Project Management

 Project is defined as a huge (mammoth) task
 which for convenience of management is broken
 down into smaller elements such that, for each of
 the smaller elements, one can identify the finite
 requirements of resources and finite requirements
 of time. These smaller elements are referred as
 activities of the project i.e. project essentially
 comprises of a number of activities e.g.
 construction of building is a project and electrical
 work is one of the activities of the project.
                                                Contd…
Slide 2



Project Management

 Like the electrical activity, a project will have a number
 of activities. The first task of the project manager is to
 define all the activities of the project in terms of time and
 other dimensions like cost etc. The second task is to
 establish the inter relation & interdependence of the
 defined activities. The following are some examples to
 explain small projects.
Slide 3



Example 1
Christine Philips is in charge of planning and coordinating next
spring’s sales management training program for her company.
Christine has listed following activities information for this project.

                                                Immediate     Duration
        Activity          Description
                                               predecessors   (weeks)
           A       Select location                  -            2
           B       Obtain speakers                  -            3
           C       Make speaker travel plans      A, B           2
           D       Prepare and mail brochure      A, B           2
           E       Take reservations                D            3

Draw the network diagram; find the critical path and the duration
along the critical path.
Slide 4

  Example 2
  A research and development department is developing a new power supply for a
  console television set. It has broken down the job into the following form:
                                                       Immediate       Duration
          Activity             Description
                                                      predecessors      (days)
             A       Determine output voltages             -              5
                     Determine whether to use solid
             B                                             A              7
                     state rectifiers
             C       Choose rectifiers                     B              2
             D       Choose filter                         B              3
             E       Choose transformer                    C              1
              F      Choose chassis                        D              2
             G       Choose rectifiers mounting            C              1
             H       Layout chassis                       E, F            3
              I      Build and test                       G, H            10

Draw the critical path schedule, indicate the critical path. What is the time required for
completion for the project?
Slide 5


Categories of Project
The following is an illustrative list of categories of project:
i. Complex projects with unknown elements for e.g.
     Construction of nuclear power plants
ii. Large projects with standard elements for e.g. Construction of
     an automobile factory
iii. Intermediate project for e.g. layout of machine, implementing
     TQM programme, developing new markets etc.
iv. Small projects for e.g. installing a new machine, conducting a
     market survey etc.
v. Turnkey project is one which starts from zero to proceed to a
     finished ‘product’. Concept of turnkey is that when the project
     is finished one turns a key to set the facility in operation, for
     e.g. Reliance refinery project at Jamnagar is a turnkey project.
Slide 6



Session Objective

 Given the activities, their duration and their inter relation,
 our objective in this session is:

   i. to represent these relation of activities in the form of
       a network diagram

   ii. to analyze the network diagram using CPM (Critical
       Path Method)
Slide 7



Network Diagram

       Network diagram is a graphical / pictorial
       representation of a series or a sequence of activities in
       the logical order of their performance, such that we
       establish the inter relation and interdependence of one
       activity on all other activities of the project.
       Network Diagram comprises of two basic elements:
(i)    Activity
(ii)   Event (Node)
Slide 8



Elements of Network Diagram
i.    Activity: An activity is denoted by an arrow

            Tail                               Head
      It signifies the deployment of finite resources over a
      finite period of time. The tail of the arrow signifies the
      commencement of the activity and the head signifies
      the completion of the activity.

ii.   Events or Nodes: An event is denoted by a circle
                              i    where, i={1,2,3,4…. and so on}
      It signifies the status of the project at a point of time. It
      indicates the start & completion of an activity.
Slide 9



  A-O-A Convention (i-j convention)
                         Activity A or Activity i-j

                                      A
                     i                                   j
                                      tij
                Tail Event                         Head Event
                                      i<j
Tail event signifies commencement status of the activity.
Head Event signifies completion status of the activity
Arrow signifies deployment of finite resources over a finite period of time.

tij is the duration of the activity
Slide 10


Good practices of drawing a Network
Diagram
i.     Drawing a network diagram is a trial and error procedure
ii.    The starting event is always one event, irrespective of the number
       of starting activities. This event signifies the commencement status
       of the project
iii.   The completion event is always one event, irrespective of the
       number of final activities. This event signifies the completion
       status of the project.
iv.    The length of the arrow is the convenience of drawing the network
       diagram. It is no indication of the duration of activity.
v.     The arrows must be drawn in the forward direction. Avoid crossing
       of arrows.
vi.    The numbering of events starts with the first event and
       progressively moves from the left to the right of the network
       diagram
vii.   There is no uniqueness in the final picture of the network diagram.
Slide 11


