Construction Issues:
                           EPC Contracting and
                            FIDIC Silver Book
            Francis Ho                              An Update on Real Estate Laws in
            Senior Associate, King & Spalding LLP   the UAE and Saudi Arabia
            Email: fho@kslaw.com                    Radisson Blu Media City Hotel,
            Tel: +971 2 652 3426                    Dubai, UAE
            Mob: +971 50 557 0446                   31 January – 1 February 2010




428006 v1
EPC Contracts
        §  Engineering, procurement and construction contracts are most
            common form of contract used in major international infrastructure
            projects
        §  An EPC Contractor s obligations typically include:
        §  Turnkey responsibility to deliver:
              §  a complete facility
              §  for a guaranteed price
              §  by a guaranteed date
              §  which must perform to a specified level
        §  Because EPC Contracts involve Contractor taking a high level of
            risk they are, to some extent, resisted by contractors (partially due
            to high insurance costs). That said, they are still the dominant
            model because sponsors and lenders prefer certainty they offer

428006 v1                                                                           2
FIDIC Silver Book
        §  FIDIC – International Federation of Consulting
            Engineers
        §  Standard Forms of Contract widely used in international
            engineering and construction projects
        §  Range of contracts – White, Red, Yellow, Orange and
            Silver Books
        §  Silver book – Turnkey contract which departs from usual
            balance of risk allocation in FIDIC contracts




428006 v1                                                             3
Basic Contractual Structure
                           of a Power Project
                                Government
      Equity Support                              Concession                  Financing and
        Agreement                                 Agreement                 Security Agreements

            Sponsors            Project Co                          Lenders


             EPC                Longterm                    Fuel Supply
                                                                                   PPA
            Contract           O&M Contract                  Agreement


          EPC             O&M Contractor                        Fuel             Offtaker
        Contractor        (often a Sponsor)                    Supplier

                                               Direct Agreement
    Note: Contractors often become one of sponsors in large projects now although ordinarily
    sell down their interest after financial close as they wish to free up their capital for other
    projects                                                                                         4
428006 v1
Bankability
        §  EPC contracts must have risk allocation that satisfies Lenders
        §  Lenders focus on ability (or more particularly the lack of) Contractor to
            claim:
             §  Additional costs; and/or
             §  Extensions of time
        §  Lenders also look to Contractor s security (e.g. parent company
            guarantees/bank guarantees securing Contractor s performance)
        §  The less comfortable Lenders are with the above, the more equity the
            Sponsors will be required to contribute
        §  Lenders will also need to be satisfied with technical risk
        §  Price is a general bankability issue also (but a broader project issue)
        §  Engineering, procurement and construction contracts are most common
            form of contract used



428006 v1                                                                               5
General Bankability Issues in
                    Construction Contracts
        §  Fixed completion date (Silver Book Art. 8.2)
        §  Fixed completion price (Silver Book Arts. 4.11 and 14.1)
        §  No or limited technology risk (Silver Book Arts. 5.8, 7.5, 9.1 and 11
            etc)
        §  Output guarantees (Silver Book – no performance LDs, rather
            obligations to remedy defects and/or reduction in contract price)
        §  Liquidated damages for both delay and performance
        §  Security from Contractor and/or its parent (Silver Book Art. 4.2)
        §  Large caps on liability – ideally none but often one is negotiated
            (Silver Book Art. 17.6)
        §  Restrictions on ability of Contractor to claim extensions of time and
            additional costs (Silver Book Arts. 13.1 and 13.4)
        §  An EPC Contract (and Silver Book with amendments) generally
            delivers above
428006 v1                                                                           6
Key Clauses in EPC Contracts and
                 Common Approaches (1)
        §  Single point of responsibility – Contractor is responsible for all design,
            engineering, procurement, construction, commissioning and testing
            activities. If EPC Contractor is a joint venture, liability/responsibility is joint
            and several (Silver Book Arts. 4.1 & 5 – fit for purpose )
        §  Fixed Contract Price – limited opportunities for Contractor to claim extra
            costs/time. Generally limited to directed variations to works (Silver Book
            Arts. 13.1, 14.1 and 20)
        §  Fixed completion date – guaranteed date for completion. Failure to meet
            this date will attract LDs. In order for these to be enforceable they must be
            a genuine pre-estimate of the loss that the project company will suffer if the
            power station is not completed on time (Silver Book Arts. 8.2, 13 and 20)
        §  Note: Additionally extension of time clause must provide for an EOT to be
            granted where Contractor is delayed due to act/omissions of owner/project
            company (Silver Book Art. 8.4(c))



428006 v1                                                                                         7
Key Clauses in EPC Contracts and
                Common Approaches (2)
        §  Performance Guarantees: Project Co s revenue will come from revenue
            from project. This is important to service project debt. It is vital then that
            facility performs in respect of output, efficiency and reliability. This is
            purpose of the Performance Liquidated Damages payable by the
            Contractor if performance requirements are not met. (Silver Book does not
            provide for performance liquidated damages – see e.g. Art. 9.4. Can be
            amended as required.)
        §  Performance Liquidated Damages must also be genuine pre-estimate of
            loss. They are usually calculated on net present value (less expenses)
            calculation of revenue foregone over the project
        §  E.g. in case of a power station what this might mean is if plant output is 5
            MW less than required performance liquidated damages will be designed
            to compensate project company for that loss of revenue for life of project
            by being unable to sell that 5 MW



428006 v1                                                                                    8
Key Clauses in EPC Contracts and
                Common Approaches (3)
        §  Caps on liability: most EPC Contractors will baulk at unlimited
            liability. Market is generally a cap at 100% of the Contract Price.
            Sub-caps of 20% of Contract Price on delay and performance
            liquidated damages also common (Silver Book – LOL is dealt with
            in Special Conditions – see Art. 17.6)
        §  Consequential damages are also generally excluded. Profit also
            often expressly excluded (Silver Book Art. 17.6)
        §  There may be some exceptions to those caps (e.g. wilful
            misconduct, breach of patent rights)
        §  Security – EPC Contract will require that performance security be
            supplied by the Contractor in respect of its obligations under EPC
            Contract (Silver Book Art. 4.2)



428006 v1                                                                         9
Key Clauses in EPC Contracts and
                Common Approaches (4)
        §  Market security includes:
             §  Bank guarantee for between 5-15% of Contract Price
             §  Retention (withholding of 5-15%) of each payment under EPC
                 contract (Silver Book Arts. 4.2 and 14.3(c) and Annex F)
             §  Advance Payment Guarantee – if an advance payment is made
                 (Silver Book Art. 4.2 and Annex E)
             §  Parent Company Guarantee – to secure Contractor s
                 performance if it does not perform (Silver Book Art. 4.2 and
                 Annex A)
        Variations
        §  Project Co must have right to order variations/agree to suggested
            variations – clause must contemplate omission of work as well as
            pricing (Silver Book Arts. 3.5 and 13)

