SlideShare uma empresa Scribd logo
1 de 30
Role of HOST ENTITY in GIP
Ensuring AIESEC
Support to EP
including
accommodation,
support, logistics,
travel etc!
JD Alignment
between EP and the
company along
with the right
expectation setting
Effective
Integration of EP
into the city,
culture etc!
WHY?
Right
number of
People to
Deliver high
volume QUALITY
Experiences
Clear JD
and KPI for
members working
on delivery
Growing in Exchange means
we NEED to have enough
People to MANAGE
experiences for high quality.
This is the most important!
HOW?
STEP 1:
Plan for Capacity
for Quality
STEP 2:
Structure, JD and
KPI in different LC
Volumes in iGIP
STEP 1: Plan for Capacity for Summer
Use the TM Planning tool to plan
STEP 1: Plan for Capacity for Summer
Here enter
number of
interns/EPs one
member can
deliver Eg: 1
member – 3 EPs
STEP 1: Plan for Capacity for Summer
That number from
slide 2 will multiply
with Re goal you enter
for the quarter so you
know how many
members are needed
for delivery in each
programme
STEP 2: Create structures for quality delivery
Structures by
Volume of
Realizations the LC
does
Customize your
structures for the
fruit peak if needed
STEP 2: An LC that has planned between 0-15 in 2014
Number of members: Depends on Realization goal and efficiency (from planning framework)
Job Description:
• Raising (from Market Research, sales, raise)
• Matching (S&D analysis, matching process)
• Delivery (Legal and Reception, EP Experience delivery)
VP
Member Member Member Member
All members are doing Ra, Ma and Re
STEP 2: JD within the structure
Recommendation: Each member is delivering to EPs he/she
has matched since the LC is still at start up and does not
have a HIGH VOLUME of EPs
JD for Delivery
0 Supporting Eps through the match process (especially for visa) and at realization
0 Delivery through fulfilling all exchange minimums
0 Very important: Airport pick up, Logistics, Supporting Accommodation of EPs , Integration of EPs, Ensuring
alignment between EP and company
0 FAST firefighting on NPS in case of any EP issues/complaints
0 Showcasing promoter EP stories
0 Ensuring smooth payment of salary to EP from company
0 During the sales and raise process, keep in mind that members are aligning JD expectations with Company so
that after the match the EP is satisfier
STEP 2: KPI within the structure
KPI 1:
For a single member - % of Promoters/Total Realizations of the member
For a Team - % of Promoters/Total Realizations of the team
KPI 2:
Reducing/Eliminating the largest detractor issue of the LC/MC
STEP 2: Ideal duration of teams
Makes sense for teams
to be for 6 months –
This gives members
time to deliver the
Realization effectively
It is important to MAKE
SURE that once the
team duration ends the
same members are
communicating and
supporting Eps and this
is still part of their role
In case the same
members cannot
continue to
communicate with Eps,
transition the existing
Eps to new members
STEP 2: Ensuring high quality through transition of teams
Team A is finishing their term in July
end and has Realizations in June
Team A needs to ensure complete
delivery to Eps and that the new iGIP
team is aware of their role in delivery
Team B starts in July end and it is PART
OF THEIR role (along with support
from some people on Team A) to
communicate with Eps and ensure
support throughout the Eps experience
STEP 2: An LC that has planned between 15-40 Re in 2014
VP
TL
Ra&Ma
Ra&Ma
Deliv.
TL
Ra&Ma
Ra&Ma
Deliv.
∞ ∞
 Team Leaders can be split by Industry or by
Sub Product depending on your external
reality
 We have the same people working on Raise
and Match within the structure for effective
and fast account management
 We have specific members only to work on
EP Experience delivery so that EVERY EP has
a great experience and the rest of the team
can focus on account management
STEP 2: An LC that has planned between 15-40 Re in 2014
VP
TL
Ra&Ma
Ra&Ma
Deliv.
TL
Ra&Ma
Ra&Ma
Deliv.
Compared to the structure of the start up LC, this structure has specific
members for Delivery – who will work on delivering high quality
experiences pre realization, during realization and post realization
STEP 2: JD within the structure
JD of Delivery members in the team
During Raising period During Matching period During Realization
• Ensure clear and high
quality JD in a specific
product
• Clear expectation
setting with company
about role of EP, salary
and duration of
internship
• Visa Support (The key
issue is Eps want MORE
and ACCURATE
information about the
process and documents
related to visa)
• As soon as matches are
confirmed start working
on accommodation
• By now accommodation
should be confirmed and
ready
• Arrange for EP Pick up
and integration into the
LC and city
• Trainee Buddy assigned
for EP
• Induction meeting with
EP and company
STEP 2: JD within the structure
JD of Delivery members in the team
During Raising period
• Ensure clear and high
quality JD in a specific
product
• Clear expectation
setting with company
about role of EP, salary
and duration of
internship
• In this structure, since the delivery members are not
the ones selling there needs to be clear SYNERGY
between the delivery members and Sales
members to ensure sales members are doing the
right expectation setting
STEP 2: JD within the structure
JD of Delivery members in the team
• In some cases members doing matching are in touch
with the EP however ALL the visa support and
information needs to be coordinated by delivery
members so matching members can focus on
more matching
• It makes sense to start working on EP
accommodation, rent details, contracts etc right
after the match so that it is done in time for the
realization.
• Send Eps a detailed booklet of the city and details
about accommodation so that EP is prepared
During Matching period
• Visa Support (The key
issue is Eps want MORE
and ACCURATE
information about the
process and documents
related to visa)
• As soon as matches are
confirmed start working
on accommodation
STEP 2: JD within the structure
JD of Delivery members in the team
Who is a trainee buddy? – An LC member (doesn’t need to be
only from the iGIP team) who is responsible for meeting and
communicating with the EP regularly, who support the delivery
team in the EP Pick up, integration etc
Having trainee buddy makes the job of a delivery team simpler
