ENG 3731



Materials and Methods of
      Construction



                           1
1. INTRODUCTION TO MATERIALS
AND METHODS OF CONSTRUCTION




                               2
1.1 Introduction to Materials and Methods of
Construction
   General introduction: syllabus, text book, laboratory classes and instruction
    sheets, assessment procedure
   Motivation for including this course in the civil engineering curriculum: Earlier
    course(s) in materials, continuing evolution of construction industry - (i) New
    building products such as composites, new grades of steel and concrete, new
    forms of construction (light gauge construction, glass technologies, etc); (ii)
    Changed social and political climate (construction workplace safety,
    environmental regulations, energy conservation in building, controlling codes of
    practice, etc.)
   Text book is rather challenging, to say the least - 330 typed pages, 491 pages of
    drawings and photographs, chapters of the book: Buildings, foundations, wood
    and construction, masonry and construction, steel and construction, concrete
    and construction, roofing materials, glazing materials, cladding systems, interior
    finishes, interior walls and partitions, ceiling and floor finishes, etc.
   Laboratory format - Five experiments - One experiment to be finished within
    the same day for the whole class - Three sittings in one afternoon.

                                                                                  3
Chapter 1
Making Buildings




                   4
1.2 Making Buildings - Outline
   Why do we need a building ? “Birds & animals”,
    “Beast master”, “Lost World”, “Survivors” - Common
    link - We are not them
   Designing and making buildings : Stakeholders - “Sky
    is the limit”, constraints to the choice of building
    systems - Codes, regulations, ordinances, unions, etc.
   How to choose a building system ? “Experience”,
    “Pleasing to the eyes”, “Economical”, etc.
   Performance during and after construction



                                                         5
1.2.1 Why do we Need Buildings?

   We build because little that we do can take place
    outdoors. We need shelter from sun, wind, rain, and
    snow. We need dry, level platforms for our activities.
    Often we need to stack these platforms to multiply
    available ground space. On these platforms, and within
    our shelter, we need air that is warmer or cooler, more or
    less humid, than outdoors. We need less light by day, and
    more light by night, than is offered by the natural world.
    We need services that provide energy, communications
    and water and disposal of wastes. So we gather materials
    and assemble them into the constructions we call
    buildings to satisfy these needs.
                                                           6
1.3 Stakeholders in the Building Systems
   Owner - Role ? Prime mover
   Architect - Selects the team of professionals - Develops the
    building concept in consultation with the owner - also carries out
    feasibility study
   Team of designers : Chemical, civil, electrical & mechanical
    engineers and naval architects ; draftsmen - Develop contract
    documents
   General contractor : Selects subcontractors - Begin construction
   Approving authorities and Compliance review
   Building inspectors, architect, and consultants - Compliance to
    design and code requirement
   “…for want of a nail the shoe was lost; for want of a shoe the
    horse was lost ….”
                                                                         7
1.4 Constraints to Choosing Building Systems
   General physical limitations: Land area available for building,
    weight of building and soil strength, structural dimensions,
    material performance under exposure conditions, contractual
    arrangements regarding building construction.
   Material selection dependent on: Designer/Architect with inputs
    from owner (for appearance and performance) and contractor
    (for cost, availability & constructability)
   Budget - Permitted and overruns
   Zoning ordinances: Imposed by local authorities (Planning
    Department - Residential or industrial, area covered by and
    offsets required for building, parking spaces, floor area, height of
    building, center-city fire zones, etc.



                                                                           8
1.4 Constraints to Choosing Building Systems
                     (Cont’d)

Who is Primarily Responsible for
Construction Methods?