428006 v1                                                                       10
Key Clauses in EPC Contracts and
                Common Approaches (5)
        Defects Liability
        §  Contractors required to repair defects 12-24 months following
            completion of performance testing – can be one period or tiered
            (Silver Book Art. 11)
        Intellectual Property
        §  Contractor must warrant it has the rights regarding any proposed
            LP. Also note there is often an indemnity for breach (Silver Book
            Art. 17.5)
        Force Majeure
        §  Parties excused from performance for certain Force Majeure events
            (Silver Book Art. 19)
        Suspension
        §  Project Co has this right (Silver Book Arts. 8.8 to 8.12)

428006 v1                                                                       11
Termination
        §  Contractor has very limited rights e.g. non-payment/
            extended suspension, material breach by employer
            (Silver Book Art. 16.2)

        §  Project company has much broader rights. This will be
            tied with third party agreements. Can terminate:
             §  For convenience (Silver Book Art. 15.5)
             §  For breach/insolvency, otherwise (Silver Book Art.
                 15.2)



428006 v1                                                             12
Power-specific Clauses in EPC
                        Contracts
        §  General interface issues:
            §  Commencement and completion dates
            §  LDs amounts and trigger points (NB: Silver Book does not
                provide for performance liquidated damages and will need
                adaptation)
            §  Caps on liability
            §  Indemnities
            §  Entitlements to extensions of time
            §  Force Majeure (Silver Book fairly wide, beyond a Party s
                Control and could not reasonably have been provided against
                before entering into the Contract )
            §  Third party interfaces
            §  Intellectual Property

428006 v1                                                                     13
Key Power Issues
        §  Grid Access
        §  EPC Contract must provide that Project Company provides Grid Access –
            this has 2 levels:
             §  (a) obligation to ensure that the infrastructure is in place; and
             §  (b) obligation to ensure that Contractor is permitted to export power
        §  Interfacing of commissioning and testing regimes (fuel for testing?)
        §  Consistency between testing/offtake/PPA regime? – important that they
            relate
        §  Interfacing of issues between the Offtaker and EPC Contractor
        §  Project company must control relationship with Offtaker (on-going
            relationship)
        §  Silver Book will require substantial modification – issues such as
            connection, metering, point of delivery and third party interfaces to be dealt
            with


428006 v1                                                                                    14
Key Performance Issues in Power
                       Projects (1)
        §  Liquidated Damages is main relevant provision governing
            performance
             §  Output LDs (how many mega watts produced)
             §  Heat rate (how much fuel burnt to produce required power
                 output)
        §  Delay liquidated damages
        Testing performance – most common approaches
        §  Functional Tests – pumps/conveyers/pressure vessels. Test
            functionality of parts at station but not whole station. Important as
            condition LDs will attach
        §  Emissions Tests – compliance against environmental requirements.
            Absolute obligation – generally not linked to LDs



428006 v1                                                                           15
Key Performance Issues in Power
                       Projects (2)
        §  Silver Book will require substantial modification to provide for
            performance liquidated damages and testing in power projects:
             §  Employer s remedy for defective plant accepted into service is
                 a reduction in the Contract Price; and
             §  Testing and commissioning provisions are generally defined
                 and require further definition – can use technical schedules
             §  Guarantee Tests – these are the ability of power station to meet
                 the performance criteria set out in Contract
             §  Generally these are set at maximum level of required
                 performance. Lender s input will be important in determining
                 this level. Lender s interest though will be that debt service
                 obligations are met – Sponsor s interest will be to get optimal
                 performances


428006 v1                                                                           16
Key Performance Issues in Power
                        Projects (3)
            §   Hand-over ought to occur after all performance tests are
                satisfied. This retains Sponsor s potential rights to both
                performance and delay damages
            §  Contractor s will often request a right to modify station in event
                performance guarantees are not met (EPC Contract must
                allocate costs for this eventuality)
            §  Silver Book provisions will need modification to be made
                applicable to project specific requirements (See Art. 9 of Silver
                Book)




428006 v1                                                                            17
Technical Issues
        §  Testing procedures ought to be set out in EPC Contract including:
             §  Testing Methodology (i.e. American Society of Mechanical
                 Engineers)
             §  Testing Equipment – (who must provide it, where will it be, how
                 sensitive)
             §  Tolerances – what is margin of error?
             §  Ambient Conditions – what atmospheric conditions are
                 assumed to be base case (testing results will need to be
                 adjusted to take into account any variance from these
                 conditions)
             §  If a multi-unit station individual unit tests and then whole of plant
                 testing
             §  Provision of fuel and consumables

428006 v1                                                                                18
To EPC or not to EPC?


       Advantages                                   Disadvantages

       1.  Bankable                                 1.    Higher Contract price than
       2.  Certainty (as far as that is possible)         alternative structure due to risk
       3.  Turnkey responsibility on the                  allocation (and built-in Contractor
           EPC Contractor                                 contingencies)
                                                    2.    Limited scope for Project Sponsor
                                                          to intervene if problems arise
                                                          during construction
                                                    3.    Not many players




428006 v1                                                                                       19
To Silver Book or not to Silver Book?
        §  Silver Book very general and requires modification for
            complex process driven projects
        §  No provision for lender or concession grantor step-in in
            project-financed (including PPP and BOT) deals
        §  Dispute resolution provisions require consideration –
            currently dispute adjudication board appointed (can be
            expensive)
        §  Performance liquidated damages against Contract Price
            reduction – lenders requirements and debt servicing
        §  Substantial modification required for project-financed
            deals

428006 v1                                                              20

Mais conteúdo relacionado

Mais procurados

FIDIC Red Book (PEC 2019).pdf
FIDIC Red Book (PEC 2019).pdfFIDIC Red Book (PEC 2019).pdf
FIDIC Red Book (PEC 2019).pdfsajidkhan82714
 
# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN PanigrahiSN Panigrahi, PMP
 
Fidic contract
Fidic contract Fidic contract
Fidic contract Yash Patel
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentationJeff B
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -artijagadish108
 
