Presentation to Institution of Engineers, Malaysia Electrified Double Track Project Ipoh to Padang Besar PIPE ARCH TUNNEL by Mr. Don R. Hall Head of Tunneling Division,  Gamuda Engineering Sdn Bhd May 2010
Outline of Presentation: General Project Information – Berapit Tunnel Pipe Arch Tunnel – Geological Profile & Concept Pipe Arch Tunnel – Chronology of Construction Construction of Triple Cell 3m Ф Drainage Culvert Demolition of Existing 3m x 3m Twin Box Drainage Culvert Pipe Arch Tunnel Construction Catastrophe Summary and Q&A
General Project Information  – Berapit Tunnel
General Project Information – Berapit Tunnel
General Project Information – Berapit Tunnel North-South Expressway (NSE) YTL CEMENT PLANT To Taiping To Ipoh Pipe Arch Tunnel Crossing NSE Existing Railway Track ,[object Object]
  Twin Tunnels, Single track each
  Track Structure : Slab Track,[object Object]
General Project Information – Berapit Tunnel Typical Berapit Tunnel Cross Section:
8 General Project Information – Berapit Tunnel
General Project Information – Berapit Tunnel CROSS PASSAGES EVERY 350m
Pipe Arch Tunnel –  Chronology of Construction
Pipe Arch Tunnel – Chronology of Construction 1. Triple 3mФcell drainage culvert at KM 232.6 of PLUS North-South Highway to replace existing 3m x3m twin box culvert Northbound Southbound railway tunnel Southbound Northbound railway tunnel 2. Existing 3m x 3m twin box drainage culvert to be demolished & replaced 3. Twin pipe arch tunnel crossing underneath PLUS North-South Highway KM 232.7 Plan Layout of Twin Pipe Arch Tunnel
12 Pipe Arch Tunnel – Chronology of Construction 1. Triple 3mФcell drainage culvert at KM 232.6 of PLUS North-South Highway to replace existing 3m x3m twin box culvert Southbound Northbound 2. Existing 3m x 3m twin box drainage culvert to be demolished & replaced 3. Twin pipe arch tunnel crossing underneath PLUS North-South Highway KM 232.7 3-D View of Twin Pipe Arch Tunnel
Construction Of Triple Cell
Construction of Triple Cell 3m Ф Drainage Culvert Jacking Length = 45.5m LONGITUDINAL SECTION CROSS SECTION
Construction of Triple Cell 3m Ф Drainage Culvert First drive of jacking works of 3m Ф concrete pipes ongoing. Second & third drives awaiting for jacking with prepared entrance rings Construction of Triple 3m Ф Cell with Soft Ground CutterheadMicrotunneling Machine
Construction of Triple Cell 3m Ф Drainage Culvert Jacking works ongoing Construction of Triple 3m Ф Cell with Soft Ground CutterheadMicrotunneling Machine
Construction of Triple Cell 3m Ф Drainage Culvert Breaktrough of the first drive Construction of Triple 3m Ф Cell with Soft Ground CutterheadMicrotunneling Machine
Construction of Triple Cell 3m Ф Drainage Culvert Lifting of microtunneling machine after breakthough of first drive Construction of Triple 3m Ф Cell with Soft Ground CutterheadMicrotunneling Machine
Construction of Triple Cell 3m Ф Drainage Culvert Close up of RASA microtunneling machine Construction of Triple 3m Ф Cell with Soft Ground CutterheadMicrotunneling Machine
Construction of Triple Cell 3m Ф Drainage Culvert Completed construction of triple cell drainage culverts Construction of Triple 3m Ф Cell with Soft Ground CutterheadMicrotunneling Machine
Demolition of Existing 3m x 3m Twin Box Drainage Culvert
Demolition of Existing 3m x 3m Twin Box Drainage Culvert PLAN VIEW CROSS SECTION VIEW
Demolition of Existing 3m x 3m Twin Box Drainage Culvert Existing twin box culvert at KM 232.7 PLUS North-South Expressway before demolition Demolition of Existing 3m x 3m Twin Box Culvert for Pipe Arch Tunnel Construction
Demolition of Existing 3m x 3m Twin Box Drainage Culvert Demolition by coring & hacking to rid of reinforcement within existing twin box culvert for pipe arch tunnel construction Demolition of Existing 3m x 3m Twin Box Culvert for Pipe Arch Tunnel Construction