AIA 201; The contractor shall be solely responsible for and
have control over means, methods, techniques, sequences and
procedures and for coordinating all portions of the Work under
the contract (unless instructed otherwise)




                                                                 9
1.4 Constraints to Choosing Building Systems
(Cont’d)
   Building Codes : “…. Establish minimum construction standards for the
    protection of life, health, and welfare of the public” - NBCC, IBC (2000),
    BOCA, SBC, ISO & EURO - Regulate the building activities -
    Define user groups, construction types, fire resistance ratings,
    materials, natural light, ventilation, emergency exits, structural
    design, construction methodology, fire protection systems,
    accessibility to disabled persons, energy efficiency, etc.

•   Occupancy Groups - Groups A-1 through A5        * Group B – Business Occupancy
•   Group E – Educational      * Groups H-1 through H-5 - High Hazard Occupancy
•   Groups I-1 through I-4 - Institutional - Health care, geriatrics, prisons
•   Group M – Mercantile - Stores (retail)
•   Groups R-1 through R-4 - Residential Occupancies - Homes, apartments, dorms, etc.
•   Group S-1 and S-1 - Hazardous storage  * Group U – Utility Buildings

                                                                                        10
Fire Wall




            11
   Building Regulations
   More than 44,000 jurisdictions in US regulating buildings
   Made > 12,000 amendments to the 3 model codes
   Differing standards and interpretation
                                      Tuckman, J.L., ENR 7/23/2001
   Time required for permitting can be excessive:
     – EX Miami Dade:
        » Each year reviews 120,000 – 130,000 applications,
          and performs > 1,000,000 inspections
        » Average time required to issue a permit:
            52 days for residential
            81 days for commercial
                                      Gonchar, ENR 7/30/2001


                                                                     12
1.4 Constraints to Choosing Building
Systems (Cont’d)

Health codes : Occupational health and safety

Fire codes

Plumbing codes

Electrical codes

Building Contractors’ and Labor Unions’
Regulations

                                                13
   Who is Responsible to Ensure the Contract
    Documents Conform to Code Requirements?
   Why would the Architect have Primary
    Responsibility?

   Do contractors have any responsibility for code
    conformance?

                                               14
 Material Information Resources


   American Society for Testing and Materials
    (ASTM)
   American National Standards Institute
   US Bureau of Standards
   Construction Trade & Professional Associations
    (Technical specifications often incorporated by ‘reference’)

                                                              15
1.5 How to Choose a Building System?

   Satisfy the requirements for functional performance: In
    stable equilibrium, Strength, Serviceability, Safety of
    operation
   Give the desired aesthetic qualities: Visual appearance,
    personal choice
   Not constrained by legal constraints: Codes & ordinances
   The most economical : Funds available, life-cycle costs,
    etc.
   Materials used are the most appropriate for the
    environment: least damaging and disruptive, very little
    environment damaging effluents and emissions, etc.
                                                           16
 Sustainability
   “…meeting the needs of the present generation without
    compromising the ability of future generations to meet their
    needs.”
 Sustainable Design & Construction Actions
  – Energy efficient buildings
  – Re-use existing structures
  – Efficient land use
  – Use of renewable products / materials
  – Protect soil and water resources
  – Reduce / eliminate pollution
   Sustainability - addressed on a Life Cycle basis
                                                             17
 SUSTAINABILITY CONSIDERATIONS
  WHEN SELECTING MATERIALS
 Origin & Manufacture of Building Materials
    – Plentiful? Renewable? Recycled content? Energy expended
      to acquire? Manufacturing pollutants & waste?
   Construction of the Building
    – Energy expended to acquire & install? Pollutants
      generated? Waste generated & can it be recycled?
   Building Maintenance
    – Energy use over its lifetime? Material impact on indoor air
      quality? Maintenance required? Maintenance materials
      toxic? Recyclable? Fire & smoke properties?
   Demolition
                                                            18
1.6 Performance Before and After Construction
   Performance Concerns : Building movements, structural
    deflections, thermal- and moisture- related expansion and
    contraction, heat flow, water vapor migration and condensation,
    deterioration, building maintenance, etc.
   Construction Concerns : Safety, built on time, within budget,
    quality of construction, sequencing of construction operations,
    inclement weather, quality assurance of materials, etc.