Clause 14.2 Advance Payment-Understanding Clauses in FIDIC ‘Conditions of Con...
Clause 14.2 Advance Payment-Understanding Clauses in FIDIC ‘Conditions of Con...Clause 14.2 Advance Payment-Understanding Clauses in FIDIC ‘Conditions of Con...
Clause 14.2 Advance Payment-Understanding Clauses in FIDIC ‘Conditions of Con...Divyanshu Dayal
 
110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc Projects110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc ProjectsMy own
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008AYM1979
 
FIDIC Presentation-2016.pdf
FIDIC Presentation-2016.pdfFIDIC Presentation-2016.pdf
FIDIC Presentation-2016.pdfPachyCarmona1
 
FIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementFIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementASHISH KUMAR SINGH
 

Mais procurados (20)

FIDIC Red Book (PEC 2019).pdf
FIDIC Red Book (PEC 2019).pdfFIDIC Red Book (PEC 2019).pdf
FIDIC Red Book (PEC 2019).pdf
 
Fundamentals of Construction Contracts - English, ver. 2021
Fundamentals of Construction Contracts - English, ver. 2021Fundamentals of Construction Contracts - English, ver. 2021
Fundamentals of Construction Contracts - English, ver. 2021
 
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activi...
 
# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi
 
Extension of Time (EOT) & Related Costs in Construction - Presentation Slides
Extension of Time (EOT) & Related Costs in Construction - Presentation SlidesExtension of Time (EOT) & Related Costs in Construction - Presentation Slides
Extension of Time (EOT) & Related Costs in Construction - Presentation Slides
 
Epc contracts.
Epc contracts.Epc contracts.
Epc contracts.
 
Fidic contract
Fidic contract Fidic contract
Fidic contract
 
Fidic law1
Fidic law1Fidic law1
Fidic law1
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentation
 
Fidic Form of Contract.
Fidic Form of Contract.Fidic Form of Contract.
Fidic Form of Contract.
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -arti
 
Clause 14.2 Advance Payment-Understanding Clauses in FIDIC ‘Conditions of Con...
Clause 14.2 Advance Payment-Understanding Clauses in FIDIC ‘Conditions of Con...Clause 14.2 Advance Payment-Understanding Clauses in FIDIC ‘Conditions of Con...
Clause 14.2 Advance Payment-Understanding Clauses in FIDIC ‘Conditions of Con...
 
110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc Projects110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc Projects
 
Construction contract
Construction contractConstruction contract
Construction contract
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Eot claims hr__may2012
Eot claims hr__may2012Eot claims hr__may2012
Eot claims hr__may2012
 
FIDIC Presentation-2016.pdf
FIDIC Presentation-2016.pdfFIDIC Presentation-2016.pdf
FIDIC Presentation-2016.pdf
 
Fidic contracts management introduction
Fidic contracts management introductionFidic contracts management introduction
Fidic contracts management introduction
 
FIDIC 2017 Yellow and Silver in EPC and PPP Contracts
FIDIC 2017 Yellow and Silver in EPC and PPP ContractsFIDIC 2017 Yellow and Silver in EPC and PPP Contracts
FIDIC 2017 Yellow and Silver in EPC and PPP Contracts
 
FIDIC-Relevant to Time Management
FIDIC-Relevant to Time ManagementFIDIC-Relevant to Time Management
FIDIC-Relevant to Time Management
 

Destaque

Fidic yellow vs silver
Fidic yellow vs silverFidic yellow vs silver
Fidic yellow vs silverWeero Koster
 
Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts finalFitBlar Mit
 
Claim Preparation and Project Records - 2014 Olswang Construction Law Conference
Claim Preparation and Project Records - 2014 Olswang Construction Law ConferenceClaim Preparation and Project Records - 2014 Olswang Construction Law Conference
Claim Preparation and Project Records - 2014 Olswang Construction Law ConferenceFrancis Ho
 
Delay, dispute (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
Delay, dispute  (1st annual conf. of planning in cairo 23-8-2014) engr. m magedDelay, dispute  (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
Delay, dispute (1st annual conf. of planning in cairo 23-8-2014) engr. m magedM Maged Hegazy, LLM, MBA, CCP, P3O
 
Fidic conditions of subcontract agreement
Fidic conditions of subcontract agreementFidic conditions of subcontract agreement
Fidic conditions of subcontract agreementabdmuhaiminyunus
 
A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006Melvin Lim
 
Update Delay Analysis
Update Delay AnalysisUpdate Delay Analysis
Update Delay AnalysisChris Carson
 
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of ContractSession W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of ContractProject Controls Expo
 
Methods of delay analysis
Methods of delay analysisMethods of delay analysis
Methods of delay analysiskatrin enders
 
Construction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedConstruction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedMichael Pink
 
Extension of time Analysis
Extension of time AnalysisExtension of time Analysis
Extension of time AnalysisFarhan Moosa
 
CIOB Complex Projects Contract 2013 and FIDIC: A Comparison
CIOB Complex Projects Contract 2013 and FIDIC: A ComparisonCIOB Complex Projects Contract 2013 and FIDIC: A Comparison
CIOB Complex Projects Contract 2013 and FIDIC: A ComparisonFrancis Ho
 
Fi dic silver book
Fi dic silver bookFi dic silver book
Fi dic silver bookmoodlyd
 
101313812 دورة-فيديك
101313812 دورة-فيديك101313812 دورة-فيديك
101313812 دورة-فيديكAhmed Fouda
 
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...Divyanshu Dayal
 

Destaque (17)

Fidic yellow vs silver
Fidic yellow vs silverFidic yellow vs silver
Fidic yellow vs silver
 
Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts final
 
Fidic
FidicFidic
Fidic
 
Claim Preparation and Project Records - 2014 Olswang Construction Law Conference
Claim Preparation and Project Records - 2014 Olswang Construction Law ConferenceClaim Preparation and Project Records - 2014 Olswang Construction Law Conference
Claim Preparation and Project Records - 2014 Olswang Construction Law Conference
 
Delay, dispute (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
Delay, dispute  (1st annual conf. of planning in cairo 23-8-2014) engr. m magedDelay, dispute  (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
Delay, dispute (1st annual conf. of planning in cairo 23-8-2014) engr. m maged
 
Fidic conditions of subcontract agreement
Fidic conditions of subcontract agreementFidic conditions of subcontract agreement
Fidic conditions of subcontract agreement
 
A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006
 
Update Delay Analysis
Update Delay AnalysisUpdate Delay Analysis
Update Delay Analysis
 
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of ContractSession W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
Session W2 - Delay Claims and Analysis Based on FIDIC Forms of Contract
 
Methods of delay analysis
Methods of delay analysisMethods of delay analysis
Methods of delay analysis
 
Construction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedConstruction Delay Analysis, Simplified
Construction Delay Analysis, Simplified
 
Extension of time Analysis
Extension of time AnalysisExtension of time Analysis
Extension of time Analysis
 
CIOB Complex Projects Contract 2013 and FIDIC: A Comparison
CIOB Complex Projects Contract 2013 and FIDIC: A ComparisonCIOB Complex Projects Contract 2013 and FIDIC: A Comparison
CIOB Complex Projects Contract 2013 and FIDIC: A Comparison
 
SlideShare 101
SlideShare 101SlideShare 101
SlideShare 101
 
Fi dic silver book
Fi dic silver bookFi dic silver book
Fi dic silver book
 
101313812 دورة-فيديك
101313812 دورة-فيديك101313812 دورة-فيديك
101313812 دورة-فيديك
 
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...
Clause 4.2 Performance Security-Understanding Clauses in FIDIC ‘Conditions of...
 