and also allows members to have a great experience interacting
with EPs
The induction meeting with the company can be done by the
sales members as well!
At this stage, make sure you are firefighting fast on NPS incase
EP has a comment/issue
During Realization
• By now accommodation
should be confirmed and
ready
• Arrange for EP Pick up
and integration into the
LC and city
• Trainee Buddy assigned
for EP
• Induction meeting with
EP and company
STEP 2: KPI within the structure for delivery members in the
team
KPI 1:
For a single member - % of Promoters/Total Realizations of the member
KPI 2:
Reducing/Eliminating the largest detractor issue of the LC/MC
Similar to an LC planning 15-40 Re
The differences are:
1. More members needed in teams (Use TM planning
framework) to be able to delivery high quality
experiences
2. Involve all LC members much more for delivery at
the realization stage to ensure high quality
VP
TL
Ra&Ma
Ra&Ma
Deliv.
TL
Ra&Ma
Ra&Ma
Deliv.
STEP 2: An LC that has planned between 40-70 Re in 2014
Structure and JD is similar to LC doing between 15-40 Re
VP (SP1)
TL Ra TL Ma
TL
Delivery
TL Current
Account
 Team split by Process of Raise, Match and
Delivery because this team is high volume
and requires focus on each process
 The Team for Current accounts manage raise
and match to ensure effective account
management
 There can be an added Team Leader or some
more members in Current account team in
case there are more current accounts
 It is important that JD and MoS of members
in these teams is split between Current
accounts and new accounts
 Delivery happens all year round – either
preparing for delivery or receiving interns
and supporting them hence a separate team
is crucial
STEP 2: An LC that has planned between 70-100 Re in 2014
STEP 2: JD within the structure
JD of Delivery members in the delivery team
During Raising period During Matching period During Realization
• Ensure clear and high
quality JD in a specific
product
• Clear expectation
setting with company
about role of EP, salary
and duration of
internship
• Visa Support (The key
issue is Eps want MORE
and ACCURATE
information about the
process and documents
related to visa)
• As soon as matches are
confirmed start working
on accommodation
• By now accommodation
should be confirmed and
ready
• Arrange for EP Pick up
and integration into the
LC and city
• Trainee Buddy assigned
for EP
• Induction meeting with
EP and company
STEP 2: JD within the structure
JD of Delivery members in the team
During Raising period
• Ensure clear and high
quality JD in a specific
product
• Clear expectation
setting with company
about role of EP, salary
and duration of
internship
• In this structure, since the delivery members are not
the ones selling there needs to be clear SYNERGY
between the delivery members and Sales
members to ensure sales members are doing the
right expectation setting
STEP 2: JD within the structure
JD of Delivery members in the team
• In some cases members doing matching are in touch with
the EP however ALL the visa support and information
needs to be coordinated by delivery members so matching
members can focus on more matching
• It makes sense to start working on EP accommodation, rent
details, contracts etc right after the match so that it is done
in time for the realization.
• Send Eps a detailed booklet of the city and details about
accommodation so that EP is prepared
• Since LC is HIGH volume, start creating specific reception
material etc for Entity partners and have good synergy with MC
to make this happen (Align with MC)
During Matching period
• Visa Support (The key
issue is Eps want MORE
and ACCURATE
information about the
process and documents
related to visa)
• As soon as matches are
confirmed start working
on accommodation
STEP 2: JD within the structure
JD of Delivery members in the delivery team
Who is a trainee buddy? – An LC member (doesn’t need to
be only from the iGIP team) who is responsible for meeting and
communicating with the EP regularly, who support the delivery
team in the EP Pick up, integration etc
Having trainee buddy makes the job of a delivery team simpler
and also allows members to have a great experience interacting
with EPs
The induction meeting with the company can be done by the
sales members as well!
During Realization
• By now accommodation
should be confirmed and
ready
• Arrange for EP Pick up
and integration into the
LC and city
• Trainee Buddy assigned
for EP
• Induction meeting with
EP and company
STEP 2: JD within the structure
The members in the DELIVERY Team are also managing realizations of the current account team.
Have enough members
doing delivery in this LC
structure as it is really
important to have
capacity to deliver to so
many Eps
simultaneously
Teams in this structure
might sometimes be
between 4-6 months so
make sure there is
effective transition
between two teams so
that Eps do not lose
touch with AIESEC and
there is continuous
support.
Ensure perfect synergy
between the Raising,
Matching and Delivery
team so that delivery is
smooth and there are no
communication gaps.
STEP 2: KPI within the structure for delivery members in the
team
KPI 1:
For a single member - % of Promoters/Total Realizations of the member
KPI 2:
Reducing/Eliminating the largest detractor issue of the LC/MC
Job Description (TL Raising)
• Coordinate the market research, segmentation
and division
• Process optimization from research-sales to
raise
• Coordinate the activities of the members
• Performance review and tracking
VP (SP1)
TL Ra TL Ma TL Delivery
TL Current
Account
VP
TL SP2
Ra&Ma
Ra&Ma
Delivery
TL SP3
Job Description (TL Matching)
• Supply and Demand Analysis
• LC to LC Partnership
• Coordinate the activities of the members
• Performance review and tracking
Job Description (TL Delivery)
Legal and Quality analysis
• Coordinate the activities of the members
• Performance review and tracking
• Minimum quality standard delivery to EP
• Ensuring EP has a great experiences and enable
delivery of inner journey to EP
STEP 2: An LC that has planned between 70-100 or 100-150 Re in 2014
STEP 2: An LC that has planned between 70-100 Re in 2014
For VP 1
Structure, JD and KPI is
similar to the 70-100 LC
Structure
For VP 2
Structure, JD and KPI is
similar to the LCs doing
15-40 and 40-70 Re