Demolition of Existing 3m x 3m Twin Box Drainage Culvert Demolition by coring & hacking to rid of reinforcement within existing twin box culvert for pipe arch tunnel construction Demolition of Existing 3m x 3m Twin Box Culvert for Pipe Arch Tunnel Construction
Demolition of Existing 3m x 3m Twin Box Drainage Culvert Sealing of existing twin box culvert for pipe arch tunnel construction 2. Demolition of Existing 3m x 3m Twin Box Culvert for Pipe Arch Tunnel Construction
Pipe Arch Tunnel Construction
Pipe Arch Tunnel – Concept
Pipe Arch Tunnel – Concept Mined excavation
Pipe Arch Tunnel – Concept Site picture of project by Metropolitan Atlanta Rapid Transit Authority in USA Construction Sequence    1. Execution of  sheet piles    2. Execution of the pipe arch microtunneling    3. Mined excavation of tunnel with steel ribs with bullflex, reinforced shotcrete & fibre glass elements    4. Casting of permanent concrete lining
Pipe Arch Tunnel Construction LONGITUDINAL SECTION CROSS SECTION
Pipe Arch Tunnel Construction Limits of PLUS North-South Expressway (NSE) Receiving Pit Jacking Pit Top of Soil Support Pipes Southbound NSE Northbound NSE Fill Fill 0 Cut & Cover Section Cut &Cover Section Residual Soil Direction of Microtunneling 5 Weathered Rock 10 Bottom of Structure Rock 15 20 Scale in Meters 0          5         10 Jacking Length up to Toe of Highway Embankment= 90 m
Pipe Arch Tunnel Construction (Right Bore) Limits of PLUS North-South Expressway (NSE) Receiving Pit Jacking Pit Top of Soil Support Pipes Southbound NSE Northbound NSE Fill Fill 0 Cut & Cover Section Cut &Cover Section Direction of Microtunneling Residual Soil Weathered Rock 5 10 Rock Bottom of Structure 15 20 Scale in Meters 0          5         10 Jacking Length up to Toe of Highway Embankment= 92 m
Pipe Arch Tunnel Construction Cardox System – Non-explosive blasting
Pipe Arch Tunnel Construction Cardox Gas Filling Cardox Drilling & Connection Cardox Blasting Pipe Arch Tunnel Construction
Pipe Arch Tunnel Construction Mini Pipe Arch
Pipe Arch Tunnel Construction AVN500 Microtunneling machine with retraction mechanism in case of rock face encountered Pipe Arch Tunnel Construction
Pipe Arch Tunnel Construction 10mm Pipe Wall Thickness Jacking Direction 780mm OD Pre-welded Line-up Band Pipe joint detail Pipe Arch Tunnel Construction
Pipe Arch Tunnel Construction Construction & staged excavation of  bored pile jacking pit  Pipe Arch Tunnel Construction
Pipe Arch Tunnel Construction Coring of reinforcement of shotcreted bored pile wall to prepare soft eye for microtunneling machine advance Pipe Arch Tunnel Construction
Pipe Arch Tunnel Construction Construction of thrust wall for jacking of microtunneling machine Pipe Arch Tunnel Construction
Pipe Arch Tunnel Construction Microtunneling machine preparing to jack Pipe Arch Tunnel Construction
Pipe Arch Tunnel Construction Pipe Arch Tunnel Construction
Pipe Arch Tunnel Construction Jacking of microtunneling machine ongoing Pipe Arch Tunnel Construction
Pipe Arch Tunnel Construction Welding Of Pipe
Pipe Arch Tunnel Construction Pipe Arch Tunnel Construction
Pipe Arch Tunnel Construction Pipe Arch Tunnel Construction
Pipe Arch Tunnel Construction Pipe Arch Tunnel Construction
Catastrophe Catastrophe Pipe Arch Tunnel Construction
Catastrophe Pipe Arch Tunnel Construction
Catastrophe Pipe Arch Tunnel Construction
Catastrophe Pipe Arch Tunnel Construction
Catastrophe  Set up to pull back pipe Pipe Arch Tunnel Construction
Catastrophe Locking device Pipe Arch Tunnel Construction
Catastrophe First pipe retreated Pipe Arch Tunnel Construction
Catastrophe Damaged section Pipe Arch Tunnel Construction
Catastrophe Damaged section exposed  Pipe Arch Tunnel Construction
Catastrophe Pipe Arch Tunnel Construction
Catastrophe Existing drive pressurized Pipe Arch Tunnel Construction
Catastrophe Damaged pipe on surface Pipe Arch Tunnel Construction
Catastrophe Damaged pipe on surface Pipe Arch Tunnel Construction
Catastrophe Rebar excavated under Plus Highway Pipe Arch Tunnel Construction
THANK YOU