Semelhante a FIDIC SIlver Book in Power Projects

10 filip audenaert - dg infra
10   filip audenaert - dg infra10   filip audenaert - dg infra
10 filip audenaert - dg infraLinea Trovata
 
HSE - Introduction to Project Finance
HSE - Introduction to Project FinanceHSE - Introduction to Project Finance
HSE - Introduction to Project FinanceLeighton Peter Prabhu
 
Contracts PPT.pptx
Contracts PPT.pptxContracts PPT.pptx
Contracts PPT.pptxAditya Mane
 
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...EMLI Indonesia
 
Assignment 1 Complete
Assignment 1 CompleteAssignment 1 Complete
Assignment 1 CompleteJohn Ashton
 
An Empirical Investigation into the Origins and Causes of Variation Orders in...
An Empirical Investigation into the Origins and Causes of Variation Orders in...An Empirical Investigation into the Origins and Causes of Variation Orders in...
An Empirical Investigation into the Origins and Causes of Variation Orders in...IRJET Journal
 
Tim burbury, king & spalding
Tim burbury, king & spaldingTim burbury, king & spalding
Tim burbury, king & spaldingSarah El Akkad
 
Wind power epc o&m april 2013
Wind power epc o&m  april 2013Wind power epc o&m  april 2013
Wind power epc o&m april 2013Weero Koster
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentationelliotfus
 
Risk allocation in offshore E&P projects
Risk allocation in offshore E&P projectsRisk allocation in offshore E&P projects
Risk allocation in offshore E&P projectsClydeCoOffshore
 
Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)Melvin Lim
 
Professional practices (lec 02) by k.iqbal
Professional practices (lec 02) by k.iqbalProfessional practices (lec 02) by k.iqbal
Professional practices (lec 02) by k.iqbalZakee Kazmee
 
Course on Regulation and Sustainable Energy in Developing Countries - Session 9
Course on Regulation and Sustainable Energy in Developing Countries - Session 9Course on Regulation and Sustainable Energy in Developing Countries - Session 9
Course on Regulation and Sustainable Energy in Developing Countries - Session 9Leonardo ENERGY
 

Semelhante a FIDIC SIlver Book in Power Projects (20)

Epc contracts-in-the-power-sector
Epc contracts-in-the-power-sectorEpc contracts-in-the-power-sector
Epc contracts-in-the-power-sector
 
10 filip audenaert - dg infra
10   filip audenaert - dg infra10   filip audenaert - dg infra
10 filip audenaert - dg infra
 
Fidic db-yellow-book
Fidic db-yellow-bookFidic db-yellow-book
Fidic db-yellow-book
 
HSE - Introduction to Project Finance
HSE - Introduction to Project FinanceHSE - Introduction to Project Finance
HSE - Introduction to Project Finance
 
Contracts PPT.pptx
Contracts PPT.pptxContracts PPT.pptx
Contracts PPT.pptx
 
17 10 16
17 10 1617 10 16
17 10 16
 
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
 
Assignment 1 Complete
Assignment 1 CompleteAssignment 1 Complete
Assignment 1 Complete
 
Epc Vs Epcm
Epc Vs EpcmEpc Vs Epcm
Epc Vs Epcm
 
An Empirical Investigation into the Origins and Causes of Variation Orders in...
An Empirical Investigation into the Origins and Causes of Variation Orders in...An Empirical Investigation into the Origins and Causes of Variation Orders in...
An Empirical Investigation into the Origins and Causes of Variation Orders in...
 
Tim burbury, king & spalding
Tim burbury, king & spaldingTim burbury, king & spalding
Tim burbury, king & spalding
 
Wind power epc o&m april 2013
Wind power epc o&m  april 2013Wind power epc o&m  april 2013
Wind power epc o&m april 2013
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentation
 
Risk allocation in offshore E&P projects
Risk allocation in offshore E&P projectsRisk allocation in offshore E&P projects
Risk allocation in offshore E&P projects
 
Epc overview
Epc  overviewEpc  overview
Epc overview
 
Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)
 
Professional practices (lec 02) by k.iqbal
Professional practices (lec 02) by k.iqbalProfessional practices (lec 02) by k.iqbal
Professional practices (lec 02) by k.iqbal
 
Course on Regulation and Sustainable Energy in Developing Countries - Session 9
Course on Regulation and Sustainable Energy in Developing Countries - Session 9Course on Regulation and Sustainable Energy in Developing Countries - Session 9
Course on Regulation and Sustainable Energy in Developing Countries - Session 9
 
FIDIC intro author eng. mohammed fadlalla
FIDIC intro  author eng. mohammed fadlallaFIDIC intro  author eng. mohammed fadlalla
FIDIC intro author eng. mohammed fadlalla
 
12953021.ppt
12953021.ppt12953021.ppt
12953021.ppt
 

Mais de Francis Ho

COP26: Eating for the Planet
COP26: Eating for the PlanetCOP26: Eating for the Planet
COP26: Eating for the PlanetFrancis Ho
 
City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...
City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...
City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...Francis Ho
 
City of London Law Society - Construction Law Committee - Response to Retenti...
City of London Law Society - Construction Law Committee - Response to Retenti...City of London Law Society - Construction Law Committee - Response to Retenti...
City of London Law Society - Construction Law Committee - Response to Retenti...Francis Ho
 
How will Brexit impact on Construction?
How will Brexit impact on Construction?How will Brexit impact on Construction?
How will Brexit impact on Construction?Francis Ho
 
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...Francis Ho
 
Construction Insolvency
Construction InsolvencyConstruction Insolvency
Construction InsolvencyFrancis Ho
 
The Management of Complex Contracts
The Management of Complex ContractsThe Management of Complex Contracts
The Management of Complex ContractsFrancis Ho
 