Mais conteúdo relacionado

Destaque

Induction healthchceck: East Midlands
Induction healthchceck: East MidlandsInduction healthchceck: East Midlands
Induction healthchceck: East MidlandsBridget Harris
 
Major Presentation 2015
Major Presentation 2015Major Presentation 2015
Major Presentation 2015Mark Kracht
 
Board Presentation Recruitment, Induction And Retention
Board Presentation Recruitment, Induction And RetentionBoard Presentation Recruitment, Induction And Retention
Board Presentation Recruitment, Induction And RetentionRobin McLean
 
NORMS BROCHURE (1)
NORMS BROCHURE (1)NORMS BROCHURE (1)
NORMS BROCHURE (1)C.D Webb
 
Особенности применения проводных извещателей
Особенности применения проводных извещателейОсобенности применения проводных извещателей
Особенности применения проводных извещателейТеко - Торговый Дом
 
Taking Gen2015 To My Entity
Taking Gen2015 To My EntityTaking Gen2015 To My Entity
Taking Gen2015 To My EntityAIESEC
 
Induction strategies that work
Induction strategies that workInduction strategies that work
Induction strategies that workEpic
 
Creating A Customer Centered Organization
Creating A Customer Centered OrganizationCreating A Customer Centered Organization
Creating A Customer Centered Organizationpierrecochard
 
HR Advisory Report
HR Advisory ReportHR Advisory Report
HR Advisory ReportMajid Aziz
 
oGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&DoGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&DAIESEC
 
Strategic HRM case study- vijay K
Strategic HRM case study- vijay KStrategic HRM case study- vijay K
Strategic HRM case study- vijay KVijay Kashyap
 
Bar Talk: The away-from-home consumption phenomenon
Bar Talk: The away-from-home consumption phenomenonBar Talk: The away-from-home consumption phenomenon
Bar Talk: The away-from-home consumption phenomenonfebo leondini
 
Induction about Standards and Satisfaction in Local Committee level
Induction about Standards and Satisfaction in Local Committee levelInduction about Standards and Satisfaction in Local Committee level
Induction about Standards and Satisfaction in Local Committee levelAnastasiia Isakii
 
Induction process
Induction processInduction process
Induction processcshearing
 

Destaque (20)

Induction healthchceck: East Midlands
Induction healthchceck: East MidlandsInduction healthchceck: East Midlands
Induction healthchceck: East Midlands
 
Anything HR Solutions
Anything HR SolutionsAnything HR Solutions
Anything HR Solutions
 
Major Presentation 2015
Major Presentation 2015Major Presentation 2015
Major Presentation 2015
 
Board Presentation Recruitment, Induction And Retention
Board Presentation Recruitment, Induction And RetentionBoard Presentation Recruitment, Induction And Retention
Board Presentation Recruitment, Induction And Retention
 
NORMS BROCHURE (1)
NORMS BROCHURE (1)NORMS BROCHURE (1)
NORMS BROCHURE (1)
 
Ons Company Presentation
Ons Company PresentationOns Company Presentation
Ons Company Presentation
 
Особенности применения проводных извещателей
Особенности применения проводных извещателейОсобенности применения проводных извещателей
Особенности применения проводных извещателей
 
Anything hr solutions
Anything hr solutionsAnything hr solutions
Anything hr solutions
 
