2. h Worldwide
O Availability of water is a
critical issue for the 3rd Millennium
O At HOBAS, water is the main focus
O On all 5 continents, HOBAS fulfills the highest quality
requirements for potable water and wastewater pipe
systems.
2 BAP-HEA-0909
8. Requirements for an airport
drainage system
O reconstruction needs highest demands on security
O tendering terms stipulated tight quality demands
O EU airport standards
O corrosion resistance
h CC GRP Pipe Systems fulfils all of these
8 BAP-HEA-0909
9. Why h ?
O h CC-GRP Pipe Systems meet also:
o Optimal hydraulic performance
o Ability to bear high static and dynamic loads
o High abrasion resistance
o High corrosion resistance
o Easy handling
o Long operational lifetime
9 BAP-HEA-0909
10. Facts about the IAS
drainage project
h CC-GRP SewerLiner System
o DN 1200, PN 1, SN 10000
o Two paralleling 594 m long lines
o 16 HOBAS CC-GRP Manholes
o 2 DN 1200 bends
o Open cut
o Covered with gravel sized 4 – 16 mm
o In some places 50 cm below the surface
10 BAP-HEA-0909
11. Successful Finalization
O Finalization two months before deadline
O Technical support provided by h Bosnia &
Herzegovina impressed the client
h as reliable and professional partner for airport projects
11 BAP-HEA-0909
12. Several Airport
drainage projects
with h
o Berlin Schönefeld
o Schiphol Airport /
Amsterdam
o Airport Munich
12 BAP-HEA-0909
13. h CC-GRP Applications
O Sewage applications
O Potable water supply
O Industrial applications
O Power plant pipelines
O Irrigation systems
O Trenchless applications
O Pressure and non-
pressure applications
O Special applications
13 BAP-HEA-0909