Key Developments in Emerging Markets
Key Developments in Emerging MarketsKey Developments in Emerging Markets
Key Developments in Emerging MarketsFrancis Ho
 
Using Two-Stage Tendering Effectively
Using Two-Stage Tendering EffectivelyUsing Two-Stage Tendering Effectively
Using Two-Stage Tendering EffectivelyFrancis Ho
 
Managing the Risks of Delay in Construction Projects
Managing the Risks of Delay in Construction ProjectsManaging the Risks of Delay in Construction Projects
Managing the Risks of Delay in Construction ProjectsFrancis Ho
 
It Pays to Be Right: Payment in Construction Contracts
It Pays to Be Right: Payment in Construction ContractsIt Pays to Be Right: Payment in Construction Contracts
It Pays to Be Right: Payment in Construction ContractsFrancis Ho
 
Adjudication: Tips, Traps and Tactics
Adjudication: Tips, Traps and TacticsAdjudication: Tips, Traps and Tactics
Adjudication: Tips, Traps and TacticsFrancis Ho
 
Contractual Options for Procuring Major Projects in the UK
Contractual Options for Procuring Major Projects in the UKContractual Options for Procuring Major Projects in the UK
Contractual Options for Procuring Major Projects in the UKFrancis Ho
 
Introductory Note on International Construction Contracts
Introductory Note on International Construction ContractsIntroductory Note on International Construction Contracts
Introductory Note on International Construction ContractsFrancis Ho
 
Works Insurance and Latent Defects Insurance
Works Insurance and Latent Defects InsuranceWorks Insurance and Latent Defects Insurance
Works Insurance and Latent Defects InsuranceFrancis Ho
 
Third Party Rights and Why They Matter
Third Party Rights and Why They MatterThird Party Rights and Why They Matter
Third Party Rights and Why They MatterFrancis Ho
 
A Practical Guide to the Construction (Design and Management) Regulations 2015
A Practical Guide to the Construction (Design and Management) Regulations 2015A Practical Guide to the Construction (Design and Management) Regulations 2015
A Practical Guide to the Construction (Design and Management) Regulations 2015Francis Ho
 
Construction Dispute Resolution and Avoidance in a Boom Market
Construction Dispute Resolution and Avoidance in a Boom MarketConstruction Dispute Resolution and Avoidance in a Boom Market
Construction Dispute Resolution and Avoidance in a Boom MarketFrancis Ho
 
Letters of Intent
Letters of IntentLetters of Intent
Letters of IntentFrancis Ho
 
Collateral Warranties and Third Party Rights
Collateral Warranties and Third Party RightsCollateral Warranties and Third Party Rights
Collateral Warranties and Third Party RightsFrancis Ho
 

Mais de Francis Ho (20)

COP26: Eating for the Planet
COP26: Eating for the PlanetCOP26: Eating for the Planet
COP26: Eating for the Planet
 
City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...
City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...
City of London Law Society - Submittal to BEIS on Statutory Retention Deposit...
 
City of London Law Society - Construction Law Committee - Response to Retenti...
City of London Law Society - Construction Law Committee - Response to Retenti...City of London Law Society - Construction Law Committee - Response to Retenti...
City of London Law Society - Construction Law Committee - Response to Retenti...
 
How will Brexit impact on Construction?
How will Brexit impact on Construction?How will Brexit impact on Construction?
How will Brexit impact on Construction?
 
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
Variations and their Consequences - Olswang Construction Law Masterclass - 5 ...
 
Construction Insolvency
Construction InsolvencyConstruction Insolvency
Construction Insolvency
 
The Management of Complex Contracts
The Management of Complex ContractsThe Management of Complex Contracts
The Management of Complex Contracts
 
Key Developments in Emerging Markets
Key Developments in Emerging MarketsKey Developments in Emerging Markets
Key Developments in Emerging Markets
 
Using Two-Stage Tendering Effectively
Using Two-Stage Tendering EffectivelyUsing Two-Stage Tendering Effectively
Using Two-Stage Tendering Effectively
 
Managing the Risks of Delay in Construction Projects
Managing the Risks of Delay in Construction ProjectsManaging the Risks of Delay in Construction Projects
Managing the Risks of Delay in Construction Projects
 
It Pays to Be Right: Payment in Construction Contracts
It Pays to Be Right: Payment in Construction ContractsIt Pays to Be Right: Payment in Construction Contracts
It Pays to Be Right: Payment in Construction Contracts
 
Adjudication: Tips, Traps and Tactics
Adjudication: Tips, Traps and TacticsAdjudication: Tips, Traps and Tactics
Adjudication: Tips, Traps and Tactics
 
Contractual Options for Procuring Major Projects in the UK
Contractual Options for Procuring Major Projects in the UKContractual Options for Procuring Major Projects in the UK
Contractual Options for Procuring Major Projects in the UK
 
Introductory Note on International Construction Contracts
Introductory Note on International Construction ContractsIntroductory Note on International Construction Contracts
Introductory Note on International Construction Contracts
 
Works Insurance and Latent Defects Insurance
Works Insurance and Latent Defects InsuranceWorks Insurance and Latent Defects Insurance
Works Insurance and Latent Defects Insurance
 
Third Party Rights and Why They Matter
Third Party Rights and Why They MatterThird Party Rights and Why They Matter
Third Party Rights and Why They Matter
 
A Practical Guide to the Construction (Design and Management) Regulations 2015
A Practical Guide to the Construction (Design and Management) Regulations 2015A Practical Guide to the Construction (Design and Management) Regulations 2015
A Practical Guide to the Construction (Design and Management) Regulations 2015
 
Construction Dispute Resolution and Avoidance in a Boom Market
Construction Dispute Resolution and Avoidance in a Boom MarketConstruction Dispute Resolution and Avoidance in a Boom Market
Construction Dispute Resolution and Avoidance in a Boom Market
 
Letters of Intent
Letters of IntentLetters of Intent
Letters of Intent
 
Collateral Warranties and Third Party Rights
Collateral Warranties and Third Party RightsCollateral Warranties and Third Party Rights
Collateral Warranties and Third Party Rights
 

Último

Low Rate Call Girls in Lajpat Nagar Delhi Call 9990771857
Low Rate Call Girls in Lajpat Nagar Delhi Call 9990771857Low Rate Call Girls in Lajpat Nagar Delhi Call 9990771857
Low Rate Call Girls in Lajpat Nagar Delhi Call 9990771857delhimodel235
 
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdf
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdfProvident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdf
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdffaheemali990101
 