                                                                      19
1.7 Civil Engineering Materials in Newfoundland
                  and Labrador
   www.gov.nf.ca/mines&en/mines/miningindustryoverview.htm
   Total value of mineral shipments from Newfoundland was $ 972
    million during 2000
   Many of these commodities are critical elements in construction.
   Iron ore products and gold shipments are valued at $ 923 million-
    after primary processing
   Shipments of industrial minerals, or non-metals such as dolomite,
    silica, gypsum, dimension stone, peat and sand gravel are valued at $
    48 million - after primary processing
   Do we have other scopes than primary processing?
   Material produced : Limestone/dolomite, Dimension stone, Granite,
    Anorthosite, Peat, Slate, Iron ore, Gypsum, Silica
   Other developing products: Pyrophyllite, Talc, etc.
                                                                     20
1.7 Civil Engineering Materials in Newfoundland
    and Labrador (Cont’d)
   Most building materials are sold after primary processing
   Can we go to secondary processing? Paints - a viable industry in NL
    till 1988: ceased to exist due to takeover of industry - Components of
    paint : Vehicle (film-forming substance - Cellulose nitrate, vinyl
    chloride, polyurethane or epoxy resins), Solvents (water,
    hydrocarbons, turpentine, alcohols, ketones, ester, ethers, etc.) -
    Pigments (coloring agents - iron oxides (hematite, magnetite),
    chromium oxide, etc.)
   Additives: Defoamers (silicones), Driers and wetting agents (metallic
    soaps), flattening agents (talc, pyrophyllite).
   Almost all of them can be produced in Newfoundland
   What prevents us? - Practical problems

                                                                       21

More Related Content

What's hot

Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-IKishor Ade
 
types of Foundations with animated sketches
types of Foundations with animated sketchestypes of Foundations with animated sketches
types of Foundations with animated sketchesGiri Babu S V
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMSagar Shah
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure pptAbhishekM45
 
Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication constructionDivya Vishnoi
 
Pre engineered building ppt rit
Pre engineered building ppt ritPre engineered building ppt rit
Pre engineered building ppt ritShubham Parab
 
Different rolled steel bars and sections
Different rolled steel bars and sectionsDifferent rolled steel bars and sections
Different rolled steel bars and sectionsskytechmetals
 
footing
footingfooting
footingillpa
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structuresFAIZAL MUHAMMED
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRajesh Burde
 
Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Simran Aggarwal
 

What's hot (20)

Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-I
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
types of Foundations with animated sketches
types of Foundations with animated sketchestypes of Foundations with animated sketches
types of Foundations with animated sketches
 
1.1 box jacking
1.1 box jacking1.1 box jacking
1.1 box jacking
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure ppt
 
Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication construction
 
Shotcrete
ShotcreteShotcrete
Shotcrete
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Pre engineered building ppt rit
Pre engineered building ppt ritPre engineered building ppt rit
Pre engineered building ppt rit
 
Different rolled steel bars and sections
Different rolled steel bars and sectionsDifferent rolled steel bars and sections
Different rolled steel bars and sections
 
footing
footingfooting
footing
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 
specification of Rcc
specification of Rccspecification of Rcc
specification of Rcc
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
Micropile
MicropileMicropile
Micropile
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
 
Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC)
 

Viewers also liked

Transportation Planning and Management
Transportation Planning and ManagementTransportation Planning and Management
Transportation Planning and ManagementLiving Online
 
New microsoft power point presentation
New microsoft power point presentationNew microsoft power point presentation
New microsoft power point presentationnanavanalla
 
Signal and telicommunication/sanjeet-1308143
Signal and telicommunication/sanjeet-1308143Signal and telicommunication/sanjeet-1308143
Signal and telicommunication/sanjeet-1308143sanjeet kumar
 