Mais conteúdo relacionado

Mais procurados

tunnel boring machine
tunnel boring machine tunnel boring machine
tunnel boring machine Milan Sheta
 
A Review Study on Methods of Tunneling in Hard Rocks
A Review Study on Methods of Tunneling in Hard RocksA Review Study on Methods of Tunneling in Hard Rocks
A Review Study on Methods of Tunneling in Hard Rocksijsrd.com
 
Gotthard base tunnel
Gotthard base tunnelGotthard base tunnel
Gotthard base tunnelluisaam
 
Tunneling by tunnel boring machine
Tunneling by tunnel boring machineTunneling by tunnel boring machine
Tunneling by tunnel boring machineVISHAL KUMAR SINGH
 
Atal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresAtal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresBimenpreet Kaur
 
Effect of underground tunnelling by (TBM) on foundations of existing structures
Effect of underground tunnelling by (TBM) on foundations of existing structuresEffect of underground tunnelling by (TBM) on foundations of existing structures
Effect of underground tunnelling by (TBM) on foundations of existing structuresKishor Ade
 
Tunnel boring machine
Tunnel boring machineTunnel boring machine
Tunnel boring machinerutuldave
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)Sukhdarshan Singh
 
Study of tunnel engineering
Study of tunnel engineeringStudy of tunnel engineering
Study of tunnel engineeringAdil Shaikh
 
1926 tunneling safety 2015
1926 tunneling safety 20151926 tunneling safety 2015
1926 tunneling safety 2015John Newquist
 

Mais procurados (20)

Tunnel engineering
  Tunnel engineering  Tunnel engineering
Tunnel engineering
 
tunnel boring machine
tunnel boring machine tunnel boring machine
tunnel boring machine
 
Tunnel construction
Tunnel constructionTunnel construction
Tunnel construction
 
Cut and cover
Cut and coverCut and cover
Cut and cover
 
Tunnel engineering
Tunnel engineeringTunnel engineering
Tunnel engineering
 
Tunnelling
TunnellingTunnelling
Tunnelling
 
Tunnel engg.2
Tunnel engg.2Tunnel engg.2
Tunnel engg.2
 
A Review Study on Methods of Tunneling in Hard Rocks
A Review Study on Methods of Tunneling in Hard RocksA Review Study on Methods of Tunneling in Hard Rocks
A Review Study on Methods of Tunneling in Hard Rocks
 
Under ground railway
Under ground railwayUnder ground railway
Under ground railway
 
Gotthard base tunnel
Gotthard base tunnelGotthard base tunnel
Gotthard base tunnel
 
Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
 
Presentation1mining
Presentation1miningPresentation1mining
Presentation1mining
 
Tunneling by tunnel boring machine
Tunneling by tunnel boring machineTunneling by tunnel boring machine
Tunneling by tunnel boring machine
 
Atal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and featuresAtal Rohtang Tunnel - construction process ,challenges and features
Atal Rohtang Tunnel - construction process ,challenges and features
 
Lining in tunnels
Lining in tunnelsLining in tunnels
Lining in tunnels
 
Effect of underground tunnelling by (TBM) on foundations of existing structures
Effect of underground tunnelling by (TBM) on foundations of existing structuresEffect of underground tunnelling by (TBM) on foundations of existing structures
Effect of underground tunnelling by (TBM) on foundations of existing structures
 
Tunnel boring machine
Tunnel boring machineTunnel boring machine
Tunnel boring machine
 
DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)DMRC (METRO TRAINING REPORT)
DMRC (METRO TRAINING REPORT)
 
Study of tunnel engineering
Study of tunnel engineeringStudy of tunnel engineering
Study of tunnel engineering
 
1926 tunneling safety 2015
1926 tunneling safety 20151926 tunneling safety 2015
1926 tunneling safety 2015
 