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Space
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your SpaceShapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Space
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Spaceaidasheikh47
 
Radiance Majestic Valasaravakkam Chennai.pdf
Radiance Majestic Valasaravakkam Chennai.pdfRadiance Majestic Valasaravakkam Chennai.pdf
Radiance Majestic Valasaravakkam Chennai.pdfashiyadav24
 
Pride Wonderland Dhanori Pune Brochure.pdf
Pride Wonderland Dhanori Pune Brochure.pdfPride Wonderland Dhanori Pune Brochure.pdf
Pride Wonderland Dhanori Pune Brochure.pdfabbu831446
 
Brigade Neopolis Kokapet, Hyderabad E- Brochure
Brigade Neopolis Kokapet, Hyderabad E- BrochureBrigade Neopolis Kokapet, Hyderabad E- Brochure
Brigade Neopolis Kokapet, Hyderabad E- Brochurefaheemali990101
 
Experion Elements Sector 45 Noida_Brochure.pdf.pdf
Experion Elements Sector 45 Noida_Brochure.pdf.pdfExperion Elements Sector 45 Noida_Brochure.pdf.pdf
Experion Elements Sector 45 Noida_Brochure.pdf.pdfkratirudram
 
Shapoorji Spectra Sensorium Hinjewadi Pune | E-Brochure
Shapoorji Spectra Sensorium Hinjewadi Pune | E-BrochureShapoorji Spectra Sensorium Hinjewadi Pune | E-Brochure
Shapoorji Spectra Sensorium Hinjewadi Pune | E-BrochureOmanaConsulting
 
Ryan Mahoney - How Property Technology Is Altering the Real Estate Market
Ryan Mahoney - How Property Technology Is Altering the Real Estate MarketRyan Mahoney - How Property Technology Is Altering the Real Estate Market
Ryan Mahoney - How Property Technology Is Altering the Real Estate MarketRyan Mahoney
 
Namrata 7 Plumeria Drive Pimpri Chinchwad Pune Brochure.pdf
Namrata 7 Plumeria Drive Pimpri Chinchwad Pune Brochure.pdfNamrata 7 Plumeria Drive Pimpri Chinchwad Pune Brochure.pdf
Namrata 7 Plumeria Drive Pimpri Chinchwad Pune Brochure.pdfPrachiRudram
 
Mahindra Vista Kandivali East Mumbai Brochure.pdf
Mahindra Vista Kandivali East Mumbai Brochure.pdfMahindra Vista Kandivali East Mumbai Brochure.pdf
Mahindra Vista Kandivali East Mumbai Brochure.pdfPrachiRudram
 
Kolte Patil Universe Hinjewadi Pune Brochure.pdf
Kolte Patil Universe Hinjewadi Pune Brochure.pdfKolte Patil Universe Hinjewadi Pune Brochure.pdf
Kolte Patil Universe Hinjewadi Pune Brochure.pdfPrachiRudram
 
Dynamic Netsoft A leader In Property management Software
Dynamic Netsoft A leader In Property management SoftwareDynamic Netsoft A leader In Property management Software
Dynamic Netsoft A leader In Property management SoftwareDynamic Netsoft
 
LCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptx
LCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptxLCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptx
LCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptxTom Blefko
 
_Navigating Inflation's Influence on Commercial Real Estate (CRE) Investing I...
_Navigating Inflation's Influence on Commercial Real Estate (CRE) Investing I..._Navigating Inflation's Influence on Commercial Real Estate (CRE) Investing I...
_Navigating Inflation's Influence on Commercial Real Estate (CRE) Investing I...SyndicationPro, LLC
 
Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...
Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...
Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...lizamodels9
 
Managed Farmland Brochures to get more in
Managed Farmland Brochures to get more inManaged Farmland Brochures to get more in
Managed Farmland Brochures to get more inknoxdigital1
 
Ebullient Investments Limited specializes in Building contractor
Ebullient Investments Limited specializes in Building contractorEbullient Investments Limited specializes in Building contractor
Ebullient Investments Limited specializes in Building contractorEbullient Investments Limited
 

Último (20)

Low Rate Call Girls in Lajpat Nagar Delhi Call 9990771857
Low Rate Call Girls in Lajpat Nagar Delhi Call 9990771857Low Rate Call Girls in Lajpat Nagar Delhi Call 9990771857
Low Rate Call Girls in Lajpat Nagar Delhi Call 9990771857
 
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdf
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdfProvident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdf
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdf
 
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Space
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your SpaceShapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Space
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Space
 
Radiance Majestic Valasaravakkam Chennai.pdf
Radiance Majestic Valasaravakkam Chennai.pdfRadiance Majestic Valasaravakkam Chennai.pdf
Radiance Majestic Valasaravakkam Chennai.pdf
 
Pride Wonderland Dhanori Pune Brochure.pdf
Pride Wonderland Dhanori Pune Brochure.pdfPride Wonderland Dhanori Pune Brochure.pdf
Pride Wonderland Dhanori Pune Brochure.pdf
 
Brigade Neopolis Kokapet, Hyderabad E- Brochure
Brigade Neopolis Kokapet, Hyderabad E- BrochureBrigade Neopolis Kokapet, Hyderabad E- Brochure
Brigade Neopolis Kokapet, Hyderabad E- Brochure
 
Experion Elements Sector 45 Noida_Brochure.pdf.pdf
Experion Elements Sector 45 Noida_Brochure.pdf.pdfExperion Elements Sector 45 Noida_Brochure.pdf.pdf
Experion Elements Sector 45 Noida_Brochure.pdf.pdf
 
Shapoorji Spectra Sensorium Hinjewadi Pune | E-Brochure
Shapoorji Spectra Sensorium Hinjewadi Pune | E-BrochureShapoorji Spectra Sensorium Hinjewadi Pune | E-Brochure
Shapoorji Spectra Sensorium Hinjewadi Pune | E-Brochure
 
Ryan Mahoney - How Property Technology Is Altering the Real Estate Market
Ryan Mahoney - How Property Technology Is Altering the Real Estate MarketRyan Mahoney - How Property Technology Is Altering the Real Estate Market
Ryan Mahoney - How Property Technology Is Altering the Real Estate Market
 
9953056974 Low Rate Call Girls In Saket, Delhi NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR9953056974 Low Rate Call Girls In Saket, Delhi NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Namrata 7 Plumeria Drive Pimpri Chinchwad Pune Brochure.pdf
Namrata 7 Plumeria Drive Pimpri Chinchwad Pune Brochure.pdfNamrata 7 Plumeria Drive Pimpri Chinchwad Pune Brochure.pdf
Namrata 7 Plumeria Drive Pimpri Chinchwad Pune Brochure.pdf
 