Taking Gen2015 To My Entity
Taking Gen2015 To My EntityTaking Gen2015 To My Entity
Taking Gen2015 To My Entity
 
Induction strategies that work
Induction strategies that workInduction strategies that work
Induction strategies that work
 
Creating A Customer Centered Organization
Creating A Customer Centered OrganizationCreating A Customer Centered Organization
Creating A Customer Centered Organization
 
HR Advisory Report
HR Advisory ReportHR Advisory Report
HR Advisory Report
 
Wholesystem_Eitai
Wholesystem_EitaiWholesystem_Eitai
Wholesystem_Eitai
 
oGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&DoGIP Tier 3 Building capacity and L&D
oGIP Tier 3 Building capacity and L&D
 
Strategic HRM case study- vijay K
Strategic HRM case study- vijay KStrategic HRM case study- vijay K
Strategic HRM case study- vijay K
 
L&D KPIs
L&D KPIsL&D KPIs
L&D KPIs
 
Bar Talk: The away-from-home consumption phenomenon
Bar Talk: The away-from-home consumption phenomenonBar Talk: The away-from-home consumption phenomenon
Bar Talk: The away-from-home consumption phenomenon
 
Induction about Standards and Satisfaction in Local Committee level
Induction about Standards and Satisfaction in Local Committee levelInduction about Standards and Satisfaction in Local Committee level
Induction about Standards and Satisfaction in Local Committee level
 
Induction process
Induction processInduction process
Induction process
 
Professional Feedback
Professional FeedbackProfessional Feedback
Professional Feedback
 

Semelhante a iGIP capacity for Quality Delivery

oGIP Capacity for high quality experiences
oGIP Capacity for high quality experiences oGIP Capacity for high quality experiences
oGIP Capacity for high quality experiences AIESEC
 
oGIP Capacity Quality Delivery
oGIP Capacity Quality DeliveryoGIP Capacity Quality Delivery
oGIP Capacity Quality DeliveryFirnando Buenayre
 
Capacity and structures for high quality iGCDP
Capacity and structures for high quality iGCDP Capacity and structures for high quality iGCDP
Capacity and structures for high quality iGCDP AIESEC
 
GIP Quality Strategy - Job Description Clarity Issue
GIP Quality Strategy - Job Description Clarity IssueGIP Quality Strategy - Job Description Clarity Issue
GIP Quality Strategy - Job Description Clarity IssueFirnando Buenayre
 
oGCDP Capacity Quality Delivery
oGCDP Capacity Quality DeliveryoGCDP Capacity Quality Delivery
oGCDP Capacity Quality DeliveryFirnando Buenayre
 
Capacity and structures for high quality oGCDP
Capacity and structures for high quality oGCDP Capacity and structures for high quality oGCDP
Capacity and structures for high quality oGCDP AIESEC
 
GIP Quality Strategy - Accommodation Issue
GIP Quality Strategy - Accommodation IssueGIP Quality Strategy - Accommodation Issue
GIP Quality Strategy - Accommodation IssueFirnando Buenayre
 
GIP Quality Strategy - Integration Issue
GIP Quality Strategy - Integration IssueGIP Quality Strategy - Integration Issue
GIP Quality Strategy - Integration IssueFirnando Buenayre
 
GIP Monthly Meeting May 2014
GIP Monthly Meeting May 2014GIP Monthly Meeting May 2014
GIP Monthly Meeting May 2014Cole Wirpel
 
3 Steps to Re-Raising in 2014
3 Steps to Re-Raising in 20143 Steps to Re-Raising in 2014
3 Steps to Re-Raising in 2014Cole Wirpel
 
Capacity for high volume iGCDP Tier 1
Capacity for high volume iGCDP Tier 1Capacity for high volume iGCDP Tier 1
Capacity for high volume iGCDP Tier 1AIESEC
 
Account management tier2
Account management tier2Account management tier2
Account management tier2Matheus Vrechi
 
GCDP Quality Strategy - Job Description Implementation issue
GCDP Quality Strategy - Job Description Implementation issueGCDP Quality Strategy - Job Description Implementation issue
GCDP Quality Strategy - Job Description Implementation issueFirnando Buenayre
 
EXPA - Gcdp business rules
EXPA - Gcdp business rulesEXPA - Gcdp business rules
EXPA - Gcdp business rulesNomaan Shaikh
 
Structures and learning oGCDP Tier 3
Structures and learning oGCDP Tier 3Structures and learning oGCDP Tier 3
Structures and learning oGCDP Tier 3AIESEC
 
Codelivery strategy
Codelivery strategyCodelivery strategy
Codelivery strategyPaulo Cortez
 
Learning for high quality experience delivery
Learning for high quality experience deliveryLearning for high quality experience delivery
Learning for high quality experience deliveryAIESEC
 

