SlideShare uma empresa Scribd logo
1 de 22
Baixar para ler offline
CLEANER
PRODUCTION
TECHNIQUES
Farhan Ahmad
Department of Chemical Engineering
University of Engineering & Technology
Lahore.
Cleaner Production Techniques
- An Overview
By
Farhan Ahmad
farhanahmad@uet.edu.pk
DEPARTMENT OF CHEMICAL ENGINEERING
Course Details:
3
Subject
Subject code
Contact hours
Credit hours
Sessional
Mid term
Final term
Cleaner Production Techniques
Ch.E. - 320
2 + 3
2 + 1
30 % (Quizzes + Attendance + Class participation + Assignments)
30%
40%
Evaluation Procedure:
Course Outline
 Cleaner production and sustainable development; Cleaner production
principles and phases; cleaner production plans and strategies for
implementing cleaner production plans; cleaner production and eco-
efficiencies.
 Environmental management systems; closed loop operations; detailed
chemical/material flow analysis; renewable energy resources; life cycle
design and impact assessment.
 Waste minimization; re-use of waste products; specific examples from
industry where the methods of cleaner production have been applied. 4
5
Cleaner Production
- An Introduction
BACKGROUND …. Responses
PASSIVE
Ignore pollution
REACTIVE
Dilution and dispersion
PROACTIVE
Cleaner Production
CONSTRUCTIVE
End-of-pipe treatment
1 2
43
Cleaner Production …… Definition by UNEP
“ Cleaner Production is the continuous application of
an integrated, preventive environmental strategy
towards processes, products and services in order to
increase overall efficiency and reduce damage and
risks for humans and the environment.”
Cleaner Production …… Definition by UNEP
“ Cleaner Production is the continuous application of an
integrated, preventive environmental strategy towards processes,
products and services in order to increase overall efficiency and
reduce damage and risks for humans and the environment.”
Continuous
Preventive
Integrated
ENVIRONMENTAL
STRATEGY
Processes
Products
Services
RISK
REDUCTION
Humans
Environment
Cleaner Production ……
In other words, CP is a tool to answer 3 questions:
CP is a method and tool to identify
 where and why a company are losing resources in the
form of waste and pollution, and
 how these losses can be minimized
– CP assessment CP options
– CP options Less waste
– Less waste Improved productivity
Cleaner Production …… key points
1. CP adds value to the EMS: it places emphasis on pollution prevention
rather than control, with clear improvement in environmental
performance.
2. CP does not deny or impede growth but insists that growth can be
ecologically sustainable.
3. CP is not limited only to manufacturing industries of a certain type or
size, it can be applied towards the provision of services also.
4. CP includes safety and protection of health.
5. CP emphasizes risk reduction.
6. CP improves immediate efficiency as well as long-term efficacy.
7. CP is Win-Win-Win factor: it benefits the environment, communities and
businesses.
Cleaner Production …… Economics
Cleaner Production …… Benefits
 CP improves products and services
 CP lowers risks (liability)
 CP improves company image
 CP improves worker’s health and safety conditions
 CP reduces waste treatment and disposal costs
 CP saves costs on raw material, energy and water
 CP makes companies more profitable and competitive
Cleaner Production …… Categories
TECHNOLOGY
INPUT MATERIALS
OPERATION
PRODUCTS
PRODUCTION PROCESS
WASTE &
EMISSIONS
Cleaner Production …… Option 1: Input material substitution
TECHNOLOGY
OPERATION
PRODUCTS
PRODUCTION PROCESS
WASTES &
EMISSIONS
1/ Change inputs materials, water and energy:
> Replacing toxic or harmful materials with less toxic
> Use of renewable materials
> Use materials with longer lifetime
> Material purification
Change INPUT MATERIALS
Cleaner Production …… Option 2 : Technology Change
TECHNOLOGY
OPERATION
PRODUCTS
PRODUCTION PROCESS
2/ Technology
change:
> Replacing
> Equipment modification
> Optimal process conditions
> Increased automation
> Improved process control
> Improved equipment lay-out
Improve equipment
and process control
New technology
WASTES &
EMISSIONS
Change INPUT MATERIALS
Cleaner Production …… Option 3: Good Operation Practice
TECHNOLOGY
OPERATION
PRODUCTS
PRODUCTION PROCESS
3/ Improved
operation
practices:
> Production scheduling
> Energy management (peak shaving)
> Maintenance programmes
> Working instructions and procedures
> Training and incentives program
> Adequate process control operations
> Proper maintenance and cleaning
Improved
management
WASTES &
EMISSIONS
Workers skills &
process control
Improve equipment
and process control
Change INPUT MATERIALS
New technology
Cleaner Production …… Option 4: product Modification
PRODUCTS
modification
TECHNOLOGY
OPERATION
PRODUCTION PROCESS
4/ Product modification:
> Recycling friendly design
> Product Life Extension
> More efficient, less material intensive packaging
> Reduction of harmful substances.
WASTES &
EMISSIONS
Improve equipment
and process control Improved
management
Workers skills &
process control
Change INPUT MATERIALS
New technology
Cleaner Production …… Option 5: Reuse and Recycling
TECHNOLOGY
OPERATION
PRODUCTION PROCESS
5/ On-site reuse and recycling:
> On site recovery and re-use of raw materials in the process,
waste water, waste heat and cooling water
> Transforming waste into useful by-products
> Waste segregation and storage
WASTES &
EMISSIONS
Improve equipment
and process control Improved
management
Workers skills &
process control
PRODUCTS
modification
Re-use and recycling
Change INPUT MATERIALS
New technology
Barriers to CP Implementation
INTERNAL BARRIERS
 Traditional philosophy of CEOs (low awareness)
 Internal organization and communication (initial constraints)
 Limited information, data and expertise on waste and emissions
 Focus on end of pipe solutions and short term profits
 Inadequate cost/profit calculations CP options
 Missing, outdated or unreliable process instrumentation
 No or limited support of middle management
 No EMS to achieve continual improvement
EXTERNAL BARRIERS
 Availability of investment capital
 Availability of CP technologies
To be solved by
an organised approach
CP Methodology
The recognized need
for Cleaner Production
1.Planning and
Organization
2.Assessment
3.Feasibility
Analysis
4.Implementation
Successfully implemented
Cleaner Production projects
Sustain
&
Continue
(EMS)
> Obtain management commitment
> Organise project team
> Identify barriers & solutions
> Set objectives
> Pre-assess
> Identify sources (WHERE)
> Analyse causes (WHY)
> Generate possible options (HOW)
> Evaluate options on:
Technical, environmental
and economic feasibility
> Select best options
> Option implementation
> Monitoring and evaluation
> Sustain and continue
CP Methodology …… Continuity model
Continuous
CP loop
3- Assessment
1- Start CP
project
2- Project
organization
4- CP options
5- Feasibility analysis
6- Assessment report
7- Project implementation
8- Measure
progress
9- Final report
10- Top Management
reviews
Reduction of material and
energy use and of waste
and emission generation
Time
Sectors Concerned
Automobile manufacturing / Bakeries / Breweries / Cement production /
Ceramics / Coffee sector / Chemicals / Edible oil processing /
Electroplating / Fertilizers / Foundries / Hospitals / Leather processing /
Mechanical manufacturing / Metallurgy / Mining / Municipality / Oil
refineries / Plastics / Printing / Pulp and paper / Remanufacturing
industries / Rubber processing / Steel manufacturing / Sugar sector /
Textile manufacturing and processing

Mais conteúdo relacionado

Mais procurados

Industrial wastewater treatment
Industrial wastewater treatmentIndustrial wastewater treatment
Industrial wastewater treatment
Mohamed Ramzy
 

Mais procurados (20)

EIA report presentation
EIA report presentationEIA report presentation
EIA report presentation
 
Industrial ecology
Industrial ecologyIndustrial ecology
Industrial ecology
 
Life cycle assessment
Life cycle assessmentLife cycle assessment
Life cycle assessment
 
Environmental Management Plan
Environmental Management PlanEnvironmental Management Plan
Environmental Management Plan
 
Biological treatment of hazardous waste
Biological treatment of hazardous wasteBiological treatment of hazardous waste
Biological treatment of hazardous waste
 
Cleaner production
Cleaner productionCleaner production
Cleaner production
 
Life Cycle Assessment (LCA)
Life Cycle Assessment (LCA)Life Cycle Assessment (LCA)
Life Cycle Assessment (LCA)
 
Cleaner production
Cleaner productionCleaner production
Cleaner production
 
Landfill gas management
Landfill gas managementLandfill gas management
Landfill gas management
 
Leachate Treatment
Leachate TreatmentLeachate Treatment
Leachate Treatment
 
L 7 waste volume reduction
L  7 waste volume reductionL  7 waste volume reduction
L 7 waste volume reduction
 
Muncipal Solid Waste Management
Muncipal Solid Waste ManagementMuncipal Solid Waste Management
Muncipal Solid Waste Management
 
Sludge management and Sludge digesters
Sludge management and Sludge digestersSludge management and Sludge digesters
Sludge management and Sludge digesters
 
Hazardous wastes - Characterisation & TCLP
Hazardous wastes - Characterisation & TCLPHazardous wastes - Characterisation & TCLP
Hazardous wastes - Characterisation & TCLP
 
Design criteria for waste water treatment
Design criteria for waste water treatmentDesign criteria for waste water treatment
Design criteria for waste water treatment
 
Eia - environmental impact assessment
Eia - environmental impact assessmentEia - environmental impact assessment
Eia - environmental impact assessment
 
Municipal Solid waste Management in INDIA
Municipal Solid waste Management in INDIAMunicipal Solid waste Management in INDIA
Municipal Solid waste Management in INDIA
 
Industrial wastewater treatment
Industrial wastewater treatmentIndustrial wastewater treatment
Industrial wastewater treatment
 
Activity Cleaner Production
Activity Cleaner ProductionActivity Cleaner Production
Activity Cleaner Production
 
zero effluent discharge system
zero effluent discharge systemzero effluent discharge system
zero effluent discharge system
 

Semelhante a Cleaner production techniques

Prospecting & capturing
Prospecting & capturingProspecting & capturing
Prospecting & capturing
Rakesh Khandal
 
GREEN SUPPLY CHAIN- updated
GREEN SUPPLY CHAIN- updatedGREEN SUPPLY CHAIN- updated
GREEN SUPPLY CHAIN- updated
Magzoub Saad
 
design for environmental
design for environmental design for environmental
design for environmental
Intan Ayuna
 
Part 10 lean operation in health industry
Part 10   lean operation in health industryPart 10   lean operation in health industry
Part 10 lean operation in health industry
Arya Wirabhuana
 

Semelhante a Cleaner production techniques (20)

Cleaner production
Cleaner productionCleaner production
Cleaner production
 
Prospecting & capturing
Prospecting & capturingProspecting & capturing
Prospecting & capturing
 
Tpm final
Tpm finalTpm final
Tpm final
 
Cleaner Technology
Cleaner TechnologyCleaner Technology
Cleaner Technology
 
GREEN SUPPLY CHAIN- updated
GREEN SUPPLY CHAIN- updatedGREEN SUPPLY CHAIN- updated
GREEN SUPPLY CHAIN- updated
 
Cpgp day01-session 3 - introduction to cp
Cpgp day01-session 3 - introduction to cpCpgp day01-session 3 - introduction to cp
Cpgp day01-session 3 - introduction to cp
 
WASTE MINIMIZATION
WASTE MINIMIZATIONWASTE MINIMIZATION
WASTE MINIMIZATION
 
cleanerproduction.pdf
cleanerproduction.pdfcleanerproduction.pdf
cleanerproduction.pdf
 
Environmental Management System and Green Productivity (EMS_GP) Implementatio...
Environmental Management System and Green Productivity (EMS_GP) Implementatio...Environmental Management System and Green Productivity (EMS_GP) Implementatio...
Environmental Management System and Green Productivity (EMS_GP) Implementatio...
 
CP1_Slides.ppt
CP1_Slides.pptCP1_Slides.ppt
CP1_Slides.ppt
 
Cleaner production ingles
Cleaner production inglesCleaner production ingles
Cleaner production ingles
 
Production and operations management
Production and operations managementProduction and operations management
Production and operations management
 
Cleaner production
Cleaner productionCleaner production
Cleaner production
 
TURA and Tech Diffusion in the Plating and Food Industry
TURA and Tech Diffusion in the Plating and Food IndustryTURA and Tech Diffusion in the Plating and Food Industry
TURA and Tech Diffusion in the Plating and Food Industry
 
design for environmental
design for environmental design for environmental
design for environmental
 
Tools for sustainable cleaner production Group 7.ppt
Tools for sustainable cleaner production Group 7.pptTools for sustainable cleaner production Group 7.ppt
Tools for sustainable cleaner production Group 7.ppt
 
Unido tool kit 1-textbook
Unido tool kit 1-textbookUnido tool kit 1-textbook
Unido tool kit 1-textbook
 
Part 10 lean operation in health industry
Part 10   lean operation in health industryPart 10   lean operation in health industry
Part 10 lean operation in health industry
 
Unit of competence kaizen level ii berhanu tadesse (1)
Unit of competence kaizen level ii berhanu tadesse (1)Unit of competence kaizen level ii berhanu tadesse (1)
Unit of competence kaizen level ii berhanu tadesse (1)
 
sustainability-13-12121-v2.pdf
sustainability-13-12121-v2.pdfsustainability-13-12121-v2.pdf
sustainability-13-12121-v2.pdf
 

Último

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Último (20)

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 

Cleaner production techniques

  • 1. CLEANER PRODUCTION TECHNIQUES Farhan Ahmad Department of Chemical Engineering University of Engineering & Technology Lahore.
  • 2. Cleaner Production Techniques - An Overview By Farhan Ahmad farhanahmad@uet.edu.pk DEPARTMENT OF CHEMICAL ENGINEERING
  • 3. Course Details: 3 Subject Subject code Contact hours Credit hours Sessional Mid term Final term Cleaner Production Techniques Ch.E. - 320 2 + 3 2 + 1 30 % (Quizzes + Attendance + Class participation + Assignments) 30% 40% Evaluation Procedure:
  • 4. Course Outline  Cleaner production and sustainable development; Cleaner production principles and phases; cleaner production plans and strategies for implementing cleaner production plans; cleaner production and eco- efficiencies.  Environmental management systems; closed loop operations; detailed chemical/material flow analysis; renewable energy resources; life cycle design and impact assessment.  Waste minimization; re-use of waste products; specific examples from industry where the methods of cleaner production have been applied. 4
  • 6. BACKGROUND …. Responses PASSIVE Ignore pollution REACTIVE Dilution and dispersion PROACTIVE Cleaner Production CONSTRUCTIVE End-of-pipe treatment 1 2 43
  • 7. Cleaner Production …… Definition by UNEP “ Cleaner Production is the continuous application of an integrated, preventive environmental strategy towards processes, products and services in order to increase overall efficiency and reduce damage and risks for humans and the environment.”
  • 8. Cleaner Production …… Definition by UNEP “ Cleaner Production is the continuous application of an integrated, preventive environmental strategy towards processes, products and services in order to increase overall efficiency and reduce damage and risks for humans and the environment.” Continuous Preventive Integrated ENVIRONMENTAL STRATEGY Processes Products Services RISK REDUCTION Humans Environment
  • 9. Cleaner Production …… In other words, CP is a tool to answer 3 questions: CP is a method and tool to identify  where and why a company are losing resources in the form of waste and pollution, and  how these losses can be minimized – CP assessment CP options – CP options Less waste – Less waste Improved productivity
  • 10. Cleaner Production …… key points 1. CP adds value to the EMS: it places emphasis on pollution prevention rather than control, with clear improvement in environmental performance. 2. CP does not deny or impede growth but insists that growth can be ecologically sustainable. 3. CP is not limited only to manufacturing industries of a certain type or size, it can be applied towards the provision of services also. 4. CP includes safety and protection of health. 5. CP emphasizes risk reduction. 6. CP improves immediate efficiency as well as long-term efficacy. 7. CP is Win-Win-Win factor: it benefits the environment, communities and businesses.
  • 12. Cleaner Production …… Benefits  CP improves products and services  CP lowers risks (liability)  CP improves company image  CP improves worker’s health and safety conditions  CP reduces waste treatment and disposal costs  CP saves costs on raw material, energy and water  CP makes companies more profitable and competitive
  • 13. Cleaner Production …… Categories TECHNOLOGY INPUT MATERIALS OPERATION PRODUCTS PRODUCTION PROCESS WASTE & EMISSIONS
  • 14. Cleaner Production …… Option 1: Input material substitution TECHNOLOGY OPERATION PRODUCTS PRODUCTION PROCESS WASTES & EMISSIONS 1/ Change inputs materials, water and energy: > Replacing toxic or harmful materials with less toxic > Use of renewable materials > Use materials with longer lifetime > Material purification Change INPUT MATERIALS
  • 15. Cleaner Production …… Option 2 : Technology Change TECHNOLOGY OPERATION PRODUCTS PRODUCTION PROCESS 2/ Technology change: > Replacing > Equipment modification > Optimal process conditions > Increased automation > Improved process control > Improved equipment lay-out Improve equipment and process control New technology WASTES & EMISSIONS Change INPUT MATERIALS
  • 16. Cleaner Production …… Option 3: Good Operation Practice TECHNOLOGY OPERATION PRODUCTS PRODUCTION PROCESS 3/ Improved operation practices: > Production scheduling > Energy management (peak shaving) > Maintenance programmes > Working instructions and procedures > Training and incentives program > Adequate process control operations > Proper maintenance and cleaning Improved management WASTES & EMISSIONS Workers skills & process control Improve equipment and process control Change INPUT MATERIALS New technology
  • 17. Cleaner Production …… Option 4: product Modification PRODUCTS modification TECHNOLOGY OPERATION PRODUCTION PROCESS 4/ Product modification: > Recycling friendly design > Product Life Extension > More efficient, less material intensive packaging > Reduction of harmful substances. WASTES & EMISSIONS Improve equipment and process control Improved management Workers skills & process control Change INPUT MATERIALS New technology
  • 18. Cleaner Production …… Option 5: Reuse and Recycling TECHNOLOGY OPERATION PRODUCTION PROCESS 5/ On-site reuse and recycling: > On site recovery and re-use of raw materials in the process, waste water, waste heat and cooling water > Transforming waste into useful by-products > Waste segregation and storage WASTES & EMISSIONS Improve equipment and process control Improved management Workers skills & process control PRODUCTS modification Re-use and recycling Change INPUT MATERIALS New technology
  • 19. Barriers to CP Implementation INTERNAL BARRIERS  Traditional philosophy of CEOs (low awareness)  Internal organization and communication (initial constraints)  Limited information, data and expertise on waste and emissions  Focus on end of pipe solutions and short term profits  Inadequate cost/profit calculations CP options  Missing, outdated or unreliable process instrumentation  No or limited support of middle management  No EMS to achieve continual improvement EXTERNAL BARRIERS  Availability of investment capital  Availability of CP technologies To be solved by an organised approach
  • 20. CP Methodology The recognized need for Cleaner Production 1.Planning and Organization 2.Assessment 3.Feasibility Analysis 4.Implementation Successfully implemented Cleaner Production projects Sustain & Continue (EMS) > Obtain management commitment > Organise project team > Identify barriers & solutions > Set objectives > Pre-assess > Identify sources (WHERE) > Analyse causes (WHY) > Generate possible options (HOW) > Evaluate options on: Technical, environmental and economic feasibility > Select best options > Option implementation > Monitoring and evaluation > Sustain and continue
  • 21. CP Methodology …… Continuity model Continuous CP loop 3- Assessment 1- Start CP project 2- Project organization 4- CP options 5- Feasibility analysis 6- Assessment report 7- Project implementation 8- Measure progress 9- Final report 10- Top Management reviews Reduction of material and energy use and of waste and emission generation Time
  • 22. Sectors Concerned Automobile manufacturing / Bakeries / Breweries / Cement production / Ceramics / Coffee sector / Chemicals / Edible oil processing / Electroplating / Fertilizers / Foundries / Hospitals / Leather processing / Mechanical manufacturing / Metallurgy / Mining / Municipality / Oil refineries / Plastics / Printing / Pulp and paper / Remanufacturing industries / Rubber processing / Steel manufacturing / Sugar sector / Textile manufacturing and processing