Destaque

Access Engineering PLC - Training Presentation
Access Engineering PLC - Training PresentationAccess Engineering PLC - Training Presentation
Access Engineering PLC - Training PresentationGihan Anuradha Bombuwala
 
SL011 - Drainage Plan
SL011 - Drainage PlanSL011 - Drainage Plan
SL011 - Drainage Plansamson oakley
 
2 louis p. pollono - 4046169- pipe support for use in a nuclear system
2   louis p. pollono - 4046169-  pipe support for use in a nuclear system2   louis p. pollono - 4046169-  pipe support for use in a nuclear system
2 louis p. pollono - 4046169- pipe support for use in a nuclear systemMello_Patent_Registry
 
Drainage systerm
Drainage systerm Drainage systerm
Drainage systerm dezyneecole
 
Hydrant flushing programs
Hydrant flushing programsHydrant flushing programs
Hydrant flushing programsBrian Gongol
 
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...Britt Bettell
 
Hydrant bags
Hydrant bagsHydrant bags
Hydrant bagsmvfd2380
 
Pipe Insulation System
Pipe Insulation SystemPipe Insulation System
Pipe Insulation SystemWafik Zakhary
 
Seminar basalt fiber rebars
Seminar basalt fiber rebarsSeminar basalt fiber rebars
Seminar basalt fiber rebarsATHUL ASOK
 
Rcc box culvert methodology and designs including computer method
Rcc box culvert   methodology and designs including computer methodRcc box culvert   methodology and designs including computer method
Rcc box culvert methodology and designs including computer methodcoolidiot07
 
F3 Subsoil drainage and installation
F3 Subsoil drainage and installationF3 Subsoil drainage and installation
F3 Subsoil drainage and installationtoverwater
 
Chapter9 Hydrant Bradburn
Chapter9 Hydrant BradburnChapter9 Hydrant Bradburn
Chapter9 Hydrant Bradburnmjbradburn
 

Destaque (20)

Biblioteca
BibliotecaBiblioteca
Biblioteca
 
Access Engineering PLC - Training Presentation
Access Engineering PLC - Training PresentationAccess Engineering PLC - Training Presentation
Access Engineering PLC - Training Presentation
 
SL011 - Drainage Plan
SL011 - Drainage PlanSL011 - Drainage Plan
SL011 - Drainage Plan
 
2 louis p. pollono - 4046169- pipe support for use in a nuclear system
2   louis p. pollono - 4046169-  pipe support for use in a nuclear system2   louis p. pollono - 4046169-  pipe support for use in a nuclear system
2 louis p. pollono - 4046169- pipe support for use in a nuclear system
 
Drainage systerm
Drainage systerm Drainage systerm
Drainage systerm
 
Vietnam Auto Expo 2016
Vietnam Auto Expo 2016Vietnam Auto Expo 2016
Vietnam Auto Expo 2016
 
EFAC's toilet block
EFAC's toilet blockEFAC's toilet block
EFAC's toilet block
 
Hydrant flushing programs
Hydrant flushing programsHydrant flushing programs
Hydrant flushing programs
 
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
 
Hydrant bags
Hydrant bagsHydrant bags
Hydrant bags
 
Ukuran hanger road
Ukuran hanger roadUkuran hanger road
Ukuran hanger road
 
Pipe Insulation System
Pipe Insulation SystemPipe Insulation System
Pipe Insulation System
 
Prof. thomas pogge
Prof. thomas poggeProf. thomas pogge
Prof. thomas pogge
 
Cardox Technology for the Lime Industry
Cardox Technology for the Lime IndustryCardox Technology for the Lime Industry
Cardox Technology for the Lime Industry
 
Seminar basalt fiber rebars
Seminar basalt fiber rebarsSeminar basalt fiber rebars
Seminar basalt fiber rebars
 
Rcc box culvert methodology and designs including computer method
Rcc box culvert   methodology and designs including computer methodRcc box culvert   methodology and designs including computer method
Rcc box culvert methodology and designs including computer method
 
F3 Subsoil drainage and installation
F3 Subsoil drainage and installationF3 Subsoil drainage and installation
F3 Subsoil drainage and installation
 
Chapter9 Hydrant Bradburn
Chapter9 Hydrant BradburnChapter9 Hydrant Bradburn
Chapter9 Hydrant Bradburn
 
Box culvert
Box culvertBox culvert
Box culvert
 
Pipe shields for beginners
Pipe shields for beginnersPipe shields for beginners
Pipe shields for beginners
 

Semelhante a 20100514 pipe arch presentation to iem may 2010

Construction of bukit berapit twin bore pipe arch tunnel
Construction of bukit berapit twin bore pipe arch tunnelConstruction of bukit berapit twin bore pipe arch tunnel
Construction of bukit berapit twin bore pipe arch tunnelMa Ma Neymus
 
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMIshant Gautam.
 