Good practices of drawing a Network
Diagram

 These Guidelines are explained with the
 following five illustrations of network
 diagram:
Slide 12



Analysis of Network Diagram

   There are two popular tools used for analysis of Network
    Diagram
   CPM (Critical Path Method)
   PERT (Program Evaluation & Review Technique)


In the following slides, CPM is explained with examples.
Slide 13



Manager’s View of Critical Path Method

         Inputs                            Outputs
 (What information must          (What information results
  be supplied to CPM)           from CPM that provides for
                                better project management)
1.   a complete list of        1. Estimated duration of
     project activities
                           C        project
2.   Precedence            P   2. Identification of critical
     relationship among             activities
     activities            M   3. Amount of Float for
3.   Estimate of each               each activity
     activities duration
Slide 14



Critical Path Method
   It was developed in 1956 / 1957 by Remington Rand and Du-
    pont to help schedule maintenance projects in chemical plants
    and construction projects.
   Critical Path Method is a systematic scientific method based
    on principle of time estimates to perform a detailed analysis of
    Network in an application of Project Management
   Time estimates in CPM relate to estimating the time for the
    events of the network diagram. Since the event signifies the
    status of the project at a point of time, the time estimates in
    turn signify the status of the project at different points of time.
    There are two important time estimates; (i) Earliest starting
    time & (ii) Latest finishing time.
Slide 15



Guidelines for Earliest Start Time (EST)

      Earliest Start Time (EST): It signifies the earliest
      that an activity can start with reference to the
      commencement status of the project. The following
      are the guidelines to obtain EST.
i.    Earliest starting time for event 1 is taken as zero
      because event 1 signifies the commencement status
      of the project i.e. status of the project corresponding
      to time ‘t = 0’.
ii.   For the calculation of EST we start from event 1
      and progressively move from left to right in the
      network diagram (referred as forward pass)
Slide 16



Guidelines for Earliest Start Time (EST)
iii.Consider two adjacent events

                Ei                                         Ej

                i                                           j
                                      tij
            Tail Event                                Head Event

                             Ej = Ei + tij

EST of the head event    =    EST of the tail event   +   the duration of the activity
Slide 17



Guidelines for Earliest Start Time (EST)

iv.       Consider a merging event (in case more than
          one activity is merging towards an event).
              Ea
                                      Ed = Ea + tad
               a
                           tad        Ed = Eb + tbd
      Eb                         Ed
                   tbd
      b                          d    Ed = Ec + tcd
                         tcd
               Ec
                                      Take the maximum value
                   c
Slide 18



Guidelines for Latest Finish Time (LFT)
      Latest Finish Time (LFT): It is the latest time by which an
      activity should finish, otherwise the project completion time
      will be delayed. The following are the guidelines to obtain
      LFT.
i.    For the last event of the network diagram, LFT = EST
      (because the last event signifies the project completion status
      and both EST / LFT signify the project completion time)
ii.   For the calculation of LFT, we start with the last event of the
      network diagram & we proceed progressively from the right
      to the left of the network diagram (referred as backward
      pass).
Slide 19



Guidelines for Latest Finish Time (LFT)

iii.   For two adjacent events

             Tail Event                             Head Event


                  i                                     j
                                     tij
                 Li                                    Lj
                            Li = Lj – tij

LFT of the tail event   = LFT of the head event –   the duration of that activity
Slide 20



  Guidelines for Latest Finish Time (LFT)

For a bursting event (If there are more than one subsequent
activities busting from an event), calculate LFT for each of
the head events and take the minimum value
                      2
        t12                         L1 = L2 – t12
                      L2
                t13                 L1 = L3 – t13
   1                       3
  L1          t14          L3       L1 = L4 – t14
                       4
                                   Take the minimum value
                      L4
Slide 21




Note:
  Both EST and LFT for starting event
  (event 1 of the network diagram) are
  always zero
Slide 22



  Total Float of an Activity

     Total Float signifies the maximum permissible delay in
      performing the activity without delaying the project
      completion time. The following is the mathematical relation
      for Total Float
                  E                           Head Event
                        i

                    i                                         j
                                         tij
                Tail Event                                   Lj
        Total Float of Activityi-j = Lj – Ei – tij