Mahindra Vista Kandivali East Mumbai Brochure.pdf
Mahindra Vista Kandivali East Mumbai Brochure.pdfMahindra Vista Kandivali East Mumbai Brochure.pdf
Mahindra Vista Kandivali East Mumbai Brochure.pdf
 
Kolte Patil Universe Hinjewadi Pune Brochure.pdf
Kolte Patil Universe Hinjewadi Pune Brochure.pdfKolte Patil Universe Hinjewadi Pune Brochure.pdf
Kolte Patil Universe Hinjewadi Pune Brochure.pdf
 
Dynamic Netsoft A leader In Property management Software
Dynamic Netsoft A leader In Property management SoftwareDynamic Netsoft A leader In Property management Software
Dynamic Netsoft A leader In Property management Software
 
LCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptx
LCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptxLCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptx
LCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptx
 
Hot call girls in Moti Bagh🔝 9953056974 🔝 escort Service
Hot call girls in Moti Bagh🔝 9953056974 🔝 escort ServiceHot call girls in Moti Bagh🔝 9953056974 🔝 escort Service
Hot call girls in Moti Bagh🔝 9953056974 🔝 escort Service
 
_Navigating Inflation's Influence on Commercial Real Estate (CRE) Investing I...
_Navigating Inflation's Influence on Commercial Real Estate (CRE) Investing I..._Navigating Inflation's Influence on Commercial Real Estate (CRE) Investing I...
_Navigating Inflation's Influence on Commercial Real Estate (CRE) Investing I...
 
Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...
Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...
Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...
 
Managed Farmland Brochures to get more in
Managed Farmland Brochures to get more inManaged Farmland Brochures to get more in
Managed Farmland Brochures to get more in
 
Ebullient Investments Limited specializes in Building contractor
Ebullient Investments Limited specializes in Building contractorEbullient Investments Limited specializes in Building contractor
Ebullient Investments Limited specializes in Building contractor
 