Semelhante a iGIP capacity for Quality Delivery (20)

oGIP Capacity for high quality experiences
oGIP Capacity for high quality experiences oGIP Capacity for high quality experiences
oGIP Capacity for high quality experiences
 
oGIP Capacity Quality Delivery
oGIP Capacity Quality DeliveryoGIP Capacity Quality Delivery
oGIP Capacity Quality Delivery
 
iGCDP Quality Capacity
iGCDP Quality CapacityiGCDP Quality Capacity
iGCDP Quality Capacity
 
Capacity and structures for high quality iGCDP
Capacity and structures for high quality iGCDP Capacity and structures for high quality iGCDP
Capacity and structures for high quality iGCDP
 
GIP Quality Strategy - Job Description Clarity Issue
GIP Quality Strategy - Job Description Clarity IssueGIP Quality Strategy - Job Description Clarity Issue
GIP Quality Strategy - Job Description Clarity Issue
 
oGCDP Capacity Quality Delivery
oGCDP Capacity Quality DeliveryoGCDP Capacity Quality Delivery
oGCDP Capacity Quality Delivery
 
Capacity and structures for high quality oGCDP
Capacity and structures for high quality oGCDP Capacity and structures for high quality oGCDP
Capacity and structures for high quality oGCDP
 
GIP Quality Strategy - Accommodation Issue
GIP Quality Strategy - Accommodation IssueGIP Quality Strategy - Accommodation Issue
GIP Quality Strategy - Accommodation Issue
 
GIP Quality Strategy - Integration Issue
GIP Quality Strategy - Integration IssueGIP Quality Strategy - Integration Issue
GIP Quality Strategy - Integration Issue
 
GIP Monthly Meeting May 2014
GIP Monthly Meeting May 2014GIP Monthly Meeting May 2014
GIP Monthly Meeting May 2014
 
3 Steps to Re-Raising in 2014
3 Steps to Re-Raising in 20143 Steps to Re-Raising in 2014
3 Steps to Re-Raising in 2014
 
Capacity for high volume iGCDP Tier 1
Capacity for high volume iGCDP Tier 1Capacity for high volume iGCDP Tier 1
Capacity for high volume iGCDP Tier 1
 
Account management tier2
Account management tier2Account management tier2
Account management tier2
 
GCDP Quality Strategy - Job Description Implementation issue
GCDP Quality Strategy - Job Description Implementation issueGCDP Quality Strategy - Job Description Implementation issue
GCDP Quality Strategy - Job Description Implementation issue
 
EXPA - Gcdp business rules
EXPA - Gcdp business rulesEXPA - Gcdp business rules
EXPA - Gcdp business rules
 
Structures and learning oGCDP Tier 3
Structures and learning oGCDP Tier 3Structures and learning oGCDP Tier 3
Structures and learning oGCDP Tier 3
 
Codelivery strategy
Codelivery strategyCodelivery strategy
Codelivery strategy
 
Learning for high quality experience delivery
Learning for high quality experience deliveryLearning for high quality experience delivery
Learning for high quality experience delivery
 
Midhun cv' 2016
Midhun cv' 2016Midhun cv' 2016
Midhun cv' 2016
 
iGIP National OCP workshop
iGIP National OCP workshopiGIP National OCP workshop
iGIP National OCP workshop
 

Mais de Firnando Buenayre

HARA - Global & Transparent Blockchain-based Data Exchange
HARA - Global & Transparent Blockchain-based Data Exchange HARA - Global & Transparent Blockchain-based Data Exchange
HARA - Global & Transparent Blockchain-based Data Exchange Firnando Buenayre
 
GCDP Quality Strategy - Communication Issue
GCDP Quality Strategy - Communication IssueGCDP Quality Strategy - Communication Issue
GCDP Quality Strategy - Communication IssueFirnando Buenayre
 
GCDP Quality Strategy - Logistic issue
GCDP Quality Strategy - Logistic issueGCDP Quality Strategy - Logistic issue
GCDP Quality Strategy - Logistic issueFirnando Buenayre
 
Balance GCDP and GIP for Quality Delivery
Balance GCDP and GIP for Quality DeliveryBalance GCDP and GIP for Quality Delivery
Balance GCDP and GIP for Quality DeliveryFirnando Buenayre
 
L&D for quality experience delivery
L&D for quality experience deliveryL&D for quality experience delivery
L&D for quality experience deliveryFirnando Buenayre
 
IGN regional s&d GCDP 1-15 May 2014
IGN regional s&d GCDP 1-15 May 2014IGN regional s&d GCDP 1-15 May 2014
IGN regional s&d GCDP 1-15 May 2014Firnando Buenayre
 
AP regional s&d GCDP 1-15 May 2014
AP regional s&d GCDP 1-15 May 2014AP regional s&d GCDP 1-15 May 2014
AP regional s&d GCDP 1-15 May 2014Firnando Buenayre
 
Role of MC in TM Driving Quality Delivery
Role of MC in TM Driving Quality DeliveryRole of MC in TM Driving Quality Delivery
Role of MC in TM Driving Quality DeliveryFirnando Buenayre
 