AICP Prep Course - Transportation Planning
AICP Prep Course - Transportation PlanningAICP Prep Course - Transportation Planning
AICP Prep Course - Transportation Planningguestd509af
 
Presentation on railway construction and maintenance
Presentation on railway construction and maintenancePresentation on railway construction and maintenance
Presentation on railway construction and maintenanceMohd Bakhsh
 
Introduction to Railway Signalling
Introduction to Railway SignallingIntroduction to Railway Signalling
Introduction to Railway SignallingSandeep Patalay
 
Signalling and Interlocking
Signalling and InterlockingSignalling and Interlocking
Signalling and Interlockingsrinivas2036
 
Erection of steel Structure
Erection of steel StructureErection of steel Structure
Erection of steel StructureGaurang Kakadiya
 
indian railway signal system ppt
indian railway signal system pptindian railway signal system ppt
indian railway signal system pptVimal Tripathi
 
TRANSPORTATION PLANNING
TRANSPORTATION PLANNINGTRANSPORTATION PLANNING
TRANSPORTATION PLANNINGintan fatihah
 
Utsp virtual lab (desktop version)
Utsp virtual lab (desktop version)Utsp virtual lab (desktop version)
Utsp virtual lab (desktop version)Debabrata Tripathy
 
Transportation planning
Transportation planningTransportation planning
Transportation planningTousif Jaman
 

Viewers also liked (17)

Transportation Planning and Management
Transportation Planning and ManagementTransportation Planning and Management
Transportation Planning and Management
 
New microsoft power point presentation
New microsoft power point presentationNew microsoft power point presentation
New microsoft power point presentation
 
Signal and telicommunication/sanjeet-1308143
Signal and telicommunication/sanjeet-1308143Signal and telicommunication/sanjeet-1308143
Signal and telicommunication/sanjeet-1308143
 
Interlocking
InterlockingInterlocking
Interlocking
 
Railway signal
Railway signalRailway signal
Railway signal
 
(Part i)- open channels
(Part i)- open channels(Part i)- open channels
(Part i)- open channels
 
AICP Prep Course - Transportation Planning
AICP Prep Course - Transportation PlanningAICP Prep Course - Transportation Planning
AICP Prep Course - Transportation Planning
 
Presentation on railway construction and maintenance
Presentation on railway construction and maintenancePresentation on railway construction and maintenance
Presentation on railway construction and maintenance
 
Introduction to Railway Signalling
Introduction to Railway SignallingIntroduction to Railway Signalling
Introduction to Railway Signalling
 
Signalling and Interlocking
Signalling and InterlockingSignalling and Interlocking
Signalling and Interlocking
 
Erection of steel Structure
Erection of steel StructureErection of steel Structure
Erection of steel Structure
 
indian railway signal system ppt
indian railway signal system pptindian railway signal system ppt
indian railway signal system ppt
 
Space frame
Space frameSpace frame
Space frame
 
Open Channel Flow
Open Channel FlowOpen Channel Flow
Open Channel Flow
 
TRANSPORTATION PLANNING
TRANSPORTATION PLANNINGTRANSPORTATION PLANNING
TRANSPORTATION PLANNING
 
Utsp virtual lab (desktop version)
Utsp virtual lab (desktop version)Utsp virtual lab (desktop version)
Utsp virtual lab (desktop version)
 
Transportation planning
Transportation planningTransportation planning
Transportation planning
 

Similar to Materials and methods of construction

Guc arct 702 legislations lecture 8 - building codes a 16-11-2017
Guc arct 702 legislations   lecture 8 - building codes a 16-11-2017Guc arct 702 legislations   lecture 8 - building codes a 16-11-2017
Guc arct 702 legislations lecture 8 - building codes a 16-11-2017Galala University
 
Sustainability and Specifications
Sustainability and SpecificationsSustainability and Specifications
Sustainability and SpecificationsAndrej_M
 