Total Float of Activity     =
                                    LFT
                                (Head Event)
                                               –       EST
                                                   (Tail Event)
                                                                  –   Duration of Activity
Slide 23



Free Float of an Activity
Free float signifies the maximum permissible delay in
commencement of an activity without affecting the commencement
of the succeeding activity
              Ei                              Ej

 Tail Event   i                               j    Head Event
                              tij
              Li                              Lj

Head Event Float = Lj – Ej
Free Float = Total Float – Head Event Float
Slide 24


Definition of Critical Path
   If total float of an activity is zero, it means there is no
    permissible delay in performing the activity i.e. any delay
    in performing the activity will result in a corresponding
    delay in the project completion time. Such activities are
    referred as critical activities.
   Path of network is a continuous series or sequence of
    activities that joins the first event with the last event of
    the network diagram.
   In a network one can enumerate many sequences of
    activities from starting event to end event. Each sequence
    will contain different combination of activities with
    different duration.
Slide 25



Definition of Critical Path
   To know the possible time by which the project can be
    completed, we determine the critical path i.e. the sequence of
    activities with longest duration. It is known as critical path
    and any delay in activities lying on this path would cause a
    delay in the whole project.
   Alternately, Critical Path is a continuous series or sequence of
    critical activities that joins the first event with the last event of
    the network diagram.
   To quicken the process, the activities lying on the critical path
    should be taken first. The activity lying on non-critical path
    has some flexibility in their starting time and their delay in
    start is not likely to affect the final completion date. These are
    known as slack activities and should be given priority in order
    of their float value.

More Related Content

What's hot

Project management & Network analysis
Project management & Network analysisProject management & Network analysis
Project management & Network analysisHarinadh Karimikonda
 
5 phases of project management
5 phases of project management5 phases of project management
5 phases of project managementJared C. Powell
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULEAjeesh Mk
 
PERT and CPM
PERT and CPMPERT and CPM
PERT and CPMstudent
 
Project Types and their importance
Project Types and their importanceProject Types and their importance
Project Types and their importanceUjjwal Joshi
 
Project management planning
Project management planningProject management planning
Project management planningAlvin Niere
 
PERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTPERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTsalsa moyara
 
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...Zulfiquer Ahmed Amin
 
Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Akaresh Jose Kaviyil JY
 
Critical path method
Critical path methodCritical path method
Critical path methodNicola2903
 
CPM/PERT and Gantt charts
CPM/PERT and Gantt chartsCPM/PERT and Gantt charts
CPM/PERT and Gantt chartsVARSHA RUSTAGI
 
Project management Pert & cpm
Project management Pert & cpm Project management Pert & cpm
Project management Pert & cpm RandhirKumar172
 

What's hot (20)

Project management & Network analysis
Project management & Network analysisProject management & Network analysis
Project management & Network analysis
 
5 phases of project management
5 phases of project management5 phases of project management
5 phases of project management
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
 
Project Planning & Management
Project Planning & ManagementProject Planning & Management
Project Planning & Management
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
PERT and CPM
PERT and CPMPERT and CPM
PERT and CPM
 
Project Types and their importance
Project Types and their importanceProject Types and their importance
Project Types and their importance
 
Critical path method
Critical path methodCritical path method
Critical path method
 
Pert
PertPert
Pert
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Project management planning
Project management planningProject management planning
Project management planning
 
Pert and CPM
Pert and CPMPert and CPM
Pert and CPM
 
PERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTPERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENT
 
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
 
Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )
 
Critical path method
Critical path methodCritical path method
Critical path method
 
Project networks
Project networksProject networks
Project networks
 
CPM/PERT and Gantt charts
CPM/PERT and Gantt chartsCPM/PERT and Gantt charts
CPM/PERT and Gantt charts
 
Project management Pert & cpm
Project management Pert & cpm Project management Pert & cpm
Project management Pert & cpm
 
crashing of project
crashing of project crashing of project
crashing of project
 

Viewers also liked

An Overview Of Project Financing
An Overview Of Project FinancingAn Overview Of Project Financing
An Overview Of Project FinancingEdureka!
 