Talent Capacity in Quality Delivery Introduction
Talent Capacity in Quality Delivery IntroductionTalent Capacity in Quality Delivery Introduction
Talent Capacity in Quality Delivery IntroductionFirnando Buenayre
 
Nps goal setting yearly quarterly - monthly
Nps goal setting yearly   quarterly - monthlyNps goal setting yearly   quarterly - monthly
Nps goal setting yearly quarterly - monthlyFirnando Buenayre
 
Nps goal setting let's get it started!
Nps goal setting   let's get it started!Nps goal setting   let's get it started!
Nps goal setting let's get it started!Firnando Buenayre
 

Mais de Firnando Buenayre (17)

HARA - Global & Transparent Blockchain-based Data Exchange
HARA - Global & Transparent Blockchain-based Data Exchange HARA - Global & Transparent Blockchain-based Data Exchange
HARA - Global & Transparent Blockchain-based Data Exchange
 
GCDP Quality Strategy - Communication Issue
GCDP Quality Strategy - Communication IssueGCDP Quality Strategy - Communication Issue
GCDP Quality Strategy - Communication Issue
 
GCDP Quality Strategy - Logistic issue
GCDP Quality Strategy - Logistic issueGCDP Quality Strategy - Logistic issue
GCDP Quality Strategy - Logistic issue
 
Balance GCDP and GIP for Quality Delivery
Balance GCDP and GIP for Quality DeliveryBalance GCDP and GIP for Quality Delivery
Balance GCDP and GIP for Quality Delivery
 
L&D for quality experience delivery
L&D for quality experience deliveryL&D for quality experience delivery
L&D for quality experience delivery
 
GCDP GIP strategy intro
GCDP GIP strategy introGCDP GIP strategy intro
GCDP GIP strategy intro
 
IGN S&D GIP 1-15 May 2014
IGN S&D GIP 1-15 May 2014IGN S&D GIP 1-15 May 2014
IGN S&D GIP 1-15 May 2014
 
AP S&D GIP 1-15 May 2014
AP S&D GIP 1-15 May 2014AP S&D GIP 1-15 May 2014
AP S&D GIP 1-15 May 2014
 
WENA S&D GCDP 1-15 May 2014
WENA S&D GCDP 1-15 May 2014WENA S&D GCDP 1-15 May 2014
WENA S&D GCDP 1-15 May 2014
 
IGN regional s&d GCDP 1-15 May 2014
IGN regional s&d GCDP 1-15 May 2014IGN regional s&d GCDP 1-15 May 2014
IGN regional s&d GCDP 1-15 May 2014
 
AP regional s&d GCDP 1-15 May 2014
AP regional s&d GCDP 1-15 May 2014AP regional s&d GCDP 1-15 May 2014
AP regional s&d GCDP 1-15 May 2014
 
WENA S&D GIP 1-15 May 2014
WENA S&D GIP 1-15 May 2014WENA S&D GIP 1-15 May 2014
WENA S&D GIP 1-15 May 2014
 
Role of MC in TM Driving Quality Delivery
Role of MC in TM Driving Quality DeliveryRole of MC in TM Driving Quality Delivery
Role of MC in TM Driving Quality Delivery
 
Talent Capacity in Quality Delivery Introduction
Talent Capacity in Quality Delivery IntroductionTalent Capacity in Quality Delivery Introduction
Talent Capacity in Quality Delivery Introduction
 
Quality Planning
Quality PlanningQuality Planning
Quality Planning
 
Nps goal setting yearly quarterly - monthly
Nps goal setting yearly   quarterly - monthlyNps goal setting yearly   quarterly - monthly
Nps goal setting yearly quarterly - monthly
 
Nps goal setting let's get it started!
Nps goal setting   let's get it started!Nps goal setting   let's get it started!
Nps goal setting let's get it started!
 

Último

How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 

Último (20)