Tunnel Construction info.pdf
Tunnel Construction info.pdfTunnel Construction info.pdf
Tunnel Construction info.pdfHamzaQayyum27
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationShuBham RaNa
 
Mahakali Bridge Project Presentation (2077 chaitra 11)
Mahakali Bridge Project Presentation (2077 chaitra 11)Mahakali Bridge Project Presentation (2077 chaitra 11)
Mahakali Bridge Project Presentation (2077 chaitra 11)Rabindra Shrestha
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Rajesh Prasad
 
Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report muhammad khurram
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Rajesh Prasad
 
DMRC CC 66 training ppt
DMRC CC 66 training pptDMRC CC 66 training ppt
DMRC CC 66 training pptVikas Kumar
 
signature bridge short presentation
signature bridge short presentationsignature bridge short presentation
signature bridge short presentationPravin Gaurav
 
Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...
Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...
Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...CrimsonPublishersAMMS
 

Semelhante a 20100514 pipe arch presentation to iem may 2010 (20)

Construction of bukit berapit twin bore pipe arch tunnel
Construction of bukit berapit twin bore pipe arch tunnelConstruction of bukit berapit twin bore pipe arch tunnel
Construction of bukit berapit twin bore pipe arch tunnel
 
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
 
Tunnel Construction info.pdf
Tunnel Construction info.pdfTunnel Construction info.pdf
Tunnel Construction info.pdf
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
 
Saurabhk601
Saurabhk601Saurabhk601
Saurabhk601
 
Mahakali Bridge Project Presentation (2077 chaitra 11)
Mahakali Bridge Project Presentation (2077 chaitra 11)Mahakali Bridge Project Presentation (2077 chaitra 11)
Mahakali Bridge Project Presentation (2077 chaitra 11)
 
Intership in DMRC
Intership in DMRCIntership in DMRC
Intership in DMRC
 
Eurasia tunnel1
Eurasia tunnel1Eurasia tunnel1
Eurasia tunnel1
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...
 
Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report
 
Project report
Project reportProject report
Project report
 
Major Project ppt
Major Project ppt Major Project ppt
Major Project ppt
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
Bridge construction atlas
Bridge construction atlasBridge construction atlas
Bridge construction atlas
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 
DMRC CC 66 training ppt
DMRC CC 66 training pptDMRC CC 66 training ppt
DMRC CC 66 training ppt
 
signature bridge short presentation
signature bridge short presentationsignature bridge short presentation
signature bridge short presentation
 
presentation
presentationpresentation
presentation
 
Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...
Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...
Application of Macro-Synthetic-Fiber-Reinforced Sprayed Concrete for Primary ...
 

Último

How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxJisc
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...Nguyen Thanh Tu Collection
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxDr. Ravikiran H M Gowda
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxannathomasp01
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 

Último (20)