23 realestate laws-maha
23 realestate laws-maha23 realestate laws-maha
23 realestate laws-mahaArun Prakaash
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction managementXubitech
 
Legal Aspects for Property Transactions
Legal Aspects for Property TransactionsLegal Aspects for Property Transactions
Legal Aspects for Property TransactionsManaan Choksi
 
Network analysis in gis
Network analysis in gisNetwork analysis in gis
Network analysis in gisstudent
 
THE LEGAL ASPECT OF PURCHASING
THE LEGAL ASPECT OF PURCHASING THE LEGAL ASPECT OF PURCHASING
THE LEGAL ASPECT OF PURCHASING Zamri Yahya
 
Project Financing
Project FinancingProject Financing
Project Financingkhankm
 
Projects types
Projects types Projects types
Projects types Ahmed Sakr
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentationelliotfus
 
Quality Management In Construction
Quality Management In ConstructionQuality Management In Construction
Quality Management In ConstructionIsidro Sid Calayag
 
Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with exampleAbhijeet Bhosale
 
5 Basic Phases of Project Management
5 Basic Phases of Project Management 5 Basic Phases of Project Management
5 Basic Phases of Project Management Project Insight
 

Viewers also liked (20)

Network analysis
Network analysisNetwork analysis
Network analysis
 
Network analysis
Network analysisNetwork analysis
Network analysis
 
Construction law
Construction lawConstruction law
Construction law
 
An Overview Of Project Financing
An Overview Of Project FinancingAn Overview Of Project Financing
An Overview Of Project Financing
 
23 realestate laws-maha
23 realestate laws-maha23 realestate laws-maha
23 realestate laws-maha
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
 
Legal Aspects for Property Transactions
Legal Aspects for Property TransactionsLegal Aspects for Property Transactions
Legal Aspects for Property Transactions
 
Mrtp act
Mrtp actMrtp act
Mrtp act
 
Network analysis in gis
Network analysis in gisNetwork analysis in gis
Network analysis in gis
 
THE LEGAL ASPECT OF PURCHASING
THE LEGAL ASPECT OF PURCHASING THE LEGAL ASPECT OF PURCHASING
THE LEGAL ASPECT OF PURCHASING
 
Project Financing
Project FinancingProject Financing
Project Financing
 
Construction safety management
Construction safety managementConstruction safety management
Construction safety management
 
Projects types
Projects types Projects types
Projects types
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentation
 
Quality Management In Construction
Quality Management In ConstructionQuality Management In Construction
Quality Management In Construction
 
Site planning
Site planningSite planning
Site planning
 
Site planning
Site planningSite planning
Site planning
 
Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with example
 
5 Basic Phases of Project Management
5 Basic Phases of Project Management 5 Basic Phases of Project Management
5 Basic Phases of Project Management
 
Phases of a Project
Phases of a ProjectPhases of a Project
Phases of a Project
 

Similar to Network analysis & cpm

Network analysis cpm module3 ppt
Network analysis cpm module3 pptNetwork analysis cpm module3 ppt
Network analysis cpm module3 pptahsanrabbani
 
Cpm network analysis and problems
Cpm network analysis and problemsCpm network analysis and problems
Cpm network analysis and problemsSHAHIDBASHIRMALIK
 
Basics CPM&PERT.ppt
Basics CPM&PERT.pptBasics CPM&PERT.ppt
Basics CPM&PERT.pptssuserad50d3
 
Operation research-Network analysis (Critical Path Method)
Operation research-Network analysis (Critical Path Method)Operation research-Network analysis (Critical Path Method)
Operation research-Network analysis (Critical Path Method)Kamel Attar
 
203wbs Network Gantt Chart
203wbs Network Gantt Chart203wbs Network Gantt Chart
203wbs Network Gantt Chartbtecexpert
 
Unit.6. network analysis with cpm and pert
Unit.6. network analysis with cpm and pertUnit.6. network analysis with cpm and pert
Unit.6. network analysis with cpm and pertDagnaygebawGoshme
 
Operation research's CPM techniques
Operation research's CPM techniques Operation research's CPM techniques
Operation research's CPM techniques Mohammad Younus
 
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERSPLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERSHafiz JUNAID
 
Project Management & Engineering Economics
Project Management & Engineering EconomicsProject Management & Engineering Economics
Project Management & Engineering EconomicsDeepak Paithankar
 