FIDIC SIlver Book in Power Projects

  • 1. Construction Issues: EPC Contracting and FIDIC Silver Book Francis Ho An Update on Real Estate Laws in Senior Associate, King & Spalding LLP the UAE and Saudi Arabia Email: fho@kslaw.com Radisson Blu Media City Hotel, Tel: +971 2 652 3426 Dubai, UAE Mob: +971 50 557 0446 31 January – 1 February 2010 428006 v1
  • 2. EPC Contracts §  Engineering, procurement and construction contracts are most common form of contract used in major international infrastructure projects §  An EPC Contractor s obligations typically include: §  Turnkey responsibility to deliver: §  a complete facility §  for a guaranteed price §  by a guaranteed date §  which must perform to a specified level §  Because EPC Contracts involve Contractor taking a high level of risk they are, to some extent, resisted by contractors (partially due to high insurance costs). That said, they are still the dominant model because sponsors and lenders prefer certainty they offer 428006 v1 2
  • 3. FIDIC Silver Book §  FIDIC – International Federation of Consulting Engineers §  Standard Forms of Contract widely used in international engineering and construction projects §  Range of contracts – White, Red, Yellow, Orange and Silver Books §  Silver book – Turnkey contract which departs from usual balance of risk allocation in FIDIC contracts 428006 v1 3
  • 4. Basic Contractual Structure of a Power Project Government Equity Support Concession Financing and Agreement Agreement Security Agreements Sponsors Project Co Lenders EPC Longterm Fuel Supply PPA Contract O&M Contract Agreement EPC O&M Contractor Fuel Offtaker Contractor (often a Sponsor) Supplier Direct Agreement Note: Contractors often become one of sponsors in large projects now although ordinarily sell down their interest after financial close as they wish to free up their capital for other projects 4 428006 v1
  • 5. Bankability §  EPC contracts must have risk allocation that satisfies Lenders §  Lenders focus on ability (or more particularly the lack of) Contractor to claim: §  Additional costs; and/or §  Extensions of time §  Lenders also look to Contractor s security (e.g. parent company guarantees/bank guarantees securing Contractor s performance) §  The less comfortable Lenders are with the above, the more equity the Sponsors will be required to contribute §  Lenders will also need to be satisfied with technical risk §  Price is a general bankability issue also (but a broader project issue) §  Engineering, procurement and construction contracts are most common form of contract used 428006 v1 5
  • 6. General Bankability Issues in Construction Contracts §  Fixed completion date (Silver Book Art. 8.2) §  Fixed completion price (Silver Book Arts. 4.11 and 14.1) §  No or limited technology risk (Silver Book Arts. 5.8, 7.5, 9.1 and 11 etc) §  Output guarantees (Silver Book – no performance LDs, rather obligations to remedy defects and/or reduction in contract price) §  Liquidated damages for both delay and performance §  Security from Contractor and/or its parent (Silver Book Art. 4.2) §  Large caps on liability – ideally none but often one is negotiated (Silver Book Art. 17.6) §  Restrictions on ability of Contractor to claim extensions of time and additional costs (Silver Book Arts. 13.1 and 13.4) §  An EPC Contract (and Silver Book with amendments) generally delivers above 428006 v1 6
  • 7. Key Clauses in EPC Contracts and Common Approaches (1) §  Single point of responsibility – Contractor is responsible for all design, engineering, procurement, construction, commissioning and testing activities. If EPC Contractor is a joint venture, liability/responsibility is joint and several (Silver Book Arts. 4.1 & 5 – fit for purpose ) §  Fixed Contract Price – limited opportunities for Contractor to claim extra costs/time. Generally limited to directed variations to works (Silver Book Arts. 13.1, 14.1 and 20) §  Fixed completion date – guaranteed date for completion. Failure to meet this date will attract LDs. In order for these to be enforceable they must be a genuine pre-estimate of the loss that the project company will suffer if the power station is not completed on time (Silver Book Arts. 8.2, 13 and 20) §  Note: Additionally extension of time clause must provide for an EOT to be granted where Contractor is delayed due to act/omissions of owner/project company (Silver Book Art. 8.4(c)) 428006 v1 7
  • 8. Key Clauses in EPC Contracts and Common Approaches (2) §  Performance Guarantees: Project Co s revenue will come from revenue from project. This is important to service project debt. It is vital then that facility performs in respect of output, efficiency and reliability. This is purpose of the Performance Liquidated Damages payable by the Contractor if performance requirements are not met. (Silver Book does not provide for performance liquidated damages – see e.g. Art. 9.4. Can be amended as required.) §  Performance Liquidated Damages must also be genuine pre-estimate of loss. They are usually calculated on net present value (less expenses) calculation of revenue foregone over the project §  E.g. in case of a power station what this might mean is if plant output is 5 MW less than required performance liquidated damages will be designed to compensate project company for that loss of revenue for life of project by being unable to sell that 5 MW 428006 v1 8
  • 9. Key Clauses in EPC Contracts and Common Approaches (3) §  Caps on liability: most EPC Contractors will baulk at unlimited liability. Market is generally a cap at 100% of the Contract Price. Sub-caps of 20% of Contract Price on delay and performance liquidated damages also common (Silver Book – LOL is dealt with in Special Conditions – see Art. 17.6) §  Consequential damages are also generally excluded. Profit also often expressly excluded (Silver Book Art. 17.6) §  There may be some exceptions to those caps (e.g. wilful misconduct, breach of patent rights) §  Security – EPC Contract will require that performance security be supplied by the Contractor in respect of its obligations under EPC Contract (Silver Book Art. 4.2) 428006 v1 9
  • 10. Key Clauses in EPC Contracts and Common Approaches (4) §  Market security includes: §  Bank guarantee for between 5-15% of Contract Price §  Retention (withholding of 5-15%) of each payment under EPC contract (Silver Book Arts. 4.2 and 14.3(c) and Annex F) §  Advance Payment Guarantee – if an advance payment is made (Silver Book Art. 4.2 and Annex E) §  Parent Company Guarantee – to secure Contractor s performance if it does not perform (Silver Book Art. 4.2 and Annex A) Variations §  Project Co must have right to order variations/agree to suggested variations – clause must contemplate omission of work as well as pricing (Silver Book Arts. 3.5 and 13) 428006 v1 10
  • 11. Key Clauses in EPC Contracts and Common Approaches (5) Defects Liability §  Contractors required to repair defects 12-24 months following completion of performance testing – can be one period or tiered (Silver Book Art. 11) Intellectual Property §  Contractor must warrant it has the rights regarding any proposed LP. Also note there is often an indemnity for breach (Silver Book Art. 17.5) Force Majeure §  Parties excused from performance for certain Force Majeure events (Silver Book Art. 19) Suspension §  Project Co has this right (Silver Book Arts. 8.8 to 8.12) 428006 v1 11
  • 12. Termination §  Contractor has very limited rights e.g. non-payment/ extended suspension, material breach by employer (Silver Book Art. 16.2) §  Project company has much broader rights. This will be tied with third party agreements. Can terminate: §  For convenience (Silver Book Art. 15.5) §  For breach/insolvency, otherwise (Silver Book Art. 15.2) 428006 v1 12
  • 13. Power-specific Clauses in EPC Contracts §  General interface issues: §  Commencement and completion dates §  LDs amounts and trigger points (NB: Silver Book does not provide for performance liquidated damages and will need adaptation) §  Caps on liability §  Indemnities §  Entitlements to extensions of time §  Force Majeure (Silver Book fairly wide, beyond a Party s Control and could not reasonably have been provided against before entering into the Contract ) §  Third party interfaces §  Intellectual Property 428006 v1 13
  • 14. Key Power Issues §  Grid Access §  EPC Contract must provide that Project Company provides Grid Access – this has 2 levels: §  (a) obligation to ensure that the infrastructure is in place; and §  (b) obligation to ensure that Contractor is permitted to export power §  Interfacing of commissioning and testing regimes (fuel for testing?) §  Consistency between testing/offtake/PPA regime? – important that they relate §  Interfacing of issues between the Offtaker and EPC Contractor §  Project company must control relationship with Offtaker (on-going relationship) §  Silver Book will require substantial modification – issues such as connection, metering, point of delivery and third party interfaces to be dealt with 428006 v1 14
  • 15. Key Performance Issues in Power Projects (1) §  Liquidated Damages is main relevant provision governing performance §  Output LDs (how many mega watts produced) §  Heat rate (how much fuel burnt to produce required power output) §  Delay liquidated damages Testing performance – most common approaches §  Functional Tests – pumps/conveyers/pressure vessels. Test functionality of parts at station but not whole station. Important as condition LDs will attach §  Emissions Tests – compliance against environmental requirements. Absolute obligation – generally not linked to LDs 428006 v1 15
  • 16. Key Performance Issues in Power Projects (2) §  Silver Book will require substantial modification to provide for performance liquidated damages and testing in power projects: §  Employer s remedy for defective plant accepted into service is a reduction in the Contract Price; and §  Testing and commissioning provisions are generally defined and require further definition – can use technical schedules §  Guarantee Tests – these are the ability of power station to meet the performance criteria set out in Contract §  Generally these are set at maximum level of required performance. Lender s input will be important in determining this level. Lender s interest though will be that debt service obligations are met – Sponsor s interest will be to get optimal performances 428006 v1 16
  • 17. Key Performance Issues in Power Projects (3) §  Hand-over ought to occur after all performance tests are satisfied. This retains Sponsor s potential rights to both performance and delay damages §  Contractor s will often request a right to modify station in event performance guarantees are not met (EPC Contract must allocate costs for this eventuality) §  Silver Book provisions will need modification to be made applicable to project specific requirements (See Art. 9 of Silver Book) 428006 v1 17
  • 18. Technical Issues §  Testing procedures ought to be set out in EPC Contract including: §  Testing Methodology (i.e. American Society of Mechanical Engineers) §  Testing Equipment – (who must provide it, where will it be, how sensitive) §  Tolerances – what is margin of error? §  Ambient Conditions – what atmospheric conditions are assumed to be base case (testing results will need to be adjusted to take into account any variance from these conditions) §  If a multi-unit station individual unit tests and then whole of plant testing §  Provision of fuel and consumables 428006 v1 18
  • 19. To EPC or not to EPC? Advantages Disadvantages 1.  Bankable 1.  Higher Contract price than 2.  Certainty (as far as that is possible) alternative structure due to risk 3.  Turnkey responsibility on the allocation (and built-in Contractor EPC Contractor contingencies) 2.  Limited scope for Project Sponsor to intervene if problems arise during construction 3.  Not many players 428006 v1 19
  • 20. To Silver Book or not to Silver Book? §  Silver Book very general and requires modification for complex process driven projects §  No provision for lender or concession grantor step-in in project-financed (including PPP and BOT) deals §  Dispute resolution provisions require consideration – currently dispute adjudication board appointed (can be expensive) §  Performance liquidated damages against Contract Price reduction – lenders requirements and debt servicing §  Substantial modification required for project-financed deals 428006 v1 20