Material Selection and Design Standards
Material Selection and Design Standards Material Selection and Design Standards
Material Selection and Design Standards Naseel Ibnu Azeez
 
Commercial Building Science - Comfortable Environments Through Sustainable De...
Commercial Building Science - Comfortable Environments Through Sustainable De...Commercial Building Science - Comfortable Environments Through Sustainable De...
Commercial Building Science - Comfortable Environments Through Sustainable De...Safe Rise
 
TACC Presentation - Risks of Green Buildings
TACC Presentation - Risks of Green BuildingsTACC Presentation - Risks of Green Buildings
TACC Presentation - Risks of Green Buildingstmstaffordlbfg
 
CSA S478 Guideline on Durability in Buildings
CSA S478 Guideline on Durability in BuildingsCSA S478 Guideline on Durability in Buildings
CSA S478 Guideline on Durability in BuildingsMorrison Hershfield
 
Cycle 2 engineering design process (hampton & fisk)
Cycle 2   engineering design process (hampton & fisk)Cycle 2   engineering design process (hampton & fisk)
Cycle 2 engineering design process (hampton & fisk)MissEWu172
 
Construction Safety Training_Session 01_Overview of the Construction Industry
Construction Safety Training_Session 01_Overview of the Construction IndustryConstruction Safety Training_Session 01_Overview of the Construction Industry
Construction Safety Training_Session 01_Overview of the Construction IndustryMuizz Anibire
 
National building codes
National building codesNational building codes
National building codesSelf employed
 
1347 notes ii_ppe_304
1347 notes ii_ppe_3041347 notes ii_ppe_304
1347 notes ii_ppe_304kriti201
 
Daup mupd-upl-2015-lecture 2
Daup mupd-upl-2015-lecture 2Daup mupd-upl-2015-lecture 2
Daup mupd-upl-2015-lecture 2Galala University
 

Similar to Materials and methods of construction (20)

building construction
building constructionbuilding construction
building construction
 
Damian Trevor - Materials and Methods of Construction
Damian Trevor - Materials and Methods  of ConstructionDamian Trevor - Materials and Methods  of Construction
Damian Trevor - Materials and Methods of Construction
 
Damian Trevor- Building Materials and Methods of Construction
Damian Trevor- Building Materials and Methods of ConstructionDamian Trevor- Building Materials and Methods of Construction
Damian Trevor- Building Materials and Methods of Construction
 
ACH 122 Lecture 01 (Bldg Codes)
ACH 122 Lecture 01 (Bldg Codes)ACH 122 Lecture 01 (Bldg Codes)
ACH 122 Lecture 01 (Bldg Codes)
 
ACH 122 Lecture 01 (Bldg Codes)
ACH 122 Lecture 01 (Bldg Codes)ACH 122 Lecture 01 (Bldg Codes)
ACH 122 Lecture 01 (Bldg Codes)
 
ACH 122 Lecture 01 (Bldg Codes)
ACH 122 Lecture 01 (Bldg Codes)ACH 122 Lecture 01 (Bldg Codes)
ACH 122 Lecture 01 (Bldg Codes)
 
Guc arct 702 legislations lecture 8 - building codes a 16-11-2017
Guc arct 702 legislations   lecture 8 - building codes a 16-11-2017Guc arct 702 legislations   lecture 8 - building codes a 16-11-2017
Guc arct 702 legislations lecture 8 - building codes a 16-11-2017
 
Sustainability and Specifications
Sustainability and SpecificationsSustainability and Specifications
Sustainability and Specifications
 
Material Selection and Design Standards
Material Selection and Design Standards Material Selection and Design Standards
Material Selection and Design Standards
 
Commercial Building Science - Comfortable Environments Through Sustainable De...
Commercial Building Science - Comfortable Environments Through Sustainable De...Commercial Building Science - Comfortable Environments Through Sustainable De...
Commercial Building Science - Comfortable Environments Through Sustainable De...
 