Yagmur Bostanci47 Hackensack Street, East Rutherford, NJ929-22.docx
Yagmur Bostanci47 Hackensack Street, East Rutherford, NJ929-22.docxYagmur Bostanci47 Hackensack Street, East Rutherford, NJ929-22.docx
Yagmur Bostanci47 Hackensack Street, East Rutherford, NJ929-22.docxjeffevans62972
 
Pertcpm projectmanagement-120628224438-phpapp02
Pertcpm projectmanagement-120628224438-phpapp02Pertcpm projectmanagement-120628224438-phpapp02
Pertcpm projectmanagement-120628224438-phpapp02kongara
 
Pertcpm projectmanagement SIDDANNA M BALAPGOL
Pertcpm projectmanagement SIDDANNA M BALAPGOLPertcpm projectmanagement SIDDANNA M BALAPGOL
Pertcpm projectmanagement SIDDANNA M BALAPGOLSiddanna Balapgol
 

Similar to Network analysis & cpm (20)

Spm
SpmSpm
Spm
 
IGNOU PERT CPM
IGNOU PERT CPMIGNOU PERT CPM
IGNOU PERT CPM
 
Network analysis cpm module3 ppt
Network analysis cpm module3 pptNetwork analysis cpm module3 ppt
Network analysis cpm module3 ppt
 
CPM PERT.pptx
CPM PERT.pptxCPM PERT.pptx
CPM PERT.pptx
 
Cpm network analysis and problems
Cpm network analysis and problemsCpm network analysis and problems
Cpm network analysis and problems
 
Project Management
Project Management Project Management
Project Management
 
Basics CPM&PERT.ppt
Basics CPM&PERT.pptBasics CPM&PERT.ppt
Basics CPM&PERT.ppt
 
MGT-Ch07.ppt
MGT-Ch07.pptMGT-Ch07.ppt
MGT-Ch07.ppt
 
Project Management
Project ManagementProject Management
Project Management
 
Operation research-Network analysis (Critical Path Method)
Operation research-Network analysis (Critical Path Method)Operation research-Network analysis (Critical Path Method)
Operation research-Network analysis (Critical Path Method)
 
203wbs Network Gantt Chart
203wbs Network Gantt Chart203wbs Network Gantt Chart
203wbs Network Gantt Chart
 
Unit.6. network analysis with cpm and pert
Unit.6. network analysis with cpm and pertUnit.6. network analysis with cpm and pert
Unit.6. network analysis with cpm and pert
 
Operation research's CPM techniques
Operation research's CPM techniques Operation research's CPM techniques
Operation research's CPM techniques
 
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERSPLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
 
Project Management & Engineering Economics
Project Management & Engineering EconomicsProject Management & Engineering Economics
Project Management & Engineering Economics
 
Yagmur Bostanci47 Hackensack Street, East Rutherford, NJ929-22.docx
Yagmur Bostanci47 Hackensack Street, East Rutherford, NJ929-22.docxYagmur Bostanci47 Hackensack Street, East Rutherford, NJ929-22.docx
Yagmur Bostanci47 Hackensack Street, East Rutherford, NJ929-22.docx
 
Ch3 proj.mgt
Ch3 proj.mgtCh3 proj.mgt
Ch3 proj.mgt
 
Pertcpm projectmanagement-120628224438-phpapp02
Pertcpm projectmanagement-120628224438-phpapp02Pertcpm projectmanagement-120628224438-phpapp02
Pertcpm projectmanagement-120628224438-phpapp02
 
Pertcpm projectmanagement SIDDANNA M BALAPGOL
Pertcpm projectmanagement SIDDANNA M BALAPGOLPertcpm projectmanagement SIDDANNA M BALAPGOL
Pertcpm projectmanagement SIDDANNA M BALAPGOL
 
Cpmprt
CpmprtCpmprt
Cpmprt
 

Recently uploaded

Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...RKavithamani
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 

Recently uploaded (20)

Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 

Network analysis & cpm

  • 1. Slide 1 Project Management Project is defined as a huge (mammoth) task which for convenience of management is broken down into smaller elements such that, for each of the smaller elements, one can identify the finite requirements of resources and finite requirements of time. These smaller elements are referred as activities of the project i.e. project essentially comprises of a number of activities e.g. construction of building is a project and electrical work is one of the activities of the project. Contd…
  • 2. Slide 2 Project Management Like the electrical activity, a project will have a number of activities. The first task of the project manager is to define all the activities of the project in terms of time and other dimensions like cost etc. The second task is to establish the inter relation & interdependence of the defined activities. The following are some examples to explain small projects.
  • 3. Slide 3 Example 1 Christine Philips is in charge of planning and coordinating next spring’s sales management training program for her company. Christine has listed following activities information for this project. Immediate Duration Activity Description predecessors (weeks) A Select location - 2 B Obtain speakers - 3 C Make speaker travel plans A, B 2 D Prepare and mail brochure A, B 2 E Take reservations D 3 Draw the network diagram; find the critical path and the duration along the critical path.
  • 4. Slide 4 Example 2 A research and development department is developing a new power supply for a console television set. It has broken down the job into the following form: Immediate Duration Activity Description predecessors (days) A Determine output voltages - 5 Determine whether to use solid B A 7 state rectifiers C Choose rectifiers B 2 D Choose filter B 3 E Choose transformer C 1 F Choose chassis D 2 G Choose rectifiers mounting C 1 H Layout chassis E, F 3 I Build and test G, H 10 Draw the critical path schedule, indicate the critical path. What is the time required for completion for the project?
  • 5. Slide 5 Categories of Project The following is an illustrative list of categories of project: i. Complex projects with unknown elements for e.g. Construction of nuclear power plants ii. Large projects with standard elements for e.g. Construction of an automobile factory iii. Intermediate project for e.g. layout of machine, implementing TQM programme, developing new markets etc. iv. Small projects for e.g. installing a new machine, conducting a market survey etc. v. Turnkey project is one which starts from zero to proceed to a finished ‘product’. Concept of turnkey is that when the project is finished one turns a key to set the facility in operation, for e.g. Reliance refinery project at Jamnagar is a turnkey project.
  • 6. Slide 6 Session Objective Given the activities, their duration and their inter relation, our objective in this session is: i. to represent these relation of activities in the form of a network diagram ii. to analyze the network diagram using CPM (Critical Path Method)
  • 7. Slide 7 Network Diagram Network diagram is a graphical / pictorial representation of a series or a sequence of activities in the logical order of their performance, such that we establish the inter relation and interdependence of one activity on all other activities of the project. Network Diagram comprises of two basic elements: (i) Activity (ii) Event (Node)
  • 8. Slide 8 Elements of Network Diagram i. Activity: An activity is denoted by an arrow Tail Head It signifies the deployment of finite resources over a finite period of time. The tail of the arrow signifies the commencement of the activity and the head signifies the completion of the activity. ii. Events or Nodes: An event is denoted by a circle i where, i={1,2,3,4…. and so on} It signifies the status of the project at a point of time. It indicates the start & completion of an activity.
  • 9. Slide 9 A-O-A Convention (i-j convention) Activity A or Activity i-j A i j tij Tail Event Head Event i<j Tail event signifies commencement status of the activity. Head Event signifies completion status of the activity Arrow signifies deployment of finite resources over a finite period of time. tij is the duration of the activity
  • 10. Slide 10 Good practices of drawing a Network Diagram i. Drawing a network diagram is a trial and error procedure ii. The starting event is always one event, irrespective of the number of starting activities. This event signifies the commencement status of the project iii. The completion event is always one event, irrespective of the number of final activities. This event signifies the completion status of the project. iv. The length of the arrow is the convenience of drawing the network diagram. It is no indication of the duration of activity. v. The arrows must be drawn in the forward direction. Avoid crossing of arrows. vi. The numbering of events starts with the first event and progressively moves from the left to the right of the network diagram vii. There is no uniqueness in the final picture of the network diagram.
  • 11. Slide 11 Good practices of drawing a Network Diagram These Guidelines are explained with the following five illustrations of network diagram:
  • 12. Slide 12 Analysis of Network Diagram  There are two popular tools used for analysis of Network Diagram  CPM (Critical Path Method)  PERT (Program Evaluation & Review Technique) In the following slides, CPM is explained with examples.