How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 

20100514 pipe arch presentation to iem may 2010

  • 1. Presentation to Institution of Engineers, Malaysia Electrified Double Track Project Ipoh to Padang Besar PIPE ARCH TUNNEL by Mr. Don R. Hall Head of Tunneling Division, Gamuda Engineering Sdn Bhd May 2010
  • 2. Outline of Presentation: General Project Information – Berapit Tunnel Pipe Arch Tunnel – Geological Profile & Concept Pipe Arch Tunnel – Chronology of Construction Construction of Triple Cell 3m Ф Drainage Culvert Demolition of Existing 3m x 3m Twin Box Drainage Culvert Pipe Arch Tunnel Construction Catastrophe Summary and Q&A
  • 3. General Project Information – Berapit Tunnel
  • 4. General Project Information – Berapit Tunnel
  • 5.
  • 6. Twin Tunnels, Single track each
  • 7.
  • 8. General Project Information – Berapit Tunnel Typical Berapit Tunnel Cross Section:
  • 9. 8 General Project Information – Berapit Tunnel
  • 10. General Project Information – Berapit Tunnel CROSS PASSAGES EVERY 350m
  • 11. Pipe Arch Tunnel – Chronology of Construction
  • 12. Pipe Arch Tunnel – Chronology of Construction 1. Triple 3mФcell drainage culvert at KM 232.6 of PLUS North-South Highway to replace existing 3m x3m twin box culvert Northbound Southbound railway tunnel Southbound Northbound railway tunnel 2. Existing 3m x 3m twin box drainage culvert to be demolished & replaced 3. Twin pipe arch tunnel crossing underneath PLUS North-South Highway KM 232.7 Plan Layout of Twin Pipe Arch Tunnel
  • 13. 12 Pipe Arch Tunnel – Chronology of Construction 1. Triple 3mФcell drainage culvert at KM 232.6 of PLUS North-South Highway to replace existing 3m x3m twin box culvert Southbound Northbound 2. Existing 3m x 3m twin box drainage culvert to be demolished & replaced 3. Twin pipe arch tunnel crossing underneath PLUS North-South Highway KM 232.7 3-D View of Twin Pipe Arch Tunnel
  • 15. Construction of Triple Cell 3m Ф Drainage Culvert Jacking Length = 45.5m LONGITUDINAL SECTION CROSS SECTION
  • 16. Construction of Triple Cell 3m Ф Drainage Culvert First drive of jacking works of 3m Ф concrete pipes ongoing. Second & third drives awaiting for jacking with prepared entrance rings Construction of Triple 3m Ф Cell with Soft Ground CutterheadMicrotunneling Machine
  • 17. Construction of Triple Cell 3m Ф Drainage Culvert Jacking works ongoing Construction of Triple 3m Ф Cell with Soft Ground CutterheadMicrotunneling Machine
  • 18. Construction of Triple Cell 3m Ф Drainage Culvert Breaktrough of the first drive Construction of Triple 3m Ф Cell with Soft Ground CutterheadMicrotunneling Machine
  • 19. Construction of Triple Cell 3m Ф Drainage Culvert Lifting of microtunneling machine after breakthough of first drive Construction of Triple 3m Ф Cell with Soft Ground CutterheadMicrotunneling Machine
  • 20. Construction of Triple Cell 3m Ф Drainage Culvert Close up of RASA microtunneling machine Construction of Triple 3m Ф Cell with Soft Ground CutterheadMicrotunneling Machine
  • 21. Construction of Triple Cell 3m Ф Drainage Culvert Completed construction of triple cell drainage culverts Construction of Triple 3m Ф Cell with Soft Ground CutterheadMicrotunneling Machine
  • 22. Demolition of Existing 3m x 3m Twin Box Drainage Culvert
  • 23. Demolition of Existing 3m x 3m Twin Box Drainage Culvert PLAN VIEW CROSS SECTION VIEW
  • 24. Demolition of Existing 3m x 3m Twin Box Drainage Culvert Existing twin box culvert at KM 232.7 PLUS North-South Expressway before demolition Demolition of Existing 3m x 3m Twin Box Culvert for Pipe Arch Tunnel Construction
  • 25. Demolition of Existing 3m x 3m Twin Box Drainage Culvert Demolition by coring & hacking to rid of reinforcement within existing twin box culvert for pipe arch tunnel construction Demolition of Existing 3m x 3m Twin Box Culvert for Pipe Arch Tunnel Construction
  • 26. Demolition of Existing 3m x 3m Twin Box Drainage Culvert Demolition by coring & hacking to rid of reinforcement within existing twin box culvert for pipe arch tunnel construction Demolition of Existing 3m x 3m Twin Box Culvert for Pipe Arch Tunnel Construction
  • 27. Demolition of Existing 3m x 3m Twin Box Drainage Culvert Sealing of existing twin box culvert for pipe arch tunnel construction 2. Demolition of Existing 3m x 3m Twin Box Culvert for Pipe Arch Tunnel Construction
  • 28. Pipe Arch Tunnel Construction
  • 29. Pipe Arch Tunnel – Concept
  • 30. Pipe Arch Tunnel – Concept Mined excavation
  • 31. Pipe Arch Tunnel – Concept Site picture of project by Metropolitan Atlanta Rapid Transit Authority in USA Construction Sequence 1. Execution of sheet piles 2. Execution of the pipe arch microtunneling 3. Mined excavation of tunnel with steel ribs with bullflex, reinforced shotcrete & fibre glass elements 4. Casting of permanent concrete lining
  • 32. Pipe Arch Tunnel Construction LONGITUDINAL SECTION CROSS SECTION
  • 33. Pipe Arch Tunnel Construction Limits of PLUS North-South Expressway (NSE) Receiving Pit Jacking Pit Top of Soil Support Pipes Southbound NSE Northbound NSE Fill Fill 0 Cut & Cover Section Cut &Cover Section Residual Soil Direction of Microtunneling 5 Weathered Rock 10 Bottom of Structure Rock 15 20 Scale in Meters 0 5 10 Jacking Length up to Toe of Highway Embankment= 90 m
  • 34. Pipe Arch Tunnel Construction (Right Bore) Limits of PLUS North-South Expressway (NSE) Receiving Pit Jacking Pit Top of Soil Support Pipes Southbound NSE Northbound NSE Fill Fill 0 Cut & Cover Section Cut &Cover Section Direction of Microtunneling Residual Soil Weathered Rock 5 10 Rock Bottom of Structure 15 20 Scale in Meters 0 5 10 Jacking Length up to Toe of Highway Embankment= 92 m
  • 35. Pipe Arch Tunnel Construction Cardox System – Non-explosive blasting
  • 36. Pipe Arch Tunnel Construction Cardox Gas Filling Cardox Drilling & Connection Cardox Blasting Pipe Arch Tunnel Construction
  • 37. Pipe Arch Tunnel Construction Mini Pipe Arch
  • 38. Pipe Arch Tunnel Construction AVN500 Microtunneling machine with retraction mechanism in case of rock face encountered Pipe Arch Tunnel Construction
  • 39. Pipe Arch Tunnel Construction 10mm Pipe Wall Thickness Jacking Direction 780mm OD Pre-welded Line-up Band Pipe joint detail Pipe Arch Tunnel Construction
  • 40. Pipe Arch Tunnel Construction Construction & staged excavation of bored pile jacking pit Pipe Arch Tunnel Construction
  • 41. Pipe Arch Tunnel Construction Coring of reinforcement of shotcreted bored pile wall to prepare soft eye for microtunneling machine advance Pipe Arch Tunnel Construction
  • 42. Pipe Arch Tunnel Construction Construction of thrust wall for jacking of microtunneling machine Pipe Arch Tunnel Construction
  • 43. Pipe Arch Tunnel Construction Microtunneling machine preparing to jack Pipe Arch Tunnel Construction
  • 44. Pipe Arch Tunnel Construction Pipe Arch Tunnel Construction
  • 45. Pipe Arch Tunnel Construction Jacking of microtunneling machine ongoing Pipe Arch Tunnel Construction
  • 46. Pipe Arch Tunnel Construction Welding Of Pipe
  • 47. Pipe Arch Tunnel Construction Pipe Arch Tunnel Construction
  • 48. Pipe Arch Tunnel Construction Pipe Arch Tunnel Construction
  • 49. Pipe Arch Tunnel Construction Pipe Arch Tunnel Construction
  • 50. Catastrophe Catastrophe Pipe Arch Tunnel Construction
  • 51. Catastrophe Pipe Arch Tunnel Construction
  • 52. Catastrophe Pipe Arch Tunnel Construction
  • 53. Catastrophe Pipe Arch Tunnel Construction
  • 54. Catastrophe Set up to pull back pipe Pipe Arch Tunnel Construction
  • 55. Catastrophe Locking device Pipe Arch Tunnel Construction
  • 56. Catastrophe First pipe retreated Pipe Arch Tunnel Construction
  • 57. Catastrophe Damaged section Pipe Arch Tunnel Construction
  • 58. Catastrophe Damaged section exposed Pipe Arch Tunnel Construction
  • 59. Catastrophe Pipe Arch Tunnel Construction
  • 60. Catastrophe Existing drive pressurized Pipe Arch Tunnel Construction
  • 61. Catastrophe Damaged pipe on surface Pipe Arch Tunnel Construction
  • 62. Catastrophe Damaged pipe on surface Pipe Arch Tunnel Construction
  • 63. Catastrophe Rebar excavated under Plus Highway Pipe Arch Tunnel Construction