TACC Presentation - Risks of Green Buildings
TACC Presentation - Risks of Green BuildingsTACC Presentation - Risks of Green Buildings
TACC Presentation - Risks of Green Buildings
 
CSA S478 Guideline on Durability in Buildings
CSA S478 Guideline on Durability in BuildingsCSA S478 Guideline on Durability in Buildings
CSA S478 Guideline on Durability in Buildings
 
Cycle 2 engineering design process (hampton & fisk)
Cycle 2   engineering design process (hampton & fisk)Cycle 2   engineering design process (hampton & fisk)
Cycle 2 engineering design process (hampton & fisk)
 
Construction Safety Training_Session 01_Overview of the Construction Industry
Construction Safety Training_Session 01_Overview of the Construction IndustryConstruction Safety Training_Session 01_Overview of the Construction Industry
Construction Safety Training_Session 01_Overview of the Construction Industry
 
OP YADAV PROJECT
OP YADAV PROJECTOP YADAV PROJECT
OP YADAV PROJECT
 
National building codes
National building codesNational building codes
National building codes
 
ACH 121 Lecture 03 (Codes)
ACH 121 Lecture 03 (Codes)ACH 121 Lecture 03 (Codes)
ACH 121 Lecture 03 (Codes)
 
Safety by design
Safety by designSafety by design
Safety by design
 
1347 notes ii_ppe_304
1347 notes ii_ppe_3041347 notes ii_ppe_304
1347 notes ii_ppe_304
 
Daup mupd-upl-2015-lecture 2
Daup mupd-upl-2015-lecture 2Daup mupd-upl-2015-lecture 2
Daup mupd-upl-2015-lecture 2
 

Recently uploaded

Employablity presentation and Future Career Plan.pptx
Employablity presentation and Future Career Plan.pptxEmployablity presentation and Future Career Plan.pptx
Employablity presentation and Future Career Plan.pptxryandux83rd
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
Objectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxObjectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxMadhavi Dharankar
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptxmary850239
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...Nguyen Thanh Tu Collection
 
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...HetalPathak10
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...DhatriParmar
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxAnupam32727
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWQuiz Club NITW
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDhatriParmar
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...Nguyen Thanh Tu Collection
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
An Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERPAn Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERPCeline George
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 

Recently uploaded (20)

Employablity presentation and Future Career Plan.pptx
Employablity presentation and Future Career Plan.pptxEmployablity presentation and Future Career Plan.pptx
Employablity presentation and Future Career Plan.pptx
 
Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Objectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxObjectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptx
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 - I-LEARN SMART WORLD - CẢ NĂM - CÓ FILE NGHE (BẢN...
 
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
Satirical Depths - A Study of Gabriel Okara's Poem - 'You Laughed and Laughed...
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITW
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
An Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERPAn Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERP
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 

Materials and methods of construction

  • 1. ENG 3731 Materials and Methods of Construction 1
  • 2. 1. INTRODUCTION TO MATERIALS AND METHODS OF CONSTRUCTION 2
  • 3. 1.1 Introduction to Materials and Methods of Construction  General introduction: syllabus, text book, laboratory classes and instruction sheets, assessment procedure  Motivation for including this course in the civil engineering curriculum: Earlier course(s) in materials, continuing evolution of construction industry - (i) New building products such as composites, new grades of steel and concrete, new forms of construction (light gauge construction, glass technologies, etc); (ii) Changed social and political climate (construction workplace safety, environmental regulations, energy conservation in building, controlling codes of practice, etc.)  Text book is rather challenging, to say the least - 330 typed pages, 491 pages of drawings and photographs, chapters of the book: Buildings, foundations, wood and construction, masonry and construction, steel and construction, concrete and construction, roofing materials, glazing materials, cladding systems, interior finishes, interior walls and partitions, ceiling and floor finishes, etc.  Laboratory format - Five experiments - One experiment to be finished within the same day for the whole class - Three sittings in one afternoon. 3
  • 5. 1.2 Making Buildings - Outline  Why do we need a building ? “Birds & animals”, “Beast master”, “Lost World”, “Survivors” - Common link - We are not them  Designing and making buildings : Stakeholders - “Sky is the limit”, constraints to the choice of building systems - Codes, regulations, ordinances, unions, etc.  How to choose a building system ? “Experience”, “Pleasing to the eyes”, “Economical”, etc.  Performance during and after construction 5
  • 6. 1.2.1 Why do we Need Buildings?  We build because little that we do can take place outdoors. We need shelter from sun, wind, rain, and snow. We need dry, level platforms for our activities. Often we need to stack these platforms to multiply available ground space. On these platforms, and within our shelter, we need air that is warmer or cooler, more or less humid, than outdoors. We need less light by day, and more light by night, than is offered by the natural world. We need services that provide energy, communications and water and disposal of wastes. So we gather materials and assemble them into the constructions we call buildings to satisfy these needs. 6
  • 7. 1.3 Stakeholders in the Building Systems  Owner - Role ? Prime mover  Architect - Selects the team of professionals - Develops the building concept in consultation with the owner - also carries out feasibility study  Team of designers : Chemical, civil, electrical & mechanical engineers and naval architects ; draftsmen - Develop contract documents  General contractor : Selects subcontractors - Begin construction  Approving authorities and Compliance review  Building inspectors, architect, and consultants - Compliance to design and code requirement  “…for want of a nail the shoe was lost; for want of a shoe the horse was lost ….” 7
  • 8. 1.4 Constraints to Choosing Building Systems  General physical limitations: Land area available for building, weight of building and soil strength, structural dimensions, material performance under exposure conditions, contractual arrangements regarding building construction.  Material selection dependent on: Designer/Architect with inputs from owner (for appearance and performance) and contractor (for cost, availability & constructability)  Budget - Permitted and overruns  Zoning ordinances: Imposed by local authorities (Planning Department - Residential or industrial, area covered by and offsets required for building, parking spaces, floor area, height of building, center-city fire zones, etc. 8
  • 9. 1.4 Constraints to Choosing Building Systems (Cont’d) Who is Primarily Responsible for Construction Methods? AIA 201; The contractor shall be solely responsible for and have control over means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the contract (unless instructed otherwise) 9
  • 10. 1.4 Constraints to Choosing Building Systems (Cont’d)  Building Codes : “…. Establish minimum construction standards for the protection of life, health, and welfare of the public” - NBCC, IBC (2000), BOCA, SBC, ISO & EURO - Regulate the building activities - Define user groups, construction types, fire resistance ratings, materials, natural light, ventilation, emergency exits, structural design, construction methodology, fire protection systems, accessibility to disabled persons, energy efficiency, etc. • Occupancy Groups - Groups A-1 through A5 * Group B – Business Occupancy • Group E – Educational * Groups H-1 through H-5 - High Hazard Occupancy • Groups I-1 through I-4 - Institutional - Health care, geriatrics, prisons • Group M – Mercantile - Stores (retail) • Groups R-1 through R-4 - Residential Occupancies - Homes, apartments, dorms, etc. • Group S-1 and S-1 - Hazardous storage * Group U – Utility Buildings 10
  • 11. Fire Wall 11
  • 12. Building Regulations  More than 44,000 jurisdictions in US regulating buildings  Made > 12,000 amendments to the 3 model codes  Differing standards and interpretation Tuckman, J.L., ENR 7/23/2001  Time required for permitting can be excessive: – EX Miami Dade: » Each year reviews 120,000 – 130,000 applications, and performs > 1,000,000 inspections » Average time required to issue a permit: 52 days for residential 81 days for commercial Gonchar, ENR 7/30/2001 12
  • 13. 1.4 Constraints to Choosing Building Systems (Cont’d) Health codes : Occupational health and safety Fire codes Plumbing codes Electrical codes Building Contractors’ and Labor Unions’ Regulations 13
  • 14. Who is Responsible to Ensure the Contract Documents Conform to Code Requirements?  Why would the Architect have Primary Responsibility?  Do contractors have any responsibility for code conformance? 14
  • 15.  Material Information Resources  American Society for Testing and Materials (ASTM)  American National Standards Institute  US Bureau of Standards  Construction Trade & Professional Associations (Technical specifications often incorporated by ‘reference’) 15
  • 16. 1.5 How to Choose a Building System?  Satisfy the requirements for functional performance: In stable equilibrium, Strength, Serviceability, Safety of operation  Give the desired aesthetic qualities: Visual appearance, personal choice  Not constrained by legal constraints: Codes & ordinances  The most economical : Funds available, life-cycle costs, etc.  Materials used are the most appropriate for the environment: least damaging and disruptive, very little environment damaging effluents and emissions, etc. 16
  • 17.  Sustainability  “…meeting the needs of the present generation without compromising the ability of future generations to meet their needs.”  Sustainable Design & Construction Actions – Energy efficient buildings – Re-use existing structures – Efficient land use – Use of renewable products / materials – Protect soil and water resources – Reduce / eliminate pollution  Sustainability - addressed on a Life Cycle basis 17
  • 18.  SUSTAINABILITY CONSIDERATIONS WHEN SELECTING MATERIALS  Origin & Manufacture of Building Materials – Plentiful? Renewable? Recycled content? Energy expended to acquire? Manufacturing pollutants & waste?  Construction of the Building – Energy expended to acquire & install? Pollutants generated? Waste generated & can it be recycled?  Building Maintenance – Energy use over its lifetime? Material impact on indoor air quality? Maintenance required? Maintenance materials toxic? Recyclable? Fire & smoke properties?  Demolition 18
  • 19. 1.6 Performance Before and After Construction  Performance Concerns : Building movements, structural deflections, thermal- and moisture- related expansion and contraction, heat flow, water vapor migration and condensation, deterioration, building maintenance, etc.  Construction Concerns : Safety, built on time, within budget, quality of construction, sequencing of construction operations, inclement weather, quality assurance of materials, etc. 19
  • 20. 1.7 Civil Engineering Materials in Newfoundland and Labrador  www.gov.nf.ca/mines&en/mines/miningindustryoverview.htm  Total value of mineral shipments from Newfoundland was $ 972 million during 2000  Many of these commodities are critical elements in construction.  Iron ore products and gold shipments are valued at $ 923 million- after primary processing  Shipments of industrial minerals, or non-metals such as dolomite, silica, gypsum, dimension stone, peat and sand gravel are valued at $ 48 million - after primary processing  Do we have other scopes than primary processing?  Material produced : Limestone/dolomite, Dimension stone, Granite, Anorthosite, Peat, Slate, Iron ore, Gypsum, Silica  Other developing products: Pyrophyllite, Talc, etc. 20
  • 21. 1.7 Civil Engineering Materials in Newfoundland and Labrador (Cont’d)  Most building materials are sold after primary processing  Can we go to secondary processing? Paints - a viable industry in NL till 1988: ceased to exist due to takeover of industry - Components of paint : Vehicle (film-forming substance - Cellulose nitrate, vinyl chloride, polyurethane or epoxy resins), Solvents (water, hydrocarbons, turpentine, alcohols, ketones, ester, ethers, etc.) - Pigments (coloring agents - iron oxides (hematite, magnetite), chromium oxide, etc.)  Additives: Defoamers (silicones), Driers and wetting agents (metallic soaps), flattening agents (talc, pyrophyllite).  Almost all of them can be produced in Newfoundland  What prevents us? - Practical problems 21