  • 13. Slide 13 Manager’s View of Critical Path Method Inputs Outputs (What information must (What information results be supplied to CPM) from CPM that provides for better project management) 1. a complete list of 1. Estimated duration of project activities C project 2. Precedence P 2. Identification of critical relationship among activities activities M 3. Amount of Float for 3. Estimate of each each activity activities duration
  • 14. Slide 14 Critical Path Method  It was developed in 1956 / 1957 by Remington Rand and Du- pont to help schedule maintenance projects in chemical plants and construction projects.  Critical Path Method is a systematic scientific method based on principle of time estimates to perform a detailed analysis of Network in an application of Project Management  Time estimates in CPM relate to estimating the time for the events of the network diagram. Since the event signifies the status of the project at a point of time, the time estimates in turn signify the status of the project at different points of time. There are two important time estimates; (i) Earliest starting time & (ii) Latest finishing time.
  • 15. Slide 15 Guidelines for Earliest Start Time (EST) Earliest Start Time (EST): It signifies the earliest that an activity can start with reference to the commencement status of the project. The following are the guidelines to obtain EST. i. Earliest starting time for event 1 is taken as zero because event 1 signifies the commencement status of the project i.e. status of the project corresponding to time ‘t = 0’. ii. For the calculation of EST we start from event 1 and progressively move from left to right in the network diagram (referred as forward pass)
  • 16. Slide 16 Guidelines for Earliest Start Time (EST) iii.Consider two adjacent events Ei Ej i j tij Tail Event Head Event Ej = Ei + tij EST of the head event = EST of the tail event + the duration of the activity
  • 17. Slide 17 Guidelines for Earliest Start Time (EST) iv. Consider a merging event (in case more than one activity is merging towards an event). Ea Ed = Ea + tad a tad Ed = Eb + tbd Eb Ed tbd b d Ed = Ec + tcd tcd Ec Take the maximum value c
  • 18. Slide 18 Guidelines for Latest Finish Time (LFT) Latest Finish Time (LFT): It is the latest time by which an activity should finish, otherwise the project completion time will be delayed. The following are the guidelines to obtain LFT. i. For the last event of the network diagram, LFT = EST (because the last event signifies the project completion status and both EST / LFT signify the project completion time) ii. For the calculation of LFT, we start with the last event of the network diagram & we proceed progressively from the right to the left of the network diagram (referred as backward pass).
  • 19. Slide 19 Guidelines for Latest Finish Time (LFT) iii. For two adjacent events Tail Event Head Event i j tij Li Lj Li = Lj – tij LFT of the tail event = LFT of the head event – the duration of that activity
  • 20. Slide 20 Guidelines for Latest Finish Time (LFT) For a bursting event (If there are more than one subsequent activities busting from an event), calculate LFT for each of the head events and take the minimum value 2 t12 L1 = L2 – t12 L2 t13 L1 = L3 – t13 1 3 L1 t14 L3 L1 = L4 – t14 4 Take the minimum value L4
  • 21. Slide 21 Note: Both EST and LFT for starting event (event 1 of the network diagram) are always zero
  • 22. Slide 22 Total Float of an Activity  Total Float signifies the maximum permissible delay in performing the activity without delaying the project completion time. The following is the mathematical relation for Total Float E Head Event i i j tij Tail Event Lj Total Float of Activityi-j = Lj – Ei – tij Total Float of Activity = LFT (Head Event) – EST (Tail Event) – Duration of Activity
  • 23. Slide 23 Free Float of an Activity Free float signifies the maximum permissible delay in commencement of an activity without affecting the commencement of the succeeding activity Ei Ej Tail Event i j Head Event tij Li Lj Head Event Float = Lj – Ej Free Float = Total Float – Head Event Float
  • 24. Slide 24 Definition of Critical Path  If total float of an activity is zero, it means there is no permissible delay in performing the activity i.e. any delay in performing the activity will result in a corresponding delay in the project completion time. Such activities are referred as critical activities.  Path of network is a continuous series or sequence of activities that joins the first event with the last event of the network diagram.  In a network one can enumerate many sequences of activities from starting event to end event. Each sequence will contain different combination of activities with different duration.
  • 25. Slide 25 Definition of Critical Path  To know the possible time by which the project can be completed, we determine the critical path i.e. the sequence of activities with longest duration. It is known as critical path and any delay in activities lying on this path would cause a delay in the whole project.  Alternately, Critical Path is a continuous series or sequence of critical activities that joins the first event with the last event of the network diagram.  To quicken the process, the activities lying on the critical path should be taken first. The activity lying on non-critical path has some flexibility in their starting time and their delay in start is not likely to affect the final completion date. These are known as slack activities and should be given priority in order of their float value.