How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 

iGIP capacity for Quality Delivery

  • 1.
  • 2. Role of HOST ENTITY in GIP Ensuring AIESEC Support to EP including accommodation, support, logistics, travel etc! JD Alignment between EP and the company along with the right expectation setting Effective Integration of EP into the city, culture etc!
  • 3. WHY? Right number of People to Deliver high volume QUALITY Experiences Clear JD and KPI for members working on delivery Growing in Exchange means we NEED to have enough People to MANAGE experiences for high quality. This is the most important!
  • 4. HOW? STEP 1: Plan for Capacity for Quality STEP 2: Structure, JD and KPI in different LC Volumes in iGIP
  • 5. STEP 1: Plan for Capacity for Summer Use the TM Planning tool to plan
  • 6. STEP 1: Plan for Capacity for Summer Here enter number of interns/EPs one member can deliver Eg: 1 member – 3 EPs
  • 7. STEP 1: Plan for Capacity for Summer That number from slide 2 will multiply with Re goal you enter for the quarter so you know how many members are needed for delivery in each programme
  • 8. STEP 2: Create structures for quality delivery Structures by Volume of Realizations the LC does Customize your structures for the fruit peak if needed
  • 9. STEP 2: An LC that has planned between 0-15 in 2014 Number of members: Depends on Realization goal and efficiency (from planning framework) Job Description: • Raising (from Market Research, sales, raise) • Matching (S&D analysis, matching process) • Delivery (Legal and Reception, EP Experience delivery) VP Member Member Member Member All members are doing Ra, Ma and Re
  • 10. STEP 2: JD within the structure Recommendation: Each member is delivering to EPs he/she has matched since the LC is still at start up and does not have a HIGH VOLUME of EPs JD for Delivery 0 Supporting Eps through the match process (especially for visa) and at realization 0 Delivery through fulfilling all exchange minimums 0 Very important: Airport pick up, Logistics, Supporting Accommodation of EPs , Integration of EPs, Ensuring alignment between EP and company 0 FAST firefighting on NPS in case of any EP issues/complaints 0 Showcasing promoter EP stories 0 Ensuring smooth payment of salary to EP from company 0 During the sales and raise process, keep in mind that members are aligning JD expectations with Company so that after the match the EP is satisfier
  • 11. STEP 2: KPI within the structure KPI 1: For a single member - % of Promoters/Total Realizations of the member For a Team - % of Promoters/Total Realizations of the team KPI 2: Reducing/Eliminating the largest detractor issue of the LC/MC
  • 12. STEP 2: Ideal duration of teams Makes sense for teams to be for 6 months – This gives members time to deliver the Realization effectively It is important to MAKE SURE that once the team duration ends the same members are communicating and supporting Eps and this is still part of their role In case the same members cannot continue to communicate with Eps, transition the existing Eps to new members
  • 13. STEP 2: Ensuring high quality through transition of teams Team A is finishing their term in July end and has Realizations in June Team A needs to ensure complete delivery to Eps and that the new iGIP team is aware of their role in delivery Team B starts in July end and it is PART OF THEIR role (along with support from some people on Team A) to communicate with Eps and ensure support throughout the Eps experience
  • 14. STEP 2: An LC that has planned between 15-40 Re in 2014 VP TL Ra&Ma Ra&Ma Deliv. TL Ra&Ma Ra&Ma Deliv. ∞ ∞  Team Leaders can be split by Industry or by Sub Product depending on your external reality  We have the same people working on Raise and Match within the structure for effective and fast account management  We have specific members only to work on EP Experience delivery so that EVERY EP has a great experience and the rest of the team can focus on account management
  • 15. STEP 2: An LC that has planned between 15-40 Re in 2014 VP TL Ra&Ma Ra&Ma Deliv. TL Ra&Ma Ra&Ma Deliv. Compared to the structure of the start up LC, this structure has specific members for Delivery – who will work on delivering high quality experiences pre realization, during realization and post realization
  • 16. STEP 2: JD within the structure JD of Delivery members in the team During Raising period During Matching period During Realization • Ensure clear and high quality JD in a specific product • Clear expectation setting with company about role of EP, salary and duration of internship • Visa Support (The key issue is Eps want MORE and ACCURATE information about the process and documents related to visa) • As soon as matches are confirmed start working on accommodation • By now accommodation should be confirmed and ready • Arrange for EP Pick up and integration into the LC and city • Trainee Buddy assigned for EP • Induction meeting with EP and company
  • 17. STEP 2: JD within the structure JD of Delivery members in the team During Raising period • Ensure clear and high quality JD in a specific product • Clear expectation setting with company about role of EP, salary and duration of internship • In this structure, since the delivery members are not the ones selling there needs to be clear SYNERGY between the delivery members and Sales members to ensure sales members are doing the right expectation setting
  • 18. STEP 2: JD within the structure JD of Delivery members in the team • In some cases members doing matching are in touch with the EP however ALL the visa support and information needs to be coordinated by delivery members so matching members can focus on more matching • It makes sense to start working on EP accommodation, rent details, contracts etc right after the match so that it is done in time for the realization. • Send Eps a detailed booklet of the city and details about accommodation so that EP is prepared During Matching period • Visa Support (The key issue is Eps want MORE and ACCURATE information about the process and documents related to visa) • As soon as matches are confirmed start working on accommodation
  • 19. STEP 2: JD within the structure JD of Delivery members in the team Who is a trainee buddy? – An LC member (doesn’t need to be only from the iGIP team) who is responsible for meeting and communicating with the EP regularly, who support the delivery team in the EP Pick up, integration etc Having trainee buddy makes the job of a delivery team simpler and also allows members to have a great experience interacting with EPs The induction meeting with the company can be done by the sales members as well! At this stage, make sure you are firefighting fast on NPS incase EP has a comment/issue During Realization • By now accommodation should be confirmed and ready • Arrange for EP Pick up and integration into the LC and city • Trainee Buddy assigned for EP • Induction meeting with EP and company
  • 20. STEP 2: KPI within the structure for delivery members in the team KPI 1: For a single member - % of Promoters/Total Realizations of the member KPI 2: Reducing/Eliminating the largest detractor issue of the LC/MC
  • 21. Similar to an LC planning 15-40 Re The differences are: 1. More members needed in teams (Use TM planning framework) to be able to delivery high quality experiences 2. Involve all LC members much more for delivery at the realization stage to ensure high quality VP TL Ra&Ma Ra&Ma Deliv. TL Ra&Ma Ra&Ma Deliv. STEP 2: An LC that has planned between 40-70 Re in 2014 Structure and JD is similar to LC doing between 15-40 Re
  • 22. VP (SP1) TL Ra TL Ma TL Delivery TL Current Account  Team split by Process of Raise, Match and Delivery because this team is high volume and requires focus on each process  The Team for Current accounts manage raise and match to ensure effective account management  There can be an added Team Leader or some more members in Current account team in case there are more current accounts  It is important that JD and MoS of members in these teams is split between Current accounts and new accounts  Delivery happens all year round – either preparing for delivery or receiving interns and supporting them hence a separate team is crucial STEP 2: An LC that has planned between 70-100 Re in 2014
  • 23. STEP 2: JD within the structure JD of Delivery members in the delivery team During Raising period During Matching period During Realization • Ensure clear and high quality JD in a specific product • Clear expectation setting with company about role of EP, salary and duration of internship • Visa Support (The key issue is Eps want MORE and ACCURATE information about the process and documents related to visa) • As soon as matches are confirmed start working on accommodation • By now accommodation should be confirmed and ready • Arrange for EP Pick up and integration into the LC and city • Trainee Buddy assigned for EP • Induction meeting with EP and company
  • 24. STEP 2: JD within the structure JD of Delivery members in the team During Raising period • Ensure clear and high quality JD in a specific product • Clear expectation setting with company about role of EP, salary and duration of internship • In this structure, since the delivery members are not the ones selling there needs to be clear SYNERGY between the delivery members and Sales members to ensure sales members are doing the right expectation setting
  • 25. STEP 2: JD within the structure JD of Delivery members in the team • In some cases members doing matching are in touch with the EP however ALL the visa support and information needs to be coordinated by delivery members so matching members can focus on more matching • It makes sense to start working on EP accommodation, rent details, contracts etc right after the match so that it is done in time for the realization. • Send Eps a detailed booklet of the city and details about accommodation so that EP is prepared • Since LC is HIGH volume, start creating specific reception material etc for Entity partners and have good synergy with MC to make this happen (Align with MC) During Matching period • Visa Support (The key issue is Eps want MORE and ACCURATE information about the process and documents related to visa) • As soon as matches are confirmed start working on accommodation
  • 26. STEP 2: JD within the structure JD of Delivery members in the delivery team Who is a trainee buddy? – An LC member (doesn’t need to be only from the iGIP team) who is responsible for meeting and communicating with the EP regularly, who support the delivery team in the EP Pick up, integration etc Having trainee buddy makes the job of a delivery team simpler and also allows members to have a great experience interacting with EPs The induction meeting with the company can be done by the sales members as well! During Realization • By now accommodation should be confirmed and ready • Arrange for EP Pick up and integration into the LC and city • Trainee Buddy assigned for EP • Induction meeting with EP and company
  • 27. STEP 2: JD within the structure The members in the DELIVERY Team are also managing realizations of the current account team. Have enough members doing delivery in this LC structure as it is really important to have capacity to deliver to so many Eps simultaneously Teams in this structure might sometimes be between 4-6 months so make sure there is effective transition between two teams so that Eps do not lose touch with AIESEC and there is continuous support. Ensure perfect synergy between the Raising, Matching and Delivery team so that delivery is smooth and there are no communication gaps.
  • 28. STEP 2: KPI within the structure for delivery members in the team KPI 1: For a single member - % of Promoters/Total Realizations of the member KPI 2: Reducing/Eliminating the largest detractor issue of the LC/MC
  • 29. Job Description (TL Raising) • Coordinate the market research, segmentation and division • Process optimization from research-sales to raise • Coordinate the activities of the members • Performance review and tracking VP (SP1) TL Ra TL Ma TL Delivery TL Current Account VP TL SP2 Ra&Ma Ra&Ma Delivery TL SP3 Job Description (TL Matching) • Supply and Demand Analysis • LC to LC Partnership • Coordinate the activities of the members • Performance review and tracking Job Description (TL Delivery) Legal and Quality analysis • Coordinate the activities of the members • Performance review and tracking • Minimum quality standard delivery to EP • Ensuring EP has a great experiences and enable delivery of inner journey to EP STEP 2: An LC that has planned between 70-100 or 100-150 Re in 2014
  • 30. STEP 2: An LC that has planned between 70-100 Re in 2014 For VP 1 Structure, JD and KPI is similar to the 70-100 LC Structure For VP 2 Structure, JD and KPI is similar to the LCs doing 15-40 and 40-70 Re

Notas do Editor

  1. What to cover for capacity: different LC scales, role of middle management