretary, Planning Commission; (c) Secretary, Department of Expenditure; (d) Secretary, Department of Legal Affairs; and (e) Secretary of the Department sponsoring a project. • The Committee may co-opt experts as necessary.
  • 11. Institutional Structure • The Committee would be serviced by the Department of Economic Affairs, who will set up a special cell, called the PPPAC Secretariat for servicing such proposals.
  • 12. Institutional Structure • The Ministry of Finance will be the nodal Ministry responsible for examining concession agreements from the financial angle, deciding on guarantees to be extended, and generally assesses risk allocation from the investment and banking perspectives. • It would also ensure that projects are scrutinised from the perspective of government expenditure.
  • 14. Institutional Structure • The Planning Commission will set up a PPP Appraisal Unit (PPPAU), similar to the existing PAMD which appraises public sector projects. This unit will prepare an appraisal note for the PPPAC providing specific suggestions for improving the concession terms, where this is possible.
  • 16. Institutional Structure • Ministry of Law and Justice, Department of Legal Affairs, would also be represented on the PPP Appraisal Committee, as the concession agreements would require careful legal scrutiny.
  • 17. Applicability • These guidelines will apply to all PPP projects sponsored by Central Government Ministries or Central Public Sector Undertakings (CPSUs), statutory authorities or other entities under their administrative control.
  • 18. Applicability • The procedure specified herein will apply to all PPP projects with capital costs exceeding Rs. 100 crore or where the underlying assets are valued at a sum greater than Rs. 100 crore. For appraisal/approval of PPP projects involving a lower capital cost/value, detailed instructions will be issued by the Department of Expenditure.
  • 19. Project Identification • The sponsoring Ministry will identify the projects to be taken up through PPPs and undertake preparation of feasibility studies, project agreements etc. with the assistance of legal, financial and technical experts as necessary.
  • 21. Inter-Ministerial Consultations • The Administrative Ministry may, if deemed necessary, discuss the details of the project and the terms of concession agreement in an inter-ministerial consultative committee and comments, if any, may be incorporated or annexed to the proposal for consideration of PPPAC.
  • 22. Inter-Ministerial Consultations • There could be projects, which involve more than one Ministry/Department. While considering such projects, PPPAC may seek participation of such Ministries/ Departments.
  • 23. ‘In Principle’ Approval of PPPAC • While seeking ‘In Principle’ clearance of PPPAC, the Administrative Ministry shall submit its proposal (in six copies, both in hard and soft form) to the PPPAC Secretariat in the format specified at Annex-II and accompanied by the prefeasibility/ feasibility report and a term-sheet containing the salient features of the proposed project agreements.
  • 24. ‘In Principle’ Approval of PPPAC • PPPAC Secretariat will circulate the copies of PPPAC memo and associated documents to all concerned. A meeting of the PPPAC will be convened within three weeks to consider the proposal for ‘In Principle’ approval.
  • 25. ‘In Principle’ Approval of PPPAC • In cases where the PPP project is based on a duly approved Model Concession Agreement (MCA), ‘In Principle’ clearance by the PPPAC would not be necessary. In such cases, approval of the PPPAC may be obtained before inviting the financial bids as detailed below.
  • 26. Expression of Interest Following the ‘In Principle’ clearance of • PPPAC, the Administrative Ministry may invite expressions of interest in the form of Request for Qualification (RFQ) to be followed by short-listing of pre-qualified bidders.
  • 28. Formulation of Project Documents • The documents that would need to be prepared would, inter alia, include the various agreements to be entered into with the concessionaire detailing the terms of the concession and the rights and obligations of the various parties. • These project documents would vary depending on the sector and type of project.
  • 29. Formulation of Project Documents • Typically, a PPP will involve the concession agreement that will specify the terms of the concession granted to the private party and will include the rights and obligations of all parties. There could be associated agreements based on specific requirements.
  • 30. Appraisal/Approval of PPPAC • RFP (Request for Proposals), i.e. invitation to submit financial bids, should normally include a copy of all the agreements that are proposed to be entered into with the successful bidder. After formulating the draft RFP, the Administrative Ministry would seek clearance of the PPPAC before inviting the financial bids.
  • 32. Appraisal/Approval of PPPAC • The proposal for seeking clearance of PPPAC shall be sent (in six copies) to the PPPAC Secretariat in the format specified at Annex-III along with copies of all draft project agreements and the Project Report. • The proposal will be circulated by PPPAC Secretariat to all members of the PPPAC.
  • 33. Appraisal/Approval of PPPAC • Planning Commission will appraise the project proposal and forward its Appraisal Note to the PPPAC Secretariat. Ministry of Law and any other Ministry/ Department involved will also forward written comments to the PPPAC Secretariat within the stipulated time period. The PPPAC Secretariat will forward all the comments to the Administrative Ministry for submitting a written response to each of the comments.
  • 34. Appraisal/Approval of PPPAC • The concession agreement and any supporting agreements/ documents thereof, along with the PPPAC Memo, will be submitted for consideration of PPPAC. The PPPAC will take a view on the Appraisal Note and on the comments of different Ministries, along with the response from the Administrative Ministry.
  • 35. Appraisal/Approval of PPPAC • PPPAC will either recommend the proposal for approval of the competent authority (with or without modifications) or request the Administrative Ministry to make necessary changes for further consideration of PPPAC.
  • 36. Appraisal/Approval of PPPAC • Once cleared by the PPPAC, the project would be put up to the competent authority for final approval. The competent authority for each project will be the same as applicable for projects approval by PIB.
  • 37. Invitation of Bids • Financial bids may be invited after final approval of the competent authority has been obtained. However, pending approval of the competent authority, financial bids could be invited after clearance of PPPAC has been conveyed.
  • 39. Time Frame • The time frame for the appraisal of projects under the above procedure is at Annex-IV.
  • 41. Exemption from the Above Procedure • Ministry of Defence, Department of Atomic Energy and Department of Space will not be covered under the purview of these guidelines.
  • 42. References Guidelines  Formulation, Appraisal and Approval of Public Private Partnership Projects • By: The Secretariat for the Committee on Infrastructure • Planning Commission, Government of India • Urbanization Urban Development & Metropolitan Cities in India • Dr V. Nath